FY 2021-2030SUPERINTENDENT’S PROPOSED
CAPITAL IMPROVEMENT PROGRAM BUDGET
Alexandria City Public SchoolsEVERY STUDENT SUCCEEDS
http://www.acps.k12.va.us/Alexandria, Virginia (USA)
This page intentionally left blank.
School Board
Cindy Anderson, ChairVeronica Nolan, Vice Chair
Meagan AldertonRamee A. Gentry Jacinta GreeneMargaret Lorber
Michelle Rief, Ph.D.Christopher SuarezHeather Thornton
Administrative Personnel
Gregory C. Hutchings, Jr., Ed.D.Superintendent of Schools
Alexandria City Public SchoolsOperations Department1340 Braddock Place
Alexandria, Virginia 22314Telephone: 703-619-8038http://www.acps.k12.va.us/
FY 2021 - 2030 Capital Improvement Program Budget
Jennifer Abbruzzese, Director of Policy & Board InitiativesSusan Neilson, Clerk of the Board
Shanel Hill, Deputy Clerk of the Board
Terri H. Mozingo, Ed.D. Chief Academic Officer
Superintendent’s Designee
Julie Crawford, Ed.D.Chief Student Services Officer
Clinton PageChief Accountability Officer
Lisa Piehota, Ph.D.Executive Director of Elementary Instruction
Kurt HuffmanDirector of School, Business, and Community Partnerships
Stephen Wilkins, Ed.D.Chief Human Resources Officer
Superintendent’s Designee
Mignon R. AnthonyChief Operating Officer
Dominic TurnerChief Financial Officer
Elizabeth Hoover, Ed.D.Chief Technology Officer
Gerald Mann, Ed.D.Executive Director of Secondary Instruction
Helen LloydDirector of Communications
Transportation
Charles StoneDirector
Kifaya HamadAssistant Director
Safety and Security Services
James BartlettDirector
John ContrerasCoordinator, Security and Emergency Management
School Nutrition Services
Cynthia HormelDirector
ACKNOWLEDGEMENT
The Operations staff extends thanks and appreciation to the School Board, principals, senior staff, program managers and support staff who contributed to the production of the FY 2021-2030 Capital Improvement Program. This process takes a tremendous amount of time and effort. Your hard work and cooperation allow us to present an effective budget.
Educational Facilities
Anita CordovaActing Director of Facilities
Tracey ArmahFinancial Analyst
Alex AlexanderFacilities Engineer
Paul MayConstruction Project Manager
Azuka BartlettConstruction Project Manager
John FinniganConstruction Project Manager
Eric KellyBuilding Systems Manager
Key Operations Staff
Anita CordovaDirector of Operations Coordination
Erika GulickSenior Planner
Executive Summary Introduction ....................................NA
Strategic Planning Framework........NA CIP Planning and Project ................NA FY 2020-2029 CIP...........................NA Capacity Plan..................................NA Non-Capacity Program...................NA Basis of Estimates..........................NA Operating Budget Impact................NA Budget Timeline and Planning Cycle................................................NA
Projects
Overview..........................................1Charles Barrett.................................2Cora Kelly.........................................4Douglas Macarthur..........................6Ferdinand T. Day.............................8George Mason.................................10James K. Polk.................................13 Jefferson-Houston...........................16 John Adams.....................................18Lyles-Crouch Traditional Academy..21Matthew Maury................................24 Mount Vernon Community School.............................................27 Patrick Henry...................................29 Samuel Tucker................................31Williams Ramsay.............................34Francis C. Hammond......................37 George Washington........................40 T.C. Williams: Minnie Howard.........43 T.C. Williams:King Street ................44 Building Systems Upgrades & Modernization..................................47 Capacity...........................................48 System-Wide...................................49Rowing Facility................................50Transportation Services..................51
Supporting Data Enrollment Projections............................NA
CIP by Site...............................................53
TABLE OF CONTENTS
This page intentionally left blank.
The Executive Summary will be
inserted here when the CIP Book is
finalized for the School Board’s
Adopted FY 2021-2030 CIP.
This page is intentionally left blank.
OVERVIEW OF CIP BUDGET: The elementary projects represent all planned projects for the elementary school sites. There are 14 existing elementary sites, which include two grade K-8 schools, Jefferson-Houston and Patrick Henry. The other sites are Charles Barrett, Lyles-Crouch, Ferdiand T. Day, John Adams which is co-located with the Early Childhood Center, Cora Kelly, Douglas MacArthur, George Mason, Matthew Maury, James K. Polk, William Ramsay, Samuel W. Tucker and Mount Vernon. The ACPS School Board approved implementation of new elementary school boundaries for the 2018-2019 school year. Projections in the document are based on school year 2018-2019 enrollment and will be updated in the School Board adopted CIP.
The secondary projects represent all planned projects for the secondary school sites. There are four secondary sites: Francis C. Hammond, George Washington, and the two campuses of T.C. Williams High School: Minnie Howard Cam-pus and King Street Campus. Other ACPS facilities and system-wide accounts are represented in the following areas: Building Systems Upgrades and Modernization; Capac-ity Projects; System-Wide; Swing Space; Rowing Facility; and Transportation Services.
PROJECT DETAILS:
The project descriptions for FY 2021-2025 for each school, where available, are based on the budget request shown in Table 2.
READING THE PROJECT DESCRIPTIONS:
Each project narrative begins with the project name, description and the project years during which the work will be completed.
Each project is assigned to a group, as follows:
• Group 1: Ongoing, regular capital mainte-nance programs, including a relatively con-sistent funding level from year to year, used to fund capital maintenance efforts of relatively smaller size.
• Group 2: Stand-alone, major capital main-tenance projects, typically $300k-$400k and above in total cost.
• Group 3: New or expanded capital facilities or infrastructure. Typically, these projects have a clearly defined start and stop date, but could also be an ongoing, regular funding stream if the result of the project is an ex-pansion of capital assets. There is no dollar threshold for this category.
Elementary Projects
Page 1 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
OVERVIEW OF PROJECTS
Charles Barrett Elementary School (K-5)1115 Martha Custis DriveAlexandria, VA 22302 Tel: 703-824-6960 | Fax: 703-379-3782 Principal: Kellie Conlanhttp://www.acps.k12.va.us/barrett/
Community Use• Community Police Liaison program • Church rentals• Extended day care• Girl Scout/Boy Scout programs• Recreation Department programs
SITE SUMMARY:
Charles Barrett Elementary School, which cur-rently serves grades K-5 and a full-time recreation center, was originally constructed in 1949. There have been four major additions over the years. The kindergarten wing was built in 1971, the gym addition was built in 1977 (it was remodeled into a full-time recreation center in 1995), and the media center addition was constructed in 1997. A class-room addition was installed for fall 2011 use and another four classroom addition was opened at the start of the 2015-2016 school year.
Enrollment at Charles Barrett is projected to increase with the new 2018-2019 boundaries.
Table 2. Actual and Projected Enrollment
Elementary Projects
Page 2 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Table 1
Charles Barrett Statistics
CHARLES BARRETT SCHOOL
Tabl
e 3
CIP
FY
2021
- 20
30
Tabl
e 4
PRO
GR
AM
DET
AIL
FY
2021
- 20
25
Elementary Projects
Page 3 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Prog
ram
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Grand
Total
Elevator rep
air/replacem
ent
106,00
0
106,00
0
Exterior Playgroun
ds or Sports
Areas
50,000
50,000
Floo
ring
Rep
air/Re
place
175,00
0
175,00
0
HVA
C Re
pair or Re
placem
ent
1,20
0,00
0
1,20
0,00
0
Kitche
n/ Cafeteria ren
ovation
and reconfigurations
810,39
4
810,39
4
Interior/Exterior Paintin
g88
,555
88,555
106,00
0
1,37
5,00
0
50,000
810,39
4
88,555
2,42
9,94
9
Charles
Barrett
Charles Ba
rrett To
tal
Site
Program
Program Details
2021
2022
2023
2024
2025
Elevator re
pair/
replacem
ent
This project w
ill re
place the hydraulic elevator.
106,00
0
Exterio
r Playgroun
ds or S
ports
Areas
This project w
ill re
place playgrou
nd equ
ipmen
t.50
,000
Floo
ring Re
pair/
Replace
This project fun
ds ca
rpet re
placem
ent.
175,00
0
HVAC
Rep
air o
r Rep
lacemen
tThis project w
ill re
place HV
AC equ
ipmen
t which has
reache
d the en
d of its life
‐cycle.
1,20
0,00
0
Kitche
n/ Cafeteria re
novatio
n an
d reconfigurations
This project fun
ds kitche
n up
grades as
recommen
ded in th
e B&
D assessmen
t.81
0,39
4
Interio
r/Exterio
r Painting
This project w
ill perform
life‐cycle painting.
88,555
Charles B
arrett
Community Use• Extended day care • Church rentals• Recreation Department programs• Girl Scout/Boy Scout programs• Head Start
SITE SUMMARY:
Cora Kelly School for Math, Science and Technology, which serves grades K-5, was originally constructed in 1955. The City’s recreation department constructed a gymnasium/community center connected to the school facility in 1991. In 1996, a classroom addition was constructed in response to the continued growth on the east end of the city. A large city park, Four Mile Run Park, is adjacent to this school facility.
The Long Range Educational Facilities Plan indicates a renovation of this building should be performed. The addition of 10 classrooms is proposed for increased elementary capacity in FY 2029.
Cora Kelly School for Math, Science and Technology (PreK-5)3600 Commonwealth AvenueAlexandria, VA 22305 Tel: 703-706-4420 | Fax: 703-706-4425 Principal: Jasibi Crews-Westwww.acps.k12.va.us/kelly/
Table 1
Cora Kelly Statistics
Table 2. Actual and Projected Enrollment
Elementary Projects
Page 4 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
CORA KELLY ELEMENTARY SCHOOL
Tabl
e 3
CIP
FY
2021
- 20
30
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
01 -
2025
Site
Program
Program Details
2021
2022
2023
2024
2025
Build
ing En
velope
Re
pair
This project will rep
lace 30 windo
ws an
d sills and
provide
cau
lking
60,000
Elevator
repa
ir/rep
lacemen
tTh
is project provide
s a sing
le 350
0lb hy
drau
lic elevator from
the main lobb
y to th
e second
floo
r.15
0,00
0
This project will in
sulate existing exterior ducts on the roof.
75,000
This project will rep
lace th
e existing
gas fired pa
ckaged
RTU
s an
d do
mestic water hea
ters
438,00
0
Interior
Acoustics/Lighting
This project will evaluate existing
system ade
quacy an
d prov
ide supp
lemen
tal emergency
lighting un
its.
75,000
This project wll remod
el boy
s an
d girls room
s on
the second
floo
r.15
0,00
0
This project will rep
lace plumbing
fixtures in
the original portion
of the
building.
45,000
This project provide
s draina
ge and
ven
tilation
to red
uce hu
midity issues und
er th
e flo
or and
in
classroo
ms. Tne
mec rust inh
ibitor paint on existing
trusses an
d stee
l.10
,000
This project will relocate the sprink
ler ba
ckflo
w preventor and
main valve to a m
ore accessible
location
.12
,000
This project will rep
lace th
e ob
solete pan
elbo
ard.
