Application to the Environmental Protection Agency for an Industrial Emissions Directive (IED) Licence in respect of North Cork Co-Operative Creameries Ltd, Kanturk, Co. Cork Further Information Request (Feb 2017) Prepared by AWN Consulting Ltd June 2017 For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 09-06-2017:03:28:52

Upload: others

Post on 26-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

Application to the

Environmental Protection Agency

for an

Industrial Emissions Directive (IED) Licence

in respect of

North Cork Co-Operative Creameries Ltd,

Kanturk, Co. Cork

Further Information Request (Feb 2017)

Prepared by

AWN Consulting Ltd

June 2017

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 2: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

EOB/16/9011WL03 30 May 2017 Office of Environmental Sustainability Environmental Protection Agency PO Box 3000, Johnstown Castle Estate, Wexford Dear Grainne, Re: Further Information Request (February 2017) for an Industrial Emissions Licence Application for North Cork Co-Operative Creameries Ltd., Strand Street, Kanturk, Co. Cork (Reg. No.: P1051-01) Please find enclosed response to a Request for Further Information in respect of IED Licence Application P1051-01 further to your letter dated 7 March 2017. The following documents are enclosed:

• 1 original and 1 hardcopy of the Further Information Request Response;

• 2 no. CD Roms containing electronic copies of the documents in the required format; and

• 1 no. hardcopy of CONFIDENTIAL INFORMATION. We hereby confirm that the content of the electronic files on the accompanying CD ROMs is a true copy of the information provided in hardcopy format. Please feel free to contact the undersigned should you wish to discuss. Yours faithfully

Emer O’ Brien Robert Hunt Environmental Consultant Senior Environmental Consultant cc: Ms Mary O’ Connor, Technical and Environmental Manager; North Cork Co-Operative Creameries Ltd.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 3: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

NCCCL Licence Application P1051-01 Request for Further Information Feb 2017 AWN Consulting Limited _____________________________________________________________________________________________________

_____________________________________________________________________________________________________

CONTENTS

Item 1 – BioAtlantis Ownership ............................................................................. 1 Appendix 1 - Certificate of Incorporation

Item 2 – Confirmation of Chelation Step ............................................................... 2

Appendix 2 - Letter from BioAtlantis

Item 3 – Planning Permissions Relating to BioAtlantis Operations ................... 3

Appendix 3(1) - Planning Reference No. 948/73

Appendix 3(2) - Confirmation on EIS Requirement

Item 4 – Details on BioAtlantis Seaweed ............................................................... 4 Item 5 – BioAtlantis Operation and Process Flow Diagram ................................ 5 Item 6 – Applicability of BAT to BioAtlantis Operation ........................................ 6 Item 7 – Natura Impact Statement Update ............................................................. 7

Appendix 7 - Updated Natura Impact Statement

Item 8 – Actions to be Carried out with respect to Noise Assessment Report .. 8 Item 9 – Provide details in accordance with Regulation 9(2)(g), 9(2)(k) and 9(2)(i)

Item 9(a) – BioAtlantis Sludge Generation ........................................................ 9

Appendix 9.a(1) Report on BioAtlantis’ Sludge - Algacore

Item 9(b) – Wastewater Sludge/Solid Wastes Management ............................ 10

Appendix 9.b(1) Laboratory Analysis of Sludge Type A

Appendix 9.b(2) Laboratory Analysis of Sludge Type B

Appendix 9.b(3) Nutrient Management Plans

Item 9(c) – Sludge Storage at Shay Galvin’s Farm ........................................... 14

Appendix 9.c(1) Letter from Shay Galvin

Item 9(d) – Details of Effluent Streams .............................................................. 15

Appendix 9.d(1) Laboratory Analysis of Effluent from BioAtlantis

Appendix 9.d(2) Laboratory Analysis of Effluent from NCCCL

Item 9(e) – Wastewater Sludge Characterisation ............................................. 16

Appendix 9.e(1) Laboratory Analysis of NCCCL Sludge – Sludge Type A

Appendix 9.e(2) Laboratory Analysis of NCCCL Sludge – Sludge Type B

Appendix 9.e(3) Sludge Characterisations from Licensed IPC/IED Dairy Activities

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 4: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

NCCCL Licence Application P1051-01 Request for Further Information Feb 2017 AWN Consulting Limited _____________________________________________________________________________________________________

_____________________________________________________________________________________________________

Item 9(f) – Monitoring Data for SW1 .................................................................. 18

Item 9(g) – Adequacy of Wastewater Treatment Process ................................ 19

Appendix 9.g(1) Assessment of WWTP: April 2017

Item 9(h) – Assimilative Capacity Update ......................................................... 20

Appendix 9.h(1) Update of Assimilative Capacity Calculations

Item 9(i) – Table E.2 (ii) for Emission Points SW3 and SW6 ............................ 21

Appendix 9.i(1) Tables E.2 (i) and (ii) for SW3 and SW6

Item 9(j) – Clarification of Interceptors used on Site ....................................... 22

