    GAYATRITANKS

    &

    VESSELS

    PRIVATELIMITED

    COMPANYPROFILEPLOTNO.65,ROADNO.2,SECTOR1S

    NEWPANVEL,DIST.RAIGAD410206

    MAHARASHTRA,INDIA

    PH:912227451333/27461468

    FAX:912227461458

    Email:[email protected]

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    2/32

    INDEXPg.Hd Sub PARTICULARS

    110 Introduction

    220 BasicInformation

    330 OrganizationChart

    440 ListofKeyPersonnel

    550 EngineeringInfrastructure

    551 Designcapabilities

    552 ManufacturingFacilities

    553 QualityAssurance&ControlFacilities

    554 NonDestructiveTests

    660 QualityPolicy

    7

    7

    0

    Quality

    Procedure

    880 ListofPrestigiousclients

    990 ListofMajorJobsExecuted

    10100 ListofMajorjobsunderexecution

    11110 ManpowerResources

    12120 Health,Safety&EnvironmentPolicy

    13130 ListofMachineries&Equipments

    1414

    0

    NSICRegistration

    certificate

    15150 SolvencyCertificate

    16160 P.F.Registrationcertificate

    17170 Balancesheet &Profit and LossAccount

    18180 WorkOrdercopieswithinspectionreports

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    3/32

    INTRODUCTION

    1-1-0We hereby introduce ourselves M/s. Gayatri Tanks & Vessels as a leading Manufacturer

    established in 1992 to carry out the Mechanical work in the various kind of projects like

    Petrochemicals, Power and Oil companies etc for past 17years. During the year 2006, our

    companyincorporated asPrivateLimitedfirm.

    We have successfully supplied and completedmany contracts upto the full satisfaction of our

    clientsinthevariouspartsofIndia.

    We are highly specialized inMechanical fabrication of Process Equipments at ourworks and

    clientssiteincludingpipelineandstructuralerection.

    Someofourspecializedactivitiesare thefabrication&Erectionof M.S/S.S. Equipments,Storage

    Tanks,

    heavy

    structural

    and

    Pipeline

    Job.

    We

    are

    highly

    specialized

    in

    manufacturing

    of

    Site

    StorageTanks rangingfrom20KLto2200KLCapacities

    WearehavinghighlyexperiencedandefficientteamsofManpowerincludingqualifiedMechanical

    Engineers, Supervisors, Technicians and welders etc. for carrying out all kinds of assignments

    withinthescheduledtimeofcompletion. Weareintheprocessofopeningupofnewfrontiers

    in the highly competitive construction field and we are confident that our resources and

    capabilitieswillfetch usthedesiredresults.

    M/s.Gayatri Tanks&VesselsPrivateLimited isstronglycommittedtotheQuality,Productivity&

    Scheduledcompletionaspectsofourprojects. Itisourentiredesiretobeapartof Clientontheir

    marchtowardstakingacompetitiveleadinthisageofglobaleconomy.

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    4/32

    BASICINFORMATION2201. Nameofthe Company : GayatriTanks&VesselsPrivateLimited

    2. Registered&AdministrativeOffice : PlotNo.65,RoadNo.2,Sector1S,

    NewPanvel,Dist.Raigad410206,

    Maharashtra,India

    OfficeArea

    :1800

    Sq.

    Ft.

    3. ContactNos. : Phone: 912227451333/27461468

    TeleFax:912227461458

    Email:[email protected]

    4. FactoryAddress : PlotNo.76,RoadNo.2,Sector1S,

    NewPanvel,Dist.Raigad410206,

    Maharashtra,India

    CoveredArea

    :7000

    Sq.ft

    5. WeeklyHoliday : Office :Sunday, FactoryTuesday

    7. NearestRailwaystation : Panvel

    8. BankersName : Bank ofIndia,NewPanvel&HDFCBank,NewPanvel

    9. MVAT TINNo. : 27070618818V

    10. CSTTINNo. : 27070618818C

    11DNH

    VAT

    No.