7,50
0
Cora Kelly
HVAC Re
pair or
Replacem
ent
Plum
bing
/Restroo
mUpgrade
s
Reno
vation
s &
Reconfigurations
Elementary Projects
Page 5 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Prog
ram
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Grand
Total
Building Envelope
Rep
air
60,000
60,000
Constructio
n of Ren
ovation &
Capacity
30,227
,289
30,227
,289
Design, Project M
anagem
ent &
Other Soft C
osts
7,55
6,82
2
7,55
6,82
2
Elevator re
pair/replacem
ent
150,00
0
150,00
0
HVA
C Re
pair or Rep
lacemen
t75
,000
438,00
0
513,00
0
Interio
r Acoustics/Lightin
g75
,000
75,000
Plum
bing
/Re
stroom
Upgrade
s15
0,00
0
45,000
195,00
0
Reno
vatio
ns & Recon
figurations
10,000
19,500
29,500
385,00
0
573,00
0
64,500
7,55
6,82
2
30,227
,289
38,806
,611
Cora Kelly
Cora Kelly Total
Community Use• Extended day care • Recreation department programs• Girl Scout/Boy Scout programs • City/Public meetings
SITE SUMMARY:
Douglas MacArthur Elementary School, which serves grades K-5, originally opened in 1942 and has received six subsequent additions, includ-ing a gymnasium addition in 1966 and a major classroom addition in 1971, which doubled the size of the school. The most recent addition was the media center in 2003.
CAPACITY: A total school replacement is recommended to rectify the deteriorating building condition and to accomodate current and projected future enrollment. Douglas MacArthur’s 2018-2019 boundary was expanded for this capacity change.
Douglas MacArthur Elementary School (K-5)1101 Janneys LaneAlexandria, VA 22302 Tel: 703-461-4190 | Fax: 703-370-2719 Principal: Linda Miller, Ed.D.www.acps.k12.va.us/macarthur/
Table 2. Actual and Projected Enrollment
Table 1
Douglas MacArthur Statistics
Elementary Projects
Page 6 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
DOUGLAS MACARTHUR ELEMENTARY SCHOOL
Tabl
e 3
CIP
FY
2021
- 20
30
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
1 - 2
025
Elementary Projects
Page 7 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Progra
m202
1202
2202
3202
4202
5202
6202
7202
8202
9203
0Gra
nd To
tal
Dougl
as Ma
cArthu
rDe
sign, P
roject
Mana
gement
& Oth
er Sof
t Co
sts; Co
nstruc
tion o
f Reno
vation
& Cap
acity
69,433
,250
69,
433,25
0
69,433
,250
69,
433,25
0
Dougl
as Ma
cArthu
r Tota
l
Site
Program
Program
Detai
ls 20
2120
2220
2320
2420
25
Douglas
MacArthur
Desig
n, Proje
ct Man
agem
ent &
Ot
her S
oft Co
sts; C
onstr
uctio
n of
Reno
vatio
n & Ca
pacity
This i
nclud
es so
ft and
hard co
sts as
socia
ted with
site w
ork a
nd
constru
ction
of a ne
w sch
ool w
ith a 82
5 stud
ent c
apacity
.69
,433,2
50
SITE SUMMARY:
Ferdinand T. Day Elementary School was pur-chased and retrofittied for an elementary school using FY 2017 funding. Boundaries were adjust-ed to incorporate the new school capacity in the 2018-2019 school year, when the school is set to open.
Ferdinand T. Day Elementary School1701 N. Beauregard StreetAlexandria, VA 22311Tel: 703-619-8430Principal: Rachael Dischner
Community Use
Table 1. Actual and Projected Enrollment
Elementary Projects
Page 8 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
FERDINAND T. DAY ELEMENTARY SCHOOL
Tabl
e 3
CIP
FY
2021
- 20
30
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
1 - 2
025
Elementary Projects
Page 9 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Prog
ram
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Gran
d To
tal
Constructio
n of
Reno
vatio
n & Cap
acity
496,74
1
496,74
1
Site Hardscape
Re
pair/Re
placem
ent
70,000
830,00
0
900,00
0
566,74
1
830,00
0
1,39
6,74
1
Ferdinan
d T.
Day Fe
rdinan
d T. Day Total
Site
Prog
ram
Prog
ram Details
2021
2022
2023
2024
2025
Constructio
n of Ren
ovation &
Capa
city
This project fu
nds gym add
ition
escalation in
constructio
n costs.
496,74
1
This project fu
nds the de
sign
for p
arking
garage
upda
tes ba
sed on
assessm
ent.
70,000
This project fu
nds pa
rking garage upd
ates based
on
assessmen
t.83
0,00
0
Ferdinan
d T.
Day
Site Hardscape
Re
pair/R
eplacemen
t
Community Programs• Recreation Department programs • Extended day care• Girl Scout/Boy Scout programs
George Mason Elementary School 2601 Cameron Mills RoadAlexandria, VA 22302 Tel: 703-706-4470 | Fax: 703-683-9011 Principal: Brian Orrenmaawww.acps.k12.va.us/mason/
SITE SUMMARY:
George Mason Elementary School was built in the center of the city as a Works Progress Admin-istration project in 1939. This was part of Frank-lin Roosevelt’s New Deal Program’s Federal Emergency Administration of Public Works. A classroom addition was constructed in 1949 and a multipurpose room addition constructed in 1961. This facility currently serves grades K-5.
CAPACITY: A total school replacement is recom-mended to rectify the deteriorating building condi-tion and to accomodate projected future enroll-ment. The 2018-2019 school boundaries were adjusted to provide George Mason with capacity relief.
Table 2. Actual and Projected Enrollment
Elementary Projects
Page 10 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Table 1
George Mason Statistics
GEORGE MASON ELEMENTARY SCHOOL
Tabl
e 3
CIP
FY
2021
- 20
30
Elementary Projects
Page 11 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
SitePro
gram
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Grand
Total
Buildin
g Enve
lope R
epair
60,000
60,
000
Constru
ction o
f Renov
ation &
Cap
acity
27,198
,934
27,198
,934
54,397
,867
Design
, Proje
ct Mana
gement
& Oth
er Soft
Costs
13,599
,467
13,599
,467
Elevat
or repa
ir/repl
aceme
nt200
,000
200
,000
Plumb
ing /R
estroo
mUpgr
ades
15,000
15,
000
Roof Re
pair or
Repla
cement
205,00
0
205,00
0
280,00
0
200,00
0
13,599
,467
27,198
,934
27,198
,934
68,477
,334
Georg
e Ma
son
Georg
e Maso
n Tota
l
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
1 - 2
025
Site
Progra
mPro
gram
Detai
ls 20
2120
2220
2320
2420
25
Build
ing En
velop
e Rep
airTh
is proj
ect ad
dresse
s wate
r intru
sion is
sues in
court
yard a
nd fro
m sta
irwell
to ele
ctrica
l pane
l in
basem
ent.
60,00
0
Const
ructio
n of
Reno
vation
& Ca
pacit
yTh
is incl
udes
hard
costs a
ssocia
ted wi
th site
work
and c
onstr
uction
of a n
ew sc
hool w
ith 70
0 stud
ent
capaci
ty.27
,198,9
34
27
,198,9
34
De
sign,
Projec
t Ma
nagem
ent &
Othe
r Soft
Co
sts
These
are t
he so
ft cost
s asso
ciated
with
the co
nstruc
tion o
f the m
odern
izatio
n prog
ram. T
his inc
ludes
but is
not li
mited
to fe
es, pe
rmitti
ng, d
esign
, proj
ect m
anage
ment,
legal f
ees.
13,59
9,467
Elevat
or rep
air/re
placem
ent
This p
roject
will r
eplac
e exis
ting e
levato
r with
a 2‐st
op cu
stom
2500
lb hydr
aulic
200,0
00
Plumb
ing
/Rest
roomU
pgrad
esTh
is proj
ect wi
ll rep
lace e
xistin
g dup
lex se
wage
ejecto
r.15
,000
Roof
Repa
ir or
Repla
cemen
tTh
is proj
ect wi
ll upg
rade r
oofin
g and
gutte
rs over
origin
al build
ing.
205,0
00
Georg
e Ma
son
Elementary Projects
Page 12 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
James K. Polk Elementary School (K-5)5000 Polk AvenueAlexandria, VA 22304 Tel: 703-461-4180 | Fax: 703-751-8614 Principal: PreeAnn Johnsonwww.acps.k12.va.us/polk/
Community Use• Church rentals • Extended day care • Recreation Department programs• Girl Scout/Boy Scout programs
SITE SUMMARY:
The James Polk Elementary School, which serves grades K-5, was constructed in the west end of the city in 1965. Minor renovations converted base-ment spaces into music and art classrooms. An addition and renovation project in 1994 expanded the media center and relocated the main adminis-trative office. A new gymnasium addition and ADA accessibility project and additional classrooms were completed in 2011. Another four classroom addition was completed during the summer of FY 2016. Relocatable classrooms were installed on James K. Polk Elementary School site during the summer of 2017 for pre-K students from Patrick Henry School. The 2018-2019 boundries changed to provide capacity relief throughout the west end.
Table 2. Actual and Projected Enrollment
Table 1
James K. Polk Statistics
Elementary Projects
Page 13 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
JAMES K. POLK ELEMENTARY SCHOOL
Tabl
e 3
CIP
FY
2021
- 20
30
Elementary Projects
Page 14 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Progra
m20
2120
2220
2320
2420
2520
2620
2720
2820
2920
30Gr
and T
otal
Building
Envelop
e Rep
air21
,312
21
,312
Exteri
or Pla
ygrou
nds o
r Spo
rts
Areas
250,0
00
25
0,000
Floori
ng Re
pair/Re
place
167,1
75
16
7,175
Interi
or wa
lls mo
dify/r
epair
/repla
ce12
2,000
122,0
00
Plumb
ing /R
estroo
mUpgrad
es36
,635
36
,635
Reno
vation
s & Re
confi
gurat
ions
350,0
00
35
0,000
Roof
Repair o
r Rep
lacem
ent
1,470
,000
1,470
,000
Storm
water
managem
ent
47,00
0
47,00
0
Kitchen
/ Cafe
teria r
enovati
on an
d rec
onfigura
tions
1,771
,687
1,771
,687
Interi
or/Ext
erior
Paint
ing11
1,000
111,0
00
814,1
75
15
8,635
1,581
,000
1,771
,687
21,31
2
4,346
,809
James
K. Po
lk James
K. Po
lk To
tal
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
1 - 2
025
Elementary Projects
Page 15 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Program
Program Details
2021
2022
2023
2024
2025
Exterio
r Play
grou
nds o
r Sports Areas
This proje
ct inc
ludespo
ured
in pl
ace r
ubbe
r play
ing su
rface.
250,0
00
Flooring
Repa
ir/Re
place
This proje
ct repla
ces v
inyl fl
oor tile.
167,1
75
Interio
r walls
mod
ify/re
pair/
repla
ceTh
is proje
ct will p
erform
necessa
ry in
terio
r wall m
odific
ation
s, repa
irs or
repla
cemen
ts.12
2,000
Plumbin
g /Restro
omUp
grad
esTh
is proje
ct will r
eplac
e D20
11 co
mmercia
l grade
water closet with
flush
valve
and r
eplac
e D20
12 ur
inal w
ith flu
sh va
lve.
36,63
5
Reno
vatio
ns &
Reconfigu
ratio
nsTh
is proje
ct will p
erform
necessa
ry in
terio
r ren
ovation
s and
/or
reconfigu
ratio
ns.
350,0
00
Roof Re
pair or
Repla
cemen
tTh
is proje
ct will r
eplac
e the
TPO roof.
