Installation &
Cabling Manual
G D C - 0 0 2 / 5 9
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
2/72
INTRACOM TELECOM
19.7 km Markopoulou Ave., Peania, Athens, GR 19002T +30 210 667 1000, F +30 210 667 1001
http: / /www.intracom-telecom.com
INTRACOM S.A. TELECOM SOLUTIONS, 2011. All rights reserved.
All copyright, intellectual and industrial rights in this document and in the technical knowledge it containsare owned by INTRACOM S.A. TELECOM SOLUTIONS and/or their respective owners.
This document is made available to the end users only for their internal use.No part of this document nor any data herein may be published, disclosed, copied, reproduced,redistributed by any form or means, electronically or mechanically, or used for any other purposewhatsoever without the prior written approval of INTRACOM S.A. TELECOM SOLUTIONS.Information as well as drawings and specifications contained in this document are subject to changewithout prior notice.
All trademarks and copyrights mentioned herein are the property of INTRACOM S.A. TELECOMSOLUTIONS and/or their respective owners. Any rights not expressly granted herein are reserved.
Printed in Greece.
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
3/72
WiBAS BRB 10.5 Installation Manual
1
Table of Contents
1. Introduction ............................................................................................................................3
About this Document ...............................................................................................................3
Declaration of Conformity........................................................................................................4 Equipment Disposal.................................................................................................................5
Safety Precautions...................................................................................................................6 Transportation & Storage Information .....................................................................................7
2. Preliminary Information ........................................................................................................8
Installation Overview................................................................................................................9 Order Information...................................................................................................................12 Tools, Kits & Accessories......................................................................................................14 Site Prerequisites...................................................................................................................19
3. Unpacking / Checking the Delivered Equipment .............................................................22
4.
Installation Instructions ......................................................................................................25
Installing the Mounting Bracket .............................................................................................27 Preparing BRB.......................................................................................................................32 Installing BRB ........................................................................................................................33 Grounding the BRB................................................................................................................36 Preparing the Coaxial Cable..................................................................................................37 Connecting the Cables to the BRB........................................................................................44 Fastening Cables...................................................................................................................49
Glossary .......................................................................................................................................50
Appendix: Site Survey Form......................................................................................................52
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
4/72
WiBAS BRB 10.5 Installation Manual
2
(Page intentionally left blank)
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
5/72
WiBAS BRB 10.5 Installation Manual
3
1. Introduction
About this Document
Objective The purpose of this document is to provide detailed installation and cablinginstructions on the proper installation of a single WiBAS Base station RadioBox – BRB 10.5 GHz (corresponding to one WiBAS-C sector).
Targetaudience
This document is intended for technical personnel (installers) with experiencein the installation and assembly of outdoor radio equipment, on the buildings’roofs, and especially on masts or towers.
The installers must also have experience in carrying out antenna alignmentworks, by using the appropriate tools (compass, inclinometer, etc.) and therequired site information (geographical co-ordinates, etc.).
Further, it is recommended that the installers are familiarized with thedangerous conditions that may exist during the installation of telecomequipment in outdoor environments and on high buildings or structures.
DocumentConventions
This document applies the following conventions:
This symbol means DANGER. The purpose of this symbol is to
warn you that any wrong action can cause bodily injury or evendeath.
This symbol means CAUTION. The purpose of this symbol is toprevent you from performing an action that might result indamage of the equipment.
NOTE
A note calls your attention to important supplementaryinformation.
Contactinformation
INTRACOM S.A. TELECOM SOLUTIONS
19.7 km Markopoulou Ave., Peania, Athens, GR-19002
Tel. (+30) 210 667 1000, Fax: (+30) 210 667 1001
http://www.intracom-telecom.com
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
6/72
WiBAS BRB 10.5 Installation Manual
4
Declaration of Conformity
Hereby, INTRACOM S.A. TELECOM SOLUTIONS declares that the WiBAS
system is in compliance with the essential requirements of the R & TTEDirective 1999/5/EC.
For further information about the relevant Declaration of Conformity, pleasevisit our website at http://emc.intracom.gr
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
7/72
WiBAS BRB 10.5 Installation Manual
5
Equipment Disposal
Disposal of old electrical and electronic equipment (applicable through the
European Union and other European countries with separate waste collectionsystems).
This symbol, found on this product and any of its parts or on its operating
instructions or on its packaging, indicates that electrical and electronic equipment
may not be disposed of as unsorted municipal waste. Instead, this product should
be handed over to applicable collection points for the recycling of electrical and
electronic equipment.
By ensuring the correct disposal of this product, you will help prevent potential
negative consequences to the environment and human health, which could
otherwise be caused by inappropriate disposal of this product.
By recycling, reusing and other forms of recovery of old electrical and electronic
equipment you are making an important contribution to the conservation of natural
resources and to the protection of the environment.
For more information about the recycling of this product, please contact your local
municipal authorities, municipal waste disposal service or the store where you
purchased this product.
Απόρριψη παλαιών ηλεκτρικών και ηλεκτρονικών συσκευών (ισχύει στην
Ευρωπαϊκή Ένωση και άλλες Ευρωπαϊκές χώρες µε συστήµατα χωριστής
συλλογής απορριµµάτων).
