Report of Findingsfor
Facility Condition Assessment
University Hospitals Authority & Trust
Terracon Project #FX196033
August 27, 2019
Final
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment
Table of Contents
Executive Summary .......................................................................................................................... i
1. Project Background ................................................................................................................. 1
1.1 Contract History ............................................................................................................ 1
1.2 Goals and Objectives of the Work ................................................................................ 1
1.3 Scope of Work .............................................................................................................. 2
1.4 Facilities Included in the Scope of Work ...................................................................... 2
1.5 Facility Location Hierarchy............................................................................................ 2
2. Execution of the Work ............................................................................................................. 3
2.1 Project Kick-Off Meeting ............................................................................................... 3
2.2 Background Data Review ............................................................................................. 3
2.3 On-Site Facility Condition Assessment ........................................................................ 4
2.3.1 Field Assessment Staff ............................................................................................. 4
2.3.2 On Site Data Review................................................................................................. 4
2.3.3 Escorts and Interviews of UHAT Staff ...................................................................... 7
2.3.4 Documentation of Facility Inventory Components ................................................... 7
2.3.5 Field Condition Ratings ............................................................................................. 9
2.3.6 Creation of Work Items ........................................................................................... 11
2.3.7 Work Item Budget Accounts ................................................................................... 11
2.4 Cost Estimating ........................................................................................................... 12
2.5 Cost Markups and Burden Factors ............................................................................. 12
2.6 Work Packaging .......................................................................................................... 13
2.7 Data Analysis .............................................................................................................. 13
2.8 Qualifications and Exclusions from the Survey .......................................................... 13
3. Report Data Backup .............................................................................................................. 15
4. Inventory and Condition Assessment Findings .................................................................... 16
4.1 Plant Replacement Value ........................................................................................... 16
4.2 Inventory Summary ..................................................................................................... 16
4.3 Detailed Replacement Value ...................................................................................... 16
4.4 FCI Ratings ................................................................................................................. 16
4.5 Work Items Generated ................................................................................................ 17
4.6 Work Packages Generated......................................................................................... 18
4.7 Preventative Maintenance Requirements .................................................................. 18
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment
4.8 Preventative Maintenance Discussion ....................................................................... 19
5. Data Analysis ......................................................................................................................... 21
5.1 Requirements Analysis ............................................................................................... 21
Tables
Table 1 - Direct Condition Rating Definitions ............................................................................... 10
Table 2 - FCI Ratings Summary ................................................................................................... 17 Table 3 - Work Item Summary by Building ................................................................................... 18 Table 4 – Preventative Maintenance Requirement Costs and Service Life Impact .................... 19 Table 5 - Requirements Analysis, By Budget Account, 10 Years Starting in 2020 ..................... 21
Table 6 - Requirements Analysis, By Budget Account, 10 Years Starting in 2020 ..................... 22
Appendices
Appendix A - Facilities List
Appendix B – Facilities ranked by Facility Condition Index (FCI)
Appendix C - Asset Summary and History
Appendix D - Inventory Summary
Appendix E - Work Item Summary
Appendix F – Work Item Detail Reports
Appendix G – Work Item Drawings
Appendix H - Work Package Detail Reports
Appendix I – Ten-Year Inventory Recapitalization List
Appendix J - Facility Asset Management Glossary of Terms
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment i | P a g e
EXECUTIVE SUMMARY
Terracon Consultants, Inc. (“Terracon”) conducted a Facility Condition Assessment of 8 facilities
owned and managed by the University Hospitals Authority & Trust (“UHAT”). The buildings which
are the subject of this report have a combined gross floor area of 1,391,909 square feet with an
estimated total Plant Replacement Value (PRV) of approximately $329.4 million. The Current
Replacement Value (CRV) of building components included in the inventory have an estimated
total value of $207.3 million. The buildings included in the assessment were reportedly
constructed between 1974 and 2016.
Terracon used its Facility Condition Assessment and Capital Asset Management Planning
software tool called Paragon to store and analyze collected data and to calculate cost estimates
for maintenance, repair and replacement of inventoried building components over a ten-year study period. The assets included in the assessment are generally considered in Good condition, with an overall average Facility Condition Index (FCI) rating of 00096. The FCI is calculated as the sum of the costs to eliminate deferred maintenance items divided by the Plant Replacement Value (PRV) for the facilities assessed. The FCI indicates that components representing less than 1% of the Plant Replacement Value of the buildings included in the assessment need to be either repaired or replaced in the near future and are considered “deferred maintenance” items.
Figure 1 - Portfolio Condition Summary, by Facility Condition Index (FCI) Ranges
• 1 of the 8 buildings surveyed (Children’s Atrium) representing 7.7% of the portfolio PRV is
considered in Very Good condition based on the FCI ratings. No Work Item deficiencies
were identified in this building.
• 7 of the 8 buildings surveyed representing 92.3% of the portfolio PRV are considered in Good
condition based on the FCI ratings. The current repair and replacement (R&R) costs impacting
the FCI rating for these buildings totals $3,164,283.
• None of the buildings surveyed were considered in Poor or Fair condition based on the FCI
ratings.
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment ii | P a g e
A total of 1,522 inventory records were recorded during the assessment. Of this total, 95 Work
Items were generated with a total cost of $3,164,283 in 2019 dollars. Of this total, $419,678 has
been estimated for Work Items to remove and dispose of equipment that has been abandoned in
place and is currently not in service. Work Items were grouped into 30 Work Packages by building
and similar building systems groups. This represents the deferred maintenance backlog that is
forecasted for repairs and replacements beginning in 2020.
As shown in the table below, the total requirements for maintenance, repairs and replacements
(MR&R) over the next ten years is calculated at just under $23 million.
Figure 2 - Portfolio Requirements Summary, by Account, Ten Year Study Period
Capital Renewal requirements were estimated for the replacement of 157 components that are
forecast to reach the end of their useful service life within the next ten years. The estimated cost
for Component Renewals over the study period totals $10.7 million.
Preventative Maintenance (PM) requirements were estimated at a cost of 0.5% of the Current
Replacement Value of the inventoried components that typically require PM on at least an annual
basis. Preventative Maintenance costs are estimated at $787,934 in 2020, and $9.0 million over
the ten-year study period. Preventative Maintenance requirements are included in each year of
the budget forecast, inflated at a rate of 3% per year.
Raw costs used to describe current replacement values for inventory records are extracted to
inventory line items in the Paragon Cost Catalog. Raw costs for inventory items and Work Items
are “marked-up” by a factor of 1.41, based on geographic location, to reflect soft costs burdens.
Additional details describing the soft cost burden factors is provided in Section 2.5 of this report.
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 1 | P a g e
1. Project Background
University Hospitals Authority & Trust (“UHAT”) is responsible for the maintenance and
management planning of their owned properties. Through a competitive bid process, UHAT
selected Terracon Consultants, Inc. (“Terracon”) to conduct a Facility Condition Assessment
(FCA) of selected UHAT-owned facilities. The primary purpose of the work was to identify
deficiencies in critical building systems and prioritize these deficiencies to allow UHAT to make
key investment decisions regarding facility asset sustainment.
The findings from the FCA were intended to catalog how much funding UHAT should be
budgeting for facility improvements to repair deferred maintenance items and replace
components before failure. The results of the FCA are meant to define capital outlay
requirements to proactively address building component deficiencies.
1.1 Contract History
Terracon received UHAT’s Request for Proposal for Facility Condition Assessments, Solicitation
Number 19004 (the “RFP”) on February 20, 2019. Terracon received clarifications to the RFP
from UHAT’s response to bidders’ questions on March 7 and March 25, 2019. On March 26,
2019, Terracon submitted its bid in response to the RFP, which UHAT accepted on April 1,
2019. In accordance with RFP section A.11 Legal Contract, submitted bids are rendered as a
legal offer and any bid, when accepted by UHAT shall constitute a contract.
Pursuant to RFP section A.14 Negotiations of the RFP, however, UHAT reserves the right to
negotiate with a responding firm and such negotiation may apply to contract terminology.
Having negotiated the contract terminology with Terracon following its written Exceptions issued
on April 2, 2019, issued a contract Addendum. The Addendum was entered into by and
between UHAT and Terracon on April 26, 2019 (“Addendum Effective Date”)
1.2 Goals and Objectives of the Work
The goal of this project was to provide UHAT with an understanding of the current conditions of
critical building systems in facilities included in the Project Scope of Work, and to identify and
quantify facility conditions in terms of cyclical renewal needs and non-cyclical repairs and
replacements. The information obtained during the assessment was to be used to support the
development of a ten (10) year planning budget. The budget shall include forecasts of the
estimated capital investments required to address both cyclical replacement needs and non-
cyclical repairs and replacements.
UHAT seeks to understand the (1) overall condition of all buildings and major components, (2)
identify all deficient conditions and needed corrections with a (3) detailed prioritization and
classification of each known deficiency.
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 2 | P a g e
1.3 Scope of Work
Terracon furnished the personnel, services, equipment, materials, and other necessary
resources to conduct Facility Condition Assessments of the buildings included in the UHAT
Scope of Work. The work scope specifically excluded the inventory and condition assessment of
site features and infrastructure supporting the buildings included in the scope.
The FCA was conducted based on visual, non-destructive inspection techniques, interviews of
persons knowledgeable regarding the construction and maintenance history of the facilities, and
review of existing building data and maintenance history.
Terracon’s work was grouped into the following phases:
1.) FCA Project Planning
2.) Field Assessment and Data Collection
3.) Cost Estimating and Work Packaging
4.) Data Analysis and Forecasting
5.) Reporting and Project Deliverables
Terracon used a software program called Paragon together with its field data collection
application called Paragon Data Collector (DC) to store, analyze and report data collected as part
of the FCA. Paragon is a web-based software application that is used and offered for sale by
Terracon to its clients under license and distribution agreements with the software developer.
After delivery and acceptance of this report by UHAT, Terracon will transfer a subscription to
Paragon to UHAT to serve as its database containing all assessment data, cost estimates and
other applicable information. This software will serve as the single repository for all FCA-related
information collected and generated by Terracon during the performance of the work, as well as
data modifications and updates made by UHAT to support their on-going analyses and reporting
requirements.
1.4 Facilities Included in the Scope of Work
The RFP identified 8 that were to be included in the assessment. The gross building area of
these buildings was reported to total 1,368,874. Based on field findings, we estimated the facility
area to be slightly larger than the number provided to us, totaling 1,391,909 square feet. The
buildings were reportedly constructed between 1974 and 2016.
1.5 Facility Location Hierarchy
Facilities included in this project were organized and grouped in a two-level location hierarchy,
with UHAT as the Owner and first tier and each of the buildings as a second-tier location. The
buildings were constructed on one major block in the heart of the OU Health Sciences Center
campus northeast of downtown Oklahoma City.
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 3 | P a g e
2. Execution of the Work
This section of the report describes the means and methods used to conduct the work.
2.1 Project Kick-Off Meeting
A Kick-Off teleconference was held on May 7 at 3:00 PM. Individuals included on the call are
listed below.
The purpose of the meeting was to initiate FCA planning activities and to align Terracon’s
proposed Scope of Work with the UHAT’s goals for the project. During this meeting, Terracon
reiterated its proposed scope and clarified questions in an effort to remove potential obstacles to
conduct the work and validate the end goals and deliverables desired by UHAT.
The meeting was attended by the individuals listed below representing UHAT and Terracon
UHAT Representatives
Kevin Gates
Jeffrey Swann
Terracon Representatives
David Schultz, Project Manager
Bill Faesenmeier, Data Analyst
Jeremy Rogers, Field Assessor
Bryan Zach
During the kick-off meeting, the following items were discussed.
▪ UHAT Goals and Objectives
▪ UHAT Contacts
▪ Safety and Security
▪ Scheduling and Site Access
▪ Escorts
▪ Interviews with Persons Knowledgeable about Construction and Maintenance History
▪ On Site Workspace
▪ Building Information
▪ Existing Background Data
▪ Known Site Restrictions
▪ Software Issues
2.2 Background Data Review
Prior to mobilizing to the sites, UHAT provided Terracon with a list of facilities to be included in
the Scope of Work. Data was used to establish the Asset records in Paragon prior to mobilizing
to the field.
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 4 | P a g e
2.3 On-Site Facility Condition Assessment
Terracon’s assessors mobilized to the site and began data collection on Monday, June 3 2019.
Two of the assessors demobilized from the site on June 10th and the third assessor completed
his on-site work on June 18, 2019.
Terracon’s assessors walked through accessible interior building areas and walked over low-
sloped roofs at each building included in the Scope of Work. Field data was stored in Paragon Data Collector (Paragon DC) on an iPad, a field data collection application integrated with Paragon.
2.3.1 Field Assessment Staff
Field data collection was performed by up to four assessors. A list of the assessors who
participated in the project are shown below.
▪ David Schultz
▪ Jeremy Rogers
▪ Saeed Foroughi
▪ Johanna Monge
After completing the on-site assessments, Work Item cost estimates were generated, and data
revisions were made by the assessors based on quality control reviews conducted by
Terracon’s Data Analysts throughout the project.
2.3.2 On Site Data Review
While on site, Terracon was provided access to a limited number of background documents.
The documents we reviewed and a summary of our findings from those reviews is outlined
below.
ALL BUILDINGS
Title: Asset List Report Summary: The asset list was distributed to assessors and used as sample verification of data when data was not visually located on inspected building components / systems.
Date: Printed 6.3.2019
Author: One Call
GARRISON TOWER
Title: Ramon Franklin Roof Report – Garrison Tower
Summary: Report used to verify current roof material and age as well as compare previously observed conditions with conditions observed in field.
Date: 2017
Author: Ramon Franklin LLC
Address: 117 Roberts Cut Off Road, Fort Worth, TX, 76114
Phone No: 817-737-0500
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 5 | P a g e
Title: Garrison Tower Floor Plans Summary: General floor plan used to make note of interior finishes and perform measurement take-offs
Date: 2009
Author: UHAT
Address: 940 NE 13th St, Nicholson, 6th Fl., OKC, OK 73104
Phone No:
NICHOLSEN TOWER
Title: Ramon Franklin Roof Report – Nicholsen Tower
Summary: Report used to verify current roof material and age as well as compare previously observed conditions with conditions observed in field.
Date: 2017
Author: Ramon Franklin LLC
Address: 117 Roberts Cut Off Road, Fort Worth, TX, 76114
Phone No: 817-737-0500
Title: Nicholsen Tower Drawings - Various
Summary: Drawings were reviewed for measurement take-offs and review of past projects for determination of installation dates. Drawing provided included scans of original drawings as well as drawings of projects from 1979 to 2012
Date: Various
Author: Various
OKLAHOMA TRANSPLANT CENTER
Title: Ramon Franklin Roof Report – Oklahoma Transplant Center
Summary: Report used to verify current roof material and age as well as compare previously observed conditions with conditions observed in field.
Date: 2017
Author: Ramon Franklin LLC
Address: 117 Roberts Cut Off Road, Fort Worth, TX, 76114
Phone No: 817-737-0500
Title: Oklahoma Transplant Center – Floor Plans
Summary: General floor plan used to make note of interior finishes and perform measurement take-offs Date: 2013
Author: UHAT
Address: 940 NE 13th St, Nicholson, 6th Fl., OKC, OK 73104
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 6 | P a g e
OU PHYSICIANS BUILDING
Title: Ramon Franklin Roof Report – Oklahoma Transplant Center
Summary: Report used to verify current roof material and age as well as compare previously observed conditions with conditions observed in field.
Date: 2017
Author: Ramon Franklin LLC
Address: 117 Roberts Cut Off Road, Fort Worth, TX, 76114
Phone No: 817-737-0500
Title: OU Physicians Building - Various Summary: Drawings were reviewed for measurement take-offs and review of past projects for determination of installation dates. Drawing provided included drawings of projects from 2013.
Date: Various
Author: Various
OU CHILDRENS PHYSICIANS
Title: Ramon Franklin Roof Report – Oklahoma Transplant Center
Summary: Report used to verify current roof material and age as well as compare previously observed conditions with conditions observed in field.
Date: 2017
Author: Ramon Franklin LLC
Address: 117 Roberts Cut Off Road, Fort Worth, TX, 76114
Phone No: 817-737-0500
Title: OU Physicians Building - Various Summary: Drawings were reviewed for measurement take-offs and review of past projects. Date: Various
Author: Various
CHILDRENS ATRIUM
Title: Ramon Franklin Roof Report – Oklahoma Transplant Center
Summary: Report used to verify current roof material and age as well as compare previously observed conditions with conditions observed in field.
Date: 2017
Author: Ramon Franklin LLC
Address: 117 Roberts Cut Off Road, Fort Worth, TX, 76114
Phone No: 817-737-0500
Title: Children’s Atrium - Various Summary: Drawings primarily used to verify measurement take-off and building demarcations.
Date: Various
Author: Various
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 7 | P a g e
SAMIS EDUCATION CENTER
No Roof Report
Title: SAMIS Education Center - Various Summary: Drawings primarily used to verify measurement take-off and building demarcations.
Date: Various
Author: Various
COLLEGE of Medicine
No Drawings, No Roof Report
2.3.3 Escorts and Interviews of UHAT Staff
During the on-site work, Terracon’s assessors were escorted by one of three UHAT staff
members, listed below.
▪ Jeff Swann Director, Facilities Management
▪ David Emery Operations Manager, Facilities Management
▪ Don Still Facility Project Coordinator
The UHAT escorts provided access to each facility, ladders to gain roof access where needed,
and fielded questions from Terracon’s assessors during the facility walk-throughs. The escorts
provided limited information to the assessors while on site based on their limited tenure working
in each facility. Escorts did provide documentation as requested, when available.
The experience levels for the UHAT staff escorts ranged from a few months to nearly 20 years
on site.
2.3.4 Documentation of Facility Inventory Components
During the walk-throughs, Terracon recorded inventory records of the various building sub-
elements and components that make up the as-built construction of each facility, and that were
included in the Scope of Work. Facility inventory data was organized and documented using
the UNIFORMAT II coding methodology in general accordance with ASTM E1557-Standard
Classification for Building Elements and Related Sitework-UNIFORMAT II.
“This standard establishes a classification of building elements and related site work. Elements,
as defined here, are major components common to most buildings. Elements usually perform a
given function, regardless of the design specification, construction method, or materials used.
The classification serves as a consistent reference for analysis, evaluation, and monitoring
during the feasibility, planning, and design stages of buildings. Using UNIFORMAT II ensures
consistency in the economic evaluation of building projects over time and from project to
project.” (ASTM E 1557-09)
The building components and subcomponents typically inventoried and assessed in an FCA are
categorized by Major Group Elements (Level1) as A-Substructure, B-Shell, C-Interiors, and D-
Services. The construction of each building is classified in UNIFORMAT II by its various
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 8 | P a g e
Components (Level 5), organized within Sub-Elements (Level 4), Individual Elements (Level 3),
Group Elements (Level 2) and Major Group Elements (Level 1).
An example is shown below that describes the five levels of detail associated with a building
component. This example is for a four-ply BUR covering with gravel surface coating.
The UHAT FCA included the inventory and condition assessment of facility elements grouped
within the UNIFORMAT II, Level 2 categories listed below. The actual inventory was conducted
at UNIFORMAT II levels 4 and 5, to provide a greater level of detail than the Group Elements
listed below.
Facility Assets
A10-Foundations: Standard and special foundations, slab-on grade
A20-Basement Construction: Basement walls and floors
B10-Superstructure: Floor and roof construction
B20-Exterior Enclosure: Exterior walls, windows and doors
B30- Roofing: Roof coverings and roof openings
C10-Interior Construction: Interior partitions, doors and fittings
C20-Stairs: Stair construction and finishes
C30-Interior Finishes: Wall, floor and ceiling finishes
D10-Conveying Systems: Elevators, lifts, escalators, moving walks, and other conveying
systems
D20-Plumbing: Plumbing fixtures; domestic water distribution, sanitary waste piping and
equipment, rain water drainage and other specialty plumbing systems
D30-HVAC: Energy supply (oil, gas, steam, hot water, solar, wind); heat generating systems
(boilers, piping, auxiliary systems); cooling generating systems (chilled water systems, direct
expansion systems); distribution systems (air, exhaust ventilation, steam, hot water, chilled
water, other distribution systems); terminal and package units; controls and instrumentation;
other specialty HVAC systems (humidity control devices, dust and fume collectors, air curtains,
air purifiers)
D40-Fire Protection: Sprinklers, standpipes, fire protection specialties and other fire protection
systems
D50-Electrical: Electrical service and distribution (primary transformers, secondary
transformers, main switchgear, interior distribution transformers, branch circuit panels, motor
control centers); lighting and branch wiring; communications and security systems; emergency
generators, UPS, emergency lighting systems, lightning protection systems
The building-related site features are categorized under the Major Group Element G-Sitework.
Figure 3 - Five Level Classification of a Building Component
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 9 | P a g e
Note that components from UNIFORMAT II levels E-Equipment and Furnishings, F-Special
Construction and Demolition, ands G-Building Related Site Elements were specifically excluded
from the UHAT scope.
A current replacement value and estimated design life is automatically recorded for each
inventory record based on data stored in the Paragon Cost Catalog. This provides the
information necessary to forecast component renewals at the end of their estimated remaining
service life by replacement of each building component in future years in the Forecast analysis
models.
For each component or sub-element included in the inventory, data was recorded describing its
UNIFORMAT II classification, quantity (or size) and its year of installation. Inventory was
grouped by Section, where appropriate, based on the similarity of its location, condition, and
operational and age characteristics.
2.3.5 Field Condition Ratings
Observations were made to in the field to identify obvious problems and visible defects in the
materials and installation methods of facility components to assess their physical and
operational condition. The overall condition of each facility component was documented in the
field after the component was identified and quantified. The condition was documented using a
Direct Condition Rating (DCR) method, based on standard rating definitions (see Table 1).
In addition to the ratings shown in Table 1, Terracon added ratings for building components that
were determined to be beyond their Estimated Service Life (ESL), often called its Design Life.
These ratings were encoded with the prefix of BSL, to indicate the component was beyond its
service life based on age. BSL ratings were created for each standard rating, except for G+. A
G+ rating indicates the component is less than one year old, so the BSL ratings do not apply.
BSL ratings are linked to a Direct Rating Index of one half the percentage of the standard rating
of the same level. For example, a G- rating has a Direct Rating Index of 70% of the inventoried
component’s ESL, whereas a BSL G- rating has a Direct Rating Index of 35% of the inventoried
component’s ESL. These differences are intended to account for the impact of age on a
component, while still considering its observed physical condition.
One other rating was added to the lookup table for Direct Rating Indices, called Abandoned -in-
Place, Non-Functional. This rating, abbreviated as AIP-NF, is used to document the condition
of components that our assessors learn in the field have not been working for some time, and
are not planned for repair or replacement in accordance with information we learned from our
escorts. The Direct Rating Index for a component rated AIP-NF is zero (0), which sets the
Estimated Remaining Service Life to zero years. As a best practice, Work Items are created for
most components rated AIP_NF, to include costs for demolition and disposal. The Current
Replacement Value for components identified as AIP-NF are overridden to $0.00 in the
inventory to ensure that no costs are linked to the component for future replacement.
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 10 | P a g e
Table 1 - Direct Condition Rating Definitions
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 11 | P a g e
2.3.6 Creation of Work Items
A Work Item was created in the field and documented in Paragon DC for each inventory record
where defects or distresses were observed that warrant immediate or near-term corrective
action. Work Items are defined by name and unique ID.
Work Items were evaluated in the field for potential repair of observed defects and distresses or
for full component replacement. A narrative Problem Statement and Solution Statement was
recorded for each Work Item summarizing the nature of the defect and a proposed method to
mitigate the problem. A Priority Rating and Impact Type was also assigned to each
deficiency. Each priority rating is based on the ability for users to operate the building
component in a safe manner and the anticipated potential for failure of systems or components.
2.3.7 Work Item Budget Accounts
Each Work Item was assigned to a Budget Category and Account. Three separate accounts
were established to separate costs for funding of Preventative Maintenance, Deficiency
Repairs/Replacements and Capital Renewal at the End of Service Life (ESL). Descriptions of
each of the budget accounts are provided below.
Maintenance – Preventative Maintenance
Preventive maintenance has been defined as the planned scheduled periodic inspection,
adjustment, cleaning, lubrication, parts replacement, and minor repair of equipment and
systems for which a specific operator is not assigned (FFC, 1996).
Sustainment – Deficiency Repairs/Replacements
Deficiency repairs include the cost for repair of a facility or site infrastructure component
to such condition that it may be effectively utilized for its designated purposes by
overhaul, reprocessing, or replacement of constituent parts or materials that have
deteriorated by action of the elements or usage and have not been corrected through
maintenance. (FFC, 1996). Deficiency repairs are assigned to Work Items for each
asset.