1,470
,000
Storm water m
anagem
ent
This proje
ct will improv
e storm
water m
anagem
ent systems.
47,00
0
K itch
en/ C
afeteria
reno
vatio
n and
reconfigu
ratio
ns
This proje
ct fund
s kitc
hen u
pgrade
s as recom
men
ded i
n the
B&D
assessm
ent.
1,771
,687
Interio
r/Exterior
Paint
ingTh
is proje
ct will p
erform
life‐cycle
paint
ing.
111,0
00
James K.
Polk
Community Use• Extended day care • Church rentals• Recreation Department programs• Girl Scout/Boy Scout programs• Head Start
Jefferson-Houston School (PreK-8) 1501 Cameron StreetAlexandria, VA 22314 Tel: 703-706-4400 | Fax: 703-836-7923 Principal: MScott Berkowitzwww.acps.k12.va.us/houston/
SITE SUMMARY:
Jefferson-Houston School was built in 2014. The building includes a full size gymnasium, a white box theater, and a distributed dining operation instead of a traditional cafeteria. Adjacent to the school is the city’s Durant Recreation Center and a city swimming pool. The school also houses the ChildFind offices and a City-wide Special Educa-tion Program. This building received a LEED Gold Certification.
Table 1
Jefferson Houston Statistics
Table 2. Actual and Projected Enrollment
Elementary Projects
Page 16 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
JEFFERSON-HOUSTON SCHOOL
Tabl
e 3
CIP
FY
2021
- 20
30
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
1 - 2
025
Elementary Projects
Page 17 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Prog
ram
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Gran
d To
tal
HVAC
Rep
air o
r Rep
lacemen
t75
0,00
0
750,00
0
Storm water m
anagem
ent
10,000
10,000
20,000
750,00
0
10,000
10,000
770,00
0
Jeffe
rson
‐Ho
uston Je
fferson
‐Hou
ston
Total
Site
Program
Program Details
2021
2022
2023
2024
2025
HVA
C Re
pair or
Replacem
ent
This project fu
nds major re
pair and
replacem
ent o
f the
HVA
C system
.75
0,00
0
Storm water m
anagem
entThis project fu
nds major m
ainten
ance on the
bioreten
tion filer BMP.
10,000
Jefferson‐
Hou
ston
John Adams Elementary School (K-5)5651 Rayburn AvenueAlexandria, VA 22311 Tel: 703-824-6970 | Fax: 703-379-4853 Principal: Ginja Cantonhttp://www.acps.k12.va.us/adams/
• Early Childhood Center (PK)• 5651 Rayburn Avenue• Alexandria, VA 22311• Tel: 703-578-6822• Principal: Heidi Haggerty Wagner
SITE SUMMARY:
John Adams Elementary School was constructed in 1966 as a middle school and was converted into an elementary school in 1980. In the sum-mer of 2010, this facility was transformed into a new vision of a City-compliant pre-K through grade 5 school, which includes an Early Child-hood Learning Center, and Head Start programs.
The Early Childhood Center was expanded to add pre-K programs from Patrick Henry Elemen-tary School beginning in FY 2018 through a reno-vation project. A second phase of this project will be performed in FY 2019. The 2018-2019 boundaries for John Adams were made smaller through redistricting to accommodate space for the Early Childhood Center.
Table 2. Actual and Projected Enrollment
Elementary Projects
Page 18 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Table 1
John Adams Statistics
JOHN ADAMS ELEMENTARY SCHOOL &EARLY CHILDHOOD CENTER
Tabl
e 3
CIP
FY
2021
- 20
30
Elementary Projects
Page 19 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Progra
m20
2120
2220
2320
2420
2520
2620
2720
2820
2920
30Gra
nd To
tal
Ceilin
g rep
air/re
place
510,5
00
51
0,500
Roof
Repai
r or
Repla
cemen
t1,5
00,00
0
1,500
,000
Site H
ardsca
pe
Repai
r/Rep
lacem
ent
123,0
00
15
4,000
11,00
0
11
,500
27,00
0
32
6,500
Storm
water
ma
nagem
ent
30,00
0
15
0,000
180,0
00
Interi
or/Ext
erior
Painti
ng18
0,000
332,0
00
51
2,000
1,653
,000
81
4,500
11,00
0
19
1,500
359,0
00
3,0
29,00
0
John A
dams Joh
n Ada
ms To
tal
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
1 - 2
025
Elementary Projects
Page 20 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Progra
mPro
gram
Detai
ls 20
2120
2220
2320
2420
25
Ceilin
g rep
air/re
place
This p
roject w
ill rep
lace a
coust
ical ce
iling t
iles.
510,5
00
Roof
Repa
ir or
Repla
ceme
ntTh
is proj
ect w
ill fun
d the
rema
ining
roof
repair
. 1,5
00,00
0
Site H
ardsca
pe
Repa
ir/Re
placeme
ntTh
is proj
ect w
ill rep
air pa
ving n
eede
d in d
rivew
ay pe
r Kim
ley‐Horn
asses
smen
t.12
3,000
15
4,000
11
,000
11
,500
27
,000
This p
roject w
ill re‐d
esign
the c
ourty
ard to
preven
t flo
oding
into
the sc
hool.
30,00
0
This p
roject w
ill con
struct th
e cou
rtyard
re‐de
sign t
o pre
vent
flood
ing in
to the
scho
ol.15
0,000
Interi
or/Exter
ior Pa
inting
This p
roject w
ill perf
orm lif
e‐cycl
e pain
ting.
180,0
00
332,0
00
John A
dams
Storm
wate
r man
agem
ent
SITE SUMMARY:
Lyles-Crouch was constructed as an elementary school on one square city block in Old Town Al-exandria in 1958. This facility replaced an older, smaller school structure that was originally con-structed on this site. A small storage room addi-tion was built in 1985, and a media center addi-tion with a new main entrance was constructed in 2002. This facility currently serves grades K-5.
Lyles-Crouch Traditional Academy (K-5)530 S. St. Asaph StreetAlexandria, VA 22314 Tel: 703-706-4430 | Fax: 703-684-0252Principal: Patricia Zissios, Ph.D. www.acps.k12.va.us/crouch/
Community Use• Extended day care • Monthly community involvement service projects • Church rentals• Recreation Department programs• Girl Scout/Boy Scout programs
Elementary Projects
Page 21 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Table 1
Lyles-Crouch Statistics
LYLES-CROUCH TRADITIONAL ACADEMY
Tabl
e 3
CIP
RE
QU
ES
T FY
202
1 - 2
030
Elementary Projects
Page 22 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Progra
m20
2120
2220
2320
2420
2520
2620
2720
2820
2920
30Gr
and T
otal
Building
Envelop
e Rep
air74
0,000
740,0
00
Exter
ior Playgro
unds or
Sport
s Areas
61,05
0
13
9,860
200,9
10
Floori
ng Re
pair/Re
place
300,0
00
51
7,901
817,9
01
Interi
or Acou
stics/
Lighti
ng45
7,480
457,4
80
Reno
vatio
ns &
Reconfi
gurat
ions
58,30
8
58
,308
Site H
ardsca
pe
Repair/Re
placeme
nt11
2,500
90,00
0
22
,000
22,50
0
15
,000
262,0
00
Kitchen
/ Cafe
teria ren
ovati
on an
d rec
onfigura
tions
1,094
,838
1,0
94,83
8
Interi
or/Exter
ior Pa
inting
82,05
6
82
,056
2,308
,388
1,0
65,38
1
220,1
68
22
,500
15,00
0
82
,056
3,713
,493
Lyles‐
Crouch
Lyles‐
Crouch T
otal
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
1 - 2
025
Site
Program
Program Details
2021
2022
2023
2024
2025
Build
ing En
velope
Rep
air
This project w
ill replace windo
ws.
740,00
0
This project w
ill replace rubb
er su
rfacin
g on
the
playgrou
nd.
61,050
This project is for playgroun
d up
grad
es.
139,86
0
Floo
ring Re
pair/
Replace
This project w
ill replace carpet th
roug
hout th
e bu
ilding.
300,00
0
517,90
1
Interio
r Acoustics/Lig
hting
This project w
ill fund
necessary acoustic
s/lighting
upgrad
es.
457,48
0
Reno
vatio
ns &
Reconfigurations
This project w
ill replace metal hallid
e fixture(s) in
library and
corridors.
58,308
Site Hardscape
Re
pair/
Replacem
ent
This project w
ill re‐design, pave an
d re‐stripe
the
parking lot.
112,50
0
90,000
22,000
22,500
15,000
This project fun
ds kitche
n up
grad
es as recom
men
ded
in th
e B&
D assessmen
t.91
4,83
8
This project fun
ds design for k
itche
n up
grad
es as
recommen
ded in th
e B&
D assessmen
t.18
0,00
0
Lyles‐Crou
ch
Exterio
r Playgroun
ds or
Sports Areas
Kitche
n/ Cafeteria
reno
vatio
n an
d reconfigurations
Elementary Projects
Page 23 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Community Use• Church rentals• Girl Scout/Boy Scout troops • Extended day care • Recreation Department programs
Matthew Maury Elementary School (K-5)600 Russell RoadAlexandria, Virginia 22301 Tel: 703-706-4470 | Fax: 703-683-9011 Principal: Victor Powellwww.acps.k12.va.us/maury/
SITE SUMMARY:
Matthew Maury Elementary School was originally built as a six classroom school in 1929. In 1941, three rooms were added at the rear of the school. Two large wings were added to each side of the main building in 1949. In 1961, another wing with a new cafeteria and kitchen was constructed. The gymnasium was added in 1971, and the library has undergone renovation several times. A major renovation, completed in 2004-05, included a new media center, additional classroom space, teacher work areas and a new administrative office space. This facility currently serves grades K-5.
The proposed modernization was moved out be-yond this ten-year CIP. The Facilities staff will be using existing funds to freshen Matthew Maury in the summer of 2018.
Table 2. Actual and Projected Enrollment
Elementary Projects
Page 24 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Table 1
Matthew Maury Statistics
MATTHEW MAURY ELEMENTARY SCHOOL
Tabl
e 3
CIP
FY
2021
- 20
30Elementary Projects
Page 25 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Progra
m20
2120
2220
2320
2420
2520
2620
2720
2820
2920
30Gr
and T
otal
Building
Envelop
e Rep
air10
0,000
1,400
,000
1,500
,000
Code
Comp
liance R
equir
emen
ts30
0,000
250,0
00
550,0
00
Desig
n, Pro
ject M
anagem
ent &
Othe
r Soft
Costs
6,067
,601
6,067
,601
Fire A
larm
Syste
m15
0,000
150,0
00
Floori
ng Re
pair/Re
place
250,0
00
250,0
00
Interi
or Acou
stics/
Lighti
ng75
,000
91,38
3
166,3
83
Plumb
ing /R
estroo
mUpgrad
es25
,000
25,00
0
Roof
Repair o
r Rep
lacem
ent
1,368
,533
1,368
,533
Water
heate
rs/bo
ilers
repair
/repla
ce78
,000
25,00
0
103,0
00
Interi
or/Exter
ior Pa
inting
206,0
55
206,0
55
1,468
,533
2,128
,000
91,38
3
206,0
55
425,0
00
6,067
,601
10,38
6,572
Matth
ew
Maury
Matth
ew M
aury
Total
Tabl
e 4
CIP
FY
2021
- 20
25Elementary Projects
Page 26 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Program
Program
Details
2021
2022
2023
2024
2025
This p
rojec
t will inc
lude b
rick r
epair
and r
epoin
ting, seala
nt at
joint
s, ne
w sill
s, a r
ebuild o
f exte
rior con
crete
exit s
tairs and w
indow
rep
lacem
ent a
s well as
paint
exter
ior trim
s, cornice
s, bu
ilt in gutte
r and
relat
ed ite
ms.