    :26001001096

    12. NSICRegistrationNo. : NSIC/MUM/GP/RS/G123/MHDt.01.01.2009

    13. PANNo. : AACCG7799P

    14. ServiceTaxNo. : AACCG7799PST001

    15. P.F.RegistrationCodeNo. : MH/VASHI/117382

    16. ESICRegistrationNo. : 34000163410000699/2011dt.30.05.2011

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    5/32

    ORGANIZATIONCHART3-3-0

    MANAGING

    DIRECTOR

    TECHNICALADVISOR

    BUSINESS

    MANAGER

    FINANCEMANAGER

    ADMINISTRATION ACCOUNTS

    Manager

    Production

    Manager

    QA/QC

    Engineer

    Planning

    Manager

    Projects

    Manager

    HSE

    Workshop

    Incharge/Engineers

    Inspectors Design

    Engineers

    Site

    Engineers

    Fabrication

    Foreman

    Supervisors

    workforce

    DIRECTOR

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    6/32

    LISTOFKEYPERSONNELS4.4.0

    1. Mr.RambujhS.Sharma B.E.inMech.Engg.

    Position:ManagingDirector

    Mobile:9833497445

    Experience:20Years

    2. Mr.SidhariramP.Sharma DiplomainMechanicalEngineering

    Position: C.E.O

    Experience:50Years

    Mob:9322709235

    3. Mr.RamanujS.Sharma B.E.Mechanical,PGD(PipingDesign)

    ASNTLevelII[UT,RT,PT&MPT]

    Position:Director(Technical)

    Experience

    :

    13years

    Mob: 9833824492

    4. Mrs.RekhaSharma BachelorofArts

    Position:Director

    Experience:8Years

    5. Mr.ParasnathS.Yadav DiplomainMechanicalEngg.

    Position:Manager(Projects)

    Experience:25years

    Mob:9833358384

    6.Mr.

    Y.B.

    Patil

    B.E.

    Mechanical

    Engineering

    Position:TechnicalAdvisor

    Experience:30Years

    7. Mr.JosephMonteiro DiplomainMechanicalEngg.

    Position:ManagerProduction

    Experience:30Years

    Mob:9821066560

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    7/32

    451

    9. Mr.VinodKumarGupta DiplomainMechanicalEngg.

    Position: SiteEngineer

    Experience:15years

    Mob:9833040546/09574485171

    10. Mr.TulsidasMadhavan MasterofCommerce

    Position:FinancialAdvisor

    Experience:28Years

    11. Mr.DavisDaniel CharteredAccountant

    Position:Auditing&LegalAdvisor

    Experience:10Years

    12. Mr.SathyaManoharan BachelorofCommerce

    Position:Manager(Accounts)

    Experience:17Years

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    8/32

    5-7-0

    ENGINEERINGINFRASTRUCTURE

    551 DESIGNCAPABILITIES

    AcompetentteamisavailableforcarryingoutMechanicaldesignofthefollowing

    areas.

    PressureVessels,Columns HeatExchangers StorageTanks

    552 MANUFACTURINGFACILITIES

    Manufacturing

    Area

    : 10000Sq.ft.

    Handling : Shopisequippedwithhandlingequipmentsforweighing

    singlepiece

    up

    to

    10

    Tons

    weight

    and

    5Mtr

    Height

    for

    working withthehelpofEOTCranes,ChainPulleyBlocksetc.

    SupportServices : Engineering,QualityAssuranceandControl,Welding,

    Maintenance,IndustrialRelationsMaterial(Procuringand

    Storing)mannedbyQualifiedandexperiencedpersonnel.

    553 QUALITYASSURANCEANDCONTROLFACILITIES.

    ToachievetheproductperformancewehaveQualityAssuranceDept.which

    reportsdirectlytheChiefExecutive/BusinessManagerofthecompany. Itis

    createdfor

    ensuring:

    MaterialIdentificationandControl Adherencetorelevantcodes. TechnicalServices QualityAssuranceandAudit Qualityoffinalproduct.

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    9/32

    Andalsousedfor:

    1 Allrawmaterial/partscomingfromvendorinhouseprocessed

    parts/componentsandbroughtoutitems

    2. Documentationofworksexecuted

    3. Developmentofspecialproducts,asperspecificcustomerneeds.

    4.