Deficiency replacements includes costs for the replacement of a facility or site
infrastructure component assuming the same type, size and capacity of the component
being replaced. Capital replacements are assigned to Work Items for each asset and
are determined based on an assessor’s judgement considering the age, useful service
life, condition, code issues, and the nature and quantity of the observed deficiencies of
the inventoried component.
Sustainment – Component Renewal at End of Service Life
The forecasted replacement of facility and site infrastructure components when they
reach the end of their estimated remaining service life. Component Renewal assumes
replacement in-kind, assuming the new component is the same type, size and capacity
of the component being replaced.
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 12 | P a g e
2.4 Cost Estimating
Terracon prepared cost estimates to execute the repair or replacement activity described by
each Work Item based on documented problem and solution statements. Estimates were made
using data from cost databases developed by Terracon and used routinely in its performance of
facility condition assessments and property condition assessments. Terracon’s cost databases
are based on standard industry sources, such as RSMeans Online, or other sources derived
from years of construction bid preparation, contractor estimates and corporate research.
Cost estimates are at a “preliminary planning” level of detail and should be considered as order
of magnitude estimates for potential work without design or bid estimates, and with no
information regarding the method of execution, time of year to conduct the work or schedule to
complete the work. The general accuracy of our preliminary planning estimates is in the range
of +/- 25-percent, based on follow-up discussions with our clients Estimates were calculated
using combined costs for material and labor.
2.5 Cost Markups and Burden Factors
Soft-cost markup factors for inflation, geography, contractor overhead and profit, and owner’s
design fees, supervision, and contingencies were applied to the raw costs from settings stored
in Paragon to generate fully burdened cost estimates. Soft cost markup percentages for
Contractor and Owner Burden were established by Terracon based on discussions with UHAT’s
Project Manager. The definitions of key terms for Burden Factors are listed below, together with
the values applied to each factor.
General Factors
• Geography – 0.87: Used to adjust costs based on the geographic area (Oklahoma City) of the proposed construction. The geography factor represents the increase or decrease over the U.S average cost index.
• Inflation Rate – 3.00%: Used to account for the cost of funds for work estimated in future years.
Contractor Burden
• Markup – 10.00%: Includes Contractor’s field overhead costs such as Superintendent Labor, Project Trailer, Site Electrical, Clean- up, etc.
• G&A Overhead – 7.00%: Includes General and Administrative overhead such as office costs, administrative costs, office expenses, etc.
• Profit – 10.00%: Profit margin calculated against Contractor's marked-up costs and overhead.
Owner Burden
• Planning & Design – 7.00%: Owner's cost for project planning, design, and contract document preparation
• SIOH – 6.00%: Owner's costs for construction management, including Supervision, Inspection and Overhead
• Contingencies – 8.00%: Owner's costs associated with the risk associated with Design and Construction unknowns
• Other – 4.00%: Any additional project soft cost
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 13 | P a g e
Based on the various regional cost factors, the effective soft cost mark-ups were calculated as a
multiplier of raw costs totaling 1.41.
Burden Factors are used to calculate the Current Replacement Value (CRV) of inventoried
components stored in the inventory, as well as the soft costs associated with repair and
replacement work included in the Work Items.
2.6 Work Packaging
After costs were estimated for each Work Item, Individual Work Items were grouped into
executable Work Packages. Work Items were auto-packaged using Paragon’s Auto Work
Packaging feature. This feature groups Work Items together and creates Work Packages that
meet the following criteria.
1.) Work Items must have a Status of Active
2.) Work Items must be associated to the same Asset
3.) Work Items must have the same classification at UNIFORMAT Level 2 (B10, B20, etc.)
4.) Work Items must have the same Budget Category and Budget Account
5.) A single Work Item linked to an Asset that does not match other Work Items with respect
to classification level and Budget Category/Account will be packaged as a new Work
Package that includes only the one Work Item.
No effort was made to manually group Work Items into Work Packages. Going forward, should
UHAT desire to group Work Items together differently than currently grouped, they may do so.
Consideration should be given to the size (combined cost) of Work Packages, in that budget
constraints may exclude the consideration of overly large Work Packages in a single year if it
exceeds that year’s account budget. Note also that a Work Package is only included for funding
in a specific year if the available budget in that year will cover the entire cost of the Work
Package. Paragon’s forecasting analysis does not permit partial funding of a single Work
Package, nor spread funding out for a single Work Package over more than one year.
2.7 Data Analysis
Following completion of the field data collection, data review, Work Item cost estimating and
Work Packaging, we used Paragon to analyze the data and prepare this report of findings. Data
analysis included the generation of a Requirements Analysis. The analysis was run over a ten
(10) year time period. This provides information that can be used by UHAT in preparing its
Capital Improvement Plans (CIP).
No budget information was provided to Terracon by UHAT at the time this report was generated,
therefore; no spending forecasts were run against the Requirements data.
2.8 Qualifications and Exclusions from the Survey
Terracon’s inventory and assessment activities were intended as a preliminary review to identify
problems and general costs; it was not intended to be a detailed analysis of each facility
component or system. Although a "standard of care" was exhibited by trained professionals,
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 14 | P a g e
with this type of preliminary review it is possible that conditions may exist which will affect the
value and/or performance of the facility, but which may not have been discovered during the
assessment.
The assessment scope of work specifically excluded obtaining and testing materials and
Terracon did not perform engineering calculations to determine the adequacy of the existing
design.
The FCA was a non-destructive survey only and specifically excluded any material testing or
other investigative techniques such as moisture surveys, water intrusion testing, adhesion or
cohesion testing load testing, etc. Testing to determine the presence of asbestos, radon, lead-
based paint, or other potentially hazardous materials was specifically excluded from our scope
of work. Our work specifically excluded the dismantling or removal of casings, housings,
insulation and other enclosures to visually assess a building roof section. Our scope specifically
excluded the dismantling or removal of building elements to visually assess building substrates,
structural connections, or fasteners.
It was not Terracon’s intent to find every defect or make detailed remedial designs, but to
identify obvious, visually apparent defects and to generally quantify the extent of the observed
defect.
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 15 | P a g e
3. Report Data Backup
Data describing the building assets, component inventory, Work Items, Work Packages and
inventory scheduled for replacement over the ten-year study period are attached to this report in
various Appendices, as shown below.
Appendix A - Facilities List
Includes the final list of facilities included in the Scope of Work.
Appendix B – Facilities List ranked by Facility Condition Index (FCI)
List of facilities ranked by FCI, high to low. Includes facility size, Detailed Replacement Value
and Current Backlog Impacting FCI.
Appendix C - Asset Summary and History
Describes each asset sorted in order based on Location hierarchy selection. One Asset per
page. Provides overall summary of the Asset and its condition. Includes Asset photograph, FCI,
and narratives for Asset Summary.
Appendix D - Inventory Summary
Organized by asset with page breaks after each asset. Provides a listing of all inventory items in
each asset in a hierarchical structure based on UNIFORMAT II Classification format. Provides
data for each component included in the inventory, including Year Installed, Estimated Service
Life, Condition Rating, Remaining Service Life, Quantity and Current Replacement Value.
Appendix E - Work Item Summary
Includes a summary of each of the Work Items generated during the project, grouped by
building.
Appendix F – Work Item Detail Reports
Organized by Work Item ID; one Work Item per page. Provides a formatted report with images
and details of each deficiency.
Appendix G - Work Item Drawings
Plan drawings indicating the general location of Work Items per building per floor.
Appendix H - Work Package Detail Reports
Organized by Work Package IDs with page breaks after each asset. Provides a formatted report
with details of the Work Package including a listing of each included Work Item and associated
costs.
Appendix I – Ten-Year Inventory Recapitalization List
Includes a summary list of components scheduled for replacement in the next ten years. Data
is grouped by forecasted year of replacement, and then by facility.
Appendix J – Facility Asset Management Glossary of Terms
Includes definitions of various terms used throughout the Facility Asset management industry.
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 16 | P a g e
4. Inventory and Condition Assessment Findings
The real estate portfolio which is the subject of this report includes 8 separate facility structures.
The gross building area of these buildings was reported to total 1,368,874. Based on field
findings, we estimated the facility area to be slightly larger than the number provided to us,
totaling 1,391,909 square feet.
4.1 Plant Replacement Value
The Plant Replacement Value (PRV) for the facilities that were assessed totals $329,381,346
(2019 dollars). The PRV represents the cost to replace a facility using today’s construction
costs and building standards and codes, not including land values.
This number is calculated using unit rate costs for construction of a new facility assigned to
each different FAC Code. FAC (Facility Analysis Category) Codes are numeric codes with
descriptions that describe the general building type and/or functional use of the building. The
unit cost associated with the FAC Code is multiplied by the asset size/quantity to calculate the
PRV.
4.2 Inventory Summary
During the assessment, Terracon recorded 1,522 Inventory records.
4.3 Detailed Replacement Value
The Current Replacement Value (CRV) for the inventoried components included in the
assessment totals $ $207,278,202 (2019 dollars). The DRV is a sum of the current replacement
values for each of the facility components included in the inventory for each building. It includes
soft cost markups for the city cost index (geographic adjustment region), and Contractor and
Owner markups for items such as overhead, profit, design, supervision, and contingencies.
4.4 FCI Ratings
The Facility Condition Index (FCI) is a standard metric in the Facility Asset Management
industry. It is an indicator of the depleted value of an institution’s physical plant. The FCI
illustrates the percentage of the capital that an institution would have to spend to eliminate the
backlog of maintenance deficiencies. FCI provides a simple measurement of a facility’s
condition.
The “standard” FCI represents the ratio of the cost to correct a facility’s deficiencies compared
against the current replacement value of the facility. The equation used to calculate FCI is
shown below.
Facility Condition Index (FCI) = Cost of Eliminating Deferred Maintenance
Plant Replacement Value of the Facilities
“Deferred Maintenance” is considered renewal, replacement, and maintenance projects that
have been postponed because of perceived lower priority status than those completed with
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 17 | P a g e
available funding. It is equal to the costs for repairs and replacements of components identified
in the Work Items created during this assessment.
A Facility Condition Index (FCI) was generated for each of the facilities included in the
assessment. The combined condition index (CCI) for the entire portfolio is considered in the
Good range, with a CCI of 0.0096. A summary of the FCI ratings for buildings included in the
assessment is shown below in Table 2. A detailed list of the facilities that comprise this table is
included in Appendix B to this report.
Table 2 - FCI Ratings Summary
General industry guidelines for the evaluation of overall condition based on FCI are:
▪ 0 to 5% is good;
▪ Greater than 5% but less than or equal to 10% is fair; and
▪ Greater than 10% is poor.
Not all maintenance and maintenance deficiencies are considered Deferred Maintenance.
Maintenance is defined in SFFAS #6 as the act of keeping fixed assets in acceptable condition.
By the SFFAS #6 definition of maintenance: “maintenance includes preventative maintenance;
normal repairs, replacement of parts and structural components, and other activities needed to
preserve the asset so that it continues to provide acceptable services and achieves its expected
life. Maintenance excludes activities aimed at expanding the capacity of an asset or otherwise
upgrading it to serve needs different from, or significantly greater than, those originally
intended.” Deferred Maintenance is “maintenance that was not performed when it should have
been or when it was scheduled and which, therefore, was put off or delayed for a future period.”
4.5 Work Items Generated
A total of 95 Work Items were generated during the assessment, with a total cost of $3,164,283
(2019 dollars). A summary of the Work Items, by building, is shown in Table 3.
Condition FCI Range Buildings PRV
% of
Total
PRV
Current
Repair and
Replacement
Costs
% of
Total
Costs
Poor >0.10 0 0.0% 0.0%
Fair >0.05 and ≤ 0.10 0 0.0% 0.0%
Good >0 and ≤ 0.05 7 $303,881,729 92.3% $ 3,164,283 100.0%
Very Good 0 1 $ 25,499,616 7.7% $ -
Totals: 8 $329,381,346 $ 3,164,283 0.0096
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 18 | P a g e
Table 3 - Work Item Summary by Building
4.6 Work Packages Generated
A total of 30 Work Packages were generated from the individual Work Items described above.
4.7 Preventative Maintenance Requirements
Table 4 displays the settings used to establish annual cost requirements for Preventative
Maintenance (PM). The current spending by UHAT on PM is not known. For forecasting
purposes, we have calculated annual PM requirements as 0.5% of the Current Replacement
Value (CRV) of selected inventoried components, grouped at Level 2 of the UNIFORMAT II
classification system. We have set this as a Medium maintenance level.
Group Level Maintenance Level PM Costs
(% of CRV)
PM Service Life Factor
A10-Foundations No Maintenance Required 1.00
A20-Basement Construction No Maintenance Required 1.00
B10-Superstructure No Maintenance Required 1.00
B20-Exterior Enclosure Medium 0.5% 1.00
B30-Roofing Medium 0.5% 1.00
C10-Interior Construction No Maintenance Required 1.00
C20-Stairs No Maintenance Required 1.00
C30-Interior Finishes Medium 0.5% 1.00
D10-Conveying Medium 0.5% 1.00
D20-Plumbing Medium 0.5% 1.00
D30-HVAC Medium 0.5% 1.00
D40-Fire Protection Medium 0.5% 1.00
D50-Electrical Medium 0.5% 1.00
Asset ID Asset Name QTY Cost QTY Cost QTY Cost QTY Cost
1 Garrison Tower 15 193,875$ 7 933,587$ 13 1,495,298$ 35 2,622,760$
2 Nicholsen Tower 19 225,177$ 10 123,690$ 9 152,386$ 38 501,253$
3 Oklahoma Transplant Center 5 4,361$ 5 4,361$
4 OU Physicians Building 4 1,328$ 4 1,328$
5 OU Children's Physicians 5 23,741$ 3 7,631$ 8 31,372$
6 Children's Atrium 0 -$
7 Samis Education Center 1 626$ 3 1,313$ 4 1,939$
8 College of Medicine 1 1,269$ 1 1,269$
Totals: 35 419,678$ 35 1,089,289$ 25 1,655,315$ 95 3,164,282$
Abandoned in Place,
Removal and DisposalComponent Repairs
Component
ReplacementsTotals
Work Items
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 19 | P a g e
Group Level Maintenance Level PM Costs
(% of CRV)
PM Service Life Factor
E10-Equipment Medium 0.5% 1.00
E20-Furnishings No Maintenance Required 1.00
F10-Special Construction Medium 0.5% 1.00
F20-Selective Building Demolition No Maintenance Required 1.00
G10-Site Preparation No Maintenance Required 1.00
G20-Site Improvements Medium 0.5% 1.00
G30-Site Civil/Mechanical Utilities Medium 0.5% 1.00
G40-Site Electrical Utilities Medium 0.5% 1.00
G90-Other Site Construction Medium 0.5% 1.00
Table 4 – Preventative Maintenance Requirement Costs and Service Life Impact
At the rates shown above, the current Preventative Maintenance requirements for the inventory
and facilities included in the assessment totals $734,984 (in 2020 dollars). Preventative
Maintenance requirements are included in each year of our budget forecast, inflated at a rate of
3% per year.
Assuming UHAT funds Preventative Maintenance at or near the amounts forecasted, then the
estimated remaining service life of each of the inventoried building components should not be
negatively impacted. This is modeled in our forecast by setting the Service Life Factor to 1.00.
This factor is multiplied against the condition-based Remaining Service Life calculated for each
component going forward. Should actual PM funding fall below the calculated requirements
amounts, then the remaining service life of selected components may be shortened compared
to the data included in our forecasts.
4.8 Preventative Maintenance Discussion
Preventative maintenance is intended to enable building owners and facility managers to
proactively identify and implement solutions to building system problems before problems
become more widespread. In most instances, if problems are identified early and properly
repaired, the problem’s extent and cost of necessary repairs will be significantly less than if the
problem were left unattended.
In 1990 the Building Research Board's (BRB) Committee on Advanced Maintenance Concepts
for Buildings prepared a report entitled Committing to the Cost of Ownership—Maintenance and
Repair of Public Buildings. The report was widely distributed, and the following finding and
recommendation was quoted often:
“An appropriate budget allocation for routine M&R (maintenance and repair) for a substantial
inventory of facilities will typically be in the range of two to four percent of the aggregate current
replacement value of those facilities (excluding land and major associated infrastructure). In the
absence of specific information upon which to base the M&R budget, this funding level should
be used as an absolute minimum value. Where neglect of maintenance has caused a backlog of
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 20 | P a g e
needed repairs to accumulate, spending must exceed this minimum level until the backlog has
been eliminated.”1
Preventive maintenance is the cornerstone of a solid cost-effective M&R program. Nominally,
preventive maintenance is accomplished on a fixed schedule or frequency and consists of many
check-point activities on items, most typically equipment. Examples include filter replacement,
lubrication, and mechanical adjustments. Preventive maintenance reduces the risk of system or
component failure, which if it occurs, would interfere with essential operations, endanger life or
property, involve a high cost, or require a long lead time for replacement.
Maintenance and repair expenditures should not include “funds for any activities that are
primarily operational or any construction work that expands or changes the function of a facility
or lengthens its life beyond its original design life” (National Research Council 1996) but should
include routine repairs which are defined as “actions taken to restore a system or piece of
equipment to its original capacity, efficiency, or capability” (NRC 1996).
The Federal Facilities Council recommends, “in the absence of other information”, that annual
budgets for maintenance and repair should be set at approximately 2-4% of the current
replacement value (CRV) of constructed facilities (NRC 1994, 1996). The CRV can be defined
as the cost to replace an asset in present dollars.
In 1995, the Civil Engineering Research Foundation (CERF) attempted to validate this 2-4%
threshold to determine a suitable “level of investment” necessary to maintain constructed
facilities (CERF 1996). CERF reported that the average “level of investment” for most facilities
surveyed was less than 2% of the CRV and the results of the survey indicated that the
recommended 2-4% “would probably not be adequate for facility upkeep if a substantial amount
of deferred maintenance existed”.
Not all facility systems or components should be included in a preventive maintenance program.
These programs can be costly, so a preventive maintenance program should be reserved for
those critical systems or components where the risk of failure must be reduced or where a
preventive maintenance program can be shown to be cost effective on a life-cycle basis.
Systems or components not included in a preventive maintenance program are candidates for
“run-to-failure” repair (unplanned), programmed maintenance (planned), or planned M&R based
on condition and need. Typically, components included in a “run-to-failure” M&R strategy are
small noncritical components that can be repaired or replaced on a service call.
Note that the published recommendation for M&R spending includes both maintenance and
repairs. Based on reviews of numerous industry publications and expert studies, Preventative
Maintenance spending as a percentage of plant replacement values (PRV) typically range
between 1% and 6%, depending on industry and facility type. For public buildings, PM
spending requirements are often quoted as being between 1 and 3 percent of PRV.
1 “Committing to the Cost of Ownership: Maintenance and Repair of Public Buildings”, Committee on Advanced Maintenance Concepts for Buildings, Building Research Board Commission on Engineering and Technical Systems, National Research Council, National Academy Press, 1990
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 21 | P a g e
5. Data Analysis
Each of the facilities assessed was analyzed over a ten-year study period to estimate the costs
of preventative maintenance, repairs, and replacements (MR&R). The evaluation was based on
the condition-based age, remaining service life, preventative maintenance impact on remaining
service life, and repair and replacement costs attributed to each inventory and Work Item
record.
5.1 Requirements Analysis
The Requirements Analysis includes costs to address deferred maintenance from Work Items
created during the assessment (considered backlog), future capital renewal (replacement)
costs, and preventative maintenance requirements linked to an Asset or a group of Assets over
a defined analysis period. This analysis provides an estimate of the total MR&R budget
requirements over the next ten years for the set of inventory components included in each of the
facilities included in this assessment.
Requirements analysis does not consider funding that may be available over the analysis
period, but rather, focuses only on costs for repairs, replacements, maintenance or other
defined Work Items in the year it is first recommended for remedial action. Requirements
analysis considers costs from individual Work Items regardless if they have been assembled
into Work Packages.
Table 5 displays data views and a chart view of the combined MR&R Requirements, grouped
by budget accounts, for all facilities included in the assessment for a ten-year period, beginning
in 2020.
Table 5 - Requirements Analysis, By Budget Account, 10 Years Starting in 2020
Table 6 displays data views of the combined MR&R Requirements, grouped by Level 2
UNIFORMAT categories, for all facilities included in the assessment for a ten-year period,
beginning in 2020.
Account 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Grand Total
Component Renewal at ESL $1,413,986 $872,441 $61,254 $1,225,766 $956,982 $265,441 $2,754,291 $1,835,712 $1,272,146 $15,128 $10,673,146
Deficiency Repairs/Replacements $3,259,212 $3,259,212
Preventative Maintenance $787,934 $811,572 $835,919 $860,997 $886,827 $913,431 $940,834 $969,059 $998,131 $1,028,075 $9,032,779
Grand Total $5,461,132 $1,684,013 $897,173 $2,086,762 $1,843,808 $1,178,872 $3,695,125 $2,804,771 $2,270,277 $1,043,204 $22,965,137
University Hospitals Authority & Trust, Report of Findings for Facility Condition Assessment 22 | P a g e
Table 6 - Requirements Analysis, By Budget Account, 10 Years Starting in 2020
Requirements over the ten-year study period total just under $23 million. The first-year
requirements in 2020 total $5.46 million.
Component Renewals at the End of Service Life totals $10.7 million over the next ten years.
Preventative Maintenance requirements total $9.0 million over ten years. All costs are inflated
at an annual rate of 3% per year.
A list of the building components forecasted for replacement at the end of their estimated
service life is included as Appendix I to this report.
Level 2 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 Grand Total
A10-Foundations $1,452 $1,452
B10-Superstructure $2,292 $2,292
B20-Exterior Enclosure $174,183 $124,875 $128,621 $132,480 $136,454 $140,548 $144,764 $149,107 $153,580 $158,188 $1,442,801
B30-Roofing $159,311 $8,828 $9,093 $9,366 $9,647 $10,121 $10,234 $10,684 $10,857 $11,183 $249,325
C10-Interior Construction $188,120 $173,261 $231,008 $621,765 $496,340 $369,800 $200,857 $206,882 $213,089 $219,482 $2,920,601
C20-Stairs $18,803 $19,368 $19,949 $20,547 $21,163 $21,798 $22,452 $23,126 $23,820 $24,534 $215,560
C30-Interior Finishes $1,371,688 $970,929 $110,148 $890,899 $757,590 $110,849 $2,805,717 $1,838,409 $1,157,722 $124,762 $10,138,711
D10-Conveying $2,299,121 $46,506 $47,901 $49,338 $50,818 $52,343 $53,913 $55,530 $57,196 $58,912 $2,771,578
D20-Plumbing $175,068 $84,734 $87,276 $89,894 $92,591 $95,369 $98,230 $101,177 $104,212 $107,338 $1,035,888
D30-HVAC $657,814 $100,084 $103,086 $107,579 $109,364 $138,289 $178,773 $119,505 $358,643 $126,783 $1,999,921
D40-Fire Protection $42,424 $20,995 $21,624 $22,273 $22,941 $23,630 $24,339 $36,277 $25,821 $26,595 $266,919
D50-Electrical $294,812 $130,901 $134,828 $138,873 $143,039 $212,149 $151,750 $259,854 $160,992 $180,950 $1,808,148
G20-Site Improvements $3,430 $3,533 $3,639 $3,749 $3,861 $3,977 $4,096 $4,219 $4,346 $4,476 $39,326
G30-Site Civil/Mechanical Utilities $72,615 $72,615
Grand Total $5,461,132 $1,684,013 $897,173 $2,086,762 $1,843,808 $1,178,872 $3,695,125 $2,804,771 $2,270,277 $1,043,204 $22,965,137
Appendix A
Facilities Included in the Scope of Work
Appendix A - Facilities List
Asset
NumberAsset Name
Year
BuiltStreet Address City State
Postal
Code
Asset Size
(SF)
1 Garrison Tower 1974 940 NE 13TH Street Oklahoma City Oklahoma 73126 222,262
2 Nicholsen Tower 1978 940 NE 13th Street Oklahoma City Oklahoma 73126 255,675
3 Oklahoma Transplant Center 1985 940 NE 13th Street Oklahoma City Oklahoma 73126 43,003
4 OU Physicians Building 2001 810 NE 10th Street Oklahoma City Oklahoma 73126 189,525
5 OU Children's Physicians 2009 1200 Children's Avenue Oklahoma City Oklahoma 73126 316,658
6 Children's Atrium 2011 1200 Children's Avenue Oklahoma City Oklahoma 73126 107,757
7 Samis Education Center 2012 1200 Children's Avenue Oklahoma City Oklahoma 73126 65,063
8 College of Medicine 2016 800 Stanton L. Young Blvd. Oklahoma City Oklahoma 73126 191,966
Appendix B
Facilities Ranked by FCI
Appendix B - Facilities Ranked by FCI
Asset
NumberAsset Name Replacement Value
Current Backlog
Impacting FCIFCI
1 Garrison Tower $52,596,080 $2,622,761 0.0499
2 Nicholsen Tower $60,502,932 $501,253 0.0083
3 Oklahoma Transplant Center $10,176,230 $4,361 0.0004
5 OU Children's Physicians $74,933,949 $31,372 0.0004
7 Samis Education Center $15,396,508 $1,939 0.0001
4 OU Physicians Building $44,849,196 $1,328 0.0000
8 College of Medicine $45,426,834 $1,269 0.0000
6 Children's Atrium $25,499,616 $- 0.0000
Totals: $329,381,346 $3,164,283 0.0096
Appendix C
Asset Summary and History Reports
Asset Summary and History Report
UHAT
1 - Garrison Tower
FAC Code and Description 6100-General Administrative Building
Year Built 1974 Asset Size/UOM 222262
Active Work Items 35 Work Item Costs $2,622,761
Plant Replacement Value $52,596,080
Asset History
The building was reportedly constructed in about 1974. Some metal siding systems were replaced between 1993 and 2000.Some storefront windows were reportedly replaced in 1993. Some solid and glazed doors were reportedly replaced in 1993.Some roofing membrane systems were replaced between 1993 and 2019. Some of the mechanical equipment was replacedbetween 1993 and 2017. The fire protection/fire alarm equipment was replaced is in 1993. Some of the electrical equipmentwas replaced in 2017.
