Page 1: Fotovoltaic Project Romania (Calarasi) 2 MW

investment or other decision. No advice or any offers are given or made in this presentation. BeFicinet Consulting is authorized by SC Electra Bio Energy SRL

PRESENTATION FOR POTENTIAL INVESTORS

PFV 2.0MW

Calarasi, Calarasi county

Page 2: Fotovoltaic Project Romania (Calarasi) 2 MW

Index

1. Summary

2. Project description

3. Solar Data

4. Technical proposed solution

5. Utilities assurance

6. Project phases

7. Investment Value

8. Cost Benefit Analysis

9. Risk analysis

10. Contact

Page 3: Fotovoltaic Project Romania (Calarasi) 2 MW

2012 The content of this presentation, appendices or attachments, are not represented or waeeanted, have not been verified to prospectus or similar standard and should not be relied upon in making any

investment or other decision. No advice or any offers are given or made in this presentation. BeFicient Consulting is authorized by SC Electra Bio Energy SRL

Summary

* Strong, technically proficient team with almost 5 years of cumulated experience in the renewable

energy sector

- Balanced blend of project management experience and regenerative energy technical

expertise

- Strong connections in all Romanian institutions connected to renewable energy sector

- Speciality technical background

SPV Company established for development of renewable energy -CALARASI 2.0 MW PV

Project

* Strategy is to develop projects, fully authorizing and ready for investment starting, construct and

operate (BOT approach)

* Professional team, including a technical consultant with a large experience, over 40 years concerning

the Romanian energetic system; member of the management team of main important energetic

companies.

* The shareholders have been already involved in Romania (on behalf of important companies) for

development of renewable energy projects.

Page 4: Fotovoltaic Project Romania (Calarasi) 2 MW

2012 The content of this presentation, appendices or attachments, are not represented or waeeanted, have not been verified to prospectus or similar standard and should not be relied upon in making any

investment or other decision. No advice or any offers are given or made in this presentation. BeFicient Consulting is authorized by SC Electra Bio Energy SRL

Project description

Geographical location: Street Varianta Nordului no. 1 Calarasi, Calarasi county

Geographical coordinates: 44º12’ (44.21) N / 27º21’ (27.32) E , 18m a.s.l

Site: - approx. 1.5km from the center of Calarasi city

- access road until project location

- surface of appreciatively 4 ha

- property of SPV's owner - distance to the Grid: - Connection cost: 72.500 euro

Page 5: Fotovoltaic Project Romania (Calarasi) 2 MW

2012 The content of this presentation, appendices or attachments, are not represented or waeeanted, have not been verified to prospectus or similar standard and should not be relied upon in making any

investment or other decision. No advice or any offers are given or made in this presentation. BeFicient Consulting is authorized by SC Electra Bio Energy SRL

Project description

Information published on NASA’s site:

Monthly average temperature (10m over the land):

Average last 22 years: 12.3ºC

Min.: 8.2ºC

Max.: 16.5ºC

Average monthly downfall (last 22 years): 1.64 mm/day

Over 270 sunny days per year

Page 6: Fotovoltaic Project Romania (Calarasi) 2 MW

2012 The content of this presentation, appendices or attachments, are not represented or waeeanted, have not been verified to prospectus or similar standard and should not be relied upon in making any

investment or other decision. No advice or any offers are given or made in this presentation. BeFicient Consulting is authorized by SC Electra Bio Energy SRL

Europa

Data regarding

solar radiation

Page 7: Fotovoltaic Project Romania (Calarasi) 2 MW

2012 The content of this presentation, appendices or attachments, are not represented or waeeanted, have not been verified to prospectus or similar standard and should not be relied upon in making any

investment or other decision. No advice or any offers are given or made in this presentation. BeFicient Consulting is authorized by SC Electra Bio Energy SRL

Data regarding

solar radiation

Romania

emplacement

Page 8: Fotovoltaic Project Romania (Calarasi) 2 MW

2012 The content of this presentation, appendices or attachments, are not represented or waeeanted, have not been verified to prospectus or similar standard and should not be relied upon in making any

investment or other decision. No advice or any offers are given or made in this presentation. BeFicient Consulting is authorized by SC Electra Bio Energy SRL

Data regarding solar radiation

Emplacement

0

1

2

3

4

5

6

7

I II III IV V VI VII VIII IX X XI XII

kWh

/m2

/zi

NASA GIS Ispra Măsurători proprii

Monthly average for solar radiation intensity, incidental on horizontal surface (kWh/m2/day)

Page 9: Fotovoltaic Project Romania (Calarasi) 2 MW

2012 The content of this presentation, appendices or attachments, are not represented or waeeanted, have not been verified to prospectus or similar standard and should not be relied upon in making any

investment or other decision. No advice or any offers are given or made in this presentation. BeFicient Consulting is authorized by SC Electra Bio Energy SRL