    Materialand

    product

    testing.

    5. VendorDevelopment

    6. FailureInvestigation

    TheTestingfacilitieshavedestructiveandnondestructive testarrangements.

    554 NONDESTRUCTIVETESTS

    Radiography(Xray) D.P.Test VacuumTest

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    10/32

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    11/32

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    12/32

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    13/32

    770 QUALITYPROCEDUREToachievethedesiredqualityproductwehaveaqualityassurance/material controlinour

    systemasdetailedbelow:

    771 Design&EngineeringControl

    AnychangesindesignanddrawingiscontrolledbyManagerEngineering,whofinally

    reporttotheChiefExecutive. Nootherdepartmentcanmakeanychangeofitsownfor

    anydeviation. Properdeviationnotisputuptodesigndepartmentforitsapprovaland

    maychangecanbeincorporateafteritsapprovalonly.

    772 ResponsibilityofQualityDepartment

    Personnelofthequalityassurancedepartmentdirectlyreport totheChief Executivewho

    exercises

    overall

    control

    on

    them.

    The

    responsibilities

    of

    quality

    assurance

    department

    are

    toensure:

    Technicalspecification,todesign

    Conformancetospecifications,toinspection;

    Demandforproductstosales:

    Usabilityincludingvisualappeal,tocustomers

    Leastrejectionsandcomplaintstoproduction;

    Toachievetheabovewehavedevelopedapreplanned,systematicandintegrateapproach

    fortotal

    quality

    management

    during

    the

    manufacture

    of

    all

    the

    products.

    This

    can

    be

    ensuredthroughaquality controlplanswhoseobjectivesare:

    Toestablish adefectfreemanufacturingprocessateachstage

    Tocontrolandmonitoraprocesstomeetthedesignandspecificationsrequirements

    Toobtainonlineandfinalproductinspectiondata.

    773 QualityControlofIncomingMaterial

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    14/32

    7731 SubVendorSelection:

    Selectionofvendorisdonebasedontheirexperienceandinternalqualitycontrol. This

    ensurescorrect subvendor. InspectorsanddesignEngineersjointlyselectsubvendor.

    7732 RawMaterialrequirement:

    Ingeneral,rawmaterialslikeplates/sheets/pipes/Flangesarebeingprocured from

    Vendors/dealers. Howeverspecificationisbeing checkedbeforedispatch.

    774 QualityControlatFactory:

    Incomingmaterialisbeingcheckedwithpredispatchnotealreadyissuedandthesame is

    checked for its specification and corelatedmarkwith costmark. Proper identification

    mark / tag is given to each material to avoid any mixup. Proper tag indication for

    inspectedandacceptedmaterial ispastedon the rawmaterial. Incaseof rejection of

    materialsameisbeingsegregatedseparatelyandputinaseparatestorewith propertag

    mark. Thesameislaterdispatchedbacktothesupplier.

    775 QualityControlofProcess,Welding,HeatTreatmentand

    NondestructiveTesting

    OurQuality

    Engineer

    checks

    heat

    number

    of

    sheets/

    plates

    with

    test

    certificate

    issued

    by

    supplier/vendor. Beforecuttingthe plates/sheets,approvaltobereceivedfromQuality

    Engineer.

    Aftermarking of nozzle orientation of vessel, it is to be approved byQuality Engineer

    beforecutting.

    Forwelding, in generalwelding procedure is supplied to Production Incharge and only

    qualifiedwelderispermittedtodothejob.

    EdgepreparationisbeingcheckedbyQualityEngineerbeforeproceedingwiththewelding.

    All rootwelds in general aremade by TIG process for SS Vessels or depends onjob

    requirementand

    checked

    for

    dye

    penetration

    to

    detect

    cracks,

    if

    any.

    Subsequent

    layer

    is

    madeonlyifthesameisfoundO.K.776 FinalAssemblyQualityControl

    FinalDimensional report is prepared by Production Incharge and is to be approved by

    Quality Engineer. Waterfill /Hydraulic Testing is being done to check the leakage or

    soundnessofthebody.