Asset Summary
Deep concrete foundation assembly with basement concrete floor slab. Reinforced cast-in-place concrete basementconstruction. Reinforced cast-in-place concrete roof and floor framing. Brick veneer wall systems with metal siding accentwall panels. Aluminum fixed windows and storefront windows. Exterior solid doors and glazed doors. Exterior cast-in-placeconcrete stairs and steel metal pan stairs with concrete treads. Various rooftop elevations. TPO and asphalt paved gravelbuilt-up roof systems with aluminum downspouts, gutters, and roof hatches.Steam and chilled water are provided by remoteheating and cooling plant owned by Veolia Energy Systems for distribution of steam and chilled water to AHUs and heatexchangers. Built-up VAV style AHUs with chilled and heating water coils provide conditioned air to the building. AHUs arelocated at the mechanical rooms on each floor.Cast iron pipes are used for sanitary sewer and storm systems. Copper pipingis used for domestic water system. Commercial grade plumbing fixtures are installed at renovated men's and women'srestrooms.Building is supplied with 4,000-amp 480/277-volt electrical service. Step down transformers provide 120/208-voltelectric for general electrical usage. Light fixtures with T-8 lamps are installed in the building. A 750-KW diesel driven enginegenerator provides back-up electric to emergency lighting, life safety devices, and fire pump.Building is fully sprinklered withwet fire suppression system. A fire alarm panel provides life safety system to the building. Building is equipped with seventraction geared passenger and freight elevators but only three elevators are in service.
FCI (100-1) 95FCI 0.0499 |Good Severe
(incl. burden)
Square Feet
Geo Adj Region Regional Cost Factor
Floors Above Grade Floors Below Grade
ACI Priority 3-Relevant
0 0
Location Management
OklahomaCity
0.87
940 NE 13TH Street
Oklahoma City, Oklahoma 73126
United States
Name
Title/Role
Company
NameJeff Swann Don Still
Facility Project CoordinatorTitle/RoleDirector Facilities Management
1 CallCompany1 Call
Detail Replacement Value $28,892,173
Additional Photos
Custom Fields
Asset Summary and History Report 07/25/2019 1
Asset Summary and History Report
UHAT
2 - Nicholsen Tower
FAC Code and Description 6100-General Administrative Building
Year Built 1978 Asset Size/UOM 255675
Active Work Items 38 Work Item Costs $501,253
Plant Replacement Value $60,502,932
Asset History
The building was reportedly constructed in about 1978. Some brick veneer, metal siding, and stucco wall finishes werereplaced between 1993 and 2018. Some exterior windows were replaced between 2014 and 2018. Some exterior doorswere replaced between 1993 and 2018. Some of the mechanical equipment was replaced between 1993 and 2018. Roofingmembrane systems were replaced between 1993 and 2018. The fire protection/fire alarm equipment was replaced in 2014.Some of the electrical equipment was replaced between 2018.
Asset Summary
Deep concrete foundation system with concrete basement slab. Roof and floor construction consist of cast-in-placereinforced concrete beams and columns with concrete slabs. Exterior enclosure includes brick veneer wall systems, metalsiding systems, stucco wall finishes, drywall soffits, and various exterior painted areas. Exterior windows include aluminumfixed windows, and storefront windows. Exterior doors include solid personnel doors, glazed doors, and overhead motorizedroll-up doors. Roofing membrane systems include standing seam steel roof panel systems, asphalt flood coat with gravel built-up roof systems, and thermoplastic-polyolefin (TPO) roofing membrane of unknown thickness with aluminum downspoutsand gutters.Steam and chilled water are provided by remote heating and cooling plant owned by Veolia Energy Systems fordistribution of steam and chilled water to AHUs and heat exchangers. Built-up VAV style AHUs with chilled and heating watercoils provide conditioned air to the building. AHUs are located at the mechanical rooms on each floor. Heating, cooling, andtemperature control systems at the building are controlled by a digital direct control (DDC).Cast iron pipes are used forsanitary sewer and storm systems. Copper piping is used for domestic water system. Commercial grade plumbing fixturesare installed at renovated men's and women's restrooms.Building is supplied with 2,000-amp 480/277-volt electrical service.Step down transformers provide 120/208-volt electric for general electrical usage. Light fixtures with T-8 and LED lamps areinstalled in the building. A 450-KW diesel driven engine generator provides back-up electric to emergency lighting, life safetydevices, and fire pump.Building is fully sprinklered with wet fire suppression system. A fire alarm panel provides life safetysystem to the building.Building is equipped with two traction geared passenger elevators and one hydraulic freight elevators.
FCI (100-1) 99FCI 0.0083 |Good Severe
(incl. burden)
Square Feet
Geo Adj Region Regional Cost Factor
Floors Above Grade Floors Below Grade
ACI Priority 3-Relevant
0 0
Location Management
OklahomaCity
0.87
940 NE 13th Street
Oklahoma City, Oklahoma 73126
United States
Name
Title/Role
Company
NameJeff Swann Don Still
Facility Project CoordinatorTitle/RoleDirector Facilities Management
1 CallCompany1 Call
Detail Replacement Value $35,224,644
Additional Photos
Custom Fields
Asset Summary and History Report 07/25/2019 2
Asset Summary and History Report
UHAT
3 - Oklahoma Transplant Center
FAC Code and Description 6100-General Administrative Building
Year Built 1985 Asset Size/UOM 43003
Active Work Items 5 Work Item Costs $4,361
Plant Replacement Value $10,176,230
Asset History
The building was reportedly constructed in about 1985. Interviews with occupants and observation of interior conditionsestimate that the first and third floors received interior renovations in approximately 2010 while the second floor receivedinterior renovations in approximately 2005. Interviews confirm that the ground level was remodeled in 2016.Inspection ofHVAC equipment provided information that roof exhaust fans and several packaged AHU’s were replaced between 1994 and1997 along with the installation of several transformers. Several Variable Frequency Drives were installed as recently as2012. Electrical panels were installed sometime between 1986 and 1989 suggesting that the building is possibly constructedafter 1985.
Asset Summary
Deep concrete foundation system with concrete basement slab. Roof and floor construction consist of cast-in-placereinforced concrete beams and columns with concrete slabs. Exterior enclosure includes brick veneer wall systems andmetal panel siding systems. Exterior windows include aluminum fixed windows, glazed curtain wall, & storefront windows.Exterior doors include solid personnel doors and glazed electrically operated doors. Roofing membrane systems includestanding seam steel roof panel systems, asphalt flood coat with gravel built-up roof systems, and EPDM roofing membrane ofunknown thickness with roof drains for rain drainage.Steam and chilled water are provided from Garrison Tower via servicetunnel connecting the two buildings. Central Station Packaged AHUs with chilled and heating water coils provide conditionedair to the building. AHUs are located at the mechanical rooms on each floor.Cast iron pipes are used for sanitary sewer andstorm systems. Copper piping is used for domestic water system. Commercial grade plumbing fixtures are installed atrenovated men's and women's restrooms.Building is supplied with 400-amp 480/277-volt electrical service. Step downtransformers provide 120/208-volt electric for general electrical usage. Light fixtures with T-8 lamps are installed in thebuilding with LED light fixtures installed on the bottom floor.Building is fully sprinklered with wet fire suppression system. A firealarm panel provides life safety system to the building. Building is equipped with two hydraulic passenger elevators that serveall five floors of the building.
FCI (100-1) 100FCI 0.0004 |Good Severe
(incl. burden)
Square Feet
Geo Adj Region Regional Cost Factor
Floors Above Grade Floors Below Grade
ACI Priority 3-Relevant
0 0
Location Management
OklahomaCity
0.87
940 NE 13TH Street
Oklahoma City, Oklahoma 73126
United States
Name
Title/Role
Company
NameJeff Swann Don Still
Facility Project CoordinatorTitle/RoleDirector Facilities Management
1 CallCompany1 Call
Detail Replacement Value $7,501,523
Additional Photos
Custom Fields
Asset Summary and History Report 07/25/2019 3
Asset Summary and History Report
UHAT
4 - OU Physicians Building
FAC Code and Description 6100-General Administrative Building
Year Built 2001 Asset Size/UOM 189525
Active Work Items 4 Work Item Costs $1,328
Plant Replacement Value $44,849,196
Asset History
The building was reportedly constructed in about 2001. All foundation, superstructure, exterior enclosure, and roofingsystems were reportedly installed during original construction date in 2001. All mechanical, electrical, plumbing, and fireprotection/fire alarm equipment was installed during original construction in 2001.
Asset Summary
Primary foundation system consists of concrete deep foundation with concrete slab. Roof framing systems include cast-in-place concrete beams and columns with concrete slab of various depth, steel roof framing assemblies with metal deck. Floorframing systems include cast-in-place concrete beams and columns with concrete slab of various depth. Exterior wallsystems include stone veneer systems, metal siding systems, and exterior insulation finish (EIFS) systems with aluminumand stucco louvers. Exterior windows include aluminum fixed windows and curtain wall window panels. Exterior doors includesolid doors, glazed doors, auto sliding doors, and motorized overhead rollup doors. Primary roofing membrane systeminclude thermoplastic-polyolefin (TPO) roofing membrane of unknown thickness and standing seam steel roofingpanels.Steam and chilled water are provided by remote heating and cooling plant owned by Veolia Energy Systems fordistribution of steam and chilled water to AHUs and heat exchangers. Built-up VAV style AHUs with chilled and heating watercoils provide conditioned air to the building. AHUs are located at the mechanical room on the roof penthouse level. Heating,cooling, and temperature control systems at the building are controlled by a digital direct control (DDC).Cast iron pipes areused for sanitary sewer and storm system. Copper piping is used for domestic water system. Commercial grade plumbingfixtures are installed at men's and women's restrooms.Building is supplied with 3,000-amp 480/277-volt electrical service.Step down transformers provide 120/208-volt electric for general electrical usage. Fluorescent light fixtures with T-8 lampsand LED lighting fixtures are installed in the building.Building is fully sprinklered with wet fire suppression system. A fire alarmpanel provides life safety system to the building. Building is equipped with three traction geared passenger elevators and twohydraulic freight elevators.
FCI (100-1) 100FCI 0.0000 |Good Severe
(incl. burden)
Square Feet
Geo Adj Region Regional Cost Factor
Floors Above Grade Floors Below Grade
ACI Priority 3-Relevant
0 0
Location Management
OklahomaCity
0.87
810 NE 10TH Street
Oklahoma City, Oklahoma 73126
United States
Name
Title/Role
Company
NameJeff Swann Don Still
Facility Project CoordinatorTitle/RoleDirector Facilities Management
1 CallCompany1 Call
Detail Replacement Value $21,535,732
Additional Photos
Custom Fields
Asset Summary and History Report 07/25/2019 4
Asset Summary and History Report
UHAT
5 - OU Children's Physicians
FAC Code and Description 6100-General Administrative Building
Year Built 2009 Asset Size/UOM 316658
Active Work Items 8 Work Item Costs $31,372
Plant Replacement Value $74,933,949
Asset History
All foundation, superstructure, exterior enclosure, and roofing systems were reportedly installed during original constructiondate in 2009. All mechanical, electrical, fire protection, and life safety equipment and devices are installed during originalconstruction date in 2009. Plumbing systems and fixtures are installed during original construction date in 2009.
Asset Summary
Primary foundation system consists of concrete deep foundation assembly with concrete basement floor slab. Primary roofconstruction consists of steel roof framing assemblies with metal deck. Primary floor construction consists of cast-in-placeconcrete beams and columns with concrete slab. Exterior walls consist of brick veneer wall systems, stone veneer systems,and metal siding systems with aluminum and stucco soffits. Exterior windows consist of aluminum fixed windows, storefrontwindows, curtain wall window panels, and ribbon windows. Exterior doors consist of solid doors, glazed doors, and autosliding doors. Primary roofing membrane system consists of standing seam steel roofing panels with a small area ofthemoplastic-polyolefin (TPO) roofing membrane of unknown thickness with aluminum downspouts.Steam and chilled waterare provided by remote heating and cooling plant owned by Veolia Energy Systems for distribution of steam and chilled waterto AHUs and heat exchangers. Built-up VAV style AHUs with chilled and heating water coils provide conditioned air to thebuilding. AHUs are located at the mechanical rooms on each floor. Heating, cooling, and temperature control systems at thebuilding are controlled by a digital direct control (DDC).Cast iron pipes are used for sanitary sewer and storm system. Copperpiping is used for domestic water system. Commercial grade plumbing fixtures are installed at men's and women'srestrooms.Building is supplied with 2,500-amp 480/277-volt electrical service. Step down transformers provide 120/208-voltelectric for general electrical usage. Fluorescent light fixtures with T-8 lamps and LED lighting fixtures are installed in thebuilding. A 450-KW diesel driven engine generator provides back-up electric to emergency lighting, life safety devices, andfire pump.Building is fully sprinklered with wet fire suppression system. A fire alarm panel provides life safety system to thebuilding. Building is equipped with four traction geared passenger elevators and one traction geared freight elevator.
FCI (100-1) 100FCI 0.0004 |Good Severe
(incl. burden)
Square Feet
Geo Adj Region Regional Cost Factor
Floors Above Grade Floors Below Grade
ACI Priority 3-Relevant
14 0
Location Management
OklahomaCity
0.87
1200 Children's Avenue
Oklahoma City, Oklahoma 73126
United States
Name
Title/Role
Company
NameJeff Swann Don Still
Facility Project CoordinatorTitle/RoleDirector Facilities Management
1 CallCompany1 Call
Detail Replacement Value $54,328,974
Additional Photos
Custom Fields
Asset Summary and History Report 07/25/2019 5
Asset Summary and History Report
UHAT
6 - Children's Atrium
FAC Code and Description 6100-General Administrative Building
Year Built 2011 Asset Size/UOM 107757
Active Work Items 0 Work Item Costs $0
Plant Replacement Value $25,499,616
Asset History
All foundation, superstructure, exterior enclosure, roofing, interior construction stair construction and interior finishes systemswere reportedly installed during original construction date in 2011. All mechanical, electrical, fire protection, and life safetyequipment and devices were installed during original construction date in 2011. Plumbing systems and fixtures are installedduring original construction date in 2011.
Asset Summary
Primary foundation system consists of concrete deep foundation assembly with concrete basement floor slab. Primary floorconstruction consists of composite steel beams and steel deck with reinforced light weight concrete slab. Primary roofconstruction consists of structural steel assemblies and metal deck. Exterior walls consist of curtain wall systems and metalsiding systems. Exterior windows consist of curtain wall window panels and aluminum fixed windows. Exterior doors consistof solid doors, glazed doors, and revolving doors. Primary roofing membrane system consists of standing seam steel roofingpanels with a small area of themoplastic-polyolefin (TPO) roofing membrane of unknown thickness with skylights. Rooftopgarden is paved with concrete pavers, grass lawn, and rubber mats and enclosed with wood fence and glass panels withsteel railing. Interior construction consists of interior partition wall systems with gypsum wallboard finishes, interior storefrontwindows with aluminum frames, glazed interior doors, wood doors with metal frames, interior windows, and plastic laminatetoilet partitions in restrooms. Cast-in-place concrete stairs with tread finishes and steel pipe railing. Interior wall finishesinclude ceramic tile, wood, stone, and granite. Interior floor finishes include carpeting, ceramic tile, wood, and terrazzo floorfinishes. Interior ceiling finishes include gypsum wallboard, suspended acoustic ceiling tiles, and metal panel ceiling.Steamand chilled water are provided by remote heating and cooling plant owned by Veolia Energy Systems for distribution of steamand chilled water to AHUs and heat exchangers. Three factory built AHUs with chilled and heating water coils provideconditioned air to the building. AHUs are located at the mechanical room in children hospital on fifth floor. Two factory builtAHUs located at the mechanical room on the basement provide conditioned air to the first floor. Heating, cooling, andtemperature control systems at the building are controlled by a digital direct control (DDC).Cast iron piping is used forsanitary sewer and storm systems. Copper piping is used for domestic water system. Commercial grade plumbing fixturesare installed at men's and women's restrooms.Children Atrium building is supplied with 800-amp 480/277-volt electricalservice. Step down transformers provide 120/208-volt electric for general electrical usage. Fluorescent lighting fixtures with T-8 lamps are installed in the building.Children Atrium building is fully sprinklered with wet fire suppression system. A fire alarmpanel provides life safety to the building. Main fire alarm panel for Children Atrium building is located in Samis EducationCenter.Children Atrium building is equipped with two traction geared passenger elevators.
FCI (100-1) 100FCI 0.0000 |Good Severe
(incl. burden)
Square Feet
Geo Adj Region Regional Cost Factor
Floors Above Grade Floors Below Grade
ACI Priority 3-Relevant
6 0
Location Management
OklahomaCity
0.87
1200 Children's Avenue
Oklahoma City, Oklahoma 73126
United States
Name
Title/Role
Company
NameJeff Swann Don Still
Facility Project CoordinatorTitle/RoleDirector Facilities Management
1 CallCompany1 Call
Detail Replacement Value $12,634,432
Additional Photos
Asset Summary and History Report 07/25/2019 6
Custom Fields
Asset Summary and History Report 07/25/2019 7
Asset Summary and History Report
UHAT
7 - Samis Education Center
FAC Code and Description 6100-General Administrative Building
Year Built 2012 Asset Size/UOM 65063
Active Work Items 4 Work Item Costs $1,939
Plant Replacement Value $15,396,508
Asset History
The building was reportedly constructed in about 2012. All foundation, superstructure, exterior enclosure, and roofingsystems were reportedly installed during original construction date in 2012. All mechanical, electrical, plumbing, and fireprotection/fire alarm equipment was installed during original construction in 2012.
Asset Summary
Primary foundation system consists of concrete deep foundation assembly with concrete basement floor slab. Primary roofand floor construction consist of cast-in-place concrete beams and columns with concrete slab of various depth. Exteriorwalls consist of curtain wall systems, stone veneer systems, metal siding systems, and stucco wall finishes. Exterior windowsconsist of curtain wall window panels and rooftop garden glass canopy. Exterior doors consist of solid doors and glazeddoors. There is a pedestrian garden located on the rooftop of the building. The primary roofing membrane system for therooftop garden stairwells consists of themoplastic-polyolefin (TPO) roofing membrane of unknown thickness. The rooftopgarden is paved with concrete pavers with an elevated deck assembly paved with wood decking.Steam and chilled water areprovided by remote heating and cooling plant owned by Veolia Energy Systems for distribution of steam and chilled water toAHUs and heat exchangers. Built-up VAV style AHUs with chilled and heating water coils provide conditioned air to thebuilding. AHUs are located at the mechanical rooms on each floor. Heating, cooling, and temperature control systems at thebuilding are controlled by a digital direct control (DDC).Cast iron pipes are used for sanitary sewer and storm system. Copperpiping is used for domestic water system. Commercial grade plumbing fixtures are installed at men's and women'srestrooms.Electrical service to subject building is provided at OU Children's Physicians building electrical mainswitchboard.Building is fully sprinklered with wet fire suppression system. A fire alarm panel at OU Children's Physiciansbuilding provides life safety system to subject building. Two traction geared type elevators at Children Atrium serves thisbuilding.
FCI (100-1) 100FCI 0.0001 |Good Severe
(incl. burden)
Square Feet
Geo Adj Region Regional Cost Factor
Floors Above Grade Floors Below Grade
ACI Priority 3-Relevant
0 0
Location Management
OklahomaCity
0.87
1200 Children's Avenue
Oklahoma City, Oklahoma 73126
United States
Name
Title/Role
Company
NameJeff Swann Don Still
Facility Project CoordinatorTitle/RoleDirector Facilities Management
1 CallCompany1 Call
Detail Replacement Value $10,114,040
Additional Photos
Custom Fields
Asset Summary and History Report 07/25/2019 8
Asset Summary and History Report
UHAT
8 - College of Medicine
FAC Code and Description 6100-General Administrative Building
Year Built 2016 Asset Size/UOM 191966
Active Work Items 1 Work Item Costs $1,269
Plant Replacement Value $45,426,834
Asset History
All foundation, superstructure, exterior enclosure, and roofing systems were reportedly installed during original constructiondate in 2016. All mechanical, electrical, fire protection, and life safety equipment and devices were installed during originalconstruction date in 2016. Plumbing systems and fixtures were installed during original construction date in 2016.
Asset Summary
Primary foundation system consists of concrete deep foundations with concrete basement floor slab. Primary roof and floorconstruction consist of composite steel beams with metal deck and reinforced lightweight concrete slabs. Primary exteriorwall systems consist of exterior concrete framing walls with stone veneer systems. Exterior windows consist of ribbonwindows. Exterior doors consist of solid doors, glazed doors, and automatic sliding doors. Primary roofing membrane systemconsists of themoplastic-polyolefin (TPO) roofing membrane of unknown thickness. 4th floor rooftop garden paved withconcrete pavers and enclosed by perimeter ornamental metal railing with glass panels.Steam and chilled water are providedby remote heating and cooling plant owned by Veolia Energy Systems for distribution of steam and chilled water to AHUs andheat exchangers. Two built-up fan wall type, VAV style AHUs with chilled and heating water coils provide conditioned air tothe building. AHUs are located at the mechanical rooms on the basement level and penthouse 10th floor.Cast iron pipes areused for sanitary sewer and storm systems. Copper piping is used for domestic water system. Commercial grade plumbingfixtures are installed at men's and women's restrooms.Building is supplied with 2,000-amp 480/277-volt electrical service.Step down transformers provide 120/208-volt electric for general electrical usage. LED lighting fixtures are installed in thebuilding. A 450-KW diesel driven engine generator provides back-up electric to emergency lighting, life safety devices, andfire pump.Building is fully sprinklered with wet fire suppression system. A fire alarm panel provides life safety system to thebuilding. Building is equipped with three traction geared passenger elevators and one traction geared freight elevator.