Το σύµβολο αυτό, που απεικονίζεται πάνω στο προϊόν και σε τυχόν εξαρτήµατα του ή στο εγχειρίδιο οδηγιών του ή στη συσκευασία του, δείχνει ότι οι ηλεκτρικές και
ηλεκτρονικές συσκευές, µετά το πέρας της λειτουργίας τους, δεν θα πρέπει να
απορρίπτονται µαζί µε τα αστικά απόβλητα. Αντίθετα θα πρέπει να παραδίδονται σε
κατάλληλα σηµεία συλλογής για την ανακύκλωση των ηλεκτρικών και ηλεκτρονικών
συσκευών.
∆ιασφαλίζοντας τη σωστή απόρριψη αυτού του προϊόντος, συνεισφέρετε στην
πρόληψη πιθανών αρνητικών συνεπειών στο περιβάλλον και την ανθρώπινη υγεία,
οι οποίες θα µπορούσαν να προκληθούν από την µη ενδεδειγµένη απόρριψη του
προϊόντος.
Η ανακύκλωση, επαναχρησιµοποίηση και άλλες µορφές αξιοποίησης των παλαιών
ηλεκτρικών και ηλεκτρονικών συσκευών βοηθούν στη διαφύλαξη των φυσικών πόρων και στην προστασία του περιβάλλοντος.
Για περισσότερες πληροφορίες σχετικά την ανακύκλωση αυτού του προϊόντος,
παρακαλούµε επικοινωνήστε µε τις τοπικές δηµοτικές αρχές, την υπηρεσία
αποκοµιδής αστικών αποβλήτων ή το κατάστηµα από το οποίο αγοράσατε το
συγκεκριµένο προϊόν.
Για περισσότερες πληροφορίες , µπορείτε να επικοινωνείτε µε το Συλλογικό Σύστηµα
Εναλλακτικής ∆ιαχείρισης Αποβλήτων Ηλεκτρικού και Ηλεκτρονικού Εξοπλισµού
“ Ανακύκλωση Συσκευών Α.Ε .” (www.electrocycle.gr).
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
8/72
WiBAS BRB 10.5 Installation Manual
6
Safety Precautions
WORKING ON THE BUILDING’S ROOF
During stormy weather, do not perform any mechanical assembly orantenna beaming works on the building’s roof.
The metal structure of towers/ masts is prone to lightning.
PLUGGING/ UNPLUGGING COAXIAL CONNECTORS
Never plug (or unplug) the connector of the coaxial IF cables from theoutdoor transceiver boxes (BRBs), when the respective indoor equipmentis powered on and operating.
There is risk of equipment failure and/ or electrical shock, as the IF cable carriesthe DC operating voltage (-48 V) for the outdoor transceiver.
Before plugging or unplugging the IF cable in/ from the BRB box, you must firstextract or shut down the respective interconnected indoor unit.
PROPER GROUNDING
Ensure the effectiveness of the construction of the grounding systembefore powering up the WiBAS equipment at the Base Station.
In case of inappropriate grounding system, there is risk of equipment failure and/or electrical shock.
Ensure that the outdoor grounding system measures a path resistance of < 3 Ω.
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
9/72
WiBAS BRB 10.5 Installation Manual
7
Transportation & Storage Information
Transportation WiBAS equipment conforms to the following standard:
ETSI EN 300 019-2-2 V2.1.2: 1999, Class 2.2 “Careful Transportation” .The following excerpt from this standard concerns the extreme environmentalconditions:
Description Specification
Temperature Range -33 oC to +70 oC
Relative Humidity (RH) 95 %, non-condensing (at +30 oC)
Free Fall Not allowed
Solar Radiation 1120 W/ m2
Rate of Temperature Change 1 oC/ min.
Storage WiBAS equipment conforms to the following standard:ETSI EN 300 019-2-1 V2.1.2: 2000, Class 1.1 “Weather protected, partlytemperature-controlled storage locations” .
The following excerpt from this standard concerns the extreme environmentalconditions:
Description Specification
Temperature Range -33 oC to +55 oC
Relative Humidity (RH) 95 %, non-condensing (at +33 oC)
Solar Radiation 700 W/ m2
Rate of Temperature Change 0.5 oC/ min.
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
10/72
WiBAS BRB 10.5 Installation Manual
8
2. Preliminary Information
Introduction This section includes the following preliminary information:
# Information Refer toPage
1 Overview of WiBAS outdoor installation. 9
2 Equipment order information. 12
3 Lists of required tools, kits & accessories. 14
4 Site prerequisites (prior to installation). 19
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
11/72
WiBAS BRB 10.5 Installation Manual
9
Installation Overview
WiBAS BaseStationoverview
The following schematic depicts the typical installation of a WiBAS Base
Station composed of indoor and outdoor equipment:
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
12/72
WiBAS BRB 10.5 Installation Manual
10
Installation Overview, Continued
Spacerequirements(pole installation)
(Shown below: standalone BRB)
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
13/72
WiBAS BRB 10.5 Installation Manual
11
Installation Overview, Continued
BRB electricalconnections
Receptacle Description
1
N-Type receptacle, female, for connecting the BRB – BRA
interconnection cable coming from the BRA.