    Functional requirement is being checked as per work order detail received by Quality

    Engineer. If foundO.K. inspectioncallnotice issuedandbasedonwhichcontractsDept.

    intimatedtoinspectingagency,ifany.

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    15/32

    777 Howto DealwithDeviation

    Alldeviations, ifhaveapossibilityofaccepting arebeing sent toDesign personnel for

    acceptance. Properdeviationsnotbeing sent forapproval throughProjectManagerare

    examinedbyDesignDepartmentcriticallyinthelightoftheapplicationrequirementsand

    designcode. Furtheractionistakenaccordingly.

    778 Preservation,PackingandDispatchControl

    Surface exposed for corrosion is given the layer of grease and kept for final inspection.

    Oncefinal

    inspection

    is

    over

    and

    shipment

    released

    by

    the

    customer,

    the

    material

    is

    dispatched.

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    16/32

    LIST OFOURPRESTIGIOUSCLIENTS

    IndianOil CorporationLtd,Silvassa, Trombay&Vashi OilandNaturalGasCorporation, Uran BharatPetroleum CorporationLtd,Sewree RashtriyaChemical&FertilizersLtd,Chembur HindustanOrganicChemicalsLtd,Rasayani HindustanInsecticidesLtd,Rasayani HindustanFlurocarbonLimited,Hyderabad WalchandnagarIndustriesLimited,Mumbai HindustanPetroleumCorporationLtd,Silvassa&VisakhRefinery RelianceIndustriesLtd,Nagothane PILChemicalsLtd,Vapi ThermaxLimited,Pune IndianOiltankingLimited,JNPTUran NOCILLtd,Rabale PolygentaTechnologiesLtd,Nasik ABMauriIndiaPrivateLimited,LoteParshuram&SikandrabadU.P. IndoramaSynthetics(I)Ltd,Nagpur ModisonsPrivateLimited,Sanpada JSWIspatLimited,DolviGlobal

    Management

    (India)

    Services

    Pvt.

    Ltd,

    CBD

    RuchiSoyaIndustriesLtd,Patalganga,Rasayani BakulAeromatics&ChemicalsPrivateLtd,Rasayani U.P.TwigaFiberglassLtd,Ambernath GrindwellNortonLimited,Bangalore CIPLALimited,Patalganga LonaIndustriesLtd,Ladivali,Patalganga

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    17/32

    990

    LISTOFMAJORJOBSEXECUTEDClient NameofWork&OrderNo. Year Periodof

    Completion

    BharatPetroleum

    CorporationLtd,Sewree

    Fabrication/Supplyof15KLUnderground

    StorageTanks

    2004 15Days

    IspatIndustriesLtd,Dolvi Fabrication/SupplyofSS310ReformerTube

    TopCannister

    2004 6Months

    GlobalManagement

    Services(I)

    Pvt.

