6-2-2016AHAAC LIHTC Presentation
Gateway Apartments LIHTC Application
6-2-2016AHAAC LIHTC Presentation
2
QAP Scoring – 2016 Schedule
Review of QAP/discussion of potential changes Spring/Summer
Tax credit forum meeting October
How to apply January
CEO notification deadline January 27
Application reservation deadline March 4
CEO letter deadline April 1
Preliminary Rankings/Comment Period May 3
End comment period May 10
End rebuttal period May 17
Announce final rankings May 25
VHDA Board to review final rankings June 8
Application for allocation deadline November 2
Finalize allocations December 16
6-2-2016AHAAC LIHTC Presentation
3
QAP Scoring –Housing Needs Scoring Category Possible Gateway
Revitalization Area 0 or 10 10
Section 8 or PHA wait list preference 0 or 10 10
Subsidized Funding Commitments Up to 40 38.5
Existing RD, HUD Section 8, or 236 0 or 20 0
Tax abatement or new project based subsidy 0 or 10 0
Census <10% poverty and no other LIHTC 0 or 25 25
Development listed on Rural Development Priority 0 or 15 0
Dev. in area with little or no increase in rent burden UP to -20 0
Dev located in area with increasing rent burden Up to 20 20
6-2-2016AHAAC LIHTC Presentation
4
QAP Scoring –Dev Characteristics
Scoring Category Possible Gateway
Amenities * Up to 71 66.31
Project subsidies/HUD 504 access 5 or 10% 0 or 50 0
or HCV Payment Standard/HUD 504 access 5 or 10% 0 or 30 30
or HUD 504 accessibility for 5% 0 or 30 0
Proximity to Transit (Within NOVA or Tidewater) 0, 10, 20 20
Earthcraft or LEED Certified 0,15,30,45 45
Universal Design UP to 15 0
Developments less than 100 unis Up to 20 10.4
Waiting list preference to ID/DD within marketing plan Up to 20 0
6-2-2016AHAAC LIHTC Presentation
5
QAP Scoring –Amenities Scoring Category Possible Gateway
Community Room 0 or 5 5
Exterior Wall constructed with brick 22 19.31
Energy Star Appliances 0 or 5 5
Energy Star Windows and Glass Doors 0 or 5 5
Heat/AC – SEER rating 0 or 10 10
Sub-metered water expense 0 or 5 5
WaterSense faucets and showerheads 0 or 2 2
High speed cable, DSL, internet ready 0 or 1 1
Energy efficient water heaters O or 5 5
Water Sense toilet 0 or 2 2
Energy Star bath vent fans – new construction 0 or 2 1
R-3+ wall sheathing insulation 0 or 5 5
Cooking Surfaces – fire prevention 0 or 2 0
6-2-2016AHAAC LIHTC Presentation
6
QAP Scoring –Tenant Population
Scoring Category Possible Gateway
<=20% of units have 1 bedroom or less 15 15
Percent of Low Income units with 3 or more bedrooms 15 12.16
Notes• Points are not available for 3BR category if the
project does not have less than 20% 1BR
6-2-2016AHAAC LIHTC Presentation
7
QAP Scoring – Sponsor
Scoring Category Points Gateway
Developer Experience 10 or 50 10
Plan of Development 0 or 40 40
Notes• Max between two categories is 50 points
• Developer can get negative points due to various compliance issues on previous projects
6-2-2016AHAAC LIHTC Presentation
8
QAP Scoring –Efficient Use of Resources
Scoring Category Possible Gateway
Credit per unit Up to 200 80.33
Cost per unit Up to 100 27.71
Notes• Credit per unit scoring has is a major determining factor in the
amount of credits an applicant requests as part of the application
• Gateway Eligible for $2.43M annually in credits and requested $1.52M
• Assuming $1.00 tax credit price each 100,000 in tax credits equals $1.0 M in additional equity
6-2-2016AHAAC LIHTC Presentation
9
QAP Scoring –Bonus Points
Scoring Category Possible Gateway
Units at or below 40% AMI Up to 10 10
Units with rents at or below 50% AMI Up to 50 50
Extended Compliance/Non-profit purchase option 5,40,50,60 60
Combined 9%/4% Up to 40 0
6-2-2016AHAAC LIHTC Presentation
10
QAP Final Scores –NOVA
Project LocationQAPScore
RequestedCredits
Gilliam Place East Arlington 612.33 1,950,000
Birchwood at Brambleton
Loudoun County 585.67 843,658
Gateway Apartments Alexandria 581.22 1,524,847
Heronview Apartments Loudoun County 534.77 1,551,142
Parkside at Dumfries Prince William County
505.16 854,347
6-2-2016AHAAC LIHTC Presentation
11
Gateway Sources and Uses Sources Amount
LIHTC Equity $16.5 M
Perm Debt $5.5 M
Alexandria Debt $5.5 M
Deferred Development Fee $1.1 M
Total $28.6 M
Uses Amount
Acquisition $5.1 M
Soft Costs $3.2 M
Financing Costs $1.6 M
Construction $15.8 M
Reserves $0.5 M
Developer Fee $2.4 M
Total $28.6 M
6-2-2016AHAAC LIHTC Presentation
12
Questions?