2 F-Type receptacle, female, for connecting the coaxial cablecoming from the respective sector unit.
3 Grounding (GND) point, for connecting the BRB to thenearby grounding system.
1
3
2
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
14/72
WiBAS BRB 10.5 Installation Manual
12
Order Information
Radio boxes(BRB)
(Front) (Back)
Order Code Definition Weight(kg), Net
X
Channel frequency pair, L for low and H
for high
BRB-10-XY
Y
Channel size:
• W for Wide width (7 MHz or 14 MHz)
• U for Ultra width (14 MHz or 28 MHz)
5
NOTE
For information about the available sub-bands and channels,refer to the WiBAS Product Catalog available by IntracomTelecom.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
15/72
WiBAS BRB 10.5 Installation Manual
13
Order Information, Continued
BS Antennas at10.5 GHz
Order Code BRA-1090V BRA-1090H BRA-1060V BRA-1060H
Photo
Operating Band 10.5 GHz to 10.65 GHz
Type Sectoral 90º Sectoral 90º Sectoral 60º Sectoral 60º
Gain (min.) 16 dBi 15 dBi 17 dBi 17 dBi
Polarization V H V H
Input Flange N-Type, female
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
16/72
WiBAS BRB 10.5 Installation Manual
14
Tools, Kits & Accessories
Introduction This section lists and describes the tools, kits and coaxial cables &
connectors required for the installation of the outdoor WiBAS equipment.
Installationtools
Tool Description
Ratchet spanners R.19, R.14, R.13 and R.11(straight-type).
Screwdriver PH3.
Cable cutter.
High-accuracy compass.
Digital inclinometer.
Drilling machine fitted with 8 mm masonrydrill bit – optional.
(To be used only when the BRB is to bemounted on a wall surface).
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
17/72
WiBAS BRB 10.5 Installation Manual
15
Tools, Kits & Accessories, Continued
Cableterminationtools
For RG-11 Cables:
Tool Description
Termination tool.
Stripping tool.
Crimping tool.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
18/72
WiBAS BRB 10.5 Installation Manual
16
Tools, Kits & Accessories, Continued
BRB-INST Kit It is used for the installation of a Base Station Outdoor Unit. One kit is
required per Base Station sector (available by Intracom Telecom ):
a/a Item Description
1 Cable 16 mm2 (Green/ Yellow)
20 m grounding cable to connect the BRB onto theoutdoor grounding bar.
2 Insulating tape For electrical insulation purposes.
3 Outdoor userubber tape
To apply around the BRB coaxial input termination.
4 Cable ties (twocolors, varioussizes)
To fasten the coaxial and grounding cables.
The white ties are for indoor use and the black tiesfor outdoor use.
5 Screws/ Nuts(x2)
To install the grounding cables (item 1) on theremotely-located grounding bar.
6 Ring terminals(two types)
To terminate the grounding cables.
7 Cable clamp To electrically connect two grounding cable lengths(item 1) together.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
19/72
WiBAS BRB 10.5 Installation Manual
17
Tools, Kits & Accessories, Continued
BRB-INST-OPTinstallation kit
OK
(Available by Intracom Telecom – optional installation kit for 2.3 ″ to 4 ″ poles).
Item Description Qty
1 Hose clamps with tightening screws – two types available
(for 2.3″ to 4″ mast diameter).
2
2 Bracket (mating with BRB’s mounting bracket). 1
3 M8x25 hex-headed screw, stainless. 4
4 M8 washers (DIN125A), stainless. 8
5 Nut M8 (DIN934), stainless. 4
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
20/72
WiBAS BRB 10.5 Installation Manual
18
Tools, Kits & Accessories, Continued
Coaxial andinterconnectioncables,connectors
Material Description
RG-11 coaxial cable 75 Ω.
Used for interconnecting the BRB with theindoor unit (distance up to 150 m).
F-Type connector for RG-11 cable termination(BRB side).
Available by Intracom Telecom.
Interconnection cable 1.50 m used forinterconnecting the BRB with the BRA. It is asemi-flexible cable ½” terminated to male, N-Type connectors at both ends.
Available by Intracom Telecom
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
21/72
WiBAS BRB 10.5 Installation Manual
19
Site Prerequisites
Introduction This section discusses all the prerequisites prior to installing the Base Station
outdoor equipment. (see Appendix for Site Survey Form)
Siteinformation
Premises information
• Site details (address, contact persons, GPS and/or map co-ordinates, etc.)
• Site access and storage information (means of transport, equipmentstorage, etc.)
• Site location maps
Network planning – Site survey information
• Geographical positions of the BS site
• Rain zone
• Beaming data for sector antennas
• Polarization of the antennas
• Height of all buildings at the installation premises
• Rooftop information (height, status, access, dimensions, layout, etc.)
• Information about pre-existing outdoor equipment
• Available mounting space (on the buildings’ roofs) to reserve for the
installation of the outdoor equipment
Site-specific information
• Mechanical specifications of masts/ towers (type, dimensions/ diameter,material, exterior finishing, etc.)
