Convene Kit Cart WHERE ARE MY SHOES??? 60 Old Route r 36 72 SCRAP 18 66 90 10 Cobbler travels to Desk, SMOH, Cabinet, and custom cells to gauge need, travels back to cut, then returns to said areas with shoes, and finally returns to GRL. Night shift has a water spider route. Shoes are made on demand without a standard process creating enormous waste in the process. Old miter saw

Upload: matthew-larson

Post on 16-Aug-2015

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: foundmyshoes

Convene Kit Cart

WHERE ARE MY SHOES???

60

Old Route

r

3672

SCRAP

1866

9010

Cobbler travels to Desk, SMOH, Cabinet, and custom cells to gauge need, travels back to cut, then returns to said areas with shoes, and finally returns to GRL. Night shift has a water spider route. Shoes are made on demand without a standard process creating enormous waste in the process.

Old miter saw

Page 2: foundmyshoes

Where are my shoes?

5S

Page 3: foundmyshoes

WHERE ARE MY SHOES?

8 years of waste

Page 4: foundmyshoes

Create a standard, let human ingenuity refine it

No standard to process Pieces are cut randomly as needed

Inventory depletes rapidly as demand of SMOH, Cabinet, Custom, and Desking cells is sporadic and hard to predict.

No forecast of demand Incredibly wasteful misuse of raw material

Page 5: foundmyshoes

MAKE CUTS COUNT90" 2x43+

2" scrap3x30 4x21"+

6" scrap4x23"+1" scrap

72"+18"

72" 1x66"+6" scrap

49"+23"

42"+30" 2x31"+10"

3x24"

36" 26"+10"

Largest scrap piece 6”Drastically reduces scrap, saving space and $$$Wood costs approximately:$744 per load for 3/4x3 1/2x108

Total est. annual material cost, $78,000Tasks minimized, saving time.By cutting pre-routed 90”, 72”, 36” inch shoes, portions of the routing is complete for subsequent shoes production.Time savings equates to 2/3 current rate 0r 10 man-hours per day @ $20 and 75% less material waste Cost savings= (material )$58,500 + (manpower) $73,000=$131,000 annual cost savings.

Every new formula is an easily implemented EE Suggestion and added savings!

Page 6: foundmyshoes

10

8”

90

23

12

3”

90

18

18

18

18

18

” 26

10 ”

72

36

”31

10 ”

30

36

Page 7: foundmyshoes
Page 8: foundmyshoes

108

Recycled skin

Recycled skin

10

Router

1836

72

SCRAP

Mobile cart same

height as router

Hand off order/picku

p

Found Them!!!

23

2124

6649

32

42

29

90

By cutting the area in half and standardizing the process waste is greatly reduced. A water Spider route ensures Cobblers no longer have to walk back and forth constantly. A kanban system attached to the new cart ensures the correct shoes are delivered and in a timely manner. By creating a standard for cutting from existing pre-cut sized waste is reduced by 90%

Page 9: foundmyshoes

CONCLUSION

Cost savings equate to $131,000 annually

Overproduction and excess inventory reduced to zero

Floor space reduced to 40% of previous footprint.

Success!!