Page 1Transmission Transparency, 13.12.2007
Gas Regional Initiative North-WestTransmission System Operators
Transmission Transparency Project
Project Plan The Hague, 13 December 2007
Contact:Oliver AltenhoffE.ON Gastransport AG & Co. KGKallenbergstr. 545141 [email protected]
Page 2Transmission Transparency, 13.12.2007
Gas Regional Initiative North-WestTransmission System Operators
Overview
Introduction Information to be published List of Participating Operators Interconnection Points Time Schedule Specific Time Schedule of Implementation Monitoring of Implementation Cost Statements
Page 3Transmission Transparency, 13.12.2007
Gas Regional Initiative North-WestTransmission System Operators
Introduction
• At SG meeting in Dublin, TSOs announced the development of a project plan for best practices based on requests of market participants
• EFET wish list established (Requirements go beyond current legislative requirements)
Transparency questionnaire responses and Ofgem-Workshop
A high-level plan published by TSO: commitment to the wish list
Detailled plan shows the implementation process
Page 4Transmission Transparency, 13.12.2007
Gas Regional Initiative North-WestTransmission System Operators
Information to be published
The following information refers to Interconnection Points
Max technical capacity of the transmission system Daily commercial firm and interruptible capacity Interruptions /Interrupted flows Daily flow / aggregated allocations (D+1) Daily prompt allocation information to each shipper Daily aggregate day-ahead nominations (D-1) Historic gas flow information database
Page 5Transmission Transparency, 13.12.2007
Gas Regional Initiative North-WestTransmission System Operators
List of Participating Operators
Netherlands
United Kingdom
Germany Belgium
France Ireland
Sweden
Northern Ireland
Denmark
Page 6Transmission Transparency, 13.12.2007
Gas Regional Initiative North-WestTransmission System Operators
Interconnection Points
0 0 1
74
10 10
14
20
5
02
0
5
9
0 00
0
0
0
11
9
0
0
23
5
6
3
0
0
0
5
10
15
20
25
30
Swedeg
as
Svens
ka K
raft
Bord
Gais
Nation
al Grid
Inte
rcon
necto
r
Energ
ienet
.dk
GTS
Fluxys
DEP
BEB Tra
nspo
rt
E.ON G
T
RWE T
NG
WIN
GAS Tra
ns.
Ontra
s
GdFDT
GRTgaz
confidential
publicly available
69 points publ. avbl.
57 points confid.
Page 7Transmission Transparency, 13.12.2007
Gas Regional Initiative North-WestTransmission System Operators
2007 2008
Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Identification areas of quick
wins
High level plan
Feedback
TSOs finalization on plans
Detailed project plan
Implementation at each TSO
Result
Time Schedule
First wins Later wins Final wins
Page 8Transmission Transparency, 13.12.2007
Gas Regional Initiative North-WestTransmission System Operators
Specific Time Schedule of Implementation
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Max technical capacity
Interruption
Daily commercial firm andinterruptible capacity
Daily flow / aggregatedAllocation
Daily prompt allocationinformation
Daily aggregate day-aheadnominations
Historic gas flow informationdatabase
in place
earlier
later
final
no answer
Page 9Transmission Transparency, 13.12.2007
Gas Regional Initiative North-WestTransmission System Operators
Specific Time Schedule of Implementation
E.ON GT FluxysSvensk Kraftnät
RWE TNGNational
GridInterconnect
orBGE
WINGAS Transport
Ontras GRTgazEnergien
et.dkBEB DEP
Swedegas
GdFDT GTS
Max technical capacity in place earlier in place in place in place earlier in place in place in place earlier in place in place earlier in place in place
Interruption later final final in place in place later earlier in place earlier later later earlier in place in place
Daily commercial firm and interruptible capacity
in place earlier later final in place earlier in place in place in place earlier in place in place later in place in place
Daily flow / aggregated Allocation
earlier earlier later later in place in place later earlier earlier in place earlier earlier earlier earlier earlier in place
Daily prompt allocation information
earlier final later in place in place in place in place in place in place in place in place in place in place in place in place
Daily aggregate day-ahead nominations
later in place later later final in place later earlier earlier later earlier in place
Historic gas flow information database
later final later later in place in place later earlier earlier in place in place earlier later later in place in place
April 2008 earlierOctober 2008 laterJanuary 2009 final
Page 10Transmission Transparency, 13.12.2007
Gas Regional Initiative North-WestTransmission System Operators
Monitoring of Implementation
TSO will send progress reports to RCC
First progress report in May 2008
Mid-term report in February 2008
Second progress report in November 2008
Mid-term report in July 2008
Final progress report in January 2009
Page 11Transmission Transparency, 13.12.2007
Gas Regional Initiative North-WestTransmission System Operators
Cost statements
Operators will have first cost estimations in Jan/Febr. 2008 for discussion with RCC.
Should be handled on the national level first
Page 12Transmission Transparency, 13.12.2007
Gas Regional Initiative North-WestTransmission System Operators
Transmission Transparency Project
Contact:Oliver AltenhoffE.ON Gastransport AG & Co. KGKallenbergstr. 545141 [email protected]
Thank you!