    Ltd

    Fabricated/Supplyof450Nos.SS310

    ReformerTube

    Top

    Cannisters

    for

    Nigeria

    Plant

    2005 5Months

    IndoramaSynthetic(I)Ltd Fabrication/ErectionofStructuralJob 2005 2Months

    HindustanOrganic

    Chemical Ltd

    Fabrication/Supply/Erection

    OfD3TowerforSAPlant

    2006 3Months

    Oil&NaturalGas

    CorporationLtd

    RetubingofTubeBundle

    Of IHI&NPCompressorStageInterCoolers

    2007 4Months

    PILChemicalsLtd Fabrication/Supplyof

    15KLSS316StorageTank

    2007 2Months

    IndianOilTankingLtd

    Mumbai

    Fabrication/Supplyof25KLHorizontalU/G

    Tanks

    2008 2Months

    ThermaxLimited,

    Pune

    Fabrication/SupplyofM.S.Vertical&

    HorizontalStorageTanks

    2008 3Months

    HindustanFlurocarbonLtd,

    Hyderabad

    Fabrication/Supply/Erectionof

    Distillationcolumn,Condensers&Cooler

    &Tanks

    2008 4Months

    NOCILLtd,Rabale Fabrication/SupplyofSS304Hopper 2008 2Months

    HindustanInsecticidesLtd,

    Rasayani

    Fabrication/SupplyofChillerforMCP

    Chlorination

    2008 3Months

    PolygentaTechnologies

    Ltd,NasikFabrication/Supply

    of

    SS304 Silos&Equipments2008

    4Months

    PolygentaTechnologies

    Ltd,Nasik

    Fabrication/Erectionof

    SS/MSPipeline&Structural

    2009 5Months

    IspatIndustriesLtd,Dolvi Fabrication/SupplyofSS310ReformerTube

    TopCannister

    2004 6Months

    IndoramaSynthetic(I)Ltd Fabrication/ErectionofStructuralJob 2005 2Months

    HindustanOrganic

    Chemical Ltd

    Fabrication/Supply/Erection

    OfD3TowerforSAPlant

    2006 3Months

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    18/32

    Client NameofWork&OrderNo. Year Periodof

    Completion

    Oil&NaturalGas

    CorporationLtd

    RetubingofTubeBundle

    Of IHI&NPCompressorStageInter

    Coolers

    2007 4Months

    PILChemicalsLtd Fabrication/Supplyof

    15KLSS316StorageTank

    2007 2Months

    IndianOilTankingLtd

    Mumbai

    Fabrication/Supplyof25KLHorizontalU/G

    Tanks

    2008 2Months

    ThermaxLimited,

    Pune

    Fabrication/Supplyof

    M.S.

    Vertical

    &

    HorizontalStorageTanks

    2008

    3Months

    HindustanFlurocarbon

    Ltd,Hyderabad

    Fabrication/Supply/Erectionof

    Distillationcolumn,Condensers&Cooler

    &Tanks

    2008 4Months

    NOCILLtd,Rabale Fabrication/SupplyofSS304Hopper 2008 2Months

    HindustanInsecticides

    Ltd,Rasayani

    Fabrication/SupplyofChillerforMCP

    Chlorination

    2008 3Months

    PolygentaTechnologies

    Ltd,Nasik

    Fabrication/Supplyof

    SS304 Silos&Equipments

    2008 4Months

    PolygentaTechnologies

    Ltd,Nasik

    Fabrication/Erectionof

    SS/MSPipeline&Structural

    2009 5Months

    IndianOilCorporation

    Ltd,Silvassa

    Fabrication/Erectionof TankswithCivil

    foundation

    2009 6Months

    Walchandnagar

    IndustriesLtd

    Fabrication,Erection,Testingof 13Nos

    Tanks(Storage,Day&ServiceTank)for

    74HPCL,NewGreaseSpecialityProduct

    Plantat Silvassa.

    2010 4Months

    IspatIndustriesLtd

    Dolvi,Pen

    Fabrication&SupplyofM.S. PipeSize:

    900Diato1400Dia.

    2010 2Months

    RuchiSoyaIndustries SS304CylindricalxHorizontalStorage

    Tanks3Nos.

    2010 2Months

    ABMauriIndiaPvt.Ltd

    MST147Dt.25.03.2011

    Fabrication,ErectionandTestingof2Nos.

    12.5MtrDiax12.0MtrHt.Molassess

    StorageTankatSikandrabadSite.(U.P.)

    2011

    &

    2012

    3Months

    IndianOilCorporation

    Ltd,Silvassa

    Design,Supply,Fabrication,Erection,

    Calibration,Testing,Paintingand

    commissioningofProductTanks&

    Pipeline&CivilworksforSCFPAtLBP,

    Silvassa(Daman)

    2011 8Months

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    19/32

    Client NameofWork&OrderNo. Year Periodof

    Completion

    IndianOilCorporationLtd,

    VashiGreasePlant

    Design,Supply,Fabrication,Erection,

    Calibration,Testing,Paintingand

    commissioningof500KLStorageTankwith

    Sandpadfoundation.

    2012 5Months

    RashtriyaChemical&

    FertilizersLtd

    Fabrication&SupplyofM.S.Hopper

    Size:4000Dia2Nos&3500Dia1No.

