Garment production starts with the cutting process. In this process,fabric is being cut into components (shapes or patterns of dierentgarment parts, i.e. front, back, sleeve, collar shapes etc.). In massproduction multiple layers of fabrics are laid on a table and largenumber of garments is being cut at a time. The laid fabric stack iscalled as lay. The cutting process includes number of subprocessesand !ow of the processes is as following. "ach process is brie!ye#plained in the following.
1. Pattern / Marker:$ccording to the design and %t, patterns of
dierent garment parts are made on the pattern paper and cut into
pattern pieces. &or manual marker these pattern pieces are used for
marker making. 'n the other hand in $ system patterns are madein computer. *ater using a plotter markers are made on sheet. In the
second case cutting department receive ready marker.
2. Cut ratio receiving:+rior to cutting, cutting department get a
ob sheet from planning department or merchandiser or production
manager that includes total -uantity of garment pieces to be cut,
-
7/25/2019 Garment Production Starts With the Cutting Process
2/3
sies ratio of the garments and colourwise sie break up. $ccording
to the sie and colour ratio cutting team prepare one marker or
multiple markers. /arker length and number of lay to be cut are
planned in this stage.
3. Fabric receiving:&abric re-uirement for an order is calculated
according to the average consumption of the fabric from the marker.
In case of multiple colour order, colour wise re-uirement is made.
&abric department issue fabric to cutting against the fabric
re-uirement (generally re-uisition slip is used).
4. Fabric relaxation:This process is optional. 0pecially used for
knits fabric. uring rolling of fabric it get stretched. 0o it is essentialto bring the fabric on stable form otherwise garment would shrink
after making. To rela# the fabric roll or th1n is opened and spread
and kept for about 23 hours.
5. Spreading Fabric !a"ering#:In this stage fabric sheet is
layered one above another maintaining prede%ned maker length
and correct ply tension. &abric is layered up to a certain height to
avoid cutting -uality problem. 0preading is done by manual layering
or automatic layering machine can be used. uring layering of thefabric, fabric edge is aligned at one side.
$. Marker Making:$fter layering of a lay, pre made paper patterns
(or ready markers made by plotter) are placed on the top layer of
the lay. In manual marker making, marking is done around each
pattern shape using marking chalk. This process is called as marker
making. In a marker all garment components are placed.
%. Cutting:*ay is cut following the marked lines on the top of thelay. utting is done using straight knife or other cutting means. In
cutting process garment component are separated. 'n the basis of
pattern shape dierent cutting method4 machine are selected.
&. 'u(bering:0eparated garment components are numbered to
ensure that in stitching all components from same layer are stitched
-
7/25/2019 Garment Production Starts With the Cutting Process
3/3
together. It is important to avoid shade variation in a garment.
5etween the cutting and sewing processes cut components may be
passed through other processes like printing and embroidery. There
is ma#imum chance of mi#ing of the components. If there is layer
number in each component then at the time of stitching only correctcomponents will be stitched together.
). Sorting:$ccording to production system (/ake through,
progressive bundle or one piece !ow system) cut components are
sorted. In sorting all component of a garment placed together. 0ie
wise sorting and in case multiple colours are cut in a single lay,
colour wise sorting will be re-uired.
1*. +undling:$s per the production line re-uirement a certainnumber of pieces with all component are tied together. This process
is known as bundling. "ach bundle is marked with bundle number,
style name, sie number and -uantity of pieces in that bundle. $t