Page 1: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Foundation has been tarred to grade line

Page 2: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Bluewater Plumbing has arrived for in-floor heat

Page 3: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Peter changing light bulbs on the pole

Page 4: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Former Parkhill PUC utility truck

Page 5: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Installing the top plates

Page 6: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Basement bathroom roughed in with pump pit

Page 7: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Solid Big ‘O’ for downspouts

Page 8: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Stone covering the footing tile, laying the downspout tile

Page 9: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Joins to drain to the east slope

Page 10: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Upright Big ‘O’ is for a downspout

Page 11: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Don and J.J. creating a drain area at the garage door

Page 12: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Backfill for the foundation - gravel

Page 13: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Don Heard backfilling the foundation

Page 14: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Replacement windows arrive under black sky

Page 15: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Replacement windows stacked and ready to install

Page 16: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Insulation blanket to go under the radiant floor heating

Page 17: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Organized chaos

Page 18: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Spreading the backfill along the foundation wall

Page 19: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Laying out the wire mesh for the concrete floor

Page 20: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

We’ve started with the open web floor joists

Page 21: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Installing the floor heating tubes

Page 22: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Wired to the mesh in a grid

Page 23: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Moving the concrete slab – carefully! Tipping as he moves.

Page 24: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Unload it at the back of the barn

Page 25: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

Layout is completed

Page 26: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

I will have to take measurements for partitions

Page 27: Foundation has been tarred to grade line. Bluewater Plumbing has arrived for in-floor heat

The heater will be located in the old basement