FCI (100-1) 100FCI 0.0000 |Good Severe
(incl. burden)
Square Feet
Geo Adj Region Regional Cost Factor
Floors Above Grade Floors Below Grade
ACI Priority 3-Relevant
0 0
Location Management
OklahomaCity
0.87
800 Stanton L. Young Blvd.
Oklahoma City, Oklahoma 73126
United States
Name
Title/Role
Company
NameJeff Swann Don Still
Facility Project CoordinatorTitle/RoleDirector Facilities Management
1 CallCompany1 Call
Detail Replacement Value $37,684,555
Additional Photos
Custom Fields
Asset Summary and History Report 07/25/2019 9
Appendix D
Inventory Summary
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
A10 Foundations
A1010 Standard Foundations
A101001 Foundation Assemblies
A101001003 Basement Foundation (foundationassembly, with concrete basement floor slab)
- 1974 100 G 90.0 28,034 SF $962,900
A101001004 Deep Foundation (foundationassembly, up to 50' pile, with slab)
- 1974 100 G- 70.0 28,034 SF $826,529
B10 Superstructure
B1010 Floor Construction
B101001 Cast in Place (CIP) Concrete, Raised Floor Structural Assembly
B101001001 CIP Concrete Beams and Slab,with columns, slab depth varies
- 1974 100 G- 70.0 222,262 SF $6,982,316
B1020 Roof Construction
B102004 Cast in Place (CIP) Concrete, Roof Structural Assembly
B102004001 CIP Concrete Beams and Slab,with columns, slab depth varies
- 1974 100 G- 70.0 28,034 SF $880,683
B20 Exterior Enclosure
B2010 Exterior Walls
B201002 Brick Veneer Wall Systems
B201002 Brick Veneer Wall Systems 1974 75 G 67.5 16,050 SF $351,905
B201002 Brick Veneer Wall Systems 1974 75 G 67.5 19,488 SF $427,284
B201002 Brick Veneer Wall Systems 1974 75 G 67.5 15,188 SF $333,004
B201002 Brick Veneer Wall Systems - - 1974 75 Y+ 41.3 17,498 SF $383,653
B201007 Metal Siding Systems, type varies
B201007 Metal Siding Systems, type varies South 3rd floor 2000 35 Y+ 19.3 1,062 SF $11,441
B201007 Metal Siding Systems, type varies 1993 35 G- 24.5 624 SF $6,721
B201018 Exterior Louvers and Screens
B201018002 Metal Louvers - 1993 40 G- 28.0 302 SF $12,490
B201018002 Metal Louvers South 3rd floor 1993 40 Y+ 22.0 20 SF $828
B201021 Exterior Soffits
B201021004 Soffit, Stucco 1993 30 Y+ 16.5 2,989 SF $38,984
B201025 Exterior Stairs
1Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
B201025001 Stairs, CIP Concrete 1974 100 G- 70.0 22 Riser $10,874
B201025005 Stairs, Steel, metal pan withconcrete tread, picket rail, with landing
1974 65 G- 45.5 20 Riser $111,279
B2020 Exterior Windows
B202008 Aluminum Fixed Window, various sizes
B202008 Aluminum Fixed Window, various sizes 1974 60 G- 42.0 12,094 SF $1,012,410
B202012 Storefronts
B202012 Storefronts 1993 30 G- 21.0 200 SF $17,061
B2030 Exterior Doors
B203006 Solid Doors
B203006 Solid Doors - 1993 30 G- 21.0 224 SF $21,133
B203006 Solid Doors South 3rd floor 2000 30 Y+ 16.5 84 SF $7,924
B203007 Glazed Doors
B203007 Glazed Doors - 1993 35 G- 24.5 112 SF $10,213
B30 Roofing
B3010 Roof Coverings
B301001 High Slope Roof Assemblies (roof coverings and flashing, no insulation)
B301001004 Steel Roofing Panels, standingseam, standard or zinc aluminum alloy finish
South 3rd floor 1993 40 Y+ 22.0 1,500 SF $21,404
B301002 Low Slope Roof Assemblies (roof coverings and flashing, no insulation)
B301002001 Built-up Roof (BUR), asphalt floodcoat w/gravel
North 5th and 4th 1993 20 BSL Y 4.6 2,057 SF $17,750
B301002002 Built-up Roof (BUR), asphalt floodcoat, smooth
South 5th floor 1993 20 BSL Y 4.6 700 SF $5,468
B301002002 Built-up Roof (BUR), asphalt floodcoat, smooth
North 2nd floor 1993 20 BSL Y 4.6 809 SF $6,320
B301002002 Built-up Roof (BUR), asphalt floodcoat, smooth
Painted North 3rd floor 2019 20 G 18.0 945 SF $7,381
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
Penthouse 2000 20 G- 14.0 1,920 SF $6,686
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
Northwest 8th floor 2000 20 G- 14.0 7,604 SF $26,483
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
Southwest 7th floor 2000 20 BSL Y 4.6 12,032 SF $41,904
2Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
South 8th floor 2000 20 BSL Y 4.6 676 SF $2,355
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
South 3rd floor 2000 20 Y+ 11.0 1,291 SF $4,496
B301009 Gutters & Downspouts
B301009003 Aluminum gutters, 5" box South 3rd floor 2000 20 Y 9.0 50 LF $351
B301009010 Aluminum downspouts - 1993 20 BSL G- 7.0 24 LF $113
B301009010 Aluminum downspouts South 3rd floor 2000 20 BSLY+
5.6 33 LF $155
B3020 Roof Openings
B302002 Roof Hatches
B302002001 Roof hatch, with curb, aluminum orsteel, 1" fiberglass insulation
2000 75 G- 52.5 16 SF $2,796
C10 Interior Construction
C1010 Interior Wall Partitions
C101001 Interior Partition Wall System with Gypsum Wallboard Finishes, 8' to 10' FTC height
C101001 Interior Partition Wall System withGypsum Wallboard Finishes, 8' to 10' FTC height
- 1974 50 R 5.0 23,025 FloorArea
$515,872
C101006 Interior Glazed Partitions and Storefronts
C101006004 Interior Glazing, 3/8" Clear Glass - 2018 30 G 27.0 192 SF $8,392
C101007 Interior Windows
C101007 Interior Windows - - 2000 50 G- 35.0 25 SF $1,743
C101007 Interior Windows - 1974 50 G- 35.0 36 SF $2,508
C101007 Interior Windows - 2000 50 G- 35.0 420 SF $29,273
C101007 Interior Windows - 1974 50 R 5.0 620 SF $43,212
C101007 Interior Windows - - 1974 50 Y+ 27.5 260 SF $18,121
C1020 Interior Doors (doors, frames, casings, finishes, hardware)
C102005 Metal door/Metal frame, flush, hollow core, w/ hinges and locksets
C102005 Metal door/Metal frame, flush, hollowcore, w/ hinges and locksets
- 1974 40 R 4.0 1,475 SF $138,221
C102005 Metal door/Metal frame, flush, hollowcore, w/ hinges and locksets
- - 1974 40 R 4.0 1,250 SF $117,136
3Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C102005 Metal door/Metal frame, flush, hollowcore, w/ hinges and locksets
- - 1974 40 Y+ 22.0 800 SF $74,967
C102005 Metal door/Metal frame, flush, hollowcore, w/ hinges and locksets
- 2000 40 G- 28.0 448 SF $41,981
C102006 Wood door/Metal frame, flush or panel face, various core types and face materials, w/ hinges and locksets
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2010 30 G- 21.0 1,875 SF $121,111
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2010 30 G- 21.0 750 SF $48,445
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2019 30 G 27.0 100 SF $6,459
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2018 30 G 27.0 1,025 SF $66,207
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2016 30 G 27.0 450 SF $29,067
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- - 1974 30 R 3.0 1,250 SF $80,741
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 1974 30 R 3.0 1,475 SF $95,274
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 1974 30 R 3.0 800 SF $51,674
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- - 1974 30 Y+ 16.5 24 SF $1,550
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 1974 30 Y+ 16.5 24 SF $1,550
C102010 Glazed Interior Doors
C102010 Glazed Interior Doors - 2016 35 G 31.5 80 SF $7,295
C102010 Glazed Interior Doors - 2018 35 G 31.5 150 SF $13,678
4Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C102010 Glazed Interior Doors - 2019 35 G 31.5 150 SF $13,678
C102010 Glazed Interior Doors Full vision lite 2010 35 G- 24.5 175 SF $15,957
C102011 Sliding & Folding Doors
C102011 Sliding & Folding Doors - 2010 30 G- 21.0 952 SF $29,290
C102011 Sliding & Folding Doors - 2016 30 G 27.0 50 SF $1,538
C1030 Fittings
C103001 Compartments, Cubicles & Toilet Partitions
C103001 Compartments, Cubicles & ToiletPartitions
- 2010 20 G- 14.0 70 EA $85,321
C103001 Compartments, Cubicles & ToiletPartitions
- 2010 20 G- 14.0 12 EA $14,626
C103001 Compartments, Cubicles & ToiletPartitions
- 2019 20 G 18.0 37 EA $45,097
C103001 Compartments, Cubicles & ToiletPartitions
- 2010 20 G- 14.0 34 EA $41,441
C103001 Compartments, Cubicles & ToiletPartitions
- 2019 20 G 18.0 7 EA $8,532
C103001 Compartments, Cubicles & ToiletPartitions
Granite toilet partitions. - 1974 20 R 2.0 8 EA $9,752
C103001 Compartments, Cubicles & ToiletPartitions
- 1974 20 R 2.0 6 EA $7,314
C103002 Toilet & Bath Accessories
C103002 Toilet & Bath Accessories - 1974 20 R 2.0 2 BthRm
$2,002
C103002 Toilet & Bath Accessories - - 1974 20 R 2.0 29 BthRm
$29,022
C103002 Toilet & Bath Accessories - 2018 20 G 18.0 15 BthRm
$15,012
C103002 Toilet & Bath Accessories - 2016 20 G- 14.0 2 BthRm
$2,002
C103002 Toilet & Bath Accessories - 2010 20 G- 14.0 3 BthRm
$3,002
C103002 Toilet & Bath Accessories - 2010 20 G- 14.0 4 BthRm
$4,003
C103007 Cabinets and Countertops (assembly)
5Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
- 2010 30 G- 21.0 85 LF $57,690
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
- 2018 30 G- 21.0 12 LF $8,144
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
- 2010 30 G- 21.0 16 LF $10,860
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
- 2015 30 G 27.0 12 LF $8,144
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
- 2010 30 G- 21.0 16 LF $10,860
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
- 2000 30 R 3.0 72 LF $48,866
C103007002 Wood Cabinets, base only, withPlastic Laminate Countertops
- 1974 30 R 3.0 164 LF $67,371
C103007002 Wood Cabinets, base only, withPlastic Laminate Countertops
- - 1974 30 R 3.0 110 LF $45,189
C103007002 Wood Cabinets, base only, withPlastic Laminate Countertops
Built in bench. 2018 30 G 27.0 28 LF $11,503
C103007002 Wood Cabinets, base only, withPlastic Laminate Countertops
- 2010 30 G- 21.0 16 LF $6,573
C103007002 Wood Cabinets, base only, withPlastic Laminate Countertops
- 2010 30 G- 21.0 24 LF $9,859
C103007005 Wood Cabinets, base and wall,with Solid Surface Countertops
- 2018 30 G 27.0 80 LF $64,804
C103007005 Wood Cabinets, base and wall,with Solid Surface Countertops
- 2019 30 G 27.0 10 LF $8,100
C103007005 Wood Cabinets, base and wall,with Solid Surface Countertops
- 2018 30 G 27.0 8 LF $6,480
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
- 2019 30 G 27.0 6 LF $3,253
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
- - 2019 30 G 27.0 20 LF $10,843
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
- 2018 30 G 27.0 30 LF $16,264
C103008 Counters
C103008002 Solid Surface Molded Counter Top - 2018 40 G 36.0 32 LF $6,317
C103008002 Solid Surface Molded Counter Top - 2018 40 G 36.0 24 LF $4,738
6Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C103008002 Solid Surface Molded Counter Top - 2019 40 G 36.0 22 LF $4,343
C103008003 Plastic Laminate Counter w/Backsplash
- - 2016 30 G 27.0 12 LF $792
C30 Interior Finishes
C3010 Wall Finishes
C301003 Ceramic Tile Wall Finishes
C301003 Ceramic Tile Wall Finishes - 2019 75 G 67.5 640 SF $6,569
C301003 Ceramic Tile Wall Finishes - 2010 75 G- 52.5 1,120 SF $11,497
C301003 Ceramic Tile Wall Finishes - 2010 75 G- 52.5 160 SF $1,643
C301003 Ceramic Tile Wall Finishes - - 1974 75 Y+ 41.3 2,400 SF $24,636
C301004 Wood Wall Finishes
C301004 Wood Wall Finishes - 2010 20 G 18.0 72 SF $405
C301009 Stone, Marble and Granite Wall Finishes
C301009 Stone, Marble and Granite WallFinishes
- - 1974 75 G- 52.5 400 SF $29,418
C3020 Floor Finishes
C302001 Carpeting
C302001 Carpeting - 2018 7 G- 4.9 8,000 SF $70,162
C302001 Carpeting - 2019 7 G 6.3 4,200 SF $36,835
C302001 Carpeting - 2019 7 G 6.3 600 SF $5,262
C302001 Carpeting - 2016 7 G 6.3 350 SF $3,070
C302001 Carpeting @ ADD PHOTO 2010 7 Y+ 3.9 23,750 SF $208,292
C302001 Carpeting - - 2000 7 R 0.7 1,200 SF $10,524
C302001 Carpeting - - 1974 7 R 0.7 11,512 SF $100,963
C302001 Carpeting - - 1974 7 R 0.7 11,545 SF $101,252
C302001 Carpeting - 1974 7 R 0.7 2,000 SF $17,540
C302001 Carpeting - - 2000 7 R 0.7 6,400 SF $56,129
C302001 Carpeting - 2010 7 R 0.7 4,500 SF $39,466
C302002 Ceramic Tile Flooring
7Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C302002 Ceramic Tile Flooring Shower tile 1974 75 R 7.5 600 SF $6,159
C302002 Ceramic Tile Flooring - 2010 75 R 7.5 1,600 SF $16,424
C302002 Ceramic Tile Flooring - 2018 75 G 67.5 1,800 SF $18,477
C302002 Ceramic Tile Flooring - 2019 75 G 67.5 600 SF $6,159
C302002 Ceramic Tile Flooring - 2010 75 G 67.5 150 SF $1,540
C302004 Vinyl and Linoleum Floor Finishes
C302004 Vinyl and Linoleum Floor Finishes Wood plank vinyl. 2018 15 G 13.5 2,200 SF $15,045
C302004 Vinyl and Linoleum Floor Finishes - 2015 15 G 13.5 1,000 SF $6,839
C302004 Vinyl and Linoleum Floor Finishes Vinyl wood plank. 2019 15 G 13.5 400 SF $2,735
C302004 Vinyl and Linoleum Floor Finishes Vinyl wood plank. - 2015 15 G- 10.5 1,150 SF $7,865
C302004 Vinyl and Linoleum Floor Finishes - - 2014 15 G- 10.5 1,250 SF $8,549
C302004 Vinyl and Linoleum Floor Finishes - 2015 15 G- 10.5 1,000 SF $6,839
C302004 Vinyl and Linoleum Floor Finishes - 2015 15 G- 10.5 14,350 SF $98,133
C302004 Vinyl and Linoleum Floor Finishes - 2016 15 G 13.5 2,700 SF $18,464
C302004 Vinyl and Linoleum Floor Finishes - - 1995 15 R 1.5 10,390 SF $71,053
C302004 Vinyl and Linoleum Floor Finishes - - 1974 15 R 1.5 11,512 SF $78,725
C302004 Vinyl and Linoleum Floor Finishes - - 1974 15 R 1.5 900 SF $6,155
C302004 Vinyl and Linoleum Floor Finishes - 1974 15 R 1.5 25,155 SF $172,023
C302007 Terrazzo Floor Finishes
C302007 Terrazzo Floor Finishes - - 1974 75 R 7.5 25 SF $1,241
C302007 Terrazzo Floor Finishes - - 1974 75 R 7.5 940 SF $46,667
C302007 Terrazzo Floor Finishes - 1974 75 R 7.5 60 SF $2,979
C302007 Terrazzo Floor Finishes - - 1974 75 Y+ 41.3 600 SF $29,788
C302007 Terrazzo Floor Finishes - - 1974 75 Y+ 41.3 650 SF $32,271
C302013 Floor Toppings and Traffic Membranes
C302013006 Composition flooring, polyurethanewith vinyl or quartz chips, 1/16"
- - 2015 30 G 27.0 1,800 SF $26,268
C3030 Ceiling Finishes
8Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C303001 Gypsum Wallboard Ceiling Finishes
C303001 Gypsum Wallboard Ceiling Finishes - - 2018 25 G 22.5 740 SF $1,575
C303001 Gypsum Wallboard Ceiling Finishes - 2000 25 G- 17.5 1,600 SF $3,407
C303001 Gypsum Wallboard Ceiling Finishes - 1974 25 R 2.5 14,966 SF $31,865
C303001 Gypsum Wallboard Ceiling Finishes - 1974 25 Y+ 13.8 60 SF $128
C303001 Gypsum Wallboard Ceiling Finishes - 1974 25 Y+ 13.8 7,470 SF $15,905
C303003 Acoustical Ceiling Tiles & Panels
C303003001 Suspended Acoustical CeilingSystems
- 1974 60 R 6.0 8,058 SF $62,490
C303003001 Suspended Acoustical CeilingSystems
- 1974 60 R 6.0 23,500 SF $182,243
C303003001 Suspended Acoustical CeilingSystems
- 1974 60 R 6.0 4,620 SF $35,828
C303003001 Suspended Acoustical CeilingSystems
- 1974 60 Y+ 33.0 640 SF $4,963
C303003001 Suspended Acoustical CeilingSystems
- 2016 60 G- 42.0 25,000 SF $193,875
C303003001 Suspended Acoustical CeilingSystems
- 2018 60 G 54.0 11,500 SF $89,183
C303003001 Suspended Acoustical CeilingSystems
- 2018 60 G 54.0 14,000 SF $108,570
C303003001 Suspended Acoustical CeilingSystems
- 2015 60 G 54.0 1,000 SF $7,755
C303003001 Suspended Acoustical CeilingSystems
- 2019 60 G 54.0 4,450 SF $34,510
C303003001 Suspended Acoustical CeilingSystems
- 2016 60 G 54.0 3,700 SF $28,694
C303003001 Suspended Acoustical CeilingSystems
- 2010 60 G- 42.0 20,750 SF $160,916
D10 Conveying
D1010 Elevators and Lifts
D101003 Freight Elevators
D101003002 Hydraulic freight elevators(class"B"), 4000 lb, 2 floors, 50 FPM
5000-Lbs, 2 floors 1974 25 Y- 8.8 1 EA $177,660
D101004 Hospital Elevators
9Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D101004009 Traction geared elevators, hospital,3500 lb, 5 floors, 200 FPM
1974 25 AIP-NF 0.0 2 EA $0
D101004014 Traction geared elevators, hospital,4000 lb, 15 floors, 350 FPM
1974 25 Y- 8.8 1 EA $523,110
D101004014 Traction geared elevators, hospital,4000 lb, 15 floors, 350 FPM
G4, 8 floors 1974 25 R+ 6.3 1 EA $523,110
D101004014 Traction geared elevators, hospital,4000 lb, 15 floors, 350 FPM
2016 25 G- 17.5 2 EA $1,046,220
D101004020 Traction gearless elevators,hospital, 5000 lb, 10 floors, 200 FPM
Elev-7, 10 floors - 1974 25 Y- 8.8 1 EA $507,600
D20 Plumbing
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures - - 2010 25 G- 17.5 18,000 FSF $116,494
D2010 Plumbing Fixtures 2010 25 G- 17.5 177,262 FSF $1,147,223
D2020 Domestic Water Distribution
D202001 Domestic Water Distribution Pipes and Fittings
D202001 Domestic Water Distribution Pipes andFittings
2010 50 G- 35.0 177,262 FSF $544,868
D202005 Domestic Water Heating Equipment-Commercial
D202005010 Commercial Water Heater, Electric,480 V, 200 gallon tank
2014 15 G 13.5 1 EA $62,209
D202006 Water Heater Storage Tanks
D202006008 Water Heater Storage Tank,galvanized steel, 500 gallon
1974 20 AIP-NF 0.0 1 EA $0
D2030 Sanitary Waste
D203001 Sanitary Waste Pipes and Fittings
D203001 Sanitary Waste Pipes and Fittings 1974 50 BSL G- 17.5 177,262 FSF $392,404
D203004 Sanitary and Vent Equipment
D203004007 Sump Pump, Cast Iron, 1 HP 1974 25 Y- 8.8 2 EA $9,024
D2040 Rain Water Drainage
D204001 Rain Water Drainage Pipes and Fittings
D204001 Rain Water Drainage Pipes andFittings
1990 50 G- 35.0 25,000 FSF $52,170
D2090 Other Plumbing Systems
10Inventory Summary 07/25/2019
D302011 Steam Auxiliary Equipment
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D209001 Special Piping Systems
D209001001 Medical Gases Piping Per Outlet 2016 25 G 22.5 25 EA $35,779
D209001001 Medical Gases Piping Per Outlet 1990 25 BSL G 11.3 18 EA $25,761
D209005 Compressed Air System (non-breathing)
D209005009 Air Compressor, 7.5 H.P., 80 gallontank
1974 25 AIP-NF 0.0 2 EA $0
D30 HVAC
D3010 Energy Supply
D301001 Fuel Oil Supply System
D301001009 Aboveground Fuel Oil StorageTank, horizontal, concrete, 500 to 1,000 gallon,incl. pad & pump
1999 50 BSL G 22.5 2,000 GAL $51,409
D3020 Heat Generating Systems
D302001 Steam Boilers
D302001015 450-1000 MBH, Gas Fired, CastIron, Steam Boiler
Incinerator 1974 30 AIP-NF 0.0 1 EA $0
D302005 Heat Exchangers
D302005001 Heat Exchanger, steam to water,shell and tube type
- 1997 30 BSL G 13.5 150 GPM $35,603
D302005001 Heat Exchanger, steam to water,shell and tube type
- 2011 30 G- 21.0 150 GPM $35,603
D302005003 Heat Exchanger, liquid-to-liquid,shell and tube type
1974 30 AIP-NF 0.0 50 GPM $0
D302005003 Heat Exchanger, liquid-to-liquid,shell and tube type
- 2018 30 G 27.0 60 GPM $17,935
D302008 Expansion Tanks, Hot Water Storage Tanks
D302008001 Expansion Tank, painted steel, 15to 400 gallon capacity
2014 30 G 27.0 10 GAL $307
D302008002 Expansion Tank, galvanized steel,15 to 400 gallon capacity
1974 30 AIP-NF 0.0 500 GAL $0
D302008002 Expansion Tank, galvanized steel,15 to 400 gallon capacity
- 1974 30 Y+ 16.5 250 GAL $13,773
D302008002 Expansion Tank, galvanized steel,15 to 400 gallon capacity
- 1974 30 BSL G 13.5 150 GAL $8,264
D302008002 Expansion Tank, galvanized steel,15 to 400 gallon capacity
- 1974 30 BSL G 13.5 250 GAL $13,773
11Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D302011004 Pressure Reducing Valve, steam,2", 125 lb. flanges, iron body, pilot operated,
2012 15 Y 6.8 1 EA $4,512
D302011006 Pressure Reducing Valve, steam,4", 125 lb. flanges, iron body, pilot operated
2012 15 Y 6.8 1 EA $8,361
D302011019 Steam Pump Package, condensatereturn w/ 2 pumps, 1 HP each, 25 GPM, 15 galstorage tank, w/ control panel
2017 20 G 18.0 1 EA $15,989
D3040 Distribution Systems
D304001 Air Distribution, Heating and Cooling
D304001002 VAV Terminal -0 to 600 CFM, HotWater Reheat
2010 15 G- 10.5 191 EA $229,452
D304001008 VAV Terminal, Fan Powered - 600CFM, Hot Water Reheat
- 2010 15 G 13.5 13 EA $21,739
D304003 Hot Water Distribution Systems
D304003003 Circulating Pump, cast iron, in line,1/4 HP, 2-1/2" size
2014 15 G 13.5 1 EA $1,658
D304003003 Circulating Pump, cast iron, in line,1/4 HP, 2-1/2" size
2014 15 G- 10.5 1 EA $1,658
D304003004 Circulating Pump, cast iron, in line,1/2 HP, 3" size
1974 15 AIP-NF 0.0 1 EA $0
D304003011 Circulating Pump, bronze, in line,1/3 HP, 3/4" to 1-1/2" size
2016 15 G 13.5 1 EA $1,875
D304003032 Circulating Pump, cast iron, bronzeimpeller, 3 HP, to 90 GPM, 2" size
- 2012 15 G- 10.5 2 EA $9,095
D304003050 Circulating Pump, cast iron, basemounted, bronze impeller, 20 HP, to 1350 GPM,6" size
- 2012 15 G 13.5 1 EA $27,707
D304003050 Circulating Pump, cast iron, basemounted, bronze impeller, 20 HP, to 1350 GPM,6" size
- 2016 15 G 13.5 1 EA $27,707
D304007 Exhaust and Ventilation Systems
D304007033 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 1450 CFM
- 1985 15 BSL G 6.8 1 EA $2,132
D304007034 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 2050 CFM
1990 15 BSL G 6.8 1 EA $2,675
D304007034 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 2050 CFM
1974 15 R 1.5 1 EA $2,675
12Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304007034 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 2050 CFM
1974 15 BSL G- 5.3 1 EA $2,675
D304007034 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 2050 CFM
2009 15 G- 10.5 1 EA $2,675
D304007035 Fan System, Wall Exhaust - WallExhaust, 6,175 CFM
1500-CFM - 1974 15 G- 10.5 1 EA $1,688
D304007035 Fan System, Wall Exhaust - WallExhaust, 6,175 CFM
1990 15 BSL G- 5.3 1 EA $1,688
D304007036 Fan System, Wall Exhaust - WallExhaust, 7,500 CFM
1974 15 BSL G- 5.3 1 EA $1,758
D304007040 Fan System, Wall Exhaust - WallExhaust, 26,250 CFM
1974 15 AIP-NF 0.0 1 EA $0
D304007055 Centrifugal Fan, airfoil, motor anddrive complete, 4,000 CFM, 3 H.P.
