gas/electric partnership workshop · 2009-02-08 · workshop february 8 –9, 2007 trends in gas...
TRANSCRIPT
Gas/Electric Partnership Gas/Electric Partnership WorkshopWorkshop
February 8 February 8 –– 9, 20079, 2007
Trends in Gas Storage & Requirements for Compression
Randall SchorrePB Energy Storage Services, Inc.
Trends in Gas Storage & Trends in Gas Storage & Requirements for CompressionRequirements for Compression
Gas storage venuesGas storage venues
Gas storage operations (Pre and Post Order 636)Gas storage operations (Pre and Post Order 636)
Controlling storage capacityControlling storage capacity
Gas storage projects (existing and proposed)Gas storage projects (existing and proposed)
Trends in gas storageTrends in gas storage
Compression requirementsCompression requirements
Life cycle cost analysisLife cycle cost analysis
ConclusionsConclusions
PBPB ESS Industry PerspectiveESS Industry Perspective
Design, drill and evaluate reservoir storage (gas)Design, drill and evaluate reservoir storage (gas) Design, drill and leach cavern storage (gas and liquids)Design, drill and leach cavern storage (gas and liquids) Design, drill fresh water wells and brine disposal wellsDesign, drill fresh water wells and brine disposal wells Design, procure and construct surface facilitiesDesign, procure and construct surface facilities
•• Leach plant / fresh water supplies / brine disposal systemLeach plant / fresh water supplies / brine disposal system•• Compressor stationsCompressor stations•• Pump stationsPump stations•• Pipelines (gas and liquids)Pipelines (gas and liquids)
Contract O&MContract O&M•• Leach plant / fresh water supplies / brine disposal systemLeach plant / fresh water supplies / brine disposal system•• Compressor stationsCompressor stations•• Pump stationsPump stations•• Pipelines (gas, hazardous liquids, brine)Pipelines (gas, hazardous liquids, brine)
Gas Storage VenuesGas Storage Venues
AquiferAquifer
Depleted reservoirsDepleted reservoirs
Leached cavernsLeached caverns•• DomalDomal saltsalt
•• Bedded saltBedded salt
AquiferAquiferWater Well
Well MonitoringWater Level Storage IO Well
Gathering System
Shallow Water Supply
Spill Observation Well
Ground Level
Water Bearing Zone
Gas Finger
Gas Reservoir
Upper Caprock
Possible Spill Area
Permeable Monitoring Zone
Caprock for S
torage Area
Boundary Storage Zone
AGA GEOP Series, Book S–1, Underground Storage, 1990
Depleted ReservoirDepleted Reservoir
DomalDomal SaltSalt
DomalDomal SaltSalt
Capacity• 6.4 Bcf (181.228 MM m3)
Depth to Cavern Roof• 4120 ft (1255.78 m)
Actual Cavern Dimension• 625 ft (190.5 m) Depth• 290 ft (88.38 m) Diameter
Bedded SaltBedded Salt
Bedded SaltBedded Salt
Important Characteristics of Important Characteristics of Each VenueEach Venue
Up to 10%Up to 10%Up to 10%Up to 10%1.0%1.0%0.5%0.5%Daily Withdrawal Rates Daily Withdrawal Rates
(% of total capacity)(% of total capacity)
Time to DevelopTime to Develop
Highly Highly variablevariable
12 12 -- 252510 10 -- 202010 10 -- 1515Cost to Develop Greenfield Project Cost to Develop Greenfield Project ($MM/($MM/BcfBcf of working gas)of working gas)
Up to 12Up to 12Up to 12Up to 121 to 21 to 211Annual TurnsAnnual Turns
Highly Highly variablevariable
20 20 -- 30 /30 /
80 80 -- 707050 / 5050 / 5065 / 3565 / 35Base Gas / Working GasBase Gas / Working Gas
.2 .2 –– 1.0 / 1.0 / caverncavern
2 2 -- 8 / 8 / caverncavern
10 10 -- 14014010 10 -- 155155Size (Size (BcfBcf Total)Total)
Bedded Bedded SaltSalt
DomalDomalSaltSalt
Depleted Depleted ReservoirReservoir
AquiferAquifer
Gas Storage Operation Gas Storage Operation ––Pre FERC Order 636Pre FERC Order 636
Storage Held by PipelinesStorage Held by Pipelines
Peak day commitments Peak day commitments vsvs average day average day capacitycapacity
Supply security / suretySupply security / surety•• HurricanesHurricanes
•• Pipeline / processing freeze offsPipeline / processing freeze offs
•• Deliverability limitationsDeliverability limitations
Gas Storage Operation Gas Storage Operation ––Pre FERC Order 636Pre FERC Order 636
Storage Held by Markets / MarketersStorage Held by Markets / Marketers
Peak day commitments Peak day commitments vsvs average day average day commitmentscommitments
Supply security / suretySupply security / surety Managing gas supply costs (weighted average Managing gas supply costs (weighted average
cost of gas)cost of gas) Pipeline system balancing Pipeline system balancing –– avoiding balancing avoiding balancing
penaltiespenalties LNG supply buffer between terminal and LNG supply buffer between terminal and
marketsmarkets
Controlling Gas Storage Capacity Controlling Gas Storage Capacity ––Ownership and/or ContractOwnership and/or Contract
OriginallyOriginally•• PipelinesPipelines