1,400
,000
This p
rojec
t will inc
lude d
esign
work for br
ick re
pair a
nd re
point
ing, sealan
t at jo
ints, ne
w sill
s, a r
ebuild o
f exte
rior con
crete
exit s
tairs
and w
indow
repla
ceme
nt as
well as
paint
exter
ior trim
s, cornice
s, bu
ilt in gutte
r and
relat
ed ite
ms.
100,0
00
Code
Comp
liance
Requ
ireme
nts
This p
rojec
t will cre
ate a ne
w security v
estib
ule with
ADA c
ompliant e
ntran
ce (w
heel chair
lift).
300,0
00
Flooring
Repa
ir/Re
place
This p
rojec
t will rep
lace c
arpeti
ng with
resili
ent floo
ring.
250,0
00
This p
rojec
t will rep
lace s
tage ligh
ting a
nd au
dio am
plificati
on sy
stems
.91
,383
This p
rojec
t will evalu
ate ex
isting
syste
m adeq
uacy an
d provid
e sup
pleme
ntal em
ergen
cy lig
hting
units.
75,00
0
Plumb
ing
/Restro
omUp
grade
sThis p
rojec
t will up
grade
plum
bing fixtures to
age a
ppropriat
e size
s.25
,000
Roof Re
pair o
r Re
placeme
ntThis p
rojec
t will rep
lace a
llsingle ply
roofi
ng an
d recon
struct a
nd ex
tend g
utter
s1,3
68,53
3
Wate
r heaters/
boilers
repa
ir/repla
ceThis p
rojec
t will rep
lace t
he ex
isting
gas fire
d dom
estic
wate
r heater
s, bo
iler a
nd pu
mps.
78,00
0
Interior
/Exte
rior P
aintin
gThis p
rojec
t will pe
rform
life‐c
ycle paint
ing.
206,0
55
Matt
hew
Mau
ry
Build
ing En
velop
e Rep
air
Interior
Acou
stics/
Lighting
SITE SUMMARY:
Mount Vernon Community School is located on one of the oldest school sites in the city. The first Mount Vernon School was constructed in 1906 at the corner of Mount Vernon Avenue and Uhler Street, where the playground currently sits. The existing three-story building was originally opened in 1923, with classroom additions in 1941 and 1950. In 1967, a major addition doubled the size of the school and reoriented the main entrance to Commonwealth Avenue. The media center addition was constructed in 1991 and the City expanded and constructed the Mount Vernon Recreation Center adjacent to the school in 1997. This school serves grades K-5 and operates with a dual language learning program.
Mount Vernon Community School (K-5) 2601 Commonwealth AvenueAlexandria, VA 22305 Tel: 703-706-4460 | Fax: 703-706-4466 Principal: Liza Burrell-Aldanawww.acps.k12.va.us/mtvernon/
Community Use• Church rental• Girl Scout/Boy Scout programs• Recreation Department programs• Extended day care
Table 2. Actual and Projected Enrollment
Table 1
Mount Vernon Statistics
Elementary Projects
Page 27 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
MOUNT VERNON COMMUNITY SCHOOL
Tabl
e 3
CIP
FY
2021
- 20
30
Tabl
e 4
CIP
FY
2021
- 20
25
Elementary Projects
Page 28 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Prog
ram
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Gran
d To
tal
Building Envelope
Rep
air
100,00
0
100,00
0
HVAC
Rep
air o
r Re
placem
ent
330,00
0
330,00
0
Reno
vatio
ns &
Reconfigurations
433,00
0
433,00
0
Storm water m
anagem
ent
350,00
0
350,00
0
Interio
r/Exterio
r Painting
206,00
0
206,00
0
780,00
0
433,00
0
206,00
0
1,41
9,00
0
Mou
nt
Vernon M
ount Verno
n To
tal
Site
Progra
mPro
gram
Detai
ls 20
2120
2220
2320
2420
25
Build
ing En
velop
e Rep
airTh
is proj
ect w
ill inv
estiga
te/de
sign d
raina
ge on
the
site.
100,0
00
HVAC
Repa
ir or
Repla
ceme
ntTh
is proj
ect w
ill rep
lace insula
tion o
n exis
ting p
iping
an
d rep
lace t
he co
oling
towe
r.33
0,000
Reno
vatio
ns &
Reconfi
gurat
ions
This p
roject w
ill up
grade
the libr
ary43
3,000
Storm
wate
r man
agem
entTh
is proj
ect w
ill re‐
desig
n and
upgra
de th
e cou
rtyard
.35
0,000
Moun
t Ve
rnon
Patrick Henry School 4643 Taney Avenue Alexandria, VA 22304Tel: 703-461-4170 | Fax: 703-823-3350 Principal: Ingrid Bynumwww.acps.k12.va.us/henry/
Community Use• Extended day care • Church rentals• Recreation Department programs• Girl Scout/Boy Scout programs• Head Start
SITE SUMMARY:
Patrick Henry School was originally constructed in 1953, with a classroom addition in 1955. The city constructed a gymnasium addition in 1973 that includes a full-time recreation center. In 1996, a media center addition was constructed. This K-5 site is shared with a full-time city recreation center and city tennis courts. The new Patrick Henry construction will be complete in the winter of 2018-2019 and open as a K-8 school. Enrollment is projected to increase rapidly with implementation of the 2018-2019 boundaries. Group 1, life cycle replacement projects will be incorporated into future CIPs when the construction of the new school is complete.
Table 2. Actual and Projected Enrollment
Elementary Projects
Page 29 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Table 1
Patrick Henry Statistics
PATRICK HENRY SCHOOL
Tabl
e 3
CIP
FY
2021
- 20
30
Tabl
e 4
CIP
FY
2021
- 20
25
Elementary Projects
Page 30 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Prog
ram
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Gran
d Total
Emerg
ency Gen
erator
300,0
00
300,0
00
Furnitu
re, Fixtu
res & Eq
uip.
15,00
0
15,00
0
315,0
00
315,0
00
Patrick Hen
ry Patrick Hen
ry To
tal
SitePro
gram
Progra
m Deta
ils 202
1202
2202
3202
4202
5
Emerg
ency G
enerat
orThi
s proje
ct will in
stall a
standb
y gener
ator.
300,00
0
Furnitu
re, Fixt
ures &
Equ
ip.Thi
s proje
ct will f
und the
purch
ase of
a scisso
r lift.
15,000
Patrick
Henry
SITE SUMMARY:
When it opened in fall 2000, Samuel Tucker Elementary School was the first new school built in the City of Alexandria in 30 years. It is located in the Cameron Station area of the city and is adjacent to the city’s Boothe Park and also to a nearby industrial area. This facility serves grades K-5 and operates on the modified school calen-dar.
Enrollment is expected to decrease with imple-mentation of the new boundaries.
Samuel W. Tucker Elementary School (K-5)435 Ferdinand Day DriveAlexandria, VA 22304 Tel: 703-933-6300 | Fax: 703-212-8465 Principal: Rene Paschalwww.acps.k12.va.us/tucker/
Community Use• Church rental• Girl Scout/Boy Scout programs• PTA Reflections Program• Recreation Department programs• Extended day care• Head Start
Table 2. Actual and Projected Enrollment
Table 1
Samuel Tucker Statistics
Elementary Projects
Page 31 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
SAMUEL W. TUCKER ELEMENTARY SCHOOL
Tabl
e 3
CIP
FY
2021
- 20
30
Elementary Projects
Page 32 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Prog
ram20
2120
2220
2320
2420
2520
2620
2720
2820
2920
30Gr
and T
otal
Building
Envelop
e Rep
air16
,000
16,00
0
HVAC
Repair o
r Re
placeme
nt16
,280
16,28
0
Interi
or walls
modif
y/rep
air/re
place
40,00
0
40,00
0
Roof
Repair o
r Re
placeme
nt1,3
90,00
0
1,390
,000
Site H
ardsca
pe
Repair/Re
placeme
nt14
7,000
98,00
0
66,00
0
11,00
0
11,50
0
12,00
0
12,50
0
358,0
00
Interi
or/Exte
rior P
aintin
g12
9,000
129,0
00
147,0
00
1,504
,000
82,28
0
51,00
0
140,5
00
12,00
0
12,50
0
1,949
,280
Samu
el Tu
cker
Total
Samu
el Tu
cker
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
1 - 2
025
Elementary Projects
Page 33 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Program
Program Details
2021
2022
2023
2024
2025
Build
ing E
nvelo
pe Rep
airThis project w
ill pe
rform
necessary b
uildin
g en
velop
e rep
airs
16,00
0
HVAC
Rep
air or
Replacem
ent
This project w
ill repla
ce HVA
C eq
uipmen
t whic
h has
reache
d the
end o
f its life‐cycle
.16
,280
Interio
r walls
mod
ify/rep
air/rep
lace
This project w
ill pe
rform
necessary interior
wall
mod
ificatio
ns, rep
airs o
r rep
lacem
ents.
40,00
0
Roof Rep
air or
Replacem
ent
This project w
ill repla
ce bu
ilt‐up r
oofin
g, total roo
f.1,3
90,00
0
Site H
ardscape
Re
pair/
Replacem
ent
This project w
ill re‐pave h
ardscape
areas.
147,0
00
98,00
0
66,00
0
11,00
0
11,50
0
Interio
r/Exterio
r Pain
ting
This project w
ill pe
rform
life‐cycle
paint
ing.
129,0
00
Samue
l Tu
cker
SITE SUMMARY:
The William Ramsay Elementary School, which serves grades K-5, was originally constructed in the west end of the City in 1958. In 1963, a three-story classroom addition was constructed. The multipurpose room/nature center addition opened in 1977, and there was a media center addition in 1990. The City Recreation Department constructed a new gymnasium/recreation center adjacent to the school in 2000. In 2002, the multi-purpose room was renovated to create additional classroom space and the city’s Jerome Buddie Ford Nature Center was expanded. This school is located adjacent to the City’s Dora Kelly Park. During FY 2015, construction to add two new el-evators and a lift were completed at this facility.
The William Ramsay boundary was adjusted significantly with the inclusion of the new school in through the redistricting process.
William Ramsay Elementary School (K-5)5700 Sanger AvenueAlexandria, VA 22311 Tel: 703-824-6950 | Fax: 703-379-7824 Principal: Michael Routhouskawww.acps.k12.va.us/ramsay/
Community Use• After-school Recreation program • Church rentals• Extended day care • Recreation Department programs• Girl Scout/Boy Scout programs• 21st Century program
Table 2. Actual and Projected Enrollment
Elementary Projects
Page 34 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Table 1
William Ramsay Statistics
WILLIAM RAMSAY ELEMENTARY SCHOOL
Tabl
e 3
CIP
FY
2021
- 20
30Elementary Projects
Page 35 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Progra
m20
2120
2220
2320
2420
2520
2620
2720
2820
2920
30Gr
and T
otal
Building
Envel
ope R
epair
175,0
00
175,0
00
Interi
or Acou
stics/L
ightin
g98
,000
98
,000
Roof
Repair o
r Rep
lacem
ent
831,9
00
831,9
00
Site H
ardsca
pe
Repair/R
eplac
emen
t74
,000
74
,000
Kitche
n/ Cafet
eria r
enovati
on an
d rec
onfigura
tions
2,310
,000
2,310
,000
Interi
or/Ext
erior
Paint
ing18
0,000
18
0,000
905,9
00
175,0
00
2,310
,000
278,0
00
3,668
,900
Willia
m Ra
msay
Willia
m Ra
msay
Total
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
1 - 2
025
Elementary Projects
Page 36 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Site
Program
Program Details
2021
2022
2023
2024
2025
Build
ing E
nvelo
pe Rep
airTh
is project w
ill pe
rform
necessary b
uildin
g en
velope
repa
irs.