1977 15 BSL G- 5.3 1 EA $4,709
D304007055 Centrifugal Fan, airfoil, motor anddrive complete, 4,000 CFM, 3 H.P.
1974 15 BSL G 6.8 1 EA $4,709
D304007055 Centrifugal Fan, airfoil, motor anddrive complete, 4,000 CFM, 3 H.P.
2000 15 BSL G 6.8 1 EA $4,709
D304007058 Centrifugal Fan, airfoil, singlewidth, V-belt drive, 6,900 CFM, with 5 H.P. motor
1997 15 BSL G 6.8 2 EA $14,462
D304007058 Centrifugal Fan, airfoil, singlewidth, V-belt drive, 6,900 CFM, with 5 H.P. motor
1974 15 BSL G 6.8 1 EA $7,232
D304007058 Centrifugal Fan, airfoil, singlewidth, V-belt drive, 6,900 CFM, with 5 H.P. motor
2010 15 G- 10.5 2 EA $14,462
D304007058 Centrifugal Fan, airfoil, singlewidth, V-belt drive, 6,900 CFM, with 5 H.P. motor
2000 15 G- 10.5 1 EA $7,232
D304007058 Centrifugal Fan, airfoil, singlewidth, V-belt drive, 6,900 CFM, with 5 H.P. motor
2000 15 G- 10.5 1 EA $7,232
D304007058 Centrifugal Fan, airfoil, singlewidth, V-belt drive, 6,900 CFM, with 5 H.P. motor
2000 15 G- 10.5 1 EA $7,232
D304007058 Centrifugal Fan, airfoil, singlewidth, V-belt drive, 6,900 CFM, with 5 H.P. motor
RAF1 2012 15 G 13.5 1 EA $7,232
D304007075 Industrial Exhauster Fan, 2,000CFM, 3 H.P.
2016 15 G 13.5 1 EA $5,844
D304007075 Industrial Exhauster Fan, 2,000CFM, 3 H.P.
- 1974 15 BSL G 6.8 1 EA $5,844
D304007076 Industrial Exhauster Fan, 4,000CFM, 7-1/2 H.P.
1974 15 AIP-NF 0.0 2 EA $0
D304008 Air Handling Units
13Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304008006 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, constant volume
1975 25 BSL G- 8.8 1 EA $26,367
D304008007 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, variable airvolume
Multi-zone AHU 1974 25 BSL G- 8.8 1 EA $32,113
D304008007 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, variable airvolume
B-G-1 1974 25 BSL Y 5.8 1 EA $32,113
D304008007 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, variable airvolume
1974 25 BSL Y- 4.5 1 EA $32,113
D304008007 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, variable airvolume
MAU-1 2016 25 G 22.5 1 EA $32,113
D304008007 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, variable airvolume
2012 25 G 22.5 1 EA $32,113
D304008007 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, variable airvolume
2010 25 G 22.5 1 EA $32,113
D304008007 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, variable airvolume
2012 25 G 22.5 1 EA $32,113
D304008009 Central Station Packaged AirHandling Unit, 10,000 CFM, 7.5 HP, variable airvolume
1975 25 BSL G 11.3 1 EA $61,229
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
2019 25 G+ 25.0 1 EA $88,689
D304008013 Central Station Packaged AirHandling Unit, 20,000 CFM, 15 HP, variable airvolume
2014 25 G 22.5 1 EA $113,928
D304008013 Central Station Packaged AirHandling Unit, 20,000 CFM, 15 HP, variable airvolume
1975 25 BSL G 11.3 1 EA $113,928
D304008013 Central Station Packaged AirHandling Unit, 20,000 CFM, 15 HP, variable airvolume
1974 25 BSL G- 8.8 1 EA $113,928
14Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304008014 Central Station Packaged AirHandling Unit, 30,000 CFM, 20 HP, variable airvolume
1974 25 AIP-NF 0.0 1 EA $0
D3050 Terminal and Package Units
D305001 Unit Ventilators
D305001004 Fan System, Utility Set - 10,000CFM
1974 15 AIP-NF 0.0 1 EA $8,636
D305003 Fan Coil Units
D305003009 Two Pipe Fan Coil Units - 2 ton 2016 15 G 13.5 1 EA $1,911
D305006 Package Units
D305006066 Rooftop Packaged Unit - 5 ton 2013 20 G 18.0 1 EA $10,046
D3060 Controls and Instrumentation
D306003 Pneumatic Controls
D306003001 Pneumatic Control for Single Unit 1975 15 AIP-NF 0.0 7 EA $0
D306008 Building Automation Systems
D306008001 Building Automation System,Complex System
2016 15 G- 10.5 177,262 FSF $749,818
D40 Fire Protection
D4010 Sprinklers
D401001 Wet pipe sprinkler systems, steel, light hazard, black, sch 40 pipe
D401001004 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 2,000 to 5,000 SF
- 1997 75 G- 52.5 5,000 SF $32,430
D401001013 Wet pipe sprinkler systems, steel,light hazard, each additional floor, 10,000 to50,000 SF
- 1997 75 G- 52.5 14,500 SF $38,641
D401016 Sprinkler Water Supply Backflow Preventers
D401016001 Backflow Preventer, up to 2" Pipe - 2012 25 G- 17.5 2 EA $1,929
D4020 Standpipe Systems and Equipment
D402008 Fire Pump Equipment
D402008001 Fire Pump, electric, 1" jockey pumpsystem, 3 HP
- 2012 25 G- 17.5 1 EA $5,393
D4030 Fire Protection Specialties
D403001 Fire Extinguisher Cabinets
D403001001 Fire Extinguisher Cabinets, singleextinguisher, steel door & frame
1974 20 BSL G- 7.0 25 EA $8,848
15Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D403001002 Fire Extinguisher Cabinets, singleextinguisher, stainless steel door & frame
2014 20 G- 14.0 86 EA $40,258
D50 Electrical
D5010 Electrical Service and Distribution
D501003 Main Switchboards
D501003010 Switchboard - 600 V, 1200 Amp OG&E 2016 25 G 22.5 1 EA $13,643
D501003010 Switchboard - 600 V, 1200 Amp BGE SBA 2016 25 G 22.5 1 EA $13,643
D501003015 Switchboards, no main disconnect,277/480 V, 4,000 amp
2016 25 G 22.5 1 EA $13,818
D501004 Interior Distribution Transformers
D501004002 Buck-boost Transformer, 240 VPrimary 208/120 V Secondary, 15 kVA
10-KVA 2010 30 G- 21.0 2 EA $6,568
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
2016 30 G 27.0 1 EA $7,015
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
2016 30 G 27.0 1 EA $7,015
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
1977 30 BSL G 13.5 4 EA $28,062
D501004006 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
1977 30 BSL G- 10.5 1 EA $4,633
D501004006 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
1974 30 BSL G- 10.5 1 EA $4,633
D501004006 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
1977 30 BSL G- 10.5 1 EA $4,633
D501004006 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
1990 30 BSL G- 10.5 1 EA $4,633
D501004007 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 45 kVA
1997 30 BSL G 13.5 4 EA $38,578
D501004007 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 45 kVA
1990 30 BSL G 13.5 2 EA $19,289
D501004008 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 75 kVA
1997 30 G- 21.0 1 EA $12,951
D501004010 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 112.5 kVA
1990 30 BSL G- 10.5 3 EA $48,476
D501004011 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 150 kVA
1977 30 BSL G- 10.5 1 EA $19,423
D501005 Panels
16Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501005001 Main Breaker Panel, 120/208/240V, 125 amp, single phase
1980 35 BSL G- 12.3 1 EA $1,755
D501005001 Main Breaker Panel, 120/208/240V, 125 amp, single phase
100-AMP 1974 35 BSL G 15.8 63 EA $110,593
D501005001 Main Breaker Panel, 120/208/240V, 125 amp, single phase
60-AMP 1977 35 BSL G 15.8 1 EA $1,755
D501005001 Main Breaker Panel, 120/208/240V, 125 amp, single phase
50-AMP - 1977 35 BSL G 15.8 1 EA $1,755
D501005001 Main Breaker Panel, 120/208/240V, 125 amp, single phase
100-AMP 1977 35 BSL G- 12.3 1 EA $1,755
D501005001 Main Breaker Panel, 120/208/240V, 125 amp, single phase
50-AMP 2012 35 G- 24.5 1 EA $1,755
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
100-AMP 2000 35 G- 24.5 1 EA $2,164
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
100-AMP 1977 35 BSL G 15.8 1 EA $2,164
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
100-AMP 1977 35 BSL G 15.8 1 EA $2,164
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
100-AMP 1977 35 BSL G 15.8 1 EA $2,164
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
100-AMP 1990 35 BSL G 15.8 2 EA $4,327
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
100-AMP - 1974 35 BSL G- 12.3 1 EA $2,164
D501005004 Main Breaker Panel, 120/208/240V, 200 amp, three phase
1977 35 BSL G 15.8 1 EA $4,539
D501005004 Main Breaker Panel, 120/208/240V, 200 amp, three phase
2014 35 G 31.5 1 EA $4,539
D501005005 Main Breaker Panel, 120/208/240V, 400 amp, three phase
1977 35 BSL G 15.8 2 EA $12,797
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 1977 35 BSL G- 12.3 4 EA $8,655
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 1974 35 BSL G- 12.3 1 EA $2,164
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 1977 35 BSL G- 12.3 1 EA $2,164
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 2016 35 G 31.5 1 EA $2,164
17Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
2009 35 G- 24.5 1 EA $2,164
D501005009 Main Lug Load Center,120/208/240 V, 200 amp, single phase
150-AMP 1977 35 BSL G 15.8 3 EA $8,731
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
- 1977 35 BSL G 15.8 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
250-AMP - 1977 35 BSL G- 12.3 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
250-AMP 1977 35 BSL G 15.8 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
250-AMP 1977 35 BSL G 15.8 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
1974 35 BSL G 15.8 2 EA $9,729
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
1977 35 BSL G- 12.3 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
1977 35 BSL G- 12.3 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
1977 35 BSL G- 12.3 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
250-AMP 1994 35 G- 24.5 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
1990 35 G- 24.5 3 EA $14,594
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
2000 35 G- 24.5 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
1997 35 G- 24.5 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
1997 35 G- 24.5 2 EA $9,729
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
2016 35 G 31.5 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
250-AMP 2016 35 G 31.5 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
84-breakers 2016 35 G 31.5 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
84-breakers 2016 35 G 31.5 1 EA $4,865
18Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501005011 Main Lug Load Center,120/208/240 V, 400 amp, three phase
1979 35 BSL G 15.8 1 EA $5,957
D501005011 Main Lug Load Center,120/208/240 V, 400 amp, three phase
- - 1977 35 BSL G- 12.3 1 EA $5,957
D501005012 Main Lug Load Center,120/208/240 V, 600 amp, three phase
500-AMP 1977 35 BSL G- 12.3 1 EA $9,024
D501005013 Main Breaker, 277/480 V, 125 amp 100-AMP 1977 35 BSL G- 12.3 5 EA $12,500
D501005013 Main Breaker, 277/480 V, 125 amp 100-AMP 1990 35 BSL G- 12.3 4 EA $10,000
D501005013 Main Breaker, 277/480 V, 125 amp 100-AMP 1977 35 BSL G 15.8 6 EA $15,000
D501005013 Main Breaker, 277/480 V, 125 amp 2019 35 G+ 35.0 1 EA $2,500
D501005013 Main Breaker, 277/480 V, 125 amp 100-AMP 1990 35 G- 24.5 1 EA $2,500
D501005014 Main Breaker, 277/480 V, 200 amp 2016 35 G 31.5 1 EA $4,406
D501005014 Main Breaker, 277/480 V, 200 amp 225-AMP 2014 35 G 31.5 1 EA $4,406
D501005014 Main Breaker, 277/480 V, 200 amp 225-AMP 1977 35 BSL G 15.8 8 EA $35,250
D501005015 Main Breaker, 277/480 V, 400 amp 1974 35 BSL G- 12.3 1 EA $6,750
D501005015 Main Breaker, 277/480 V, 400 amp 2016 35 G 31.5 5 EA $33,750
D501005021 Main Breaker, 277/480 V, 800 amp 2016 35 G 31.5 1 EA $16,638
D501005021 Main Breaker, 277/480 V, 800 amp 1000-AMP 2016 35 G 31.5 1 EA $16,638
D501005021 Main Breaker, 277/480 V, 800 amp 2016 35 G 31.5 1 EA $16,638
D501006 Enclosed Circuit Breakers
D501006012 Safety Switch, 600 V, 200 Amp 2016 25 G 22.5 1 EA $1,558
D501006012 Safety Switch, 600 V, 200 Amp 2016 25 G 22.5 1 EA $1,558
D501006012 Safety Switch, 600 V, 200 Amp 2016 25 G 22.5 1 EA $1,558
D501006012 Safety Switch, 600 V, 200 Amp 2016 25 G 22.5 2 EA $3,116
D501006012 Safety Switch, 600 V, 200 Amp 1997 25 AIP-NF 0.0 1 EA $0
D501006012 Safety Switch, 600 V, 200 Amp 175-AMP 1974 25 BSL G 11.3 28 EA $43,625
D501006012 Safety Switch, 600 V, 200 Amp Elev. Disc. Sw. 1998 25 BSL G 11.3 1 EA $1,558
D501006014 Safety Switch, 600 V, 600 Amp 1997 25 G- 17.5 1 EA $5,168
19Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501006028 Automatic Transfer Switch, 3 pole,480 volt, 150 amp
125-AMP 2016 25 G 22.5 1 EA $5,562
D501006031 Automatic Transfer Switch, 3 pole,480 volt, 400 amp
1974 25 AIP-NF 0.0 1 EA $0
D501006033 Automatic Transfer Switch, 3 pole,480 volt, 800 amp
2016 25 G 22.5 1 EA $23,871
D501006034 Automatic Transfer Switch, 3 pole,480 volt, 1,000 amp
2016 25 G 22.5 1 EA $26,215
D5020 Lighting and Branch Wiring
D502001 Branch Wiring
D502001 Branch Wiring 2012 60 G- 42.0 177,262 FSF $1,092,235
D502003 Lighting Fixtures, Interior (by lit floor area)
D502003002 Interior Lighting, Fluorescent, T8 orT12, 10 fixtures per 1000 SF
2010 20 G- 14.0 157,500 SF $1,103,713
D502003002 Interior Lighting, Fluorescent, T8 orT12, 10 fixtures per 1000 SF
1974 20 Y+ 11.0 45,000 SF $315,347
D502004 Lighting Fixtures, Exterior
D502004001 Surface Mounted ExteriorIncandescent, 150W, single spot
1974 20 BSL G 9.0 2 EA $196
D502004001 Surface Mounted ExteriorIncandescent, 150W, single spot
Soffit 1993 20 BSL G- 7.0 19 EA $1,863
D5030 Communications, Security and Alarms
D503001 Fire Detection Communications and Alarm System Assemblies (detectors, outlets, boxers, conduit, wiring)
D503001003 Fire Detection Communicationsand Alarm Systems (5 to 10 stories, 50,000 to100,000 SF)
2016 20 G 18.0 222,262 FSF $285,184
D503011 Access Control System Components (various types)
D503011002 Access control, processor for cardkey access system
2010 20 G- 14.0 73 EA $96,754
D503011011 Closed circuit television system(CCTV), surveillance cameras
2010 20 G- 14.0 44 EA $31,082
D5090 Other Electrical Services
D509002 Emergency Lighting and Power
D509002021 Generator - Diesel, 650 kW, inclbattery, charger, muffler, & day tank
750-KW 1999 25 BSL G 11.3 1 EA $213,361
D509004 Building Lightning Protection System (roof area)
20Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D509004002 Commercial Building LightningProtection System, multi-story (roof area)
- 1990 15 BSL G- 5.3 25,000 SF $54,285
D509006 Variable Frequency Motor Controllers
D509006001 Variable Frequency Drive (VFD), 3HP motor size
2010 20 G- 14.0 1 EA $3,299
D509006001 Variable Frequency Drive (VFD), 3HP motor size
2016 20 G 18.0 1 EA $3,299
D509006002 Variable Frequency Drive (VFD), 5HP motor size
2016 20 G 18.0 1 EA $3,687
D509006002 Variable Frequency Drive (VFD), 5HP motor size
2012 20 G 18.0 5 EA $18,436
D509006002 Variable Frequency Drive (VFD), 5HP motor size
2010 20 G- 14.0 1 EA $3,687
D509006002 Variable Frequency Drive (VFD), 5HP motor size
1995 20 G- 14.0 1 EA $3,687
D509006002 Variable Frequency Drive (VFD), 5HP motor size
2010 20 G- 14.0 4 EA $14,749
D509006002 Variable Frequency Drive (VFD), 5HP motor size
2012 20 G- 14.0 1 EA $3,687
D509006002 Variable Frequency Drive (VFD), 5HP motor size
2000 20 BSL G 9.0 3 EA $11,061
D509006003 Variable Frequency Drive (VFD),7.5 HP motor size
2012 20 G 18.0 4 EA $15,792
D509006004 Variable Frequency Drive (VFD),10 HP motor size
2019 20 G+ 20.0 4 EA $17,061
D509006004 Variable Frequency Drive (VFD),10 HP motor size
2012 20 G- 14.0 1 EA $4,265
D509006005 Variable Frequency Drive (VFD),15 HP motor size
2014 20 G 18.0 2 EA $11,336
D509006005 Variable Frequency Drive (VFD),15 HP motor size
1990 20 BSL G- 7.0 1 EA $5,668
D509007007 Variable Frequency Drive (VFD),30 HP motor size
2012 20 G 18.0 1 EA $11,280
D509007007 Variable Frequency Drive (VFD),30 HP motor size
2012 20 G- 14.0 1 EA $11,280
D509007009 Variable Frequency Drive (VFD),50HP motor size
- 1974 20 BSL G- 7.0 2 EA $32,783
21Inventory Summary 07/25/2019
1 - Garrison TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D509007009 Variable Frequency Drive (VFD),50HP motor size
- 2012 20 G- 14.0 2 EA $32,783
D509007010 Variable Frequency Drive (VFD),60 HP motor size
- 1974 20 BSL G- 7.0 1 EA $20,030
D509007016 Variable Frequency Drive (VFD),20 HP motor size
- 2012 20 G- 14.0 1 EA $7,501
D509007016 Variable Frequency Drive (VFD),20 HP motor size
- 2016 20 G 18.0 1 EA $7,501
G30 Site Civil/Mechanical Utilities
G3060 Fuel Distribution
G306004 Liquid Fuel Storage Tanks
G306004011 Aboveground Fuel Storage Tank,30000 Gal, Steel, Single Wall,
1974 25 AIP-NF 0.0 2 EA $0
22Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
A10 Foundations
A1010 Standard Foundations
A101001 Foundation Assemblies
A101001004 Deep Foundation (foundationassembly, up to 50' pile, with slab)
- 1978 100 G 90.0 100,782 SF $2,971,366
B10 Superstructure
B1010 Floor Construction
B101001 Cast in Place (CIP) Concrete, Raised Floor Structural Assembly
B101001001 CIP Concrete Beams and Slab,with columns, slab depth varies
- 1978 100 G 90.0 255,675 SF $8,031,979
B1020 Roof Construction
B102004 Cast in Place (CIP) Concrete, Roof Structural Assembly
B102004001 CIP Concrete Beams and Slab,with columns, slab depth varies
- 1978 100 G 90.0 100,782 SF $3,166,046
B20 Exterior Enclosure
B2010 Exterior Walls
B201002 Brick Veneer Wall Systems
B201002 Brick Veneer Wall Systems 1978 75 Y+ 41.3 14,793 SF $324,344
B201002 Brick Veneer Wall Systems - 2018 75 R- 0.8 22,500 SF $493,324
B201007 Metal Siding Systems, type varies
B201007 Metal Siding Systems, type varies 2018 35 G 31.5 2,882 SF $31,045
B201007 Metal Siding Systems, type varies - 1993 35 G- 24.5 259 SF $2,790
B201010 Stucco Wall Finishes
B201010 Stucco Wall Finishes 2014 50 G- 35.0 1,200 SF $16,497
B201010 Stucco Wall Finishes 2018 50 G 45.0 16,670 SF $229,172
B201010 Stucco Wall Finishes 2014 50 G 45.0 10,731 SF $147,524
B201018 Exterior Louvers and Screens
B201018002 Metal Louvers 2018 40 G 36.0 388 SF $16,046
B201021 Exterior Soffits
B201021003 Soffit, Drywall - 2018 30 G 27.0 3,856 SF $32,622
B201022 Exterior Paints and Coatings
23Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
B201022 Exterior Paints and Coatings 2018 15 G 13.5 12,773 SF $9,546
B2020 Exterior Windows
B202008 Aluminum Fixed Window, various sizes
B202008 Aluminum Fixed Window, various sizes 2014 60 G 54.0 220 SF $18,416
B202008 Aluminum Fixed Window, various sizes 2018 60 G 54.0 5,375 SF $449,951
B202008 Aluminum Fixed Window, various sizes 1978 60 G- 42.0 1,404 SF $117,531
B202012 Storefronts
B202012 Storefronts - 2018 30 G 27.0 334 SF $28,492
B2030 Exterior Doors
B203006 Solid Doors
B203006 Solid Doors 2018 30 G 27.0 231 SF $21,793
B203006 Solid Doors 1993 30 Y+ 16.5 154 SF $14,529
B203007 Glazed Doors
B203007 Glazed Doors 1993 35 Y+ 19.3 84 SF $7,659
B203007 Glazed Doors 2018 35 G 31.5 175 SF $15,957
B203010 Overhead and Roll-up Doors, Motorized
B203010 Overhead and Roll-up Doors,Motorized
- 2018 30 G 27.0 300 SF $14,061
B30 Roofing
B3010 Roof Coverings
B301001 High Slope Roof Assemblies (roof coverings and flashing, no insulation)
B301001004 Steel Roofing Panels, standingseam, standard or zinc aluminum alloy finish
- 2014 40 G 36.0 3,365 SF $48,016
B301001004 Steel Roofing Panels, standingseam, standard or zinc aluminum alloy finish
1993 40 Y 18.0 300 SF $4,281
B301002 Low Slope Roof Assemblies (roof coverings and flashing, no insulation)
B301002001 Built-up Roof (BUR), asphalt floodcoat w/gravel
1996 20 BSL Y 4.6 19,355 SF $167,019
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
2018 20 R- 0.2 3,080 SF $10,727
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
- 2013 20 Y+ 11.0 29,995 SF $104,464
24Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
- 2014 20 G 18.0 22,768 SF $79,294
B301009 Gutters & Downspouts
B301009003 Aluminum gutters, 5" box - 2014 20 G 18.0 438 LF $3,075
B301009010 Aluminum downspouts - 2014 20 G 18.0 120 LF $561
C10 Interior Construction
C1010 Interior Wall Partitions
C101001 Interior Partition Wall System with Gypsum Wallboard Finishes, 8' to 10' FTC height
C101001 Interior Partition Wall System withGypsum Wallboard Finishes, 8' to 10' FTC height
2000 50 G- 35.0 255,675 FloorArea
$5,728,373
C101006 Interior Glazed Partitions and Storefronts
C101006003 Interior Storefront w/ AluminumFrame with 3/8" Clear Glass
- - 1978 30 G- 21.0 450 SF $32,931
C101006003 Interior Storefront w/ AluminumFrame with 3/8" Clear Glass
- 2018 30 G 27.0 225 SF $16,466
C101006003 Interior Storefront w/ AluminumFrame with 3/8" Clear Glass
- 2019 30 G 27.0 320 SF $23,417
C101006003 Interior Storefront w/ AluminumFrame with 3/8" Clear Glass
- 1978 30 Y+ 16.5 112 SF $8,196
C101006003 Interior Storefront w/ AluminumFrame with 3/8" Clear Glass
- 1978 30 Y+ 16.5 50 SF $3,659
C101006004 Interior Glazing, 3/8" Clear Glass - 1978 30 Y+ 16.5 224 SF $9,791
C101006004 Interior Glazing, 3/8" Clear Glass - 2000 30 G- 21.0 50 SF $2,186
C1020 Interior Doors (doors, frames, casings, finishes, hardware)
C102006 Wood door/Metal frame, flush or panel face, various core types and face materials, w/ hinges and locksets
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2019 30 G 27.0 150 SF $9,690
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
Solid door 2018 30 G 27.0 375 SF $24,222
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2019 30 G 27.0 21 SF $1,356
25Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- - 1978 30 Y+ 16.5 1,125 SF $72,666
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- - 1978 30 Y+ 16.5 2,750 SF $177,629
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2000 30 Y+ 16.5 1,425 SF $92,043
C102010 Glazed Interior Doors
C102010 Glazed Interior Doors - - 1978 35 Y+ 19.3 100 SF $9,118
C102010 Glazed Interior Doors 1984 35 Y 15.8 375 SF $34,194
C102010 Glazed Interior Doors - 2019 35 G 31.5 175 SF $15,957
C102010 Glazed Interior Doors Door with Lite 2018 35 G 31.5 475 SF $43,312
C102010 Glazed Interior Doors - 2019 35 G 31.5 150 SF $13,678
C102010 Glazed Interior Doors - 2018 35 G 31.5 275 SF $25,075
C1030 Fittings
C103001 Compartments, Cubicles & Toilet Partitions
C103001 Compartments, Cubicles & ToiletPartitions
- 2010 20 G- 14.0 4 EA $4,876
C103001 Compartments, Cubicles & ToiletPartitions
- 2018 20 G- 14.0 6 EA $7,314
C103001 Compartments, Cubicles & ToiletPartitions
Office Cubicles. 2018 20 G 18.0 116 EA $141,388
C103001 Compartments, Cubicles & ToiletPartitions
- 2018 20 G 18.0 20 EA $24,377
C103001 Compartments, Cubicles & ToiletPartitions
Office cubicles 2010 20 Y+ 11.0 102 EA $124,324
C103002 Toilet & Bath Accessories
C103002 Toilet & Bath Accessories - - 2014 20 Y+ 11.0 4 BthRm
$4,003
C103002 Toilet & Bath Accessories - 2000 20 Y+ 11.0 10 BthRm
$10,008
C103002 Toilet & Bath Accessories - 2015 20 Y+ 11.0 2 BthRm
$2,002
26Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C103002 Toilet & Bath Accessories - 2018 20 G 18.0 6 BthRm
$6,005
C103007 Cabinets and Countertops (assembly)
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
- 2010 30 Y+ 16.5 6 LF $4,072
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
- 2000 30 Y+ 16.5 48 LF $32,578
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
- - 1990 30 Y+ 16.5 84 LF $57,011
C103007005 Wood Cabinets, base and wall,with Solid Surface Countertops
- 2019 30 G 27.0 56 LF $45,363
C103007005 Wood Cabinets, base and wall,with Solid Surface Countertops
- 2018 30 G 27.0 72 LF $58,323