    2011 2.5Months

    ABMauri

    India

    Pvt.

    Ltd,

    Lote

    Parshuram

    Fabricatedand

    erected

    2Nos.

    150KL

    M.S.

    StorageTankatLoteParshuram

    2012

    3Months

    ABMauriIndiaPvt.Ltd,Lote

    Parshuram

    FabricationandErectionof15mtrDiax

    13.5MtrHt.MolassesStorageTankatLote

    Parshuram.

    20112 4Months

    HindustanFlurocarbonLtd FabricatedandsuppliedE2122Shelland

    TubeVaporiserExchanger,E204Heat

    ExchangerandP207ATubeBundle.

    2012 3Months

    RashtriyaChemical&

    FertilizersLtd

    FabricatedandSupplied SS321Expansion

    Bellow600Dia

    2012 4Weeks

    CiplaLtd,

    Patalganga

    Fabricated

    and

    supplied

    4Nos.

    SS

    304

    Tanks

    and1No.C.S.ReceiverforUnitNo.I

    Expansionproject.

    2012

    3Months

    HindustanPetroleum

    CorporationLtd,Visakh

    Refinery, Vishakapatanam

    Design,Fabricatedandsupplied16thkSS

    316L F.M.RecycleTankforVisakh

    Refinery.

    2012 4Months

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    20/32

    Fabricationanderectionof TankswithcivilfoundationCapacity500M32Nos

    Client:IndianOilCorporatonLtd,Silvassa, Year:20092010

    Fabricationanderectionof TankswithcivilfoundationCapacity70&20M33Nos

    Client:IndianOilCorporatonLtd,Silvassa, Year:20092010

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    21/32

    Fabrication,ErectionandtestingMiscellaneousPiping.

    Client:WalchandnagarIndustriesLtd,Mumbai

    EndUser:HindustanPetroelumCorporationLtd,Silvass,Year:20092010

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    22/32

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    23/32

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    24/32

    Fabrication,Erectionandtestingof1No.45KL& 3Nos.24KL ProductStorageTanks

    Client:IndianOilCorporationLtd,LBPPlant,Silvassa.,Year:20102011

    FabricationandErection of ConnectingPlatformfor ProductStorageTanks

    Client:IndianOilCorporationLtd,LBPPlant,Silvassa.,Year:20102011

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    25/32

    Supply,ErectionandtestingofManifoldsforProductStorageTankswithShed

    Client:IndianOilCorporationLtd,LBPPlant,Silvassa.,Year:20102011

    Supply,ErectionandtestingofManifoldsforProductStorageTankswithShed

    Client:IndianOilCorporationLtd,LBPPlant,Silvassa.,Year:20102011

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    26/32

    Supply,Erectionand commissioningof Pumpfor with Shed forProductsTanksincludingcivilwork

    Client:IndianOilCorporationLtd,LBPPlant,Silvassa.,Year:20102011

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    27/32

    10100

    LISTOFOUR WORKSUNDEREXECUTION

    Sr.

    No. Client NatureofJob

    1. VistaProcessFoodsPvt.Ltd Fabricationandsupplyof SS304StorageTank.

    2. UltraDrytechEngg.Ltd Fabricationandsupplyof2NosSS316FilterBody.

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    28/32

    11110

    MANPOWERRESOURCES

    1. Chiefexecutive 1No

    2. TechnicalAdvisor 1No

    3. BusinessManager 1No

    4. ManagerOperation 1No

    5. ManagerProjects 1No

    6. PlanningEngineer 2Nos

    7. Mechanical/CivilEngineer 3Nos

    8. PipingEngineer 1No.

    9. DesignEngineer 1No.

    10. SiteSupervisors 5Nos

    11. Draughtmen 2Nos

    12. Foreman 2Nos

    13. QA/QCSupervisors 1No.

    14. Argon/ArcWelder 12Nos

    15. Fabricator 7Nos

    16. Pipe/Structural Fitter 4Nos

    17. OfficeStaff 3Nos

    18. Labours Skilled 8Nos

    SemiSkilled 22Nos

    Unskilled 56Nos

    Added asperrequirement

    Note:WehavesourcestoarrangemoreManpoweraccordingtothedemandofthe

    workentrusttous.