Data regarding the solar

radiation

Emplacement

0

1

2

3

4

5

6

7

I II III IV V VI VII VIII IX X XI XII

kWh

/m2

/zi

NASA GIS Ispra Măsurători proprii

Monthly average for solar radiation intensity, incidental on horizontal surface(kWh/m2/day)

NASA = 3.71 kWh/m2/day

GIS Ispra = 3.77 kWh/m2/day

Proper

measurements

= 3.70 kWh/m2/day

Values of the solar radiation

Incident on horizontal surface:

Page 10: Fotovoltaic Project Romania (Calarasi) 2 MW

2012 The content of this presentation, appendices or attachments, are not represented or waeeanted, have not been verified to prospectus or similar standard and should not be relied upon in making any

investment or other decision. No advice or any offers are given or made in this presentation. BeFicient Consulting is authorized by SC Electra Bio Energy SRL

Technical proposed solution

PF

V

•PFV

• Installed power = 1951.32 kw

•No. panels = 8484 pcs.

•Pannels angle = 30 degrees

• Inverters no.= 4 pcs.

•Produced energy = 2571.5 MWh/year

•Functioning hours = 1320 hours/year

pan

ou

ri

• Policristaline

• Putere panou =

230W

• Eficienta = 14.5%

• Tensiune MPPT = 29.8V

• Curent MPPT = 7.7A

• Coef temp = -

0.36%/oC

• Sup. panou = 1.65mp

• Garantie = 5ani@95%

25 ani@80% inve

rtoa

re

• Putere = 500kW

• Eficienta = 97.3%

• Gama tensiune =

450 – 820V

• Curent = 1200 A

• Tens. iesire = 20kV

• Frecventa = 50Hz

• Cons. Intern = 720W

• Protectie = IP54

Page 11: Fotovoltaic Project Romania (Calarasi) 2 MW

2012 The content of this presentation, appendices or attachments, are not represented or waeeanted, have not been verified to prospectus or similar standard and should not be relied upon in making any

investment or other decision. No advice or any offers are given or made in this presentation. BeFicient Consulting is authorized by SC Electra Bio Energy SRL

Technical proposed solution

PF

V

•PFV

• Installed power = 1951.32 kw

•No. panels = 8484 pcs.

•Pnels angle = 30 degrees

• Inverters no.= 4 pcs.

•Produced energy = 2571.5 MWh/year

•Functioning hours = 1320 hours/year

pan

ou

ri

•PANELS

Polycrystalline

Pannel power =230 W

Efficiency = 14.5%

Tension MPPT =29.8 V

Current MPPT = 7.7 A

Temp. Ratio = -0.36% /degree C

Panel surface = 1.65 mp

Guarantee = 5 years@95%

25 years @80%

inve

rto

are

• Putere = 500kW

• Eficienta = 97.3%

• Gama tensiune =

450 – 820V

• Curent = 1200 A

• Tens. iesire = 20kV

• Frecventa = 50Hz

• Cons. Intern = 720W

• Protectie = IP54

Page 12: Fotovoltaic Project Romania (Calarasi) 2 MW

2012 The content of this presentation, appendices or attachments, are not represented or waeeanted, have not been verified to prospectus or similar standard and should not be relied upon in making any

investment or other decision. No advice or any offers are given or made in this presentation. BeFicient Consulting is authorized by SC Electra Bio Energy SRL

Technical proposed solution

PF

V

• PFV

• Installed power = 1951.32 kw

• No. panels = 8484 pcs.

• Pnels angle = 30 degrees

• Inverters no.= 4 pcs.

• Produced energy = 2571.5 MWh/year

• Functioning hours = 1320 hours/year

pan

ou

ri

• PANELS

• Polycrystalline

• Pannel power =230 W

• Efficiency = 14.5%

• Tension MPPT =29.8 V

• Current MPPT = 7.7 A

• Temp. Ratio = -0.36% /degree C

• Panel surface = 1.65 mp

• Guarantee = 5 years@95%

• 25 years @80%

inve

rto

are

• INVERTERS

• Power = 500 Kw

• Efficiency = 97.3%

• Tension range = 450-820 V

• Current= 1200 A

• Exit tension = 20kV

• Frequency = 50Hz

• Internal cons. =720 W

• Protection = IP54

Page 13: Fotovoltaic Project Romania (Calarasi) 2 MW

2012 The content of this presentation, appendices or attachments, are not represented or waeeanted, have not been verified to prospectus or similar standard and should not be relied upon in making any

investment or other decision. No advice or any offers are given or made in this presentation. BeFicient Consulting is authorized by SC Electra Bio Energy SRL

Utilities assurance

Potable water alimentation: connection to the city water grid

Water evacuation: is realised by the proper sewerage system

Industrial cooling water: not the case

Waste disposal: by contract with a specialised company from the city

Electric energy: the consumption will be made by auto-consumption from the electrical

grid using a separated counter to the production counter

Phone lines: connection to the phone network of the city