Item 9(k) – BioAtlantis Reporting Arrangements ............................................. 23

Item 9(l) – Flood Risk Measures ......................................................................... 24

Item 9(m) – Water Quality Concerns Raised by 3rd Parties ............................ 25

Item 9(n) & 9(o) – Septic Tank Details and Connections to Sewer ................. 26

Appendix 9.o(1) Drawing 13 – Discharge to Sewer

Item 9(p) – Odour data for A2-3 .......................................................................... 27

Item 9(q) – Clarify details on Air Dispersion Model .......................................... 28

Appendix 9.q(1) Boiler Emission Tables for 2 no. New Proposed LPG Boilers

Appendix 9.q(2) Revised Air Emissions Drawing – Drawing No. 6 Revision 2

Item 9(r) – Details of Emission Point A3-3 ........................................................ 29

Item 9(s) – Management of Air Pressure in BioAtlantis Building .................... 30

Appendix 9.s(1) Report from Airflow Services

Item 9(t) – Compliance with BAT Associated Emission Levels ...................... 31

Appendix 9.t(1) BioAtlantis’ Compliance with BAT Emission Levels

Appendix 9.t(2) Letter from Odournet

Appendix 9.t(3) BioAtlantis’ SOP for Taking Odour Samples

Appendix 9.t(4) BioAtlantis’ Results for In-House Odour Sampling

Item 10 – Provide details in accordance with Regulation 9(2)(g) ...................... 32

Item 10(a) – Details on Decommissioning of Emission Point A1-1 ................. 33

Appendix 10.a(1) Updated Air Dispersion Model

Item 10(b) & 10(c) – Status on new LPG Boiler Installation and Details on

Current/Proposed Boilers................................................................................... 34

Item 11(a) and 11(b) – Provide details in accordance with Regulation 9(2)(n):

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 5: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

NCCCL Licence Application P1051-01 Request for Further Information Feb 2017 AWN Consulting Limited _____________________________________________________________________________________________________

_____________________________________________________________________________________________________

assessment with regard to Baseline Reports ..................................................... 35 Appendix 11.a(1) Soil and Groundwater Baseline Report

Item 12 – EIS Update ............................................................................................ 36 Item 13 – Non-Tech Summary Update ................................................................. 37

Appendix 13(1) Updated Non-Technical Summary

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 6: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

NCCCL Licence Application P1051-01 Request for Further Information Feb 2017 AWN Consulting Limited

_____________________________________________________________________________________________________

Page 1

1. Provide details of the ownership of the Bioatlantis operation, including (Where applicable) a certified copy of the Certificate of Incorporate for Bioatlantis under the Companies Act, the Company's registration Number from the Companies Registration Office and particulars of the Registered Office of the company. [Regulation 9(2)(a)(i)].

Submitted as Confidential Data

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 7: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

NCCCL Licence Application P1051-01 Request for Further Information Feb 2017 AWN Consulting Limited

_____________________________________________________________________________________________________

Page 2

2. Confirm whether the Bioatlantis operation includes a chelation step [Regulation 9(2)(c)]

A letter confirming that chelation is not undertaken at the Bioatlantis facility is presented as Appendix 2.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 8: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

NCCCL Licence Application P1051-01 Request for Further Information Feb 2017 AWN Consulting Limited

_____________________________________________________________________________________________________

Appendix 2

Confirmation chelation is not undertaken.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 9: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

BioAtlantis Ltd.,

Clash Industrial Estate, Tralee, Co. Kerry, Ireland.

Date: 22/05/2017

Re: Confirm whether the BioAtlantis operation includes a chelation step [Regulation 9(2)(c)l.

To Whom It May Concern:

Due to the fact that the primary focus of the company is on the production of seaweed

extracts for the plant and animal markets, BioAtlantis has decided to subcontract any potential chelation production to EPA registered companies for the foreseeable future.

We understand that if processes involving chelation are to commence at our sites in Tralee or

Kanturk, we will require a licence under Class 5, Chemicals, of the First Schedule of the EPA Act 1992.

BioAtlantis Ltd., Clash Industrial Estate, Tralee, Co. Keny, Ireland (Registered address) Tel: +353 (0)66 7118477 Fax: +353 (0)66 7119802 Email: [email protected] Web: www.bioatlantis.com VAT number: IE6397737B

A private limited company with share capital and registered in Ireland under registration number 377737

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 10: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

NCCCL Licence Application P1051-01 Request for Further Information Feb 2017 AWN Consulting Limited

_________________________________________________________________________________________________________

Page 3

3. Identify the planning permissions or planning applications pertaining to the Bioatlantis operation. [Regulation 9(2)(d) & (e)]

Planning or Appeal

Reference Number

Planning Authority/

An Bord Pleanala

Date of Planning

Decision (Final)

Brief description EIS required with

Planning Application?

(Yes/No)

If “no”, Letter of confirmation

from planning authority/An

Bord Pleanala that EIA was

not required?