TodayToday•• PipelinesPipelines•• LDCsLDCs•• Power producersPower producers•• Large commercial customersLarge commercial customers•• MarketersMarketers•• Independent storage developers / venture capitalistsIndependent storage developers / venture capitalists•• Producers / suppliersProducers / suppliers
Underground Natural Underground Natural Gas Storage Gas Storage -- 20052005
13,37613,3761741743030SaltSalt
Source: EIA, Underground Natural Gas Storage DatabaseSource: EIA, Underground Natural Gas Storage Database
83,63283,6324,0104,010394394TotalTotal
61,93061,9303,4373,437320320Depleted ReservoirDepleted Reservoir
8,3268,3263993994444AquiferAquifer
Withdrawal Withdrawal Capacity (MMcfd)Capacity (MMcfd)
Working Gas Working Gas Capacity (Capacity (BcfBcf))
SitesSitesVenueVenue
FERC Status of Gas FERC Status of Gas Storage ProjectsStorage Projects
January 2007January 2007
1414Storage Projects on the HorizonStorage Projects on the Horizon
Source: FERC, Natural Gas Storage PublicationSource: FERC, Natural Gas Storage Publication
1010Pending Storage ProjectsPending Storage Projects
5454Certificated Storage Projects Since 2000Certificated Storage Projects Since 2000
# of Projects# of ProjectsStatusStatus
Trends in Gas StorageTrends in Gas Storage
Strong demand for incremental storage Strong demand for incremental storage capacity and associated injection / delivery capacity and associated injection / delivery capacitycapacity•• Driven by daily / seasonal markets (power Driven by daily / seasonal markets (power
generation log)generation log)•• Driven by daily / seasonal supplies (LNG Driven by daily / seasonal supplies (LNG
imports)imports)
Evidenced by proposed storage projects Evidenced by proposed storage projects and storage projects under constructionand storage projects under construction
Compression RequirementsCompression RequirementsGas Storage ApplicationGas Storage Application
Injection / withdrawal volume volatilityInjection / withdrawal volume volatility
Injection / withdrawal pressure rangeInjection / withdrawal pressure range
Wide range of volume / ratio operating Wide range of volume / ratio operating pointspoints
Fast response timeFast response time
Selecting Optimum Compression Selecting Optimum Compression EquipmentEquipment
Existing InstallationsExisting Installations
ElectricElectric
GasGas
CentrifugalCentrifugalReciprocatingReciprocating
Selecting Optimum Compression Selecting Optimum Compression EquipmentEquipment
Existing InstallationsExisting Installations
ElectricElectric
GasGas
CentrifugalCentrifugalReciprocatingReciprocating
Moving Beyond the Technology Moving Beyond the Technology Preference to the Business DecisionPreference to the Business Decision
Which equipment produces the lowest life Which equipment produces the lowest life cycle cost?cycle cost?
Life Cycle CostLife Cycle Cost
Initial capital outlayInitial capital outlay•• EquipmentEquipment•• Facilities to support operationFacilities to support operation
Ongoing O&M expensesOngoing O&M expenses•• Labor / supervisionLabor / supervision•• ConsumablesConsumables•• Repairs (scheduled / unscheduled)Repairs (scheduled / unscheduled)
Fuel / power costFuel / power cost•• Function of commodity cost Function of commodity cost andand equipment efficiencyequipment efficiency
Life Cycle CostLife Cycle CostFuel / Power Cost Calculation MethodologyFuel / Power Cost Calculation Methodology
Determine Hp / MMcfd for each compressor / driver set Determine Hp / MMcfd for each compressor / driver set and each operation point (Q=100 MMcfd, Suction and each operation point (Q=100 MMcfd, Suction P=800, P=800, DischDisch P=2,100, Hp/MMcfd=?)P=2,100, Hp/MMcfd=?)
Determine (estimate) percent of time operated at each Determine (estimate) percent of time operated at each identified operation point identified operation point
Calculate annual shaft HpCalculate annual shaft Hp--HrsHrs Determine heat rate for reciprocating engine, gas turbine Determine heat rate for reciprocating engine, gas turbine
and / or electric motor for and / or electric motor for eacheach operating pointoperating point Calculate annual Calculate annual MMBtuMMBtu or or KwKw--Hr consumedHr consumed Calculate annual fuel / power costCalculate annual fuel / power cost Complete life cycle cost calculationComplete life cycle cost calculation Recommend Monte Carlo simulationRecommend Monte Carlo simulation
Trends in Gas Storage & Trends in Gas Storage & Requirements for CompressionRequirements for Compression
What does this mean for:What does this mean for:•• Asset owners / project developers?Asset owners / project developers?
•• Equipment suppliers / engineering service Equipment suppliers / engineering service providers / power providers?providers / power providers?