175,00
0
Interio
r Acoustics/Lig
hting
This project w
ill im
prov
e the
interio
r acoustic
s an
d/or lig
hting
of th
e buil
ding.
98,000
Roof Rep
air or R
eplac
emen
tTh
is project w
ill repa
ir/repla
ce th
e roo
f.83
1,90
0
Site H
ardscape
Rep
air/Rep
lacem
ent
This project w
ill pe
rform
necessary s
ite
hardscap
e rep
air work.
74,000
Kitche
n/ Cafeteria reno
vatio
n an
d reconfigu
ratio
nsTh
is project fun
ds kitche
n upg
rade
s as
recommen
ded i
n the
B&D
assessmen
t.2,31
0,00
0
Interio
r/Exterio
r Pain
ting
This project w
ill pe
rform
life‐cycle
paint
ing.
180,00
0
William
Ram
say
Table 1
Francis Hammond Statistics
SITE SUMMARY:
Francis C. Hammond Middle School, which serves grades 6-8, opened in 1956 as a four-year high school. A major classroom and cafeteria addition was completed in 1959. In 1979, it began to function as a junior high school for grades 7-9. In 1993, the facility became a middle school for grades 6-8. A major reconstruction and classroom addition, which included additional science, music, art, computer and technical education classrooms and a gymnasium, was completed in 2002. An artificial turf field was completed in 2012.
Francis C. Hammond Middle School (6-8) 4646 Seminary Road Alexandria, Virginia 22304 Tel: 703-461-4100 | Fax: 703-461-4111 Principal: Pierrette Peterswww.acps.k12.va.us/hammond/
Community Use• Church Rentals• Intramural Program• Recreation Department Programs• Tutorial Program
Table 2. Projected Enrollment and Capacity
Secondary Projects
Page 37 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
FRANCIS C. HAMMOND MIDDLE SCHOOL
Site
Progra
m20
2120
2220
2320
2420
2520
2620
2720
2820
2920
30Gr
and T
otal
Building
Envelop
e Rep
air40
,000
40
,000
Code
Comp
liance
Requ
ireme
nts25
0,000
25
0,000
Fire A
larm
System
750,0
00
750,0
00
Floori
ng Re
pair/Re
place
82,00
0
82,00
0
HVAC
Repair o
r Re
placem
ent
2,726
,696
189,5
55
138,2
28
3,054
,479
Interi
or Acou
stics/
Lighti
ng20
0,000
20
0,000
Plumb
ing
/Restr
oomU
pgrad
es15
0,000
15
0,000
Reno
vation
s &
Reconfi
gurat
ions
570,0
00
2,556
,000
3,126
,000
Roof
Repair o
r Rep
lacem
ent
905,0
00
873,7
58
1,778
,758
Site H
ardsca
pe
Repair/Re
placem
ent
350,0
00
350,0
00
Storm
water
managem
ent
60,00
0
60,00
0
Interi
or/Ext
erior
Paint
ing29
5,156
29
5,156
4,883
,696
389,5
55
138,2
28
3,429
,758
1,295
,156
10,13
6,393
Francis C
. Ha
mmon
d
Francis C
. Ham
mond
Total
Tabl
e 3
CIP
FY
2021
- 20
30Secondary Projects
Page 38 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
1 - 2
025
Site
Program
Program Details
2021
2022
2023
2024
2025
Build
ing E
nvelo
pe
Repa
irThis project includ
es cafeteria wind
ow re
placemen
t and
mitigatio
n for water intru
sion in t
he stair
well
and in g
ym.
40,00
0
Flooring
Repa
ir/Re
place
This project rep
laces th
e auxilia
ry gy
m flo
or.
82,00
0
This project w
ill repla
ce HVA
C equ
ipmen
t whic
h has re
ache
d the
end o
f its life
‐cycle
.2,6
86,69
6
189,5
55
138,2
28
This project w
ill ins
tall c
hilled
water pu
mp a
nd ex
haust fan
40,00
0
Interio
r Ac
oustics/Ligh
ting
This project w
ill evalu
ate e
xistin
g system ad
equacy an
d provid
e sup
plemen
tal emergency ligh
ting u
nits.
200,0
00
Plum
bing
/Restro
omUp
grad
esThis project w
ill reconstru
ct 2n
d floo
r toilet ro
oms in D
‐Wing
and s
pot rep
air an
d refinish 1s
t floo
r toilet
room
s.15
0,000
This project w
ill repair and r
econ
struct floo
r slab
at ba
semen
t locker roo
m co
rrido
r, provide
floor dr
ains
and s
ump p
ump.
40,00
0
This project w
ill alleviat
e basem
ent floo
ding from ex
terio
r wall at
Stair
9, insta
ll basem
ent w
ith
waterproofing
and F
rench d
rain,
insta
ll mult
iple s
ump p
umps an
d draina
ge pr
icing.
500,0
00
This project w
ill evalu
ate a
nd re
place electrical distrib
ution
and installatio
n30
,000
This project w
ill reno
vate th
e aud
itoriu
m: finishes, seatin
g, lighting
and H
VAC s
ystem.
2,000
,000
This project w
ill repla
ce ce
iling finishes an
d wall pa
inting
in th
e main
wing
s; provide
full p
aint, flo
or an
d ceilin
g at locer ro
om an
d basem
ent fitn
ess a
reas.
500,0
00
This project w
ill repla
ce th
e obsole
te pa
nelbo
ards.
56,00
0
This project w
ill repla
ce single ply
SCO Whit
e EPD
M M
embrane r
oof.
873,7
58
This project w
ill repla
ce D‐W
ing ro
of with
whit
e EPD
M m
embrane r
oof.
905,0
00
Site H
ardscape
Re
pair/
Replacem
ent
This project w
ill regrade c
ourty
ards, create s
ubsurfa
ce storm dr
ain pipin
g and
conn
ect to r
oof rain
lea
ders,
and install w
aterproo
fing a
nd fo
undatio
n drains
at ba
semen
t wall.
350,0
00
Storm water
man
agem
ent
This project fun
ds m
ajor m
aintenance r
equir
ed on
the t
ree b
ox filter B
MP.
60,00
0
Fran
cis C.
Ha
mmon
d
HVAC
Rep
air or
Replacem
ent
Reno
vatio
ns &
Reconfigu
ratio
ns
Roof Rep
air or
Replacem
ent
Secondary Projects
Page 39 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
George Washington Middle School1005 Mount Vernon Avenue Alexandria, Virginia 22301 Tel: 703-706-4500 | Fax: 703-706-4507 Principal: Jesse Mazurwww.acps.k12.va.us/washington/
Community Use• Head Start• Homework Help • Recreation Department Programs• Soccer & Tennis Clubs• Tutorial/Power Up • Vencedoras
SITE SUMMARY:
The George Washington Middle School, which serves grades 6-8, opened in 1935 as a four-year high school. A major classroom and cafeteria addition was completed in 1937. The GW An-nex building, which originally housed vocational classes, was constructed in 1941, and the GW gymnasium building was constructed in 1961. In 1979, GW was converted to a junior high school for grades 7-9. In 1993, this facility became a middle school for grades 6-8. A major reconstruc-tion and classroom addition, which interconnected all three buildings on campus, was completed in 2003. This addition/renovation included expanded science, computer, art, and technical education classrooms, as well as gymnasium facilities. The third floor was renovated in the summer of 2014 to convert office space previously held by central office into 6th grade classrooms.
Table 1George Washington Statistics
Table 2. Projected Enrollment and Capacity
Secondary Projects
Page 40 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
GEORGE WASHINGTON MIDDLE SCHOOL
Site
Prog
ram
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Gran
d Total
Asbe
stos/Lead
Paint
Re
med
iation
350,0
00
350,0
00
Building
Envelop
e Re
pair
400,0
00
150,0
00
550,0
00
Code
Compliance
Requ
iremen
ts20
,000
35,00
0
55,00
0
Exterio
r Play
grou
nds o
r Sports Areas
2,500
,000
386,0
00
2,886
,000
Fire A
larm Sy
stem
804,3
79
804,3
79
Flooring
Re
pair/Re
place
700,0
00
700,0
00
HVAC
Repair or
Repla
cemen
t51
5,000
560,0
00
1,075
,000
Plumbin
g /Restro
omUp
grades
15,00
0
15,00
0
Reno
vatio
ns &
Reconfigu
ratio
ns55
8,000
558,0
00
Roof Re
pair or
Repla
cemen
t74
0,000
740,0
00
Site H
ardscape
Re
pair/Re
placemen
t17
2,000
119,0
00
160,0
00
55,00
0
10,00
0
516,0
00
Water he
aters/bo
ilers
repair/repla
ce20
0,000
200,0
00
Interio
r/Exte
rior
Paint
ing80
,000
70,00
0
60,00
0
210,0
00
2,370
,000
4,194
,000
230,0
00
515,0
00
10,00
0
386,0
00
954,3
79
8,659
,379
George
Washing
ton T
otal
George
Washing
ton
Tabl
e 3
CIP
FY
2021
- 20
30Secondary Projects
Page 41 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
1 - 2
025
Site
Program
Program Details
2021
2022
2023
2024
2025
Asbe
stos/Lead Pa
int
Remed
iatio
nThis project w
ill co
nduct b
asem
ent A
CM and
mold testing and mitigatio
n, inclu
ding
repaintin
g.35
0,00
0
Build
ing En
velope
Rep
air
This project w
ill re
place historic windo
ws a
long
western façade
of B
uilding A.
400,00
0
This project w
ill install new
safety ladd
ers a
nd ro
of hatches.
20,000
This project w
ill clean, inspect a
nd te
st equ
ipmen
t exposed
to deterioratin
g agen
ts.
35,000
Exterio
r Playgroun
ds or
Sports Areas
This project include
s track & field im
provem
ents.
2,50
0,00
0
Floo
ring Re
pair/
Replace
This project w
ill re
move carpets a
nd old floo
ring and install new
resilient floo
ring in all
classroom
s.70
0,00
0
This project w
ill re
place HV
AC equ
ipmen
t which has re
ache
d the en
d of its life
‐cycle.
560,00
0
This project w
ill provide
ven
tilation air to cla
ssroom
s A16
0‐A1
65 from
existing air
hand
ling un
its as w
ell as the
existing chiller th
at is not ope
ratio
nal.
315,00
0
This project w
ill re
place HV
AC equ
ipmen
t which has re
ache
d the en
d of its life
‐cycle
install piping insulatio
n and HV
AC co
ntrolls
200,00
0
Plum
bing
/Restroo
mUpgrade
sThis project w
ill re
place the existing sump pu
mp in th
e mechanical equ
ipmen
t roo
m.
