![Page 1: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/1.jpg)
Meg Pirkle, P.E., Chief Engineer
Joe Carpenter, P.E., Director of P3/Program Delivery
Darryl VanMeter, P.E., State Innovative Delivery Engineer
Andrew Hoenig, P.E., Innovative Delivery Project Manager
FY 2016 Bridge Replacements
Design-Build Industry Forum
11/05/2015
![Page 2: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/2.jpg)
At this meeting the Department will provide
information about the project’s delivery goals,
anticipated scope, anticipated Design-Build
procurement process, and potential risks. Participants
will be encouraged to ask questions during this
meeting; however any information provided by
Department shall be considered as informational
only and is subject to change.
Disclaimer Statement
![Page 3: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/3.jpg)
Agenda
• Design-Build Overview
• Bridge Locations
• Project Goals and Overview
• Risk Mitigation Strategies
• Procurement Process
• Schedule
• Open Discussion
![Page 4: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/4.jpg)
Design-Build Overview
• Design-Build
o Combines preconstruction related services with
construction services into one contract
o Allows the contractor to participate in the project’s design
in an effort to reduce costs, improve communication and expedite project delivery
• Governed by
o 23 Code of Federal Regulations (CFR) Part 636
o Georgia Code Section 32-2-81 (Enacted 2004)
o Board Rules, Chapter 672-18 (Adopted 2006 & 2013)
![Page 5: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/5.jpg)
GDOT Design-Build Overview
$1
8,1
75
,17
0
$7
9,3
32
,69
6
$1
00
,24
2,2
89
$3
,02
8,0
00
$1
0,3
05
,37
9
$0
$0
$8
0,8
57
,48
7
$1
1,5
41
,88
6
$1
7,1
28
,86
5
$3
9,5
93
,62
8
$5
3,4
91
,47
3 $8
3,6
37
,89
7
$1
95
,77
6,3
88
$2
9,8
78
,17
5
$2
23
,90
8,6
92
$0.00
$50,000,000.00
$100,000,000.00
$150,000,000.00
$200,000,000.00
$250,000,000.00
FY2000 FY2001 FY2002 FY2003 FY2004 FY2005 FY2006 FY2007 FY2008 FY2009 FY2010 FY2011 FY2012 FY2013 FY2014 FY2015
30 Contracts Awarded30 Contracts Awarded30 Contracts Awarded30 Contracts Awarded$946,898,025$946,898,025$946,898,025$946,898,025
![Page 6: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/6.jpg)
Anticipated Project LocationsBridge Serial
NumberFeature Carried Feature Intersected Location County Name Dist FEMA Zone
105-5043-0 CARPENTER ROAD COLDWATER CREEK 4.5 MI NW OF RUCKERSVILLE ELBERT 1 Zone A
297-5016-0 OLD GA 138 BIG FLAT CREEK 3 MI NE OF WALNUT GROVE WALTON 1 Zone A
147-5031-0 CR 152 PRUITT CREEK 3 MI N OF VANNA HART 1 Zone A
257-5033-0 CURRAHEE LANE NORTH FORK BROAD RIVER 3.2 MI SW OF TOCCOA STEPHENS 1 Zone A
157-5013-0 CHANDLER BRIDGE RD NORTH OCONEE RIVER 1.9 MI SW OF CENTER JACKSON 1 Zone A
133-5009-0 COPELAND ROAD GREENBRIER CREEK 7.1 MI SW OF PENFIELD GREENE 2 Zone A
211-0047-0 NEWBORN ROAD LITTLE RIVER 5.9 MI SW OF RUTLEDGE MORGAN 2 Zone A
091-5015-0 JAYBIRD SPRINGS RD GUM SWAMP CREEK TRIB 5.2 MI NE OF CHAUNCEY DODGE 2 Not mapped
317-0022-0 SANDTOWN ROAD FISHING CREEK 3.3 MI NW OF METASVILLE WILKES 2 Zone A
283-5012-0KNOX MILL ROADUNION CAMP RD RED BLUFF CREEK 3.8 MI NW OF SOPERTON TREUTLEN 2 Zone A
077-5050-0 BRADBURY ROAD YELLOW JACKET CREEK 2.7 MI E OF GRANTVILLE COWETA 3 Zone A
145-5031-0 FORTUNE HOLE RD LITTLE PALMETTO CREEK 1 MI SE OF HAMILTON HARRIS 3 Zone A
197-5001-0 WALTER WELLS RD SHOAL CREEK 5.5 MI NE OF BUENA VISTA MARION 3 Zone A
231-5003-0 WILLIAMS MILL ROAD LITTLE POTATO CREEK 2 MI NE OF MEANSVILLE PIKE 3 Zone A
199-5028-0 CO LINE CHURCH RD. WHITE SULPHUR CREEK 1.5 MI S OF DURAND MERIWETHER 3 Zone A
079-5025-0 AVERY ROAD CULPEPPER CREEK 5 MI S OF ROBERTA CRAWFORD 3 Zone A
003-5026-0 COGDELL ROAD RED BLUFF CREEK APP 8.5 MI SE PEARSON ATKINSON 4 Zone A
131-0052-0 OLD THOMASVILLE RD BARNETTS CREEK THOMAS COUNTY LINE GRADY 4 Zone A
277-5043-0 LOWER BROOKFIELD R NEW RIVER APP 5 MI SE OF TIFTON TIFT 4 Zone A
017-0020-0 PERRY HOUSE ROAD WILLACOOCHEE CREEK 3.7 MI SOUTH OF FITZGERALD BEN HILL 4 Zone A