• Location of appropriate grounding points for outdoor radios
• Location of cable conduits available for routing the coaxial cables(interconnecting the indoor with the outdoor equipment)
• Total length of the coaxial IF cables required to interconnect the indoor withthe outdoor equipment
• BS configuration data (number of sectors, redundancy of units, etc.)
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
22/72
WiBAS BRB 10.5 Installation Manual
20
Site Prerequisites, Continued
Outdoorgroundingsystem
A dedicated, low-resistance grounding system (typically < 3 Ω) is required.
A grounding point (designated GND) should be located close to the mountingposition of the BRB radio boxes.
Each BRB will be connected to this grounding point, via the suppliedgrounding cable. This will provide protection of the equipment againstharmful lightning conditions.
Coaxial cables The coaxial cables, connecting the indoor units with the outdoor BRB boxes,should be of coaxial 75-ohm type.
The maximum length of these cables depends on their quality and the
degradation that they impose to the IF signal.Typical lengths are 145 m, using low-loss coaxial cable (RG-11)
NOTE
Under no circumstance should the total attenuation (imposed bythe coaxial cable itself) exceed 15 dB.
Proximity toGSM (2G / 3G)installations
GSM Cables:
The WiBAS coaxial cables must be spaced f rom neighboring GSM cablesand antennas for at least 30cm. This guideline mainly refers to the RG-6cable, of which the screening effectiveness may severely be deteriorated if
not properly rolled out. Therefore, the use of RG-11 type is highlyrecommended.
As a general rule, the close proximity with the GSM cables should beavoided (wherever this is possible). The more distance the WiBAS cablesare running in parallel with the GSM cables, the higher the amount ofinterference that will be collected.
The cable must be in good condition, without any visible breakings ordeterioration and properly terminated, as instructed in this manual.
Also, extra care must be taken during the cable unrolling from the bin, asaccidental twists may affect cable’s performance.
GSM Antennas:
When WiBAS and GSM equipment is to be collocated, BRB must beinstalled on the same pole / mast, below or above the neighboring GSMantennas and at a distance no less than 4 m.
If a different pole / mast is the only option, then the BRB should be installedin such a way that it is located outside the -20 dB radiation pattern of allneighboring 2G / 3G antennas, with a minimum horizontal distance of 4 m between the pole (where the BRB and the BRA are installed) and the polesaccommodating GSM antennas.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
23/72
WiBAS BRB 10.5 Installation Manual
21
Site Prerequisites, Continued
Premisesrequirements
• The outdoor equipment, inclusive of the BRBs, should be mounted on a
mast or on a tower.• The mast, onto which a BRB system is to be mounted, should be perfectly
perpendicular to allow correct alignment of the antenna.
• For wall mounting installation:
− The wall-mounting surface should be cement or brick masonry.
− The holes, required for inserting the wall plugs (upats), should be drilledat positions where no built-in cables are running.
• Each antenna should point toward the covered geographical sector,according to the planned co-ordinates. No obstacles should exist within theantennas’ beaming lobes.
• Access to the installation premises must be facilitated during the installationperiod.
• The roof must be engineered to bear the weight of the service personneland the outdoor equipment.
• Appropriate cable conduits should exist for the routing of installed cables,inclusive of the coaxial IF cable(s) connecting the indoor equipment withthe outdoor BRB boxes on the building’s roof .
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
24/72
WiBAS BRB 10.5 Installation Manual
22
3. Unpacking / Checking the Delivered Equipment
Introduction This section describes the contents of the delivered WiBAS Base Station
equipment packaging.
NOTE
For all the equipment delivered onsite, it is highly recommendedto note down the serial numbers (S/N) and the models, and keepthem for future reference.
NOTE
Do not throw away the packages and the associated packingmaterial of the delivered items. These should be stored in a safeplace and kept in good condition for future re-use.
NOTE
The BRB – BRA interconnection cable is not included in the
BRB’s package contents. Make sure that you have one availableprior beginning the installation. Refer to Chapter Tools, Kits &Accessories, page 14
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
25/72
WiBAS BRB 10.5 Installation Manual
23
Unpacking / Checking the Delivered Equipment, Continued
BRB packaging Excluding the BS Radio Box itself, each BRB packaging includes
Item Description
1 BRB’s mounting bracket with U-bolts mast fasteners attached.
2 Heat-shrinkable tubing.
3 M8 bolts (x2) for mounting brackets back-to-back on a mast.
4 BRB grounding cable (factory pre-terminated).
5 Cable ties (black, x2) for securing coaxial and grounding cableson the mast.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
26/72
WiBAS BRB 10.5 Installation Manual
24
Unpacking / Checking the Delivered Equipment, Continued
BRB labels (On the side of BRB).
Item Description1 Minimum and maximum operating frequencies that can be used
for radio transmission & reception.
2 Radio box type BRB (Base station).
3 Operating band (10.5 GHz).
4 Channel frequency pair High (H) or Low (L) and Channel width(W) (7/14MHz) or (U) (14/28MHz), e.g. BRB - 10-HW, means aBRB operating at the 10.5 GHz, High, while the availablechannel sizes are 7 / 14 MHz.