15,000
Reno
vatio
ns &
Reconfigurations
This project w
ill perform
reno
vatio
n work to 3rd floo
r classroom
s including
floo
ring.
558,00
0
Roof Rep
air o
r Re
placem
ent
This project w
ill re
place the roof over the
library.
740,00
0
Site Hardscape
Re
pair/
Replacem
ent
This project w
ill re
pair the existing parking lot.
172,00
0
119,00
0
160,00
0
55,000
10,000
This project w
ill re
place HV
AC equ
ipmen
t which has re
ache
d the en
d of its life
‐cycle.
100,00
0
This project w
ill re
place HV
AC equ
ipmen
t which has re
ache
d the en
d of its u
seful life
.10
0,00
0
Interio
r/Exterio
r Painting
This project w
ill perform
life‐cycle painting.
80,000
70,000
60,000
Code
Com
pliance
Requ
iremen
ts
HVAC
Rep
air o
r Re
placem
ent
Water heaters/boilers
repa
ir/replace
George
Washington
Secondary Projects
Page 42 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
T. C. Williams, Minnie Howard Campus 3801 West Braddock Road Alexandria, Virginia 22302 Tel: 703-824-6750 | Fax: 703-824-6781 Principal: Peter Balas ww.acps.k12.va.us/tcw/
Community Use• Church Rentals• Intramurals Program • Recreation Department Programs
SITE SUMMARY:
The Minnie Howard School building, which houses all students in grade nine except the students enrolled in the International Academy, was origi-nally constructed in 1954 as an elementary school. There was a major classroom and gymnasium addition in 1969 when it was converted to a middle school. The facility served as the central admin-istrative offices from 1981 to 1993, when it was renovated and became the Ninth Grade Center. It is now the Minnie Howard campus of T.C. Williams High School.
CAPACITY:A capacity project is proposed for high school, which, pending assessment, may include demoli-tion of the existing Minnie Howard school and replacing it with a new building to add
high school capacity. See Capacity section in system-wide.
Because these two campuses currently operate as one high school, and, at the time of this CIP de-velopment, configuration of the future high school capacity has not been determined, enrollment and capacity are combined in the table for both Minnie Howard and King Street campuses.
Table 1
TC Williams Minnie Howard Statistics
Table 2. Projected Enrollment and Capacity
Secondary Projects
Page 43 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
TC WILLIAMS: MINNIE HOWARD
T. C. Williams High School 3330 King Street Alexandria, Virginia 22302 Tel: 703-824-6800 | Fax: 703-824-6826 Principal: Peter Balaswww.acps.k12.va.us/tcw/
Community Use• Head Start• Public Meetings
SITE DESCRIPTION:
TC Williams High School is Alexandria’s only public high school, which serves grade levels 10-12. This state of the art facility opened in fall 2007 to staff and students. The new facility provides smaller learning communities as well as flexible academic space capable of meeting the evolv-ing secondary school curriculum requirements. This school includes an artificial turf sports field, stadium and a two story parking garage. This school was constructed under LEED guidelines as a green campus and was awarded a LEED Gold rating.
Design for the stadium project is moving forward and will include the bleachers, lighting, press box, concessions, ticket booth, track and the field. Relocatable classrooms were put on the site in the summer of 2017.
CAPACITY:A capacity project is proposed for high school, which, pending assessment, may include demoli-tion of the existing Minnie Howard school and replacing it with a new building to add high school capacity. See Capacity section in system-wide.
Because these two campuses currently operate as one high school, and, at the time of this CIP de-velopment, configuration of the future high school capacity has not been determined, enrollment and capacity are combined in Table 2 for both Minnie Howard and King Street campuses.
Table 1
TC Williams Statistics
Table 2. Projected Enrollment and Capacity
Secondary Projects
Page 44 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
TC WILLIAMS: KING STREET
Site
Prog
ram
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Gran
d To
tal
Exterio
r Lighting/Signage
13,875
13,875
Exterio
r Playgroun
ds or
Sports Areas
660,16
5
660,16
5
HVAC
Rep
air o
r Re
placem
ent
238,65
8
238,65
8
Interio
r Acou
stics
/Lighting
1,89
6,78
0
1,89
6,78
0
Site Hardscape
Re
pair/Re
placem
ent
60,000
690,00
0
750,00
0
Interio
r/Exterio
r Painting
350,00
0
350,00
0
720,16
5
2,83
9,31
3
350,00
0
3,90
9,47
8
T.C. W
illiams
King
Stree
t Ca
mpu
s
T.C. W
illiams K
ing Street Cam
pus T
otal
Tabl
e 3
CIP
FY
2021
- 20
30
Secondary Projects
Page 45 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Tabl
e 4
PRO
GR
AM
DET
AIL
S FY
202
1 - 2
025
Site
Program
Program Details
2021
2022
2023
2024
2025
Exterio
r Ligh
ting/Sig
nage
This proje
ct will r
eplac
e elec
tronic
signage.
13,87
5
Exterio
r Play
grou
nds o
r Sports Areas
This proje
ct fund
s add
ition
al ne
eds b
ased
on co
st escalat
ions for th
e sta
dium pr
oject.
660,1
65
HVAC
Rep
air or
Re
placemen
tThis proje
ct will r
eplac
e HVA
C equ
ipmen
t whic
h has re
ache
d the
end
of its life
‐cycle
.23
8,658
Interio
r Acoustics/Lig
hting
This proje
ct will r
eplac
e stage lig
hting
equip
men
t, audio
visual
proje
ctor system, and
scho
ol sta
ge au
dio eq
uipmen
t.1,8
96,78
0
Site H
ardscape
Re
pair/
Repla
cemen
tThis proje
ct fund
s design
work for pa
rking
garage up
grades.
60,00
0
690,0
00
Interio
r/Exterior
Paint
ingThis proje
ct will p
erform
life‐cycle
paint
ing.
350,0
00
T.C. W
illiam
s King
Street
Campu
s
Secondary Projects
Page 46 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
SUMMARY:
These projects provide for the replacement and modernization of the architectural building systems at all school facilities in the Alexandria City Public Schools Division.
DESCRIPTION:This funding can be used at any facility in the ACPS system, on an as-needed basis. Funding
of these projects is key to implementation of a system-wide master key system and enhancing access control to ensure the safety and security of ACPS’s students and staff. An assessment of the security status of ACPS facilities was completed in FY 2018 and funds were adjusted in this proposed budget to reflect the recommendations of this as-sessment along with a prioritization of facilities.
Site Program 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Grand Total
Access Control and Security Management
1,400,000 975,321 581,575 847,419 3,804,315
Placeholder for Non‐Capacity projects pending assessments
3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 18,000,000
Technology Modernization 371,315 393,928 417,918 1,183,161
1,400,000 1,346,636 581,575 1,241,347 3,000,000 3,417,918 3,000,000 3,000,000 3,000,000 3,000,000 22,987,476
Building System Upgrades and Modernization
Building System Upgrades and Modernization Total
Table 1
CIP FY 2021 - 2030
Table 2
CIP DETAILS FY 2021 - 2025
Division & School-Wide Projects
SCHOOL-WIDE PROJECTS: BUILDING SYSTEMS UPGRADES & MODERNIZATION
Site Program Program Details 2021 2022 2023 2024 2025
This project enhances security at TC Williams, including secure vestibule, camera upgrades and access control. 1,400,000
This project enhances security at George Washington and Francis C. Hammond.975,321
This project enhances security at WR, MM, CK, and LC.581,575
This project enhances security at CB, JH, MV, and ST.847,419
Placeholder for Non‐Capacity projects pending assessments
Placeholder for Non‐Capacity projects pending assessments3,000,000
Technology ModernizationThis project funds incremental upgrades and replacement of school integrated
audio visual systems and other technology as needed. 371,315 393,928
Building System Upgrades and Modernization
Access Control and Security Management
Page 47 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
SUMMARY:
These projects provide for expansion of school capacity due to enrollment increases at all grade levels. Sites for swing space and additional capacity are currently under review.
DESCRIPTION:
This funding will be used with the approval of the School Board, City Council, and the City Planning Commission on expansion of current buildings
and construction of new facilities. In alignment with the first deliverable recommendations of the Ad-Hoc Joint City-Schools Facilities Investment Task Force, ACPS is proposing funds for new high school construction. The estimate included is based on the School Board’s vote to maintain one high school, or a connected high school network with a new facility at Minnie Howard. This category also includes a new school in the out years to accommodate growth.
Table 1CIP FY 2020 - 2029
Division & School-Wide Projects
SCHOOL-WIDE PROJECTS: CAPACITY
Site Program 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Grand Total
High School Project
Hard costs for a new high school
103,712,469 54,503,900 158,216,369
103,712,469 54,503,900 158,216,369 High School Project Total
Site Program 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Grand Total
Construction of Renovation & Capacity
45,433,524 45,433,524
Design, Project Management & Other Soft Costs
11,358,381 11,358,381
11,358,381 45,433,524 56,791,906
New School
New School Total
Page 48 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
SUMMARY:
This project provides for division-wide renova-tion projects. This includes unanticipated and emergency renovations, asbestos removal, and instructional environment upgrades at existing school facilities throughout the school system.
DESCRIPTION:
This funding can be used for renovations at any facility in the ACPS system on an as-needed basis. This funding is also used for asbestos removal on an as-needed basis and for upgrades to the instructional environment.
Table 1
CIP FY 2020 - 2029
Division & School-Wide Projects
SCHOOL-WIDE PROJECTS: SYSTEM-WIDE
Site Program 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Grand Total
Asbestos/Lead Paint Remediation
66,950 68,959 71,027 73,158 75,353 77,613 79,942 82,340 84,810 87,355 767,507
Code Compliance Requirements
378,750 132,613 136,591 140,689 144,909 149,257 153,734 158,346 163,097 167,990 1,725,974
Emergency Repairs 772,500 795,675 819,545 844,132 869,456 895,539 922,405 950,078 978,580 1,007,937 8,855,847
Exterior Playgrounds or Sports Areas
165,000 165,000 330,000
Furniture, Fixtures & Equip. 154,500 159,135 163,909 168,826 173,891 179,108 184,481 190,016 195,716 201,587 1,771,169
HVAC Repair or Replacement
77,250 79,568 81,955 84,413 86,946 89,554 92,241 95,008 97,858 100,794 885,585
Project Planning 412,000 424,360 437,091 450,204 463,710 477,621 491,950 506,708 521,909 537,567 4,723,118
Renovations & Reconfigurations
128,750 132,613 136,591 140,689 144,909 149,257 153,734 158,346 163,097 167,990 1,475,974
Site Hardscape Repair/Replacement
20,600 21,218 21,855 22,510 23,185 23,881 24,597 25,335 26,095 26,878 236,156
Curriculum & Instruction Materials
1,089,885 929,940 985,550 1,071,420 1,172,880 452,250 1,000,000 1,000,000 1,000,000 1,000,000 9,701,925
Contract and/or Direct Employee Support
500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 500,000 5,000,000
3,766,185 3,409,080 3,354,113 3,496,040 3,655,239 2,994,079 3,603,085 3,666,177 3,731,162 3,798,097 35,473,256 System‐Wide Total
System‐Wide
Page 49 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Rowing Facility#1 Madison StreetAlexandria, VA 22314
Community Use• Alexandria City Community Rowing Association• Crew Boosters Association• Community Rentals
SITE SUMMARY:
The Alexandria Schools’ Rowing Facility is located on the Potomac River at the foot of Madison Street. This facility opened in 1986 and serves the school division’s rowing program for secondary students as well as the Alexandria City Community Rowing Association and the Crew Boosters Association.