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
- 2019 30 G 27.0 10 LF $5,421
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
- 2010 30 G- 21.0 16 LF $8,674
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
- 2018 30 G 27.0 84 LF $45,540
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
- 2018 30 G 27.0 48 LF $26,023
C103008 Counters
C103008001 Granite Counter Top - 2015 40 Y+ 22.0 12 LF $2,893
C103008002 Solid Surface Molded Counter Top Plastic laminate. - 1978 40 R 4.0 48 LF $9,475
C20 Stairs
C2010 Stair Construction
C201001 Regular Stairs Assemblies
C201001004 Stairs, CIP Concrete with TreadFinishes
@ ADD PHOTO 1978 100 G- 70.0 110 Riser $55,159
C201001004 Stairs, CIP Concrete with TreadFinishes
@ ADD PHOTO 1978 100 G- 70.0 88 Riser $44,127
C201001004 Stairs, CIP Concrete with TreadFinishes
@ ADD PHOTO 1978 100 G- 70.0 88 Riser $44,127
C201001004 Stairs, CIP Concrete with TreadFinishes
@ ADD PHOTO 1978 100 G- 70.0 88 Riser $44,127
C201001004 Stairs, CIP Concrete with TreadFinishes
@ ADD PHOTO 1978 100 G- 70.0 110 Riser $55,159
27Inventory Summary 07/25/2019
C302004 Vinyl and Linoleum Floor Finishes - 2018 15 G- 10.5 200 SF $1,368
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C201004 Handrails And Balustrades (not part of stairs)
C201004004 Ornamental Railing, aluminum withmetal posts, 42" high
Aluminum wall mounted handrail. 1978 30 Y+ 16.5 30 LF $2,190
C30 Interior Finishes
C3010 Wall Finishes
C301003 Ceramic Tile Wall Finishes
C301003 Ceramic Tile Wall Finishes - 2014 75 Y+ 41.3 900 SF $9,238
C301003 Ceramic Tile Wall Finishes - 2018 75 G 67.5 1,800 SF $18,477
C301003 Ceramic Tile Wall Finishes Counter top backsplash 2018 75 G 67.5 340 SF $3,490
C301004 Wood Wall Finishes
C301004 Wood Wall Finishes - 2018 20 G 18.0 800 SF $4,501
C301009 Stone, Marble and Granite Wall Finishes
C301009 Stone, Marble and Granite WallFinishes
- 2018 75 G 67.5 1,300 SF $95,609
C3020 Floor Finishes
C302001 Carpeting
C302001 Carpeting - 2019 7 G 6.3 8,500 SF $74,547
C302001 Carpeting - 2019 7 G 6.3 4,500 SF $39,466
C302001 Carpeting - 2018 7 G 6.3 20,000 SF $175,404
C302001 Carpeting - - 2000 7 Y+ 3.9 250 SF $2,193
C302001 Carpeting - - 2000 7 R+ 1.8 18,000 SF $157,864
C302001 Carpeting - - 2000 7 R+ 1.8 14,685 SF $128,791
C302001 Carpeting - - 1995 7 R 0.7 21,575 SF $189,218
C302002 Ceramic Tile Flooring
C302002 Ceramic Tile Flooring - 2014 75 Y+ 41.3 800 SF $8,212
C302002 Ceramic Tile Flooring - 2018 75 G 67.5 1,600 SF $16,424
C302002 Ceramic Tile Flooring - 2018 75 G 67.5 400 SF $4,106
C302004 Vinyl and Linoleum Floor Finishes
C302004 Vinyl and Linoleum Floor Finishes Vinyl wood plank. 2019 15 G 13.5 4,000 SF $27,354
28Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C302004 Vinyl and Linoleum Floor Finishes Luxury wood plank 2018 15 G 13.5 4,000 SF $27,354
C302004 Vinyl and Linoleum Floor Finishes - 2019 15 G 13.5 12,000 SF $82,062
C302004 Vinyl and Linoleum Floor Finishes - 2019 15 G 13.5 750 SF $5,130
C302004 Vinyl and Linoleum Floor Finishes - 2010 15 Y+ 8.3 250 SF $1,710
C302004 Vinyl and Linoleum Floor Finishes - - 1995 15 R+ 3.8 21,575 SF $147,541
C302007 Terrazzo Floor Finishes
C302007 Terrazzo Floor Finishes - 1978 75 Y+ 41.3 1,600 SF $79,434
C302007 Terrazzo Floor Finishes - 2010 75 G- 52.5 900 SF $44,681
C3030 Ceiling Finishes
C303001 Gypsum Wallboard Ceiling Finishes
C303001 Gypsum Wallboard Ceiling Finishes - 2018 25 G 22.5 700 SF $1,490
C303003 Acoustical Ceiling Tiles & Panels
C303003001 Suspended Acoustical CeilingSystems
- 2019 60 G 54.0 2,075 SF $16,092
C303003001 Suspended Acoustical CeilingSystems
- 2018 60 G 54.0 2,000 SF $15,510
C303003001 Suspended Acoustical CeilingSystems
- 2019 60 G 54.0 5,250 SF $40,714
C303003001 Suspended Acoustical CeilingSystems
- 2018 60 G- 42.0 10,570 SF $81,970
C303003001 Suspended Acoustical CeilingSystems
- 2018 60 G 54.0 20,000 SF $155,100
C303003001 Suspended Acoustical CeilingSystems
- 2000 60 Y+ 33.0 19,500 SF $151,223
C303003001 Suspended Acoustical CeilingSystems
1978 60 Y+ 33.0 26,200 SF $203,181
C303003001 Suspended Acoustical CeilingSystems
- 2000 60 Y+ 33.0 13,485 SF $104,577
C303003001 Suspended Acoustical CeilingSystems
1978 60 R 6.0 22,400 SF $173,712
C303003002 Fiberglass Acoustic Ceiling Tile,direct glued
1978 60 Y- 21.0 4,200 SF $10,067
C303004 Wood Ceiling
C303004001 Plywood Ceiling, 1/2" Thick - 2018 60 G 54.0 4,800 SF $51,234
29Inventory Summary 07/25/2019
D2090 Other Plumbing Systems
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D10 Conveying
D1010 Elevators and Lifts
D101002 Passenger Elevators
D101002003 Hydraulic passenger elevator, 2500lb, 2 floors, 100 FPM
1978 25 AIP-NF 0.0 1 EA $0
D101002019 Traction geared elevators,passenger, 4500 lb, 5 floors, 200 FPM
2010 25 G- 17.5 2 EA $444,714
D101003 Freight Elevators
D101003006 Hydraulic freight elevators(class"B"), 4000 lb, 5 floors, 100 FPM
1978 25 BSL G 11.3 1 EA $294,408
D1090 Other Conveying Systems
D109001 Pneumatic Tube Systems
D109001002 Pneumatic Tube System, Singletube, 100', 2 station, 4" diameter
1978 35 AIP-NF 0.0 4 EA $0
D20 Plumbing
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures 2010 25 G+ 25.0 18,000 FSF $116,494
D2020 Domestic Water Distribution
D202001 Domestic Water Distribution Pipes and Fittings
D202001 Domestic Water Distribution Pipes andFittings
2018 50 BSL G 22.5 30,000 FSF $92,214
D202003 Domestic Water Equipment
D202003006 Domestic Water Circulating Pump,1/4HP
2010 20 G- 14.0 1 EA $2,150
D2030 Sanitary Waste
D203001 Sanitary Waste Pipes and Fittings
D203001 Sanitary Waste Pipes and Fittings 2010 50 BSL G 22.5 30,000 FSF $66,411
D203004 Sanitary and Vent Equipment
D203004007 Sump Pump, Cast Iron, 1 HP 2010 25 G- 17.5 2 EA $9,024
D2040 Rain Water Drainage
D204001 Rain Water Drainage Pipes and Fittings
D204001 Rain Water Drainage Pipes andFittings
1978 50 BSL G 22.5 51,135 FSF $106,709
30Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D209005 Compressed Air System (non-breathing)
D209005004 Air Compressor, 2 H.P., 30 gallontank
1993 25 AIP-NF 0.0 1 EA $0
D209005004 Air Compressor, 2 H.P., 30 gallontank
2018 25 G 22.5 1 EA $4,392
D30 HVAC
D3020 Heat Generating Systems
D302005 Heat Exchangers
D302005001 Heat Exchanger, steam to water,shell and tube type
1978 30 AIP-NF 0.0 60 GPM $0
D302005001 Heat Exchanger, steam to water,shell and tube type
1993 30 BSLY+
8.4 120 GPM $28,482
D302005001 Heat Exchanger, steam to water,shell and tube type
1993 30 BSLY+
8.4 120 GPM $28,482
D302005003 Heat Exchanger, liquid-to-liquid,shell and tube type
1993 30 G- 21.0 30 GPM $8,968
D302008 Expansion Tanks, Hot Water Storage Tanks
D302008001 Expansion Tank, painted steel, 15to 400 gallon capacity
2010 30 G- 21.0 40 GAL $1,228
D302008001 Expansion Tank, painted steel, 15to 400 gallon capacity
1978 30 AIP-NF 0.0 60 GAL $0
D302011 Steam Auxiliary Equipment
D302011004 Pressure Reducing Valve, steam,2", 125 lb. flanges, iron body, pilot operated,
1993 15 Y- 5.3 1 EA $4,512
D302011006 Pressure Reducing Valve, steam,4", 125 lb. flanges, iron body, pilot operated
1993 15 Y- 5.3 1 EA $8,361
D3040 Distribution Systems
D304001 Air Distribution, Heating and Cooling
D304001002 VAV Terminal -0 to 600 CFM, HotWater Reheat
1978 15 AIP-NF 0.0 25 EA $0
D304001003 VAV Terminal - 610 to 1000 CFM,Hot Water Reheat
2010 15 G 13.5 112 EA $140,707
D304001008 VAV Terminal, Fan Powered - 600CFM, Hot Water Reheat
2010 15 G 13.5 10 EA $16,723
D304001009 VAV Terminal, Fan Powered - 1250CFM, Hot Water Reheat
1978 15 AIP-NF 0.0 30 EA $73,137
D304003 Hot Water Distribution Systems
31Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304003017 Circulating Pump, bronze, in line,3/4 HP, 3" size
2010 15 G- 10.5 1 EA $4,136
D304003017 Circulating Pump, bronze, in line,3/4 HP, 3" size
2010 15 G 13.5 1 EA $4,136
D304003031 Circulating Pump, cast iron, bronzeimpeller, 2 HP, to 50 GPM, 2" size
2010 15 G- 10.5 1 EA $4,351
D304003034 Circulating Pump, cast iron, bronzeimpeller, 5 HP, to 225 GPM, 3" size
2010 15 G- 10.5 2 EA $11,492
D304003051 Circulating Pump, cast iron, basemounted, bronze impeller, 25 HP, to 1550 GPM,6" size
2010 15 G- 10.5 1 EA $30,950
D304003051 Circulating Pump, cast iron, basemounted, bronze impeller, 25 HP, to 1550 GPM,6" size
2018 15 G 13.5 1 EA $30,950
D304007 Exhaust and Ventilation Systems
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
- 1997 15 BSL G- 5.3 2 EA $2,487
D304007032 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 815 CFM
- - 1978 15 BSL G 6.8 4 EA $7,569
D304007033 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 1450 CFM
- 2018 15 G 13.5 2 EA $4,264
D304007035 Fan System, Wall Exhaust - WallExhaust, 6,175 CFM
1978 15 BSL G 6.8 1 EA $1,688
D304007035 Fan System, Wall Exhaust - WallExhaust, 6,175 CFM
- - 1978 15 AIP-NF 0.0 1 EA $1,688
D304007039 Fan System, Wall Exhaust - WallExhaust, 19,800 CFM
16,500-CFM 2018 15 G 13.5 1 EA $2,883
D304007051 Roof Exhaust Fan, 2 HP, 5,000CFM
- 1997 15 G- 10.5 4 EA $73,574
D304007053 Centrifugal Fan, airfoil, motor anddrive complete, 1,000 CFM, 1/2 H.P.
2019 15 G 13.5 1 EA $3,299
D304007054 Centrifugal Fan, airfoil, motor anddrive complete, 2,000 CFM, 1 H.P.
1993 15 AIP-NF 0.0 1 EA $0
D304007056 Centrifugal Fan, airfoil, motor anddrive complete, 8,000 CFM, 7-1/2 H.P.
1993 15 G- 10.5 2 EA $13,649
D304007057 Centrifugal Fan, airfoil, motor anddrive complete, 12,000 CFM, 10 H.P.
2018 15 G 13.5 1 EA $9,292
D304007075 Industrial Exhauster Fan, 2,000CFM, 3 H.P.
2010 15 G- 10.5 1 EA $5,844
32Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304007078 Industrial Exhauster Fan, 12,000CFM, 30 H.P.
2010 15 G- 10.5 2 EA $32,402
D304007081 High Volume Lo Speed (HVLS)Paddle Blade Air Circulator, 10' diameter
2018 15 G 13.5 2 EA $14,805
D304008 Air Handling Units
D304008007 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, variable airvolume
AHU-1 2010 25 G- 17.5 1 EA $32,113
D304008007 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, variable airvolume
1978 25 BSL G 11.3 1 EA $32,113
D304008007 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, variable airvolume
- 1978 25 AIP-NF 0.0 1 EA $0
D304008009 Central Station Packaged AirHandling Unit, 10,000 CFM, 7.5 HP, variable airvolume
1978 25 BSL G 11.3 1 EA $61,229
D304008009 Central Station Packaged AirHandling Unit, 10,000 CFM, 7.5 HP, variable airvolume
AHU 3N1 1992 25 G- 17.5 1 EA $61,229
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
1978 25 BSL G 11.3 1 EA $88,689
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
1978 25 BSL G 11.3 1 EA $88,689
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
1978 25 AIP-NF 0.0 3 EA $0
D304008013 Central Station Packaged AirHandling Unit, 20,000 CFM, 15 HP, variable airvolume
AHU 3N4 1992 25 G- 17.5 1 EA $113,928
D304008013 Central Station Packaged AirHandling Unit, 20,000 CFM, 15 HP, variable airvolume
AHU 3N3 1992 25 G- 17.5 1 EA $113,928
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
30-HP, 50,000-CFM 2010 30 G- 21.0 1 EA $309,495
33Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
40,000-CFM, 25-HP 1978 30 BSL G 13.5 1 EA $309,495
D3050 Terminal and Package Units
D305002 Unit Heaters
D305002002 Hydronic Unit Heater, cabinet, hotwater, horizontal, blower type, 60 MBH
- 1978 20 AIP-NF 0.0 1 EA $0
D305005 Electric Heating
D305005014 Electric Unit Heater, single phase,208-240-277 volt, 3 kW, with fan and mountingbracket
1978 30 BSL G 13.5 10 EA $10,631
D305006 Package Units
D305006010 Window/Thru-Wall Unit AirConditioner, 18,000 BTUH
- 2010 20 G 18.0 1 EA $1,166
D3060 Controls and Instrumentation
D306003 Pneumatic Controls
D306003001 Pneumatic Control for Single Unit 1978 15 AIP-NF 0.0 18 EA $0
D306008 Building Automation Systems
D306008001 Building Automation System,Complex System
2010 15 G 13.5 255,675 FSF $1,081,505
D40 Fire Protection
D4010 Sprinklers
D401001 Wet pipe sprinkler systems, steel, light hazard, black, sch 40 pipe
D401001007 Wet pipe sprinkler systems, steel,light hazard, 1 floor, greater than 50,000 SF
2010 75 G- 52.5 51,000 SF $161,798
D401001014 Wet pipe sprinkler systems, steel,light hazard, each additional floor, greater than50,000 SF
1978 75 BSL G 33.8 150,000 SF $351,090
D401017 Sprinkler System Fire Pumps
D401017013 Fire Pump, electric, 1500 GPM, 66HP, including controller, fittings and relief valve
60-HP 2010 25 G- 17.5 1 EA $34,510
D4020 Standpipe Systems and Equipment
D402008 Fire Pump Equipment
D402008001 Fire Pump, electric, 1" jockey pumpsystem, 3 HP
2018 25 G 22.5 1 EA $5,393
D4030 Fire Protection Specialties
34Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D403001 Fire Extinguisher Cabinets
D403001001 Fire Extinguisher Cabinets, singleextinguisher, steel door & frame
1978 20 G- 14.0 32 EA $11,325
D403001002 Fire Extinguisher Cabinets, singleextinguisher, stainless steel door & frame
2010 20 G 18.0 34 EA $15,916
D50 Electrical
D5010 Electrical Service and Distribution
D501003 Main Switchboards
D501003003 Switchboard - 250 V, 800 Amp 1992 25 G- 17.5 2 EA $21,820
D501003010 Switchboard - 600 V, 1200 Amp - 1978 25 BSLY+
7.0 1 EA $13,643
D501003011 Switchboard - 600 V, 1600 Amp 1978 25 BSLY+
7.0 1 EA $21,400
D501003012 Switchboard - 600 V, 2000 Amp 1978 25 BSLY+
7.0 1 EA $22,673
D501004 Interior Distribution Transformers
D501004003 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 15 kVA
2010 30 G- 21.0 1 EA $3,330
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
1978 30 BSL G 13.5 1 EA $7,015
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
1978 30 AIP-NF 0.0 1 EA $0
D501004006 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
1992 30 G- 21.0 1 EA $4,633
D501004006 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
2010 30 G- 21.0 1 EA $4,633
D501004007 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 45 kVA
2010 30 G- 21.0 1 EA $9,644
D501004007 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 45 kVA
2000 30 G- 21.0 1 EA $9,644
D501004007 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 45 kVA
- 1978 30 BSL G- 10.5 1 EA $9,644
D501004008 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 75 kVA
1992 30 G- 21.0 1 EA $12,951
D501004008 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 75 kVA
1978 30 BSL G 13.5 1 EA $12,951
D501004008 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 75 kVA
1978 30 BSL G 13.5 1 EA $12,951
35Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501004009 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
1978 30 BSL G- 10.5 1 EA $8,347
D501004011 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 150 kVA
- - 1978 30 Y- 10.5 1 EA $19,423
D501004012 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 225 kVA
1992 30 G- 21.0 1 EA $25,063
D501005 Panels
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
100-AMP 1992 35 G- 24.5 1 EA $2,164
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
100-AMP - 1978 35 BSL G- 12.3 1 EA $2,164
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
- 2010 35 G 31.5 1 EA $2,164
D501005005 Main Breaker Panel, 120/208/240V, 400 amp, three phase
- - 1978 35 BSLR+
4.5 1 EA $6,399
D501005005 Main Breaker Panel, 120/208/240V, 400 amp, three phase
3-sections 1992 35 G- 24.5 1 EA $6,399
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 1992 35 G- 24.5 1 EA $2,164
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 1978 35 BSL G 15.8 2 EA $4,327
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 1978 35 BSL G 15.8 1 EA $2,164
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP with 225-AMP Bus 1978 35 BSL G 15.8 1 EA $2,164
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 1978 35 BSL G 15.8 1 EA $2,164
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 1978 35 BSL G- 12.3 1 EA $2,164
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 1978 35 BSL G- 12.3 1 EA $2,164
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 2010 35 G 31.5 1 EA $2,164
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
2-section 84-breakers 2010 35 G- 24.5 2 EA $9,729
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
2010 35 G- 24.5 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
- 1978 35 AIP-NF 0.0 2 EA $0
36Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
- 1978 35 BSL G 15.8 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
1978 35 BSL G 15.8 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
1978 35 BSL G 15.8 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
1997 35 BSL G 15.8 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
1978 35 BSL G 15.8 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
1992 35 G- 24.5 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
2000 35 G- 24.5 1 EA $4,865
D501005011 Main Lug Load Center,120/208/240 V, 400 amp, three phase
2-section, 84 breakers 1978 35 BSL G 15.8 3 EA $17,872
D501005012 Main Lug Load Center,120/208/240 V, 600 amp, three phase
- - 1978 35 R+ 8.8 1 EA $9,024
D501005013 Main Breaker, 277/480 V, 125 amp 100-AMP 1978 35 BSL G 15.8 1 EA $2,500
D501005013 Main Breaker, 277/480 V, 125 amp 100-AMP 1992 35 G- 24.5 1 EA $2,500
D501005013 Main Breaker, 277/480 V, 125 amp 100-AMP 1992 35 G- 24.5 1 EA $2,500
D501005013 Main Breaker, 277/480 V, 125 amp 2010 35 G- 24.5 1 EA $2,500
D501005014 Main Breaker, 277/480 V, 200 amp 225-AMP 1992 35 G- 24.5 1 EA $4,406
D501005014 Main Breaker, 277/480 V, 200 amp 225-AMP 1993 35 G- 24.5 1 EA $4,406
D501005014 Main Breaker, 277/480 V, 200 amp 225-AMP 1978 35 BSL G 15.8 1 EA $4,406
D501005014 Main Breaker, 277/480 V, 200 amp 225-AMP 1978 35 BSL G 15.8 2 EA $8,813
D501005014 Main Breaker, 277/480 V, 200 amp 225-AMP 1978 35 BSL G- 12.3 1 EA $4,406
D501005014 Main Breaker, 277/480 V, 200 amp 225-AMP 1978 35 AIP-NF 0.0 1 EA $0
D501005015 Main Breaker, 277/480 V, 400 amp 1978 35 BSL Y- 6.3 6 EA $40,499
D501005015 Main Breaker, 277/480 V, 400 amp 1978 35 BSL G 15.8 1 EA $6,750
D501005015 Main Breaker, 277/480 V, 400 amp 1992 35 G- 24.5 1 EA $6,750
D501005016 Main Breaker, 277/480 V, 600 amp 1978 35 AIP-NF 0.0 1 EA $0
37Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501005021 Main Breaker, 277/480 V, 800 amp 1992 35 G- 24.5 1 EA $16,638
D501005021 Main Breaker, 277/480 V, 800 amp - - 2010 35 G- 24.5 1 EA $16,638
D501006 Enclosed Circuit Breakers
D501006031 Automatic Transfer Switch, 3 pole,480 volt, 400 amp
1992 25 AIP-NF 0.0 4 EA $0
D501006033 Automatic Transfer Switch, 3 pole,480 volt, 800 amp
- - 1993 25 BSL G 11.3 1 EA $23,871
D5020 Lighting and Branch Wiring
D502001 Branch Wiring
D502001 Branch Wiring 1978 60 BSL G 27.0 102,270 FSF $630,157
D502001 Branch Wiring 2010 60 G 54.0 153,405 FSF $945,236
D502003 Lighting Fixtures, Interior (by lit floor area)
D502003001 Interior Lighting, Fluorescent, T8 orT12, 5 fixtures per 1000 SF
2010 20 G- 14.0 20,000 SF $71,628
D502003002 Interior Lighting, Fluorescent, T8 orT12, 10 fixtures per 1000 SF
- - 2010 20 G- 14.0 150,000 SF $1,051,155
D502003003 Interior Lighting, Incandescent,Recessed Mounted, 6 fixtures per 1000 SF
2010 20 G- 14.0 10,000 SF $33,417
D502003009 Interior Lighting, LED 2018 20 G 18.0 51,135 SF $431,160
D502004 Lighting Fixtures, Exterior
D502004001 Surface Mounted ExteriorIncandescent, 150W, single spot
LED 2018 20 G 18.0 42 EA $4,116
D502004001 Surface Mounted ExteriorIncandescent, 150W, single spot
- 2018 20 G 18.0 41 EA $4,019
D5030 Communications, Security and Alarms
D503001 Fire Detection Communications and Alarm System Assemblies (detectors, outlets, boxers, conduit, wiring)
D503001003 Fire Detection Communicationsand Alarm Systems (5 to 10 stories, 50,000 to100,000 SF)
2010 20 G- 14.0 255,675 FSF $328,056
D503011 Access Control System Components (various types)
D503011002 Access control, processor for cardkey access system
2010 20 G 18.0 64 EA $84,826
D503011011 Closed circuit television system(CCTV), surveillance cameras
2010 20 G 18.0 33 EA $23,312
D5090 Other Electrical Services
38Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D509002 Emergency Lighting and Power
D509002019 Generator - Diesel, 500 kW, inclbattery, charger, muffler, & day tank
1993 30 BSL G 13.5 1 EA $176,997
D509006 Variable Frequency Motor Controllers
D509006002 Variable Frequency Drive (VFD), 5HP motor size
2010 20 G- 14.0 2 EA $7,374
D509006002 Variable Frequency Drive (VFD), 5HP motor size
2010 20 G- 14.0 2 EA $7,374
D509006002 Variable Frequency Drive (VFD), 5HP motor size
2010 20 G- 14.0 2 EA $7,374
D509006002 Variable Frequency Drive (VFD), 5HP motor size
2010 20 G- 14.0 1 EA $3,687
D509006003 Variable Frequency Drive (VFD),7.5 HP motor size
2010 20 G- 14.0 1 EA $3,948
D509006003 Variable Frequency Drive (VFD),7.5 HP motor size
2010 20 G- 14.0 3 EA $11,844
D509006003 Variable Frequency Drive (VFD),7.5 HP motor size
2010 20 G- 14.0 1 EA $3,948
D509006004 Variable Frequency Drive (VFD),10 HP motor size
2010 20 G- 14.0 1 EA $4,265
D509006004 Variable Frequency Drive (VFD),10 HP motor size
2010 20 G- 14.0 1 EA $4,265
D509006005 Variable Frequency Drive (VFD),15 HP motor size
2018 20 G 18.0 2 EA $11,336
D509006005 Variable Frequency Drive (VFD),15 HP motor size
2010 20 G- 14.0 2 EA $11,336
D509006005 Variable Frequency Drive (VFD),15 HP motor size
1978 20 AIP-NF 0.0 3 EA $0
D509007006 Variable Frequency Drive (VFD),25 HP motor size
2010 20 G- 14.0 1 EA $9,306
D509007006 Variable Frequency Drive (VFD),25 HP motor size
2010 20 G- 14.0 2 EA $18,612
D509007008 Variable Frequency Drive (VFD),40 HP motor size
2010 20 G- 14.0 1 EA $12,796
G20 Site Improvements
G2030 Pedestrian Paving
G203003 Paving and Surfacing
39Inventory Summary 07/25/2019
2 - Nicholsen TowerUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
G203003007 Concrete Paving Stone Rooftop patio - 2000 50 G 45.0 8,710 SF $114,952
40Inventory Summary 07/25/2019
3 - Oklahoma Transplant CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
A10 Foundations
A1010 Standard Foundations
A101001 Foundation Assemblies
A101001004 Deep Foundation (foundationassembly, up to 50' pile, with slab)
- - 1985 100 G- 70.0 43,003 SF $1,267,862
B10 Superstructure
B1010 Floor Construction
B101001 Cast in Place (CIP) Concrete, Raised Floor Structural Assembly
B101001001 CIP Concrete Beams and Slab,with columns, slab depth varies
- - 1974 100 G- 70.0 31,364 SF $985,294
B101001001 CIP Concrete Beams and Slab,with columns, slab depth varies
- - 1985 100 G- 70.0 10,000 SF $314,148
B20 Exterior Enclosure
B2010 Exterior Walls
B201001 Concrete Masonry Unit (CMU) Wall Systems, 6" - 12" thick wall
B201001 Concrete Masonry Unit (CMU) WallSystems, 6" - 12" thick wall
1 x 1 split faced block, painted - 1985 50 Y+ 27.5 320 SF $9,367
B201002 Brick Veneer Wall Systems
B201002 Brick Veneer Wall Systems - - 1985 75 Y+ 41.3 11,586 SF $254,028
B201004 Concrete Exterior Walls
B201004003 Precast Tilt-Up Wall Panel 5-1/2"Thick
Cast stone between aluminumwindows at second floor.