5 Polarization Vertical (V) Horizontal (H)
6 CCC mark (for Russia).
7 CE mark (for European countries).
2 3 4
65
1
7
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
27/72
WiBAS BRB 10.5 Installation Manual
25
4. Installation Instructions
Introduction This section provides detailed instructions on the outdoor installation of the
BRB radio box and associated components.The whole installation procedure for a single BRB system can be carried outby one man and requires approx. 15 min.
Tighteningtorques
The following table gives the maximum tightening torques that must beapplied for a safe and secure BRB installation:
Exceeding these values may result in breakages or damages toequipment. If possible, use appropriate tools of adjustabletightening torque, especially for points 3, 5 & 6.
Point Description MechanicalFixing
Tool Required MaximumTorque
1 Bracket fasteningpoints.
M8 bolts (x2) Ratchet spannerR.13
20 Nm
2 Elevation retentionpoints.
M8 bolts (x2) Ratchet spannerR.13
20 Nm
3 Grounding point. M4 screw Screwdriver PH3 2 Nm
4 U-bolt fasteningpoints.
M8 nuts (x4) Ratchet spannerR.13
15 Nm
5 Coaxial input 75 Ω (RG-11).
F-Type Ratchet spanner:R.14 4.4 Nm
6 BRB – BRAinterconnection cable
N-Type Ratchet spanner:R.19
1.1 Nm
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
28/72
WiBAS BRB 10.5 Installation Manual
26
Installation Instructions, Continued
Procedures The order of installation works to carry out onsite is as follows:
# Procedure Refer toPage
1 Installing the mounting bracket. 27
2 Preparing BRB 32
3 Installing BRB 33
4 Grounding the BRB 36
5 Preparing the Coaxial Cable 37
6 Connecting the Cables to the BRB 44
7 Fastening Cables (Pole Mounting) 49
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
29/72
WiBAS BRB 10.5 Installation Manual
27
Installing the Mounting Bracket
Introduction The mounting bracket (supplied) is used for supporting one standalone BRB
radio box, on a wall or mast. This bracket is installed first, prior to theinstallation of the BRB.
Installationoptions
The mounting bracket can be installed on a pole / mast:
Installation Option Comments
1 Pole / mast of diameter from 48mmto 58mm (1.9″≤ D ≤ 2.3″)
Standalone BRB.
2 Pole / mast of diameter from 48mm
to 58mm (1.9″≤ D ≤ 2.3″)
Two BRBs back-to-back (usingitem 3 (refer to 22 ) Screws,M8x90, DIN931,A2).
3 Pole / mast of diameter from 58mmto 101mm 2.3″< D ≤ 4.0″
Standalone BRB (using theoptional adaptation kit).
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
30/72
WiBAS BRB 10.5 Installation Manual
28
Installing the Mounting Bracket, Continued
Preparation The mounting bracket should coarsely point toward the right direction before
it is f ixed on the pole/ mast. This ensures that no re-installation of themounting bracket will be needed.
An appropriate method is to install the mounting bracket so that its cantilever(1) is perpendicular to the supporting plate (2) and is also pointing towardthe center of the azimuth angle of the respective geographical sector, asshown below:
Azimuthaxis
12
Sectorarea
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
31/72
WiBAS BRB 10.5 Installation Manual
29
Installing the Mounting Bracket, Continued
Mountingprocedure, pole
(1.9″″″″≤≤≤≤ D ≤≤≤≤ 2.3″″″″) – standalone(Option #1)
To install the mounting bracket on a pole/ mast of diameter 1.9″≤ D ≤ 2.3″,
proceed as follows:Step Action
1 See the following schematic depicting the mounting procedure andthe list at the bottom with the (supplied) accessories required toinstall the mounting bracket on the pole / mast.
2 Center the mounting bracket (2) at the chosen height on the pole/mast and with the R.13 spanner fully tighten the four nuts (5) symmetrically to avoid bracket displacement.
1
1
2
345
34
5
Item Description Qty
1 U-bolts 2
2 Mounting bracket 13 Washer M8 DIN 125 4
4 Grover M8 DIN 125A 4
5 Nut M8 DIN 934 4
End of procedure.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
32/72
WiBAS BRB 10.5 Installation Manual
30
Installing the Mounting Bracket, Continued
Mountingprocedure, pole
(1.9″″″″≤≤≤≤ D ≤≤≤≤ 2.3″″″″) – back-to-back(Option #2)
To install two mounting brackets back-to-back on a pole / mast (for back-to-
back installation of a pair of BRBs), proceed as follows:Step Action
1 See the following schematic depicting the mounting procedure andthe list at the bottom with the accessories required to install the twomounting brackets on the pole/ mast (1).
2
1
2
3
4
56
(Items 1, 3, 4, 5 and 6 are not supplied).
Item Description Qty
2 Mounting bracket 2
3 Nut M8, DIN 934 4
4 Grover M8, DIN 125A 4
5 Washer M8, DIN 125 4
6 Bolt M8 x 90, hex-headed, DIN 931 42 For easy mounting, pre-assemble the whole construction before
installing it on the pole/ mast.