948/73 Cork

County

Council

09.10.1973 Construction of boiler house,

condensing plant, powder

store effluent treatment works

No See Appendix

3.(2)

Detail on the planning permission granted for the construction indicated in 948/73 is provided as Appendix 3(1). An EIS was not required for the granting of this planning permission. A letter from Cork County County Council indicating this is provided as Appendix 3(2).

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 11: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

NCCCL Licence Application P1051-01 Request for Further Information Feb 2017 AWN Consulting Limited

_________________________________________________________________________________________________________

Appendix 3(1)

Planning Permission 948/73

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 12: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 13: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 14: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 15: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 16: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 17: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 18: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 19: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 20: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 21: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 22: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 23: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 24: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 25: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 26: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 27: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

NCCCL Licence Application P1051-01 Request for Further Information Feb 2017 AWN Consulting Limited

_________________________________________________________________________________________________________

Appendix 3(2)

Letter from Cork County Council re EIS and Planning Permission

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 28: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

:~ Rt.Jc:yelort

93/0783 - Extension of Bottling Plant Building

09/8082 - Construction of extension and alteration to existing bottling plant.

11/05351 - Partial demolition of and alteratiento existing casein plant bag store, construction of new evaporator/dryer bui lding, erection of new cooling tower, and all associated site works, .

14/047 I 7 - Site improvement works consisting of construction of a new footpath and kerbing, creation of 2 formalised entrances, erection of bollards and all associated site works.

14/05423 - Retention of demolition of dwelling house, permission for demolition of l no, additional existing dwelling, house, permission-for erection of a single storey portable cabin structure for temporary use as office accotumodation and all associated site works,

14/06182 -Retention of alteration to entrance consisting of removal of existing stone wall and entrance and their replacement with new piers and entrance sate

14/06817 ~ Demolishmcnt of existing single story dwelling, dernollsh existing roadside earth and ditch, erect roadslde wall and railing, :;\11 associated site works.

I eenflrm that no Envlronmcntal Impact Assessment has been submitted it'} relation to the applications listed below.

----~ - --- --

I refer to your query regarding planning applications made by North Cork Co-Operative Creameries at Strand Street, Bluepool, Kanturk, Co. Cork.

Dear Ms. 0'13ricn

16 September 20 I G

Ms. Ern c r 0' Brien Environmental Consultant AWN Consul ting The Tecpro Building IDA Business and Technology Park Clonshaugh Dublin 17

An Rann~g Plcanala, Halla an Cho·nrac:,

B6_thar Charraig Runchfil11, Cor~gh. F{1t1t (O::'l!) '1276891 "Pnig,: (021) 486700;

R·pht>sl: ph11i11inginrou~col'lccoco.ii: Suiomh Gr~ruuliu; WW\~,~orlcco~.i\,i~

Pl:.U1niog. Dcparrmcnr, County Hall,

Carrigrohru1e Road, Cork. 'l\il (00! !) 4276891 • fnx (021) il!IG{007

Emuilr plitn11iugiu(o~corlm1co.ic: W~h! www.~orl!(oi:o.ie

Cornhairle Contae Chorea! Cork County Council

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 29: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

Caitrlona Ni Mhalnnin Administrative Officer

Yours sincerely;

o9l/o6 - Erection of Factory

268/69 - Erection of Store

948173 - Construction of boiler house, condensing plant, powder store and effluent treatment works

2701177 - Erection of Powder Store

13P8/79 - 3 Milk Silos

2440179 - Installation of 25,000 gal oil storage tank and associated bunds and relocation of existing oil Storage tank.

16/80 - Extension to Bottling Plant

34 70/81 - Installation of' wc-ighbridge, control office and installation of a 27,000 litre diesel storage tarik ·

65$)/88 - Amenity Building and New Entrance

92/0808 - Extension to Effluent Treatment Plant

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

HotDesk
Highlight
Page 30: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

NCCCL Licence Application P1051-01 Request for Further Information Feb 2017 AWN Consulting Limited

_________________________________________________________________________________________________________

Page 4

4. Provide details on the seaweed used in the Bioatlantis operation, including how

and from where it is sourced.

SUBMITTED AS CONFIDENTIAL DATA

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 31: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

NCCCL Licence Application P1051-01 Request for Further Information Feb 2017 AWN Consulting Limited

_____________________________________________________________________________________________________

Page 5

5. Provide a detailed process flow diagram and a detailed process description for

the Bioatlantis operation.

SUBMITTED AS CONFIDENTIAL DATA

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 09-06-2017:03:28:52

Page 32: Further Information Request (Feb 2017)09.10.1973 Construction of boiler house, condensing plant, powder store effluent treatment works No See Appendix 3.(2) Detail on the planning

NCCCL Licence Application P1051-01 Request for Further Information Feb 2017- CONFIDENTIAL INFORMATION AWN Consulting Limited

_____________________________________________________________________________________________________

Page 6

6. Provide an assessment of the applicability of BAT to the Bioatlantis operation.

This assessment should be accompanied by a detailed process flow diagram

and a detailed process description for the odour abatement utilised at the Bioatlantis operation [Regulation 9(2)(h)]

Submitted as Confidential Information