DESCRIPTION:
Several projects have been completed in recent years, including new lighting systems, and a custom built boat storage system that was installed for safer and more efficient use along with new siding replacement. Funding is including in 2018 to replace the dock.
Site Program 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Grand Total
Site Hardscape Repair/Replacement
62,000 50,500 11,000 11,500 15,000 16,000 16,000 182,000
Interior/Exterior Painting 350,000 350,000
62,000 400,500 11,000 11,500 15,000 16,000 16,000 532,000
Rowing Facility
Rowing Facility Total
Table 1
CIP FY 2020 - 2029
Division & School-Wide Projects
SCHOOL-WIDE PROJECTS: ROWING FACILITY
Page 50 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
SUMMARY:
This project provides for the phased replacement of older school buses as well as the phased replacement of other school vehicles.
DESCRIPTION:
The current school bus fleet consists of vehicles ranging in age from one to fifteen years. The average life expectancy of a school bus is dependent on mileage, maintenance and repairs, but is recommended to be twelve years for a conventional school bus. Funding is also included for replacement of vehicles on a phased basis which started in 2017. Many vehicles in the fleet are or are approaching over 15 years old. This includes maintenance trucks, tractors, vans, security vehicles and passenger vehicles. Additional buses are included for growing enrollment in the school division. The existing Transportation Facility requires upgrades to meet
the growing enrollment and, therefore, staff.
Renovation of the facility was originally proposed for FY 2019, but is adjusted in this proposal to reflect the recommendations of the Ad-Hoc Joint City-Schools Facilities Investment Task Force. Adjusting the schedule will allow for the project to be considered as part of a broader campus master plan with City facilities. Interim needs will be met by using system-wide funds, including a possible bathroom expansion in upcoming years.
Expansion of the parking for buses will need to be considered as part of this project.
Table 1
CIP FY 2020 - 2029
Division & School-Wide Projects
DIVISION-WIDE PROJECTS: TRANSPORTATION SERVICES
Site Program 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Grand Total
HVAC Repair or Replacement
210,000 210,000
Roof Repair or Replacement
475,000 475,000
School bus replacement 1,236,000 1,273,080 764,909 1,350,611 1,391,129 1,432,863 1,475,849 1,520,124 1,565,728 1,612,700 13,622,991
School vehicle replacement
115,000 115,000 115,000 115,000 115,000 115,000 690,000
School bus new 381,924 405,183 429,859 456,037 483,810 2,156,813
Transportation Facility Modernization
6,710,000 6,710,000
2,036,000 8,480,004 879,909 1,755,794 1,506,129 1,862,722 1,590,849 1,976,161 1,680,728 2,096,510 23,864,804
Transportation Services
Transportation Services Total
Page 51 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Supporting Data
SUPPORTING DATA
Three sections are included in this supporting data section: Enrollment Projection information, Useful Definitions, and Detailed Tables.
ENROLLMENT PROJECTIONS
ActuAl Student enrollment
As of September 30, 2018, ACPS PK-12th grade student enrollment was 15,737, an increase of 198 students and a growth rate of 1.5% from last year. Enrollment continues to grow; however, not at the higher rates experienced in recent years.
Projection ProceSS
ACPS enrollment forecasts are prepared each fall, by school and by grade for ten years and used both to prepare the annual operating and capital budgets for the school division. The actual October 1 enrollment count is the basis from which projections are developed.
To develop kindergarten enrollment projections, staff conducts an annual review of birth data collected by the Virginia Department of Health. These are births to mothers living in Alexandria, no matter where the actual birth takes place. This number is compared with the actual number of kindergarteners enrolled in ACPS. A ratio is calculated, averaged, and applied to future years to estimate the number of future kindergarteners.
For the other grades, a cohort survival method is used. This tracks the number of students moving from grade level to grade level at each school, each year. Cohort survival ratios are calculated, averaged, and applied to future years to estimate the number of 1st-12th-grade students.
ACPS has worked closely with the City Planning and Zoning staff to develop these estimates. The group is studying major factors that affect student enrollment and plan to monitor trends in order to develop more accurate forecasting models to capture the impact of development.
This collaboration will continue to support the refinement of enrollment projections by ACPS and improved estimates of the impact of development projects by the City’s Department of Planning and Zoning.
enrollment ProjectionS
Upon School Board Adoption of the FY 2021 - 2030 CIP, ACPS will incorporate the final enrollment projections into the CIP book. Staff anticipate a presentation of enrollment projections at one of the School Board’s CIP work sessions.
CIP DETAILS
A complete detailed list of the Superintendent’s Proposed FY 2021- 2030 CIP projects is inlcuded on the following pages.
Page 52 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Supporting DataTa
ble
1: C
IP
Site
Program
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Gran
d Total
Access Co
ntrol and
Security M
anagem
ent
1,400
,000
975,3
21
581,5
75
847,4
19
3,804
,315
Techno
logy M
oderniz
ation
371,3
15
393,9
28
417,9
18
1,183
,161
Placeho
lder for Non
‐Capacity
proje
cts pe
nding
assessmen
ts3,0
00,00
0
3,000
,000
3,000
,000
3,000
,000
3,000
,000
3,000
,000
18,00
0,000
1,400
,000
1,346
,636
581,5
75
1,241
,347
3,000
,000
3,417
,918
3,000
,000
3,000
,000
3,000
,000
3,000
,000
22,98
7,476
Elevator rep
air/re
placemen
t10
6,000
106,0
00
Exterio
r Play
grou
nds o
r Spo
rts Areas
50,00
0
50,00
0
Flooring
Repair/Re
place
175,0
00
175,0
00
HVAC
Repair or Re
placemen
t1,2
00,00
0
1,200
,000
Kitchen
/ Cafeteria reno
vatio
n and
reconfigu
ratio
ns81
0,394
810,3
94
Interior
/Exte
rior P
aintin
g88
,555
88,55
5
106,0
00
1,375
,000
50,00
0
81
0,394
88,55
5
2,4
29,94
9
Building
Envelop
e Rep
air60
,000
60,00
0
Desig
n, Proje
ct Managem
ent &
Other So
ft Co
sts7,5
56,82
2
7,556
,822
Constru
ction
of Re
novatio
n & Ca
pacity
30,22
7,289
30,22
7,289
Elevator rep
air/re
placemen
t15
0,000
150,0
00
HVAC
Repair or Re
placemen
t75
,000
438,0
00
513,0
00
Interior
Acoustics/L
ightin
g75
,000
75,00
0
Plumbin
g /Re
stroo
mUp
grades
150,0
00
45,00
0
195,0
00
Reno
vatio
ns & Re
configu
ratio
ns10
,000
19,50
0
29,50
0
385,0
00
573,0
00
64,50
0
7,5
56,82
2
30,22
7,289
38,80
6,611
Douglas
MacArthur
Desig
n, Proje
ct Managem
ent &
Other So
ft Co
sts;
Constru
ction
of Re
novatio
n & Ca
pacity
69,43
3,250
69,43
3,250
69,43
3,250
69,43
3,250
Build
ing
Syste
m
Upgrad
es an
d Mod
ernizatio
n
Build
ing S
ystem Upgrade
s and
Mod
ernizatio
n Total
Charles
Barrett
Charles
Barrett To
tal
Cora Ke
lly
Cora Ke
lly To
tal
Douglas
MacArthur To
tal
Page 53 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Supporting DataTa
ble
1: C
IPSit
eProgram
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Gran
d Total
Constru
ction
of Re
novatio
n & Ca
pacity
496,7
41
496,7
41
Site H
ardscape
Repair/Re
placemen
t70
,000
830,0
00
900,0
00
566,7
41
830,0
00
1,396
,741
Building
Envelop
e Rep
air40
,000
40,00
0
Code
Compliance Re
quire
men
ts25
0,000
250,0
00
Fire A
larm Sy
stem
750,0
00
750,0
00
Flooring
Repair/Re
place
82,00
0
82,00
0
HVAC
Repair or Re
placemen
t2,7
26,69
6
189,5
55
138,2
28
3,054
,479
Interio
r Acoustics/Lig
hting
200,0
00
200,0
00
Plumbin
g /Re
stroo
mUp
grades
150,0
00
150,0
00
Reno
vatio
ns & Re
configu
ratio
ns57
0,000
2,556
,000
3,126
,000
Roof Re
pair or Re
placemen
t90
5,000
873,7
58
1,778
,758
Site H
ardscape
Repair/Re
placemen
t35
0,000
350,0
00
Storm water m
anagem
ent
60,00
0
60,00
0
Interio
r/Exte
rior P
aintin
g29
5,156
295,1
56
4,883
,696
389,5
55
138,2
28
3,429
,758
1,295
,156
10,13
6,393
Building
Envelop
e Rep
air60
,000
60,00
0
Desig
n, Proje
ct Managem
ent &
Other So
ft Co
sts13
,599,4
67
13,59
9,467
Constru
ction
of Re
novatio
n & Ca
pacity
27,19
8,934
27,19
8,934
54,39
7,867
Elevator rep
air/re
placemen
t20
0,000
200,0
00
Plumbin
g /Re
stroo
mUp
grades
15,00
0
15,00
0
Roof Re
pair or Re
placemen
t20
5,000
205,0
00
280,0
00
200,0
00
13,59
9,467
27,19
8,934
27,19
8,934
68,47
7,334
Fran
cis C.
Ham
mon
d Total
George
Mason
George
Mason
Total
Ferdinan
d T.
Day
Ferdinan
d T. D
ay To
tal
Fran
cis C.