3 Center the mounting brackets (2) at the chosen height on the pole/mast and with the R.13 spanner fully tighten the four nuts (3)symmetrically to avoid displacement of mounting brackets.
End of procedure.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
33/72
WiBAS BRB 10.5 Installation Manual
31
Installing the Mounting Bracket, Continued
Mountingprocedure, pole
(2.3″″″″< D ≤≤≤≤ 4.0″″″″)(Option #3)
The following schematic depicts how to install the mounting bracket on a
mast of diameter 2.3″< D
≤ 4.0
″, using the following installation kit:
• BRB-INST-OPT (supplied as option)
During the tightening of the four screws (see schematic below, item 3),apply a final torque of 15 Nm.
Mounting
bracket
2
3
4
5
1
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
34/72
WiBAS BRB 10.5 Installation Manual
32
Preparing BRB
Introduction This procedure concerns the preparation of BRB radio box prior to itsassembly and positioning.
Procedure
Step Action
4 Using the R.13 spanner, install the BRB handle (2) and themounting bracket bolts (3) in the appropriate BRB positions:
Item Description
1 Transportation handle.
2 Long bolts (supplied) that will be used for fastening theTRBi/ TRB onto the mounting bracket.
3 Receptacle to connect the grounding cable.
4 Receptacle to connect the coaxial cable.
5 Receptacle to connect the TRB – TRA interconnection
cable (TRB radio box only).
End of procedure.
3
5
4
2
1
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
35/72
WiBAS BRB 10.5 Installation Manual
33
Installing BRB
Introduction This procedure concerns the installation of BRB onto the prior-installed
mounting bracket. The instructions given here in after show the polemounting installation.
Beware not to install the BRB unit with the IF and RFconnection receptacles facing upwards.
In case of rain there is a possibility that water may enter the radiobox.
Always install the BRB box with the IF and RF connectors facingdownwards.
Procedure To carry out the installation of the BRB onto the mounting bracket, proceedas follows:
Step Action
1 Using the R.13 spanner, unscrew the two M8 bolts / grovers /washers located at the side of BRB.
2 Hold the ΒRΒ and re-install the two M8 bolts / grovers / washers,as shown below:
3 Tighten both bolts to secure the BRB in place. Apply a finaltorque of 20 Nm.
End of procedure.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
36/72
WiBAS BRB 10.5 Installation Manual
34
Installing BRB, Continued
Two BRBs(back-to-back)
The following schematic depicts two BRBs mounted back-to-back on a pole /mast:
Continued on next page
BRB #1
BRB #2
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
37/72
WiBAS BRB 10.5 Installation Manual
35
Installing BRB, Continued
Space-savingfour-sectoredBRS solution
The following schematic depicts a four-sectored BRS arranged in a right-angled (90o) fashion. This solution is composed of four BRB systemsinstalled back-to-back (BRB #1 / BRB #3 and BRB #2 / BRB #4) to occupy
minimum height on the pole / mast, and when space is at a premium.
BRB #1
BRB #2
BRB #4
BRB #3
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
38/72
WiBAS BRB 10.5 Installation Manual
36
Grounding the BRB
Introduction This procedure concerns the connection of the BRB to a low-resistance
grounding system (< 3 Ω), as required for outdoor radio installations.
Procedure Step Action
1 Pick up the supplied grounding cable found in the packaging ofBRB. This cable is factory pre-terminated.
NOTE
The square terminal of the grounding cable will beinstalled on the BRB.
2 Τhe grounding point onto the BRB is shown below :
3 Using the screwdriver PH3, unscrew from this position the M4 x 8screw and its two grovers
4 In the M4 x 8 screw (2), pass the first M4 grover (3), then thesquare terminal (4) of the grounding cable, then the second M4grover (3).
2
4
5 Re-place and fully tighten the M4 x 8 screw to secure thegrounding cable on the BRB box. Apply a maximum tighteningtorque of 2 Nm.
6 Make use of the BRB-INST installation kit (refer to page 16),items 1, 5, 6 and 7, to properly terminate and install the other endof the grounding cable onto the tower’s grounding terminal.
End of procedure.
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
39/72
WiBAS BRB 10.5 Installation Manual
37
Preparing the Coaxial Cable
Introduction This section concerns the termination of the coaxial 75 Ω cable (RG-11) at
the BRB side. This cable will be used for interconnecting the BRB with theindoor WiBAS Base Station unit.
RG-11terminationprocedure
To terminate the RG-11 coaxial cable, proceed as follows:
Step Action
1 Insert the coaxial cable into the stripping tool as shown below(lettering on tool face toward the incoming cable):
2 Cable’s end should protrude 1 mm (approx.) out of the tool:
Continued on next page
1 mm
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
40/72
WiBAS BRB 10.5 Installation Manual
38
Preparing the Coaxial Cable, Continued
RG-11termination
procedure(continued)
Step Action3 With your finger, rotate the tool around cable end, clockwise and
several times. Stop when you feel that resistance during rotationis weakened.