299-0032-0 OLD NICHOLS HWY. HOG CREEK TRIB 15 MI NW OF WAYCROSS WARE 5 Zone A
305-5002-0WOODS ROAD
WOODS BRIDGE ROAD GOOSE CREEK 4 MI N OF JESUP WAYNE 5 Zone A
309-0024-0FAS 1120
SNOW HILL ROAD OCHWALKEE CREEK 16 MI N OF ALAMO WHEELER 5 Zone A
005-0020-0FAS 1827HWY 64 LITTLE HURRICANE CREEK 4 MI SW OF ALMA BACON 5 Zone A
271-0048-0FAS 585HWY 240 LITTLE HORSE CREEK 10.6 MI SE OF MILAN TELFAIR 5 Not mapped
![Page 7: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/7.jpg)
Anticipated Project Locations
![Page 8: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/8.jpg)
Anticipated Project Locations
077-5050-0
105-5043-0
309-0024-0
271-0048-0
![Page 9: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/9.jpg)
Department Goals
• Successfully replace existing off-system bridges
• Minimize overall public inconvenience
• Industry Participation
• Price/Budget
![Page 10: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/10.jpg)
Project Overview
• State funds
• Off-site detours (number of days will vary per site)
• Low impact (minimal utility, hydraulic & env impacts)
• No ROW
• Maintain existing profile (or minimum modification)
• Up to 5 Contracts (4 – 6 bridges per contract)
![Page 11: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/11.jpg)
Risks and Mitigation StrategiesRisk ItemRisk ItemRisk ItemRisk Item Mitigation MeasureMitigation MeasureMitigation MeasureMitigation Measure
Geotechnical Include geotechnical boring logs/samples in the RFP
Survey Database Include reliable survey database in the RFP
ROW Off-site detour
Evaluate constructability scenarios pre-let
Obtain ROW certification from Locals during the RFP development
Environmental Select locations with minimal environmental impacts
Perform environmental screening pre-let
RFP to include environmental related scope items
RFP to include anticipated review/approval durations
Industry Perform industry outreach early and actively listen
Provide as much information as early as possible (e.g. draft RFP)
Design Variance
Design Exception
Evaluate need for DV/DE during RFP development
Include approved known instances of DV/DE in the RFP
Hydraulics Select locations where FEMA coordination is notnotnotnot required
Perform hydraulics screening during RFP development
Include hydraulic opening parameters in the RFP
Include all hydraulic related data in the RFP
Pre-approve known hydraulic variance(s)
Utilities SUE QL-D ( completed by December 2015)
Early coordination with utility owners
Executed MOUs included in the RFP
![Page 12: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/12.jpg)
Risks and Mitigation StrategiesRisk ItemRisk ItemRisk ItemRisk Item Mitigation MeasureMitigation MeasureMitigation MeasureMitigation Measure
Locals Outreach/
Detour
Early and ongoing coordination with Locals during development of the RFP
Obtain ROW certification from the Locals
Post-let coordination with Locals regarding detour schedule
Conducting detour meeting post-let for each location
Cost Estimate Continue to monitor industry trends
Be open during the development of the RFP to opportunities to reduce costs
Submittals Review
Durations
Early collaborations with SMEs to establish aggressive yet realistic review
timeframes
Detour Duration Evaluate and establish reasonable durations to perform the work for each
bridge relocation
Overall Contract
Duration
Establish reasonable durations per contract in order to complete all of the work
![Page 13: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/13.jpg)
Roles and Responsibilities
• Design-Build Teamo Schedule development/management
o Bridge design
o Geotechnical reports
o Stream buffer variance application (if needed)
o Detour meeting participation, and install detour signage
o Utility/coordination and relocation (if needed)
o Replace each bridge within allowable detour duration
• GDOTo Submittal reviews and GEPA preparation/approval
o Permit preparation and mitigation costs