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    29/32

    121212

    SAFETY, HEALTH&ENVIRONMENTPOLICY(S.H.E)

    WhileworkingwithOil&GasCompanies,GayatriTanks

    &Vesselshave workedhard tomaintainan accident

    freework environment. It is compulsory inourwork

    institution to adhere to OISD norms & regulations.

    Whileworking

    with

    client

    such

    as

    IOCL

    &

    BPCL,

    we

    havecometo interactand learna lotaboutworking in

    hazardous conditions yet ensuring a foolproof safety

    standard.

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    30/32

    13130

    LISTOFMAJORMACHINERIES/EQUIPMENTS

    TRANSPORT

    1 Truck 1No.

    2. TaveraB2 1No.

    WELDINGMACHINE&ACCESSORIES

    1. TIGweldingSetswithregulators 5Sets

    2. EaseweldMakeWeldingRectifiers600Amps 20 Sets

    3.

    HireN

    Weld

    Welding

    Generators

    3Sets

    4. AirCooledweldingTransformers400amps 4Sets

    WINCHMACHINES

    1. 5TonCapacityheavydutymanuallyoperated

    winchmachines.

    1No.

    CHAINBLOCK

    1. 10MTCapacity 2Nos

    2. 05MTCapacity 3Nos

    3. 03MTCapacity 5Nos

    4.

    02MTCapacity

    6Nos

    5. 01MTCapacity 5Nos.

    DRILLMACHINES

    1. RadialDrillMachineHMTMake 1No.

    2. KPTmakeDrillmachineupto 20mm 2Nos

    BENDINGMACHINE

    1. PlateBendingMachineupto10mmthk 1No.

    PORTABLEHANDTOOLS&MACHINES

    1. BenchGrinder 2Nos

    2.

    Angle

    Grinder

    (AG

    7)

    15

    Nos

    3. AngleGrinder(AG4) 6Nos

    4. PencilGrinder 2Nos

    5. HydraulikJacks10TonCapacity 2Nos

    5TonCapacity 2Nos

    6. ScrewJacks10TonCapacity 1No.

    7. BenchVice 12 6Nos

    8. PipeVice 04Nos

    9. RatchethandleswithBoxSpanner 2Sets

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    31/32

    10. TorqueWrenchupto1500 1Set

    11. SpritLevel12 12Nos

    12. RingSpanner(differentsizes) 80Nos

    13. DSpanner(differentsizes) 80Nos

    14. GasCuttingSets 15Nos

    15. GasHeatingsetwithregulators 4Nos

    16. PipeWrench 20Nos

    17. HackSawFrame 12Nos

    18. TubeExpanders(differentsizes) 4Sets

    19. Slingsofdifferentsizes 75Nos

    20. DShacklesofdifferentsizes 150Nos

    INSPECTIONINSTRUMENTS

    1. UltrasonicDigitalThicknessMeasuringGauge 1No.

    2. VernierCaliper/Micrometer 2Nos

    3. MeasuringTaps 15Nos

    4. N.P.T.Couplings 6Nos

    5. DialGauges 1No.

    6.

    PressureGauges

    6Nos

    7. RadiographyFilmViewer 1No.

    8. VacuumTestingMachine 1No.

    MACHINESATSHOP

    1. AirCompressor 1No.

    2. PlateBendingMachine 1No.

    3. Pug cuttingMachine 1No

    4. LatheMachine 1No.

    5. RadialDrillMachine 1No.

    6.

    PressingMachine

    150Ton

    Cap

    1No.

    7. WeldingRectifier 3Nos

    8. TIGWeldingMachineSet 1Nos.

    9. BenchGrinder 1No.

    10. FlexibleGrinder 1No.

    EQUIPMENTSFORCIVILWORK

    1. Cement&SandMixer 2Nos

    2. Vibrator 1No.

    3. PlateVibrator 2Nos.

  • 8/13/2019 Gayatri Tanks - Company Profile 1

    32/32