4 Pull out the tool as shown below:
5 Outer sheath, braid, aluminum foil and inner insulation have nowbeen removed. Cable end is ready to be terminated:
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
41/72
WiBAS BRB 10.5 Installation Manual
39
Preparing the Coaxial Cable, Continued
RG-11terminationprocedure (continued)
Step Action6 Flare and evenly fold braid back and over the cable sheath.
DO NOT remove the exposed aluminum foil.
7 Tighten the F-type connector (for RG-11 coaxial cable) into themating head of the RG-11 termination tool.
8 Spot the see-through hole on the tool. It will be used for checkingproper termination later.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
42/72
WiBAS BRB 10.5 Installation Manual
40
Preparing the Coaxial Cable, Continued
RG-11terminationprocedure (continued)
Step Action9 Insert and push the end of the coaxial cable into the F-type
connector.
10 Hold the tool and cable as shown below.
Rotate the tool head several turns, and simultaneously push the
cable into the tool.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
43/72
WiBAS BRB 10.5 Installation Manual
41
Preparing the Coaxial Cable, Continued
RG-11terminationprocedure (continued)
Step Action11 Stop rotating when the connector’s center pin is visible from the
see-through hole:
12 Unscrew and remove the connector from the tool. Theconnector’s center pin is now clearly visible from the side:
13 Open the handles of the RG-11 crimping tool and select the bigRG-11 head (this should face upward):
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
44/72
WiBAS BRB 10.5 Installation Manual
42
Preparing the Coaxial Cable, Continued
RG-11terminationprocedure (continued)
Step Action14 Install the F-type connector into the tool’s head. Then, fully close
the tool’s handles:
15 Cable termination is now complete. The connector should looklike below:
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
45/72
WiBAS BRB 10.5 Installation Manual
43
Preparing the Coaxial Cable, Continued
RG-11termination
procedure(continued)
Step Action
16 For maximum protection, it is recommended to use appropriatetype of heat shrinkable tubing (for outdoor use).
NOTE
The piece of tubing should be worn over theconnector, covering its ring entirely, and also two orthree centimeters of cable’s jacket (close toconnector), as shown in the right photo below.
Finally, shrink the tubing using a hot air blower.
Before After
End of procedure.
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
46/72
WiBAS BRB 10.5 Installation Manual
44
Connecting the Cables to the BRB
Prerequisite The BRA antenna should be located on the same pole with the BRB box.
The latter should be spaced from the BRA no more than 1.20m and shouldalways have a Minimum Bend Radius (MBR) of 30mm.
Introduction This section concerns the installation of the terminated cables, coaxial andBRB – BRA interconnection cables, onto the BRB.
NOTE
After completing the termination and installation of the coaxialcable at the Base Station, it is strongly recommended to placeappropriate adhesive labels at both ends of the cable, for easyidentification of the assigned sector at any time.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
47/72
WiBAS BRB 10.5 Installation Manual
45
Connecting the Cables to the BRB, Continued
Procedure To install the terminated coaxial cable (RG-11) onto the BRB, proceed as
follows:Step Action
1 Using the appropriate ratchet spanner(1), install the F-typeconnector of the terminated coaxial cable onto the BRB’s matingF-type receptacle. To locate, refer to picture on page 25.
Apply a maximum tightening torque of 4.4 Nm.
The other end of the cable would be connected to the WiBASindoor system.
2NOTE
The BRA-BRB interconnection cable isterminated to a male N-Type connector atboth ends.
Using the appropriate ratchet spanner(2), install the N-Typeconnector of the BRB – BRA interconnection cable onto theBRB’s mating N-Type receptacle (see photo below).
Apply a maximum tightening torque of 1.1 Nm.
Connect the other end of the cable to the mating N-Typereceptor on the BRA.
Continued on next page
(1) R.14.
(2) R.19
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
48/72
WiBAS BRB 10.5 Installation Manual
46
Connecting the Cables to the BRB, Continued
Procedure
(continued) Step Action
3 Use electrical tape (see Tools, Kits & Accessories page 16 item2) and wrap around the entire area around the termination.Tightly apply sufficient length of tape.
4 Wrap the whole connector until is totally covered.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
49/72
WiBAS BRB 10.5 Installation Manual
47
Connecting the Cables to the BRB, Continued
Procedure
(continued) Step Action
5 Use the rubber-tape (see Tools, Kits & Accessories page 16 item3) and cover the entire termination area over the appliedelectrical tape.
NOTE
It is advised to use a small screwdriver in orderto keep the rubber tape always stretched.
Continued on next page
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
50/72
WiBAS BRB 10.5 Installation Manual
48
Connecting the Cables to the BRB, Continued
Procedure
(continued)
Step Action6 Finally, apply a second layer of electrical tape to complete the
protection of the connection.
7 To insulate the N-Type connector of the BRB - BRA
interconnection cable at both ends (i.e onto the BRB and theBRA), precede following the steps 3 to 6 of the previously-described procedure.
End of procedure.
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
51/72
WiBAS BRB 10.5 Installation Manual
49
Fastening Cables
Introduction
This procedure concerns the fastening of cables when BRB and BRA areinstalled on a pole / mast.
NOTE
Prior of fastening the cables on the pole, you should haveinstalled the BRA on the pole according to the instructionssupplied with the BRA.
