garrett hare senior project 2011-12

10
Garrett Hare: Senior Project 2011-12 Freestyle BMX Bicycle

Upload: garretthare

Post on 11-May-2015

109 views

Category:

Business


1 download

TRANSCRIPT

Page 1: Garrett Hare Senior Project 2011-12

Garrett Hare: Senior Project 2011-12

Freestyle BMX Bicycle

Page 2: Garrett Hare Senior Project 2011-12

Paint Sanding Prep

Everything must be laid out in order to see what needs to be done before sanding, and painting.

Page 3: Garrett Hare Senior Project 2011-12

Paint Stripping

All paint on the parts of the bike must be sanded off before the finishing paint is added.

Page 4: Garrett Hare Senior Project 2011-12

Paint Job Prep

Once everything has been sanded down, it is now ready for the finishing paint job.

Page 5: Garrett Hare Senior Project 2011-12

Removing Spokes

Before hub removal.

After hub removal, the spokes must be removed.

Spokes after removal, ready for sanding.

Page 6: Garrett Hare Senior Project 2011-12

Spokes Sanded

All spokes are sanded and ready for paint.

Page 7: Garrett Hare Senior Project 2011-12

Painting Spokes

Spokes sanded. 32 spokes painted yellow.

32 spokes painted black.

Page 8: Garrett Hare Senior Project 2011-12

Ready For Paint

Everything has been sanded and is ready to paint.

Page 9: Garrett Hare Senior Project 2011-12

Frame Paint Job

Perfection, patience and hard work pay off.

Page 10: Garrett Hare Senior Project 2011-12

Spokes and Rim Wall

Spokes and Rim Wall

Rim walls, and spokes painted and almost complete.