- 1985 75 G- 52.5 140 SF $6,331
B201007 Metal Siding Systems, type varies
B201007 Metal Siding Systems, type varies - Canopy perimeterand wall panek
siding
1985 35 Y+ 19.3 1,500 SF $16,159
B201007 Metal Siding Systems, type varies Soffit - 1985 35 Y+ 19.3 999 SF $10,761
B201018 Exterior Louvers and Screens
B201018002 Metal Louvers - 1985 40 G- 28.0 20 SF $828
B201020 Balcony Railings
B201020002 Metal Pipe Railing, 3'8" High Painted - 1985 50 G- 35.0 54 LF $3,205
B201021 Exterior Soffits
B201021004 Soffit, Stucco - 1985 30 G- 21.0 900 SF $11,738
B2020 Exterior Windows
41Inventory Summary 07/25/2019
3 - Oklahoma Transplant CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
B202008 Aluminum Fixed Window, various sizes
B202008 Aluminum Fixed Window, various sizes Aluminum fixed windows spanningmultiple floors with spandrel panels.
- 1985 60 Y+ 33.0 750 SF $62,784
B202012 Storefronts
B202012 Storefronts - - 1985 30 Y+ 16.5 400 SF $34,122
B202013 Curtain Walls
B202013 Curtain Walls - - 1985 60 G 54.0 800 SF $66,101
B2030 Exterior Doors
B203006 Solid Doors
B203006 Solid Doors 3 steel doors with steel frames. - 1985 30 Y+ 16.5 63 SF $5,943
B203007 Glazed Doors
B203007 Glazed Doors Tubelite aluminum storefront door. - 2010 35 Y+ 19.3 21 SF $1,915
B203007 Glazed Doors Automatic sliding aluminum door withmultiple lites and spandrel panel.
- 2010 35 G- 24.5 72 SF $6,565
B30 Roofing
B3010 Roof Coverings
B301002 Low Slope Roof Assemblies (roof coverings and flashing, no insulation)
B301002001 Built-up Roof (BUR), asphalt floodcoat w/gravel
- - 1995 20 Y+ 11.0 9,935 SF $85,731
B301002001 Built-up Roof (BUR), asphalt floodcoat w/gravel
- - 1985 20 Y+ 11.0 900 SF $7,766
B301006 Roof Sheet Flashing & Trim
B301006005 Sheet metal flashing andcounterflashing, stainless steel
- 1995 25 Y+ 13.8 215 SF $1,803
B3020 Roof Openings
B302001 Glazed Roof Openings
B302001002 Skylight, fiberglass glazedsandwich panels
Sloped - 1985 50 Y+ 27.5 250 SF $10,699
B302002 Roof Hatches
B302002001 Roof hatch, with curb, aluminum orsteel, 1" fiberglass insulation
- 1995 75 G- 52.5 12 SF $2,097
C10 Interior Construction
C1010 Interior Wall Partitions
C101001 Interior Partition Wall System with Gypsum Wallboard Finishes, 8' to 10' FTC height
42Inventory Summary 07/25/2019
3 - Oklahoma Transplant CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C101001 Interior Partition Wall System withGypsum Wallboard Finishes, 8' to 10' FTC height
- - 2010 50 G 45.0 43,003 FloorArea
$963,478
C101005 Interior Wall Partition, masonry, various materials and thickness
C101005002 CIP Concrete, Medium Reinforced,12" Thick
Fresh coat of paint applied in 2016. - 1985 75 G 67.5 90 SF $2,697
C101006 Interior Glazed Partitions and Storefronts
C101006003 Interior Storefront w/ AluminumFrame with 3/8" Clear Glass
- 2016 30 G 27.0 115 SF $8,416
C101006003 Interior Storefront w/ AluminumFrame with 3/8" Clear Glass
- 2016 30 G 27.0 18 SF $1,317
C101006004 Interior Glazing, 3/8" Clear Glass Small aluminum mullions. 2016 30 G 27.0 18 SF $787
C101007 Interior Windows
C101007 Interior Windows 4’ x 4’ units with four lights each. 11total.
- 2010 50 G 45.0 176 SF $12,267
C1020 Interior Doors (doors, frames, casings, finishes, hardware)
C102005 Metal door/Metal frame, flush, hollow core, w/ hinges and locksets
C102005 Metal door/Metal frame, flush, hollowcore, w/ hinges and locksets
- 1995 40 G- 28.0 21 SF $1,968
C102006 Wood door/Metal frame, flush or panel face, various core types and face materials, w/ hinges and locksets
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
Narrow lite - 1995 30 G- 21.0 147 SF $9,495
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
Solid wood door, (33) 3 x 7 & (6) 4 x 7door sizes.
- 2000 30 G- 21.0 735 SF $47,475
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
40 doors - 2010 30 G- 21.0 840 SF $54,257
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
One set of doors with vision glass andone single door.
- 2010 30 G- 21.0 84 SF $5,426
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
2016 30 G 27.0 275 SF $17,763
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
20 wood doors with large glasswindows.
- 2016 30 G 27.0 420 SF $27,128
43Inventory Summary 07/25/2019
3 - Oklahoma Transplant CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
Glass infill. Two sets of doors. - 2010 30 Y+ 16.5 84 SF $5,426
C102009 Fire Rated Wood door/Metal frame, flush, various face materials, w/ panic devices and closers
C102009 Fire Rated Wood door/Metal frame,flush, various face materials, w/ panic devicesand closers
- 2010 30 G 27.0 560 SF $72,161
C102010 Glazed Interior Doors
C102010 Glazed Interior Doors Aluminum storefront doors. - 2016 35 G 31.5 42 SF $3,830
C102012 Interior Overhead and Rolling Doors, Manual
C102012 Interior Overhead and Rolling Doors,Manual
2016 30 G 27.0 18 SF $613
C1030 Fittings
C103001 Compartments, Cubicles & Toilet Partitions
C103001 Compartments, Cubicles & ToiletPartitions
Cubicles - 2010 20 G 18.0 6 EA $7,314
C103001 Compartments, Cubicles & ToiletPartitions
Toilet Partitions - 1985 20 Y+ 11.0 3 EA $3,656
C103002 Toilet & Bath Accessories
C103002 Toilet & Bath Accessories - 2010 20 G 18.0 3 BthRm
$3,002
C103002 Toilet & Bath Accessories - 2010 20 G 18.0 5 BthRm
$5,004
C103002 Toilet & Bath Accessories - 2016 20 G 18.0 3 BthRm
$3,002
C103002 Toilet & Bath Accessories - - 2010 20 G- 14.0 3 BthRm
$3,002
C103007 Cabinets and Countertops (assembly)
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
Laminate finish on cabinets. - 2010 30 G- 21.0 57 LF $38,686
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
- - 2016 30 G 27.0 19 LF $12,896
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
- 2010 30 G 27.0 10 LF $6,788
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
4ft in (10) exam rooms & (2) waitingrooms, 5 ft in check out room, (2)offices, break room.
- 1995 30 Y+ 16.5 82 LF $55,654
44Inventory Summary 07/25/2019
3 - Oklahoma Transplant CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C103007002 Wood Cabinets, base only, withPlastic Laminate Countertops
Laminate countertops only. - 1986 30 Y+ 16.5 16 LF $6,573
C103007002 Wood Cabinets, base only, withPlastic Laminate Countertops
Counter with no base cabinets. 2016 30 G 27.0 21 LF $8,626
C103007002 Wood Cabinets, base only, withPlastic Laminate Countertops
- 1995 30 G 27.0 25 LF $10,270
C103007002 Wood Cabinets, base only, withPlastic Laminate Countertops
Reception Desk with transaction. - 1995 30 G 27.0 6 LF $2,465
C103007002 Wood Cabinets, base only, withPlastic Laminate Countertops
Wall cabinets only - 1995 30 G- 21.0 9 LF $3,697
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
Custom millwork. total of two 4‘ x 8‘ x4‘ tall custom laid tables with drawersand shelving.
- 2016 30 G 27.0 16 LF $8,674
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
Custom millwork. Stone Counter andplastic laminate desktop.
- 2016 30 G 27.0 16 LF $8,674
C20 Stairs
C2010 Stair Construction
C201001 Regular Stairs Assemblies
C201001004 Stairs, CIP Concrete with TreadFinishes
- - 1985 100 G 90.0 60 Riser $30,087
C201001004 Stairs, CIP Concrete with TreadFinishes
1985 100 G- 70.0 47 Riser $23,568
C201004 Handrails And Balustrades (not part of stairs)
C201004002 Pipe Railing steel, 2-rails, 42" high 1985 20 G 18.0 23 LF $1,427
C201004004 Ornamental Railing, aluminum withmetal posts, 42" high
1985 30 G- 21.0 83 LF $6,056
C201004004 Ornamental Railing, aluminum withmetal posts, 42" high
- - 1985 30 G- 21.0 42 LF $3,065
C201006 Roof Access Ladder
C201006002 Ladder, Steel, 20" W, bolted toconcrete/masonry, no cage
- - 2010 65 G 58.5 13 LF $969
C30 Interior Finishes
C3010 Wall Finishes
C301003 Ceramic Tile Wall Finishes
C301003 Ceramic Tile Wall Finishes - - 2010 75 G 67.5 1,200 SF $12,318
C301003 Ceramic Tile Wall Finishes - - 2016 75 G 67.5 512 SF $5,255
45Inventory Summary 07/25/2019
3 - Oklahoma Transplant CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C301003 Ceramic Tile Wall Finishes - - 1995 75 G- 52.5 420 SF $4,312
C301003 Ceramic Tile Wall Finishes - 1985 75 Y+ 41.3 250 SF $2,566
C3020 Floor Finishes
C302001 Carpeting
C302001 Carpeting - 1995 7 G- 4.9 1,902 SF $16,680
C302001 Carpeting 2010 7 G- 4.9 962 SF $8,437
C302001 Carpeting - 2010 7 G- 4.9 5,415 SF $47,490
C302001 Carpeting - 2016 7 G 6.3 3,175 SF $27,846
C302002 Ceramic Tile Flooring
C302002 Ceramic Tile Flooring - - 2010 75 G 67.5 600 SF $6,159
C302002 Ceramic Tile Flooring - - 1995 75 G- 52.5 161 SF $1,653
C302002 Ceramic Tile Flooring - 1985 75 Y+ 41.3 250 SF $2,566
C302002001 Ceramic Floor Tiles, various sizes - - 2016 75 G 67.5 125 SF $1,283
C302004 Vinyl and Linoleum Floor Finishes
C302004 Vinyl and Linoleum Floor Finishes - 1995 15 G 13.5 1,514 SF $10,354
C302004 Vinyl and Linoleum Floor Finishes Wood pattern vinyl flooring. - 2016 15 G 13.5 3,200 SF $21,883
C3030 Ceiling Finishes
C303001 Gypsum Wallboard Ceiling Finishes
C303001 Gypsum Wallboard Ceiling Finishes - 2010 25 G 22.5 590 SF $1,256
C303001 Gypsum Wallboard Ceiling Finishes - 2010 25 G 22.5 200 SF $426
C303001 Gypsum Wallboard Ceiling Finishes 2016 25 G 22.5 60 SF $128
C303001 Gypsum Wallboard Ceiling Finishes - - 1995 25 G 22.5 500 SF $1,065
C303003 Acoustical Ceiling Tiles & Panels
C303003001 Suspended Acoustical CeilingSystems
- 1995 60 G- 42.0 6,960 SF $53,975
C303003001 Suspended Acoustical CeilingSystems
- 2010 60 G 54.0 762 SF $5,909
C303003001 Suspended Acoustical CeilingSystems
- - 2010 60 G 54.0 18,852 SF $146,197
46Inventory Summary 07/25/2019
D3040 Distribution Systems
3 - Oklahoma Transplant CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C303003001 Suspended Acoustical CeilingSystems
- 2016 60 G 54.0 7,780 SF $60,334
D10 Conveying
D1010 Elevators and Lifts
D101002 Passenger Elevators
D101002012 Hydraulic passenger elevator, 3500lb, 5 floors, 100 FPM
4 levels - 1994 25 Y+ 13.8 1 EA $163,842
D101002013 Hydraulic passenger elevator, 4000lb, 5 floors, 100 FPM
4 levels - 1994 25 Y+ 13.8 1 EA $165,957
D20 Plumbing
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures - - 2010 25 G 22.5 18,852 FSF $122,009
D2010 Plumbing Fixtures - - 2016 25 G 22.5 11,639 FSF $75,326
D2010 Plumbing Fixtures - - 2005 25 G- 17.5 12,512 FSF $80,976
D2020 Domestic Water Distribution
D202001 Domestic Water Distribution Pipes and Fittings
D202001 Domestic Water Distribution Pipes andFittings
- - 1985 50 G 45.0 43,003 FSF $132,183
D2030 Sanitary Waste
D203001 Sanitary Waste Pipes and Fittings
D203001 Sanitary Waste Pipes and Fittings - - 1985 50 G 45.0 43,003 FSF $95,196
D2040 Rain Water Drainage
D204001 Rain Water Drainage Pipes and Fittings
D204001 Rain Water Drainage Pipes andFittings
- - 1985 50 G- 35.0 43,003 FSF $89,738
D30 HVAC
D3020 Heat Generating Systems
D302011 Steam Auxiliary Equipment
D302011008 Steam Regulator Valve, 1-1/2"diameter
- - 2010 6 G 5.4 1 EA $6,470
D302011019 Steam Pump Package, condensatereturn w/ 2 pumps, 1 HP each, 25 GPM, 15 galstorage tank, w/ control panel
Pump, condensate return, 2 pumps,1/3 HP
Steam System 2010 20 G- 14.0 1 EA $15,989
47Inventory Summary 07/25/2019
3 - Oklahoma Transplant CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304003 Hot Water Distribution Systems
D304003034 Circulating Pump, cast iron, bronzeimpeller, 5 HP, to 225 GPM, 3" size
140 GPM, 1800 RPM, 175 PSI Steam System 2010 15 G 13.5 2 EA $11,492
D304006 Chilled Water Distribution Systems
D304006038 Circulating Pump, cast iron, bronzeimpeller, 15 HP, to 1000 GPM, 5" size
Chilled Water Pumps: CHWP1 &CHWP2, 1770 RPM each
- 2016 15 G 13.5 2 EA $17,160
D304007 Exhaust and Ventilation Systems
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
- 1994 15 G 13.5 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
- 1994 15 G 13.5 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
1550 RPM, 1/8 HP - 1994 15 G- 10.5 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
- - 1994 15 G- 10.5 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
- - 1994 15 G- 10.5 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
- 1994 15 G- 10.5 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
1550 RPM, 1/8 HP - 1994 15 G- 10.5 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
1550 RPM, 1/8 HP - 1994 15 G- 10.5 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
- 1994 15 G- 10.5 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
- 1994 15 Y+ 8.3 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
- 1994 15 Y+ 8.3 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
2500 RPM, 1/2 HP, Biohazard - EF7 - 1994 15 Y+ 8.3 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
2500 RPM, 1/2 HP, Biohazard - 1994 15 Y+ 8.3 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
- 1994 15 Y+ 8.3 1 EA $1,244
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
- 1994 15 Y+ 8.3 1 EA $1,244
48Inventory Summary 07/25/2019
3 - Oklahoma Transplant CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304007030 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
- 1994 15 BSL Y 3.5 1 EA $1,244
D304007031 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 600 CFM
Wall exhaust 1994 15 Y+ 8.3 2 EA $3,147
D304008 Air Handling Units
D304008007 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, variable airvolume
AHU-1 - 1997 25 G- 17.5 1 EA $32,113
D304008009 Central Station Packaged AirHandling Unit, 10,000 CFM, 7.5 HP, variable airvolume
21 ton - 1994 25 G- 17.5 1 EA $61,229
D304008009 Central Station Packaged AirHandling Unit, 10,000 CFM, 7.5 HP, variable airvolume
25 Ton, indoor AHU, 15 HP - 1994 25 G- 17.5 1 EA $61,229
D304008014 Central Station Packaged AirHandling Unit, 30,000 CFM, 20 HP, variable airvolume
82 Ton, 20 HP, 33000 CFM - 1985 25 G- 17.5 1 EA $138,603
D3050 Terminal and Package Units
D305003 Fan Coil Units
D305003015 Four Pipe Fan Coil Units - 2 ton 3 ton - 1994 15 G- 10.5 1 EA $4,794
D3060 Controls and Instrumentation
D306008 Building Automation Systems
D306008001 Building Automation System,Complex System
- - 2010 15 G 13.5 43,003 FSF $181,903
D40 Fire Protection
D4010 Sprinklers
D401001 Wet pipe sprinkler systems, steel, light hazard, black, sch 40 pipe
D401001005 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 5,000 to 10,000 SF
- - 1985 75 G- 52.5 11,639 SF $58,423
D401001012 Wet pipe sprinkler systems, steel,light hazard, each additional floor, 5,000 to10,000 SF
- - 1985 75 G- 52.5 31,364 SF $96,407
D4030 Fire Protection Specialties
D403001 Fire Extinguisher Cabinets
D403001001 Fire Extinguisher Cabinets, singleextinguisher, steel door & frame
- - 2010 20 G 18.0 7 EA $2,477
49Inventory Summary 07/25/2019
3 - Oklahoma Transplant CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D403001001 Fire Extinguisher Cabinets, singleextinguisher, steel door & frame
- - 2016 20 G 18.0 18 EA $6,370
D50 Electrical
D5010 Electrical Service and Distribution
D501003 Main Switchboards
D501003007 Switchboard - 600 V, 400 Amp - - 1996 25 G- 17.5 1 EA $7,348
D501003008 Switchboard - 600 V, 600 Amp - - 1996 25 G- 17.5 1 EA $8,584
D501004 Interior Distribution Transformers
D501004003 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 15 kVA
- 1985 30 G- 21.0 1 EA $3,330
D501004003 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 15 kVA
208/120 V - 1985 30 G 27.0 1 EA $3,330
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
- 1994 30 G 27.0 1 EA $7,015
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
- - 1986 30 G- 21.0 1 EA $7,015
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
1996 30 G- 21.0 2 EA $14,031
D501005 Panels
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
EHA - 1989 35 G 31.5 1 EA $2,164
D501005005 Main Breaker Panel, 120/208/240V, 400 amp, three phase
1L & 1LE - 2 sections 84 breakers - 1996 35 G- 24.5 2 EA $12,797
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
ELA - 100 amp - 1989 35 G 31.5 1 EA $2,164
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
LPB & LPC - 84 Breakers - 1989 35 G 31.5 2 EA $9,729
D501005013 Main Breaker, 277/480 V, 125 amp BMR-HAE - 1986 35 G- 24.5 1 EA $2,500
D501005013 Main Breaker, 277/480 V, 125 amp BMR-LAE, 50 Amps - 1986 35 G- 24.5 1 EA $2,500
D501005013 Main Breaker, 277/480 V, 125 amp - 1986 35 G- 24.5 1 EA $2,500
D501005014 Main Breaker, 277/480 V, 200 amp 175-AMP 1986 35 G- 24.5 1 EA $4,406
D501005014 Main Breaker, 277/480 V, 200 amp 175-AMP 1986 35 G- 24.5 1 EA $4,406
D501005015 Main Breaker, 277/480 V, 400 amp BDP1 - 1986 35 G- 24.5 1 EA $6,750
D501005015 Main Breaker, 277/480 V, 400 amp - 1986 35 G- 24.5 1 EA $6,750
50Inventory Summary 07/25/2019
D509006005 Variable Frequency Drive (VFD),15 HP motor size
3 - Oklahoma Transplant CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501005015 Main Breaker, 277/480 V, 400 amp 225-AMP 1989 35 G 31.5 1 EA $6,750
D501005015 Main Breaker, 277/480 V, 400 amp LPA, 250 amp - 1989 35 G 31.5 1 EA $6,750
D501005018 Main Lugs, 277/480 V, 225 amp 1HA & 1HAE, 250-AMP - 1996 35 G- 24.5 2 EA $12,267
D5020 Lighting and Branch Wiring
D502001 Branch Wiring
D502001 Branch Wiring - - 1985 60 G- 42.0 43,003 FSF $264,971
D502003 Lighting Fixtures, Interior (by lit floor area)
D502003002 Interior Lighting, Fluorescent, T8 orT12, 10 fixtures per 1000 SF
- - 1995 20 G- 14.0 12,512 SF $87,681
D502003002 Interior Lighting, Fluorescent, T8 orT12, 10 fixtures per 1000 SF
- - 2010 20 G 18.0 18,852 SF $132,109
D502003002 Interior Lighting, Fluorescent, T8 orT12, 10 fixtures per 1000 SF
LED fixtures, ceiling grid, suspended. - 2016 20 G 18.0 11,147 SF $78,115
D502004 Lighting Fixtures, Exterior
D502004003 Wall Mounted ExteriorIncandescent Lantern, 60 watt
Soffit recessed. - 1985 20 R- 0.2 20 EA $2,270
D5030 Communications, Security and Alarms
D503011 Access Control System Components (various types)
D503011001 Access control, computerized cardkey system with magnetic door lock, per door(not incl. wiring)
2016 20 G 18.0 22 EA $25,281
D503011011 Closed circuit television system(CCTV), surveillance cameras
2010 20 G- 14.0 8 EA $5,651
D5090 Other Electrical Services
D509004 Building Lightning Protection System (roof area)
D509004001 Commercial Building LightningProtection System, single story (roof area)
- 2003 15 G 13.5 9,935 SF $10,086
D509006 Variable Frequency Motor Controllers
D509006005 Variable Frequency Drive (VFD),15 HP motor size
CHWP-01 & CHWP-02 - 2016 20 G 18.0 2 EA $11,336
D509006005 Variable Frequency Drive (VFD),15 HP motor size
- - 2012 20 G- 14.0 1 EA $5,668
D509006005 Variable Frequency Drive (VFD),15 HP motor size
- - 2009 20 G- 14.0 1 EA $5,668
- - 1994 20 G 18.0 1 EA $5,668
51Inventory Summary 07/25/2019
4 - OU Physicians BuildingUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
A10 Foundations
A1010 Standard Foundations
A101001 Foundation Assemblies
A101001004 Deep Foundation (foundationassembly, up to 50' pile, with slab)
- 2001 100 G 90.0 37,468 SF $1,104,673
B10 Superstructure
B1010 Floor Construction
B101001 Cast in Place (CIP) Concrete, Raised Floor Structural Assembly
B101001001 CIP Concrete Beams and Slab,with columns, slab depth varies
Elevated floor framing - 2001 100 G 90.0 37,468 SF $1,177,050
B1020 Roof Construction
B102003 Steel Roof Framing Assemblies, with 1.5" galvanized metal deck
B102003 Steel Roof Framing Assemblies, with1.5" galvanized metal deck
High roof 2001 100 G 90.0 2,052 SF $25,056
B102004 Cast in Place (CIP) Concrete, Roof Structural Assembly
B102004001 CIP Concrete Beams and Slab,with columns, slab depth varies
Low roof 2001 100 G 90.0 4,080 SF $128,172
B20 Exterior Enclosure
B2010 Exterior Walls
B201003 Stone Veneer Systems
B201003 Stone Veneer Systems 2001 75 G 67.5 8,922 SF $284,308
B201007 Metal Siding Systems, type varies
B201007 Metal Siding Systems, type varies 2001 35 G 31.5 2,046 SF $22,040
B201011 Exterior Insulation Finish System (EIFS)
B201011 Exterior Insulation Finish System(EIFS)
2001 50 G 45.0 35,862 SF $530,937
B201018 Exterior Louvers and Screens
B201018002 Metal Louvers 2001 40 G 36.0 2,021 SF $83,579
B201021 Exterior Soffits
B201021002 Soffit, Aluminum 2001 40 G 36.0 1,532 SF $21,601
B201021004 Soffit, Stucco 2001 30 G 27.0 6,890 SF $89,864
B2020 Exterior Windows
B202008 Aluminum Fixed Window, various sizes
53Inventory Summary 07/25/2019
4 - OU Physicians BuildingUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
B202008 Aluminum Fixed Window, various sizes 2001 60 G 54.0 1,090 SF $91,245
B202013 Curtain Walls
B202013 Curtain Walls 2001 60 G 54.0 30,948 SF $2,557,110
B2030 Exterior Doors
B203006 Solid Doors
B203006 Solid Doors - - 2001 30 G 27.0 154 SF $14,529
B203007 Glazed Doors
B203007 Glazed Doors 2001 35 G 31.5 81 SF $7,386
B203008 Revolving Doors
B203008003 Auto Sliding Doors (12'0" X 7'0") 2001 30 G 27.0 2 EA $68,385
B203010 Overhead and Roll-up Doors, Motorized
B203010 Overhead and Roll-up Doors,Motorized
2001 30 G- 21.0 72 SF $3,374
B30 Roofing
B3010 Roof Coverings
B301001 High Slope Roof Assemblies (roof coverings and flashing, no insulation)
B301001004 Steel Roofing Panels, standingseam, standard or zinc aluminum alloy finish
Penthouse,Mechanical Room
2001 40 G 36.0 2,052 SF $29,280
B301002 Low Slope Roof Assemblies (roof coverings and flashing, no insulation)
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
2001 20 G- 14.0 35,416 SF $123,344
B301009 Gutters & Downspouts
B301009010 Aluminum downspouts 2001 20 G 18.0 42 LF $196
B3020 Roof Openings
B302002 Roof Hatches
B302002001 Roof hatch, with curb, aluminum orsteel, 1" fiberglass insulation
2001 75 G- 52.5 8 SF $1,397
C10 Interior Construction
C1010 Interior Wall Partitions
C101007 Interior Windows
C101007 Interior Windows Glass sliding counter window withaluminum trim.