Procedure
Step Action
1 Neatly arrange the coaxial cable (1), the grounding cable (2) and
the BRB-BRA interconnection cable (3) as shown below, alwaysmaintaining a safe radius for the coaxial cable duringbending:
2 Secure both cables on the pole with cable ties (4) found in thepackaging of BRB.
End of procedure.
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
52/72
WiBAS BRB 10.5 Installation Manual
50
Glossary
BRB Base station Radio Box.
BRA Base station Radio Antenna.
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
53/72
WiBAS BRB 10.5 Installation Manual
51
(Page intentionally left blank)
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
54/72
WiBAS BRB 10.5 Installation Manual
52
Appendix: Site Survey Form
In the next pages, the Site Survey form is given, with which all the necessary
site information will be documented to be used for the WiBAS Base Stationinstallation.
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
55/72
Site Name:
Location:
Surveyed Date :
Surveyed By :
Checked & Approved by (Customer):
Signature
Department
Name
Date
Subcontractor:
Signature
Department
Name
Date
Latitude : Alt :
Longtitude :
Address :
Bearing (Deg.) :
TECHNICAL PROPOSAL
Site Photo
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
56/72
Site name:Location:
1. Site Information
2. Site Configuration
3. ExistingTransmission Equipment
4. Proposed Transmission Equipment
5. Proposed Transmission Equipment Degree Views
6. Proposed Transmission Equipment location Layout Diagram
7. Obstacle Polar Diagram
Contents
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
57/72
1. Site Information
Site Name:
Location:
Contact for Site Access
Surveyed Date:
Contact Number:
Type of Site:
Type of Building:
Height of Building (m.a.g.l):
Type of Tower / Mast:
Tower / Mast Height (m.a.g.l.):
Transmission Location:
Lattitude:
Longtitude:
Alt:
Address:
Sector A:
Sector B:
Sector C:
Sector D:
Surveyed By:
Geographical coordinates
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
58/72
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
59/72
IDU to ODU Cable Tray, IF cable (length in meters) If new required
Length of IF cable (IDU to ODU) 1 runs X (1+0)
Length of Outdoor 16mm grounding cable 1 runs X (1+0)
Base Station Sector 3
Sector Name
Number of Radio Links 1+0, 1+1
Band 10,5 GHz, 26 GHz, 28 GHz
Sub-band
Sector Azimuth
New Mounting Yes or No for sharing
Mounting Position Tower (LEG A, B, C, D) or
Minimast or Lamp Pole or Unipole or Monopole
Rooftop Mounting Wall mount boom or Tripod or Bipod
Tube Diameter 48 mm, 90mm, 114mm
Antenna Type External 90 degrees.
Height of the Antenna (AGL) (from ground level to the
proposed ANTENNA boom)
Antenna Boom New Antenna Boom, Existing Boom.
IDU to ODU Cable Tray, IF cable (length in meters) If new required
Length of IF cable (IDU to ODU) 1 runs X (1+0)
Length of Outdoor 16mm grounding cable 1 runs X (1+0)
Base Station Sector 4
Sector Name
Number of Radio Links 1+0, 1+1
Band 10,5 GHz, 26 GHz, 28 GHz
Sub-band
Sector Azimuth
New Mounting Yes or No for sharing
Mounting Position Tower (LEG A, B, C, D) or
Minimast or Lamp Pole or Unipole or Monopole
Rooftop Mounting Wall mount boom or Tripod or Bipod
Tube Diameter 48 mm, 90mm, 114mm
Antenna Type External 90 degrees.
Height of the Antenna (AGL) (from ground level to the
proposed ANTENNA boom)
Antenna Boom New Antenna Boom, Existing Boom.
IDU to ODU Cable Tray, IF cable (length in meters) If new required
Length of IF cable (IDU to ODU) 2 runs X (1+1)
Length of Outdoor 16mm grounding cable 2 runs X (1+1)
ODU Mounting Method
ODU Mounting Method
AC
B
N
A
BC
D
For TOWER site
AC
B
NN
A
BC
D
For TOWER site
AC
B
N
A
BC
D
For TOWER site
AC
B
NN
A
BC
D
For TOWER site
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
60/72
3. Existing Transmission Equipment
Photo
PhotoPhoto
Photo
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
61/72
3. Existing Transmission Equipment
Photo Photo
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
62/72
4. Proposed Transmission Equipment
Proposal
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
63/72
4. Proposed Transmission Equipment
Proposal
Proposal
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
64/72
5. Proposed Transmission Equipment Degree Views
Photo
Photo
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
65/72
5. Proposed Transmission Equipment Degree Views
Photo
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
66/72
5. Proposed Transmission Equipment Degree Views
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
67/72
5. Proposed Transmission Equipment Degree Views
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
68/72
5. Proposed Transmission Equipment Degree Views
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
69/72
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
70/72
6. Proposed Transmission Equipment location Layout Diagram
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
71/72
6. Proposed Transmission Equipment location Layout Diagram
-
8/17/2019 GDC-002 59 -WiBAS BRS 10 5 Installation en Ed1a
72/72
7. Obstacle Polar Diagram
Obstacles Distance Azimuth Comments