o Construction Oversight/CEI
![Page 14: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/14.jpg)
Anticipated Procurement Process
• Two Phase Low Bid
o All qualified – no shortlist
• Phase I - Request for Qualifications (RFQ)
o January 8 (note: restriction on communications)
o Area classes and organizational info for the team
o Past project examples (design-build or bid-build)
o Pass/Fail evaluation
o One team may pursue one or all bridge “batches”
o Multiple Statement of Qualifications (SOQ) if different team members
![Page 15: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/15.jpg)
Anticipated Procurement Process• Phase II - Request for Proposals (RFP)
o March 25 – draft RFP
� Advertised on GDOT’s SharePoint Site
� One RFP for all “batches”
o April 22 – final RFP
� Advertised on Bid Express
o Price Proposal
� Submitted via Bid Express
� Design complete/construction complete pay items
o Technical Proposal
� Simple narrative describing approach to designing
and constructing multiple bridges
![Page 16: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/16.jpg)
a. GDOT issues Public Notice Advertisement (PNA) 10/16/2015 ----------
b. Industry Forum – GDOT Room 403/404 11/5/2015 10:00 A.M.
c. Industry one-on-one meetings – GDOT Room 407* 11/5/2015 12:00 - 4:30
d. GDOT issues Request for Qualifications (RFQ) 01/08/2016 -----------
e. Deadline for the submission of written questions and Requests for Clarification 01/22/2016 -----------
f. Deadline for Statement of Qualifications (SOQ) 02/05/2016 2:00 P.M.
g. GDOT issues the Notice to Finalists 02/19/2016 -----------
h. GDOT issues draft Request for Proposals (RFP) to the Finalists 03/25/2016
i. GDOT issues final Request for Proposals (RFP) to the Finalists 04/22/2016 -----------
j. GDOT letting (receipt of bid/technical proposal from Finalists) 06/17/2016 -----------
Tentative Schedule of Events
![Page 17: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/17.jpg)
Questions
![Page 18: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/18.jpg)
GDOT Design-Build Webpage
http://www.dot.ga.gov/PS/Innovative/DesignBuild
GDOT Design-Build SharePoint Site
http://mydocs.dot.ga.gov/info/designbuild/default.aspx
Note: The sign-in sheet and presentation will be
posted on the Design-Build webpage.
![Page 19: FY 2016 Bridge Replacements Design-Build Industry Forum … · 2015. 11. 20. · oAll qualified – no shortlist • Phase I - Request for Qualifications (RFQ) oJanuary 8 (note: restriction](https://reader036.vdocuments.site/reader036/viewer/2022081616/5feb0d209833c579b82def83/html5/thumbnails/19.jpg)
Anticipated Procurement Process
BatchBatchBatchBatch
Prequalify Prequalify Prequalify Prequalify DesignDesignDesignDesign----Build Build Build Build Teams per Teams per Teams per Teams per
BatchBatchBatchBatch
Proposers submit Proposers submit Proposers submit Proposers submit Statement of Statement of Statement of Statement of
Qualifications (SOQ)Qualifications (SOQ)Qualifications (SOQ)Qualifications (SOQ)
Issue Request for Issue Request for Issue Request for Issue Request for Proposals (RFP)Proposals (RFP)Proposals (RFP)Proposals (RFP)
(draft and final)(draft and final)(draft and final)(draft and final)
Submit Price Submit Price Submit Price Submit Price ProposalProposalProposalProposal and and and and
Technical ProposalTechnical ProposalTechnical ProposalTechnical Proposal
(Letting)(Letting)(Letting)(Letting)
Evaluate Technical Evaluate Technical Evaluate Technical Evaluate Technical ProposalsProposalsProposalsProposals
Pass/FailPass/FailPass/FailPass/Fail
Issue Public Notice Issue Public Notice Issue Public Notice Issue Public Notice Advertisement Advertisement Advertisement Advertisement
(PNA)(PNA)(PNA)(PNA)
Issue Request for Issue Request for Issue Request for Issue Request for Qualifications Qualifications Qualifications Qualifications
(RFQ)(RFQ)(RFQ)(RFQ)
Q&AQ&AQ&AQ&A
Bid Review Bid Review Bid Review Bid Review Committee/Committee/Committee/Committee/
AwardAwardAwardAward