2001 50 G 45.0 225 SF $15,682
C101007 Interior Windows - 2001 50 G 45.0 225 SF $15,682
54Inventory Summary 07/25/2019
4 - OU Physicians BuildingUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C101010 Interior Guardrails & Screens
C101010003 Cable Guide Rail w/ Steel Posts Steel screen panels, steel supports,wooden top plank.
2001 20 G 18.0 468 LF $5,444
C1020 Interior Doors (doors, frames, casings, finishes, hardware)
C102005 Metal door/Metal frame, flush, hollow core, w/ hinges and locksets
C102005 Metal door/Metal frame, flush, hollowcore, w/ hinges and locksets
@ ADD PHOTO 2001 40 G- 28.0 450 SF $42,169
C102006 Wood door/Metal frame, flush or panel face, various core types and face materials, w/ hinges and locksets
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2001 30 G- 21.0 360 SF $23,254
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2001 30 G- 21.0 10,550 SF $681,447
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
Small vision lite. 2001 30 G- 21.0 210 SF $13,564
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
Full vision lite. 2001 30 G- 21.0 5,350 SF $345,568
C102011 Sliding & Folding Doors
C102011 Sliding & Folding Doors - 2001 30 G 27.0 21 SF $646
C102011 Sliding & Folding Doors Glass door with barn door hardware. 2018 30 G 27.0 28 SF $862
C1030 Fittings
C103001 Compartments, Cubicles & Toilet Partitions
C103001 Compartments, Cubicles & ToiletPartitions
Full height cubicle partitions withdoors and clerestory window panels.
2010 20 G 18.0 8 EA $9,752
C103001 Compartments, Cubicles & ToiletPartitions
- 2001 20 G- 14.0 6 EA $7,314
C103001 Compartments, Cubicles & ToiletPartitions
- - 2001 20 Y+ 11.0 30 EA $36,566
C103002 Toilet & Bath Accessories
C103002 Toilet & Bath Accessories - 2001 20 G- 14.0 68 BthRm
$68,052
C103002 Toilet & Bath Accessories - 2015 20 G 18.0 68 BthRm
$68,052
C103007 Cabinets and Countertops (assembly)
55Inventory Summary 07/25/2019
4 - OU Physicians BuildingUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C103007005 Wood Cabinets, base and wall,with Solid Surface Countertops
Quartz counters. Plastic laminatefaces.
2001 30 G- 21.0 1,530 LF $1,239,369
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
Custom reception desks. - 2001 30 G- 21.0 440 LF $238,544
C103008 Counters
C103008002 Solid Surface Molded Counter Top Plastic laminate. 2001 40 G- 28.0 75 LF $14,805
C103008002 Solid Surface Molded Counter Top 2001 40 G- 28.0 231 LF $45,599
C103008002 Solid Surface Molded Counter Top Plastic laminate bar height wallmounted counter.
2018 40 G 36.0 9 LF $1,777
C103008002 Solid Surface Molded Counter Top Quartz countertop. 2001 40 G 36.0 30 LF $5,922
C20 Stairs
C2010 Stair Construction
C201001 Regular Stairs Assemblies
C201001004 Stairs, CIP Concrete with TreadFinishes
- 2001 100 G- 70.0 104 Riser $52,152
C201001004 Stairs, CIP Concrete with TreadFinishes
@ ADD PHOTO 2001 100 G- 70.0 104 Riser $52,152
C201001004 Stairs, CIP Concrete with TreadFinishes
@ ADD PHOTO 2001 100 G- 70.0 104 Riser $52,152
C201004 Handrails And Balustrades (not part of stairs)
C201004002 Pipe Railing steel, 2-rails, 42" high @ ADD PHOTO Steel mesh wire infillwith handrail.
2001 20 G- 14.0 92 LF $5,708
C201004002 Pipe Railing steel, 2-rails, 42" high @ ADD PHOTO Steel mesh wire infillwith handrail.
2001 20 G- 14.0 92 LF $5,708
C201004002 Pipe Railing steel, 2-rails, 42" high Steel mesh wire infill with handrail. 2001 20 G- 14.0 92 LF $5,708
C30 Interior Finishes
C3010 Wall Finishes
C301003 Ceramic Tile Wall Finishes
C301003 Ceramic Tile Wall Finishes - 2010 75 G 67.5 110 SF $1,129
C301004 Wood Wall Finishes
C301004 Wood Wall Finishes Glass block knee wall. - 2001 20 G- 14.0 40 SF $226
C301006 Rigid Wall Coverings
C301006 Rigid Wall Coverings Remodel Plastic laminate. 2018 20 G 18.0 280 SF $1,753
56Inventory Summary 07/25/2019
4 - OU Physicians BuildingUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C301006 Rigid Wall Coverings - 2001 20 Y+ 11.0 1,200 SF $7,512
C3020 Floor Finishes
C302001 Carpeting
C302001 Carpeting - 2010 7 Y+ 3.9 21,000 SF $184,174
C302001 Carpeting 2010 7 R+ 1.8 23,610 SF $207,064
C302001 Carpeting - 2001 7 R 0.7 55,100 SF $483,238
C302001 Carpeting 2018 7 G 6.3 6,600 SF $57,883
C302002 Ceramic Tile Flooring
C302002 Ceramic Tile Flooring - - 2001 75 G- 52.5 69,964 SF $718,167
C302002 Ceramic Tile Flooring 2001 75 Y+ 41.3 75 SF $770
C302004 Vinyl and Linoleum Floor Finishes
C302004 Vinyl and Linoleum Floor Finishes - 2010 15 Y+ 8.3 43,728 SF $299,034
C302004 Vinyl and Linoleum Floor Finishes - 2001 15 R 1.5 100 SF $684
C302004 Vinyl and Linoleum Floor Finishes 2001 15 R+ 3.8 43,728 SF $299,034
C302004 Vinyl and Linoleum Floor Finishes - - 2001 15 G- 10.5 45 SF $307
C302004 Vinyl and Linoleum Floor Finishes - 2018 15 G 13.5 5,300 SF $36,244
C302006 Stone, Marble and Granite Flooring
C302006 Stone, Marble and Granite Flooring - 2015 50 G- 35.0 17,491 SF $427,645
C3030 Ceiling Finishes
C303003 Acoustical Ceiling Tiles & Panels
C303003001 Suspended Acoustical CeilingSystems
- 2018 60 G 54.0 750 SF $5,816
D10 Conveying
D1010 Elevators and Lifts
D101004 Hospital Elevators
D101004007 Hydraulic hospital elevators, 4500lb, 5 floors, 100 FPM
- 2001 25 G- 17.5 2 EA $434,844
D101004009 Traction geared elevators, hospital,3500 lb, 5 floors, 200 FPM
2001 25 G 22.5 3 EA $639,576
D1090 Other Conveying Systems
D109001 Pneumatic Tube Systems
57Inventory Summary 07/25/2019
4 - OU Physicians BuildingUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D109001002 Pneumatic Tube System, Singletube, 100', 2 station, 4" diameter
- 2001 35 G- 24.5 1 EA $25,380
D20 Plumbing
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures 2001 25 G- 17.5 189,525 FSF $1,226,587
D2020 Domestic Water Distribution
D202001 Domestic Water Distribution Pipes and Fittings
D202001 Domestic Water Distribution Pipes andFittings
2001 50 G- 35.0 189,525 FSF $582,563
D2030 Sanitary Waste
D203001 Sanitary Waste Pipes and Fittings
D203001 Sanitary Waste Pipes and Fittings 2001 50 G- 35.0 189,525 FSF $419,551
D2040 Rain Water Drainage
D204001 Rain Water Drainage Pipes and Fittings
D204001 Rain Water Drainage Pipes andFittings
- 2001 50 G- 35.0 15,000 FSF $31,302
D2090 Other Plumbing Systems
D209001 Special Piping Systems
D209001001 Medical Gases Piping Per Outlet Oxygen and Compressed air only, nooxygen tanks.
2001 25 G 22.5 125 EA $178,894
D209001001 Medical Gases Piping Per Outlet Oxygen and Compressed air only withtanks
2001 25 G 22.5 30 EA $42,935
D30 HVAC
D3020 Heat Generating Systems
D302005 Heat Exchangers
D302005001 Heat Exchanger, steam to water,shell and tube type
2001 30 G- 21.0 200 GPM $47,469
D302005003 Heat Exchanger, liquid-to-liquid,shell and tube type
2001 30 G- 21.0 50 GPM $14,946
D302005003 Heat Exchanger, liquid-to-liquid,shell and tube type
2001 30 G- 21.0 50 GPM $14,946
D302008 Expansion Tanks, Hot Water Storage Tanks
D302008002 Expansion Tank, galvanized steel,15 to 400 gallon capacity
2001 30 G- 21.0 500 GAL $27,544
58Inventory Summary 07/25/2019
D304007069 Centrifugal Fan, airfoil, doublewidth wheel, belt drive, 60,920 CFM, with 40 H.P.motor
4 - OU Physicians BuildingUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D302008002 Expansion Tank, galvanized steel,15 to 400 gallon capacity
2001 30 G- 21.0 425 GAL $23,413
D302011 Steam Auxiliary Equipment
D302011019 Steam Pump Package, condensatereturn w/ 2 pumps, 1 HP each, 25 GPM, 15 galstorage tank, w/ control panel
2001 20 G- 14.0 1 EA $15,989
D3040 Distribution Systems
D304001 Air Distribution, Heating and Cooling
D304001002 VAV Terminal -0 to 600 CFM, HotWater Reheat
Cooling only 2001 15 G 13.5 181 EA $217,439
D304001008 VAV Terminal, Fan Powered - 600CFM, Hot Water Reheat
2001 15 G- 10.5 2 EA $3,345
D304001010 Humidifier - 50 lb. per hour 2001 15 G- 10.5 1 EA $5,334
D304003 Hot Water Distribution Systems
D304003004 Circulating Pump, cast iron, in line,1/2 HP, 3" size
2001 15 G- 10.5 1 EA $2,303
D304006 Chilled Water Distribution Systems
D304006126 Pump, centrifugal, end suction,single stage, 1,050 GPM, 40 H.P., 5" discharge
Chilled water pumps 2001 15 G- 10.5 2 EA $31,076
D304006134 Pump, centrifugal, end suction,single stage, 1,000 GPM, 40 H.P., 5" discharge
Heating water pump 2001 15 G- 10.5 1 EA $22,088
D304007 Exhaust and Ventilation Systems
D304007033 Roof Exhaust Fan, Centrifugal,Aluminum Housing, 1450 CFM
2001 15 G- 10.5 3 EA $6,396
D304007035 Fan System, Wall Exhaust - WallExhaust, 6,175 CFM
2001 15 G- 10.5 1 EA $1,688
D304007038 Fan System, Wall Exhaust - WallExhaust, 14,300 CFM
2001 15 G- 10.5 1 EA $2,374
D304007050 Roof Exhaust Fan, 1 HP, 2,240CFM
0.75-HP - 2001 15 G- 10.5 1 EA $8,601
D304007052 Roof Exhaust Fan, 3 HP, 8,000CFM
- 2001 15 G- 10.5 2 EA $45,614
D304007069 Centrifugal Fan, airfoil, doublewidth wheel, belt drive, 60,920 CFM, with 40 H.P.motor
- 2001 15 G- 10.5 1 EA $36,606
- 2001 15 G- 10.5 1 EA $36,606
59Inventory Summary 07/25/2019
4 - OU Physicians BuildingUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304007077 Industrial Exhauster Fan, 8,000CFM, 15 H.P.
- 2001 15 G- 10.5 1 EA $10,596
D304008 Air Handling Units
D304008009 Central Station Packaged AirHandling Unit, 10,000 CFM, 7.5 HP, variable airvolume
AHU-2a 2001 25 G- 17.5 1 EA $61,229
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
AHU-5 - 2001 25 G- 17.5 1 EA $88,689
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
AHU-4 - 2001 25 G- 17.5 1 EA $88,689
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
AHU-2 - 2001 25 G- 17.5 1 EA $88,689
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
AHU-3 - 2001 25 G- 17.5 1 EA $88,689
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
AHU-1 - 2001 25 G- 17.5 1 EA $88,689
D3050 Terminal and Package Units
D305006 Package Units
D305006087 Computer Room A/C Unit, ChilledWater, 8-12 ton, for connection to existing chillersystem
2001 20 G- 14.0 1 EA $29,317
D3060 Controls and Instrumentation
D306008 Building Automation Systems
D306008001 Building Automation System,Complex System
2001 15 G 13.5 189,525 FSF $801,691
D3090 Other HVAC Systems and Equipment
D309003 Dust & Fume Collectors
D309003001 Fan, fume exhauster, 630 CFM, 1-1/2 HP, w/ 20' hose
1/2-HP FAN - 2001 15 G- 10.5 1 EA $2,522
D40 Fire Protection
D4010 Sprinklers
D401001 Wet pipe sprinkler systems, steel, light hazard, black, sch 40 pipe
60Inventory Summary 07/25/2019
4 - OU Physicians BuildingUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D401001006 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 10,000 to 50,000 SF
2001 75 G 67.5 37,900 SF $139,476
D401001014 Wet pipe sprinkler systems, steel,light hazard, each additional floor, greater than50,000 SF
2001 75 G 67.5 150,000 SF $351,090
D401017 Sprinkler System Fire Pumps
D401017002 Fire Pump, electric, 500 GPM, 27HP, including controller, fittings and relief valve
30-HP 2001 20 G- 14.0 1 EA $24,428
D4020 Standpipe Systems and Equipment
D402008 Fire Pump Equipment
D402008001 Fire Pump, electric, 1" jockey pumpsystem, 3 HP
2001 25 G 22.5 1 EA $5,393
D4030 Fire Protection Specialties
D403001 Fire Extinguisher Cabinets
D403001002 Fire Extinguisher Cabinets, singleextinguisher, stainless steel door & frame
2001 20 G- 14.0 44 EA $20,597
D50 Electrical
D5010 Electrical Service and Distribution
D501003 Main Switchboards
D501003009 Switchboard - 600 V, 800 Amp - 2001 25 G- 17.5 1 EA $11,156
D501003014 Switchboard, no main disconnect,277/480 V, 3,000 amp
2001 25 G- 17.5 1 EA $11,421
D501003025 Switchboard, fused switch,277/480 V, 1,200 amp
2001 25 G- 17.5 1 EA $21,362
D501004 Interior Distribution Transformers
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
2001 30 G- 21.0 4 EA $28,062
D501004006 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
2001 30 G- 21.0 1 EA $4,633
D501004006 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
2001 30 G- 21.0 1 EA $4,633
D501004007 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 45 kVA
- 2001 30 G- 21.0 1 EA $9,644
D501004007 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 45 kVA
2001 30 G- 21.0 1 EA $9,644
D501004010 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 112.5 kVA
2001 30 G- 21.0 8 EA $129,269
61Inventory Summary 07/25/2019
4 - OU Physicians BuildingUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501005 Panels
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
100-AMP 2001 35 G- 24.5 1 EA $2,164
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
2001 35 G- 24.5 1 EA $2,164
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
100-AMP 2001 35 G- 24.5 1 EA $2,164
D501005005 Main Breaker Panel, 120/208/240V, 400 amp, three phase
KL1 2010 35 G 31.5 1 EA $6,399
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
2001 35 G- 24.5 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
2001 35 G- 24.5 4 EA $19,458
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
2001 35 G- 24.5 2 EA $9,729
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
- 2001 35 G- 24.5 1 EA $4,865
D501005011 Main Lug Load Center,120/208/240 V, 400 amp, three phase
2001 35 G- 24.5 9 EA $53,615
D501005012 Main Lug Load Center,120/208/240 V, 600 amp, three phase
- - 2001 35 G- 24.5 9 EA $81,216
D501005013 Main Breaker, 277/480 V, 125 amp 2001 35 G- 24.5 1 EA $2,500
D501005014 Main Breaker, 277/480 V, 200 amp 225-AMP 2001 35 G- 24.5 10 EA $44,063
D501005015 Main Breaker, 277/480 V, 400 amp 2001 35 G- 24.5 1 EA $6,750
D501005016 Main Breaker, 277/480 V, 600 amp 2001 35 G- 24.5 1 EA $11,738
D501005021 Main Breaker, 277/480 V, 800 amp 2001 35 G- 24.5 1 EA $16,638
D501005021 Main Breaker, 277/480 V, 800 amp 2001 35 G- 24.5 1 EA $16,638
D501005022 Power Distribution Unit, singlecabinet, 50 kVA output, 480/208 input
2001 35 G- 24.5 1 EA $12,940
D501006 Enclosed Circuit Breakers
D501006012 Safety Switch, 600 V, 200 Amp 2001 25 G- 17.5 1 EA $1,558
D501006012 Safety Switch, 600 V, 200 Amp 2001 25 G- 17.5 4 EA $6,232
D501006012 Safety Switch, 600 V, 200 Amp - 2001 25 G- 17.5 10 EA $15,581
D501006012 Safety Switch, 600 V, 200 Amp 2001 25 G- 17.5 1 EA $1,558
62Inventory Summary 07/25/2019
4 - OU Physicians BuildingUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501006031 Automatic Transfer Switch, 3 pole,480 volt, 400 amp
2001 25 G- 17.5 1 EA $15,534
D5020 Lighting and Branch Wiring
D502001 Branch Wiring
D502001 Branch Wiring 2001 60 G- 42.0 189,525 FSF $1,167,796
D502003 Lighting Fixtures, Interior (by lit floor area)
D502003001 Interior Lighting, Fluorescent, T8 orT12, 5 fixtures per 1000