Ha
mmon
d
Page 54 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Supporting DataTa
ble
1: C
IP
Site
Program
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Gran
d To
tal
Asbe
stos/Lead Paint R
emed
iatio
n35
0,00
0
350,00
0
Building Envelope
Rep
air
400,00
0
150,00
0
550,00
0
Code
Com
pliance Re
quire
men
ts20
,000
35,000
55,000
Exterio
r Playgroun
ds or S
ports A
reas
2,50
0,00
0
386,00
0
2,88
6,00
0
Fire Alarm
System
804,37
9
804,37
9
Floo
ring Re
pair/Re
place
700,00
0
700,00
0
HVAC
Rep
air o
r Rep
lacemen
t51
5,00
0
560,00
0
1,07
5,00
0
Plum
bing
/Restroo
mUp
grades
15,000
15,000
Reno
vatio
ns & Recon
figurations
558,00
0
558,00
0
Roof Rep
air o
r Rep
lacemen
t74
0,00
0
740,00
0
Site Hardscape
Rep
air/Re
placem
ent
172,00
0
119,00
0
160,00
0
55,000
10,000
516,00
0
Water heaters/boilers re
pair/replace
200,00
0
200,00
0
Interio
r/Exterio
r Painting
80,000
70,000
60,000
210,00
0
2,37
0,00
0
4,19
4,00
0
230,00
0
515,00
0
10,000
386,00
0
954,37
9
8,65
9,37
9
High
Schoo
l Project
Hard co
sts for a new
high scho
ol10
3,71
2,46
9
54,503
,900
158,21
6,36
9
103,71
2,46
9
54,503
,900
158,21
6,36
9
Building Envelope
Rep
air
21,312
21,312
Exterio
r Playgroun
ds or S
ports A
reas
250,00
0
250,00
0
Floo
ring Re
pair/Re
place
167,17
5
167,17
5
Interio
r walls mod
ify/rep
air/replace
122,00
0
122,00
0
Plum
bing
/Restroo
mUp
grades
36,635
36,635
Reno
vatio
ns & Recon
figurations
350,00
0
350,00
0
Roof Rep
air o
r Rep
lacemen
t1,47
0,00
0
1,47
0,00
0
Storm water m
anagem
ent
47,000
47,000
Kitche
n/ Cafeteria re
novatio
n and reconfigurations
1,77
1,68
7
1,77
1,68
7
Interio
r/Exterio
r Painting
111,00
0
111,00
0
814,17
5
158,63
5
1,58
1,00
0
1,77
1,68
7
21,312
4,34
6,80
9
High
Schoo
l Project Total
James K. P
olk
James K. P
olk To
tal
George
Washington
George
Washington To
tal
Page 55 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Supporting DataTa
ble
1: C
IPSite
Program
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Grand
Total
HVA
C Re
pair or Rep
lacemen
t75
0,00
0
750,00
0
Storm water m
anagem
ent
10,000
10,000
20,000
750,00
0
10,000
10,000
770,00
0
Ceiling
repair/replace
510,50
0
510,50
0
Roof Rep
air o
r Rep
lacemen
t1,50
0,00
0
1,50
0,00
0
Site Hardscape
Rep
air/Re
placem
ent
123,00
0
154,00
0
11,000
11,500
27,000
326,50
0
Storm water m
anagem
ent
30,000
150,00
0
180,00
0
Interio
r/Exterio
r Painting
180,00
0
332,00
0
512,00
0
1,65
3,00
0
814,50
0
11,000
191,50
0
359,00
0
3,02
9,00
0
Building Envelope
Rep
air
740,00
0
740,00
0
Exterio
r Playgroun
ds or S
ports A
reas
61,050
139,86
0
200,91
0
Floo
ring Re
pair/Re
place
300,00
0
517,90
1
817,90
1
Interio
r Acoustics/Lightin
g45
7,48
0
457,48
0
Reno
vatio
ns & Recon
figurations
58,308
58,308
Site Hardscape
Rep
air/Re
placem
ent
112,50
0
90,000
22,000
22,500
15,000
262,00
0
Kitche
n/ Cafeteria re
novatio
n and reconfigurations
1,09
4,83
8
1,09
4,83
8
Interio
r/Exterio
r Painting
82,056
82,056
2,30
8,38
8
1,06
5,38
1
220,16
8
22,500
15,000
82,056
3,71
3,49
3
Building Envelope
Rep
air
100,00
0
1,40
0,00
0
1,50
0,00
0
Code
Com
pliance Re
quire
men
ts30
0,00
0
250,00
0
550,00
0
Desig
n, Project M
anagem
ent &
Other Soft C
osts
6,06
7,60
1
6,06
7,60
1
Fire Alarm
System
150,00
0
150,00
0
Floo
ring Re
pair/Re
place
250,00
0
250,00
0
Interio
r Acoustics/Lightin
g75
,000
91,383
166,38
3
Plum
bing
/Restroo
mUpgrade
s25
,000
25,000
Roof Rep
air o
r Rep
lacemen
t1,36
8,53
3
1,36
8,53
3
Water heaters/boilers re
pair/replace
78,000
25,000
103,00
0
Interio
r/Exterio
r Painting
206,05
5
206,05
5
1,46
8,53
3
2,12
8,00
0
91,383
206,05
5
425,00
0
6,06
7,60
1
10,386
,572
Lyles‐Crou
ch
Lyles‐Crou
ch Total
Matthew
Mau
ry
Matthew
Mau
ry Total
Jefferson‐
Hou
ston
Jefferson‐Hou
ston
Total
John
Ada
ms
John
Ada
ms To
tal
Page 56 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Supporting DataTa
ble
1: C
IP
Site
Program
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Gran
d Total
Building
Envelop
e Rep
air10
0,000
100,0
00
HVAC
Rep
air or
Rep
lacem
ent
330,0
00
330,0
00
Reno
vatio
ns & Recon
figuration
s43
3,000
433,0
00
Storm water m
anagem
ent
350,0
00
350,0
00
Interio
r/Exte
rior P
aintin
g20
6,000
206,0
00
780,0
00
433,0
00
206,0
00
1,419
,000
Desig
n, Pr
oject Managem
ent &
Other So
ft Co
sts11
,358,3
81
11,35
8,381
Constru
ction
of Ren
ovation
& Ca
pacity
45,43
3,524
45,43
3,524
11,35
8,381
45,43
3,524
56,79
1,906
Emergency G
enerator
300,0
00
300,0
00
Furnitu
re, Fixtures & Eq
uip.
15,00
0
15,00
0
315,0
00
315,0
00
Site H
ardscape
Rep
air/Rep
lacem
ent
62,00
0
50,50
0
11,00
0
11,50
0
15,00
0
16,00
0
16,00
0
182,0
00
Interio
r/Exte
rior P
aintin
g35
0,000
350,0
00
62,00
0
40
0,500
11,00
0
11
,500
15
,000
16
,000
16
,000
53
2,000
Building
Envelop
e Rep
air16
,000
16,00
0
HVAC
Rep
air or
Rep
lacem
ent
16,28
0
16,28
0
Interio
r walls m
odify/re
pair/repla
ce40
,000
40,00
0
Roof Rep
air or
Rep
lacem
ent
1,390
,000
1,390
,000
Site H
ardscape
Rep
air/Rep
lacem
ent
147,0
00
98,00
0
66,00
0
11,00
0
11,50
0
12,00
0
12,50
0
358,0
00
Interio
r/Exte
rior P
aintin
g12
9,000
129,0
00
147,0
00
1,504
,000
82,28
0
51
,000
14
0,500
12,00
0
12
,500
1,9
49,28
0
Mou
nt Verno
n Total
New Scho
ol
New Scho
ol To
tal
Patrick Hen
ry
Patrick Hen
ry To
tal
Mou
nt Verno
n
Rowing
Facility
Rowing
Facility
Total
Samue
l Tucker
Samue
l Tucker T
otal
Page 57 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Supporting DataTa
ble
1: C
IP
Site
Program
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Gran
d To
tal
Asbe
stos/Lead Paint R
emed
iatio
n66
,950
68,959
71,027
73,158
75,353
77,613
79,942
82,340
84,810
87,355
767,50
7
Code
Com
pliance Re
quire
men
ts37
8,75
0
132,61
3
136,59
1
140,68
9
144,90
9
149,25
7
153,73
4
158,34
6
163,09
7
167,99
0
1,72
5,97
4
Emergency Re
pairs
772,50
0
795,67
5
819,54
5
844,13
2
869,45
6
895,53
9
922,40
5
950,07
8
978,58
0
1,00
7,93
7
8,85
5,84
7
Exterio
r Playgroun
ds or S
ports A
reas
165,00
0
165,00
0
330,00
0
Furnitu
re, Fixtures & Equ
ip.
154,50
0
159,13
5
163,90
9
168,82
6
173,89
1
179,10
8
184,48
1
190,01
6
195,71
6
201,58
7
1,77
1,16
9
HVAC
Rep
air o
r Rep
lacemen
t77
,250
79,568
81,955
84,413
86,946
89,554
92,241
95,008
97,858
100,79
4
885,58
5
Project P
lann
ing
412,00
0
424,36
0
437,09
1
450,20
4
463,71
0
477,62
1
491,95
0
506,70
8
521,90
9
537,56
7
4,72
3,11
8
Reno
vatio
ns & Recon
figurations
128,75
0
132,61
3
136,59
1
140,68
9
144,90
9
149,25
7
153,73
4
158,34
6
163,09
7
167,99
0
1,47
5,97
4
Site Hardscape
Rep
air/Re
placem
ent
20,600
21,218
21,855
22,510
23,185
23,881
24,597
25,335
26,095
26,878
236,15
6
Curricu
lum & Instruction Materials
1,08
9,88
5
929,94
0
985,55
0
1,07
1,42
0
1,17
2,88
0
452,25
0
1,00
0,00
0
1,00
0,00
0
1,00
0,00
0
1,00
0,00
0
9,70
1,92
5
Contract and
/or D
irect Employee
Sup
port
500,00
0
500,00
0
500,00
0
500,00
0
500,00
0
500,00
0
500,00
0
500,00
0
500,00
0
500,00
0
5,00
0,00
0
3,76
6,18
5
3,40
9,08
0
3,35
4,11
3
3,49
6,04
0
3,65
5,23
9
2,99
4,07
9
3,60
3,08
5
3,66
6,17
7
3,73
1,16
2
3,79
8,09
7
35,473
,256
Exterio
r Lighting/Signage
13,875
13,875
Exterio
r Playgroun
ds or S
ports A
reas
660,16
5
660,16
5
HVAC
Rep
air o
r Rep
lacemen
t23
8,65
8
238,65
8
Interio
r Acoustics/Lig
hting
1,89
6,78
0
1,89
6,78
0
Site Hardscape
Rep
air/Re
placem
ent
60,000
690,00
0
750,00
0
Interio
r/Exterio
r Painting
350,00
0
350,00
0
720,16
5
2,83
9,31
3
350,00
0
3,90
9,47
8
HVAC
Rep
air o
r Rep
lacemen
t21
0,00
0
210,00
0
Roof Rep
air o
r Rep
lacemen
t47
5,00
0
475,00
0
Scho
ol bus re
placem
ent
1,23
6,00
0
1,27
3,08
0
764,90
9
1,35
0,61
1
1,39
1,12
9
1,43
2,86
3
1,47
5,84
9
1,52
0,12
4
1,56
5,72
8
1,61
2,70
0
13,622
,991
Scho
ol veh
icle replacem
ent
115,00
0
115,00
0
115,00
0
115,00
0
115,00
0
115,00
0
690,00
0
Scho
ol bus new
381,92
4
405,18
3
429,85
9
456,03
7
483,81
0
2,15
6,81
3
Transportatio
n Facility
Mod
ernizatio
n6,71
0,00
0
6,71
0,00
0
2,03
6,00
0
8,48
0,00
4
879,90
9
1,75
5,79
4
1,50
6,12
9
1,86
2,72
2
1,59
0,84
9
1,97
6,16
1
1,68
0,72
8
2,09
6,51
0
23,864
,804
Tran
sportatio
n Service
s Total
System
‐Wide
System
‐Wide To
tal
T.C. W
illiams
King
Street
Campu
s
T.C. W
illiams K
ing Street Cam
pus T
otal
Tran
sportatio
n Service
s
Page 58 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget
Supporting Data
Site
Program
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Gran
d To
tal
Building Envelope
Rep
air
175,00
0
175,00
0
Interio
r Acoustics/Lig
hting
98,000
98,000
Roof Rep
air o
r Rep
lacemen
t83
1,90
0
831,90
0
Site Hardscape
Rep
air/Re
placem
ent
74,000
74,000
Kitche
n/ Cafeteria re
novatio
n and reconfigurations
2,31
0,00
0
2,31
0,00
0
Interio
r/Exterio
r Painting
180,00
0
180,00
0
905,90
0
175,00
0
2,31
0,00
0
278,00
0
3,66
8,90
0
198,80
1,50
2
83,827
,369
22,211
,757
41,592
,320
37,756
,043
16,529
,097
41,144
,569
20,026
,719
53,861
,414
14,962
,208
530,71
2,99
9
William
Ramsay
William Ram
say To
tal
Gran
d To
tal
Tabl
e 1:
CIP
Page 59 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget