FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5 th St. Vancouver, Washington 98661 FP-03 109.01 Date Stamp (a) Project Name: Project Number: (b) Item Number: Item Description: (c) Date work performed: Copy Stamp Daily Record Of Miscellaneous Items (f) Calculations*: (g) Supporting sketch and details*: Summary of Quantities (d) Location: (e) Measured quantity: *Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work: FHWA Use Only (i) Interim Measurement Final Measurement Verified By: Construction Inspector I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record Checked By: (j) Contractor Representative FHWA Representative Date: Be sure to adjust designed clearing distances and areas to reflect actual areas of work performed 20101 Clearing and grubbing 13+320 to 14+500: 28,628 m2 per FHWA clearing report = 2.863 ha see attached documentation: (a) Contractor clearing report (b) FHWA clearing report see stations above 2.863 ha 2.863 ha Page 13 of 134

Upload: dinhthuan

Post on 28-Jul-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

Be sure to adjust designed clearing distances and areas to reflect actual areas of work performed

20101Clearing and grubbing

13+320 to 14+500: 28,628 m2 per FHWA clearing report = 2.863 ha

see attached documentation:(a) Contractor clearing report(b) FHWA clearing report

see stations above 2.863 ha

2.863

ha

Page 13 of 134

These support pages should bechecked and signed by FHWA

Page 14 of 134

Page 15 of 134

Page 16 of 134

Page 17 of 134

Page 18 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

20101Clearing and grubbing

375+00 to 400+00: 3.107 acres @ 75% complete = 2.330 acres

**Area grubbed, per Appendix A, 75 % partial payment

see attached documenation:(a) MS Excel spreadsheet(b) FHWA clearing report

see stations above 2.330 acre

2.330

acre

Page 19 of 134

Sta Sta SF375+00.00 376+50.00 7,876.00 1 acre = 43560 square feet376+50.00 383+61.10 33,298.00383+61.10 389+00.00 25,048.00389+00.00 394+50.00 34,852.00394+50.00 398+00.00 19,164.00398+00.00 400+00.00 15,103.00

135,341.00 Total 3.107 acre

Page 20 of 134

Page 21 of 134

Page 22 of 134

Page 23 of 134

Page 24 of 134

Page 25 of 134

Page 26 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

Be sure to confirm that tree isoutside of original clearing limits

20204Additional clearing and grubbing, removal of tree

10+04 LT81' from center line: 1 @ 20" dia: A = (pi/4)(20in)^2 = 314.159 sq.in78' from center line: 1 @ 26" dia: A = (pi/4)(26in)^2 = 530.929 sq.in

11+94 RT79' from center line: 2 @30" dia: A = (2)(pi/4)(30in)^2 = 1413.717 sq.in

2258.805 sq.in = 15.686 sq.ft

Total for payment = 15.686 sq.ft

see stations above 15.686 sq.ft

15.686

sq.ft

Page 27 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

20303Removal of Pavement, Asphalt

Area G = (119.88 x 1) = 119.88 m2

see attached plan sheets

0+280 to 0+360 119.88 m2

120

m2

Page 28 of 134

Page 29 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

Example 1

20401Excavation and embankment, roadway exc

105+366 LT to 105+381.5 LT: 33.03m3

see attached documentation for sliver excavation:(a) differential leveling survey notes(b) scaled cross section notes(c) average end area calculations(d) irregular polygon area calculations

see stations above 33.03m3

33

m3

Page 30 of 134

Page 31 of 134

Susan.Wright
Text Box

Page 32 of 134

Susan.Wright
Text Box

Page 33 of 134

Susan.Wright
Text Box

Page 34 of 134

Susan.Wright
Text Box

Page 35 of 134

Susan.Wright
Text Box

Page 36 of 134

Susan.Wright
Text Box

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

20401Roadway excavation

Performed 85% of the roadway exc from station 27+857 to 33+500.

Total excavation from 27+857 to 33+500 = 24,205 m3

24,205 x 0.85 = 20,574.3 m3

see attached documentation:(a) total mass spreadsheet(b) guidelines for percentage of payments for partially complete work

see stations above 20,574.3 m3

20,574

m3

Page 37 of 134

Contractor Generated Notes

FHWA project staff should provide a note toreflect that calculations are accurate and reflectthe original design or adjusted quantities

Page 38 of 134

Page 39 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

20402Excavation and embankment, subexcavation

487+82 to 488+38: (56' long)(8' wide)(1' deep) = 448 ft3

489+07 to 489+28: (21' long)(24' wide)(1.75' deep) = 882 ft3

491+58 to 492+06: (48' long)(10' wide)(1.5' deep) = 720 ft3

490+72 to 493+80: (308' long)(14' wide)(0.8' deep) = 3449.6 ft3

Total = 5499.6 ft3 = 203.7CY

see stations above 203.7 CY

204

CY

Page 40 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

20402Excavation and embankment, subexcavation

101+440 to 101+680 = 2639.4m3

see attached documents:(a) average end area calculations(b) cross-section end area reports(c) irregular polygon area calculations

see stations above 2639.4m3

2639

m3

Page 41 of 134

Page 42 of 134

Page 43 of 134

Page 44 of 134

Page 45 of 134

Page 46 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

20406Select Borrow

Subexcavation backfill from station104+200 to station 104+220

see attached documentation:(a) daily mass record(b) street delivery report - spread report

see stations above 115.7 t

115.7

t

Page 47 of 134

Page 48 of 134

Page 49 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement:

(h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Manager

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

Field Sample Notebook April 2011

Page 59 of 171

20701Eathwork Geotextile, Type VIII-B

Crew Installed Fabric From 11+696 to 11+765

Total Length=69m

Width of Fabric=16.3m

Depth of Trench= 1m x 2 for both sides = 2m

Total Installed: (69m x 16.3m)+(69m x 2m)= 1262.7 m2

*See attached sheets

11+696 to 11+765 1262.7 m2

1262.7

m2

Page 50 of 134

Page 51 of 134

Page 52 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

21101Roadway Obliteration, method 1

Obliteration Area Calculations:30+00 27' LT, 36' RT = 63'

avg. width = 64.5' area = (64.5')(50') = 3225 sq.ft29+50 30' LT, 36' RT = 66'

avg. width = 64.5' area = (64.5')(50') = 3225 sq.ft29+00 24' LT, 39' RT = 63'

avg. width = 66' area = (66')(50') = 3300 sq.ft28+50 27' LT, 42' RT = 69'

avg. width = 66' area = (66')(50') = 3300 sq.ft28+00 27' LT, 36' RT = 63'

avg. width = 63' area = (63')(50') = 3150 sq.ft27+50 27' LT, 36' RT = 63'

avg. width = 64.5' area = (64.5')(20') = 1290 sq.ft27+30 27' LT, 39' RT = 66'

Total = 17490 sq.ft = 1943.3 sq.yd

see stations above 1943.3 sq.yd

1943

sq.yd

Page 53 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

25101Placed riprap, class 3

19+320: 10m long x 2.5m wide x 0.5m thick = 12.5m320+140: 7m long x 2m wide x 0.3m thick = 4.2m3

Total = 16.7m3

see attached placed riprap detail

see stations above 16.7 m3

17

m3

Page 54 of 134

Sta

tion

19+3

20@

20'l

efto

fcen

terl

ine

Page 55 of 134

Sta

tion

20+1

40@

24'r

ight

ofce

nter

line

Page 56 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

25101Placed riprap, class 2

Class 2 riprap placement at 104+300 LT to 104+447 LT: 2503.2 m3

see attached documentation:(a) average end area hand calculation sheet

see stations above 2503.2 m3

2503

m3

Page 57 of 134

In order to check the As-Builts when the project iscomplete, these quantities should also have areference to center line. Page 58 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

25103Keyed riprap

Station 1+005 – End SectionArea Volume = 215.0 m3

Station 1+015Area Volume = 729.3 m3

Station 1+030Area Volume = 789.3 m3

Station 1+045Area Volume = 695.3 m3

Station 1+060Area Volume = 208.5 m3

Station 1+070 – End SectionTotal = 2637.4 m3

see attached criss-cross + average end area calculation spreadsheet

see stations above 2637.4 m3

2637

m3

Page 59 of 134

Page 60 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

25125Boulder

Crew placed 4 boulders as directed by FHWA in Rockefeller Turnout.

see attached plan sheet

see stations above 4 EA

4

EA

Page 61 of 134

Page 62 of 134

FORM FHWA 17-348 (12/2007) U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION Western Federal Lands Highway Division 610 E. 5th St. Vancouver, Washington 98661 FP-03 109.01

Date Stamp

(a) Project Name: Project Number:

(b) Item Number: Item Description:

(c) Date work performed:

Copy Stamp

Daily Record Of Miscellaneous Items (f) Calculations*:

(g) Supporting sketch and details*:

Summary of Quantities (d) Location: (e) Measured quantity:

*Attach additional sheets if necessary. Total Quantity: Unit of Measurement: (h) Name of person measuring work:

FHWA Use Only(i) Interim Measurement Final Measurement Verified By:

Construction Inspector

I certify the above measurements and calculations are correct and the total quantity is subject to direct payment for the item identified. Approved Entered To Record

Checked By:(j) Contractor Representative FHWA Representative Date:

26201Rockery Wall

Rockery wall station 104+31 to station 104+61.1 (12' left offset from center line)= 134.27 m2

see attached documentation:(a) field cross section(b) irregular polygon area calculator sheets

see stations above 134.27 m2

134.3

m2

Page 63 of 134

Page 64 of 134

Page 65 of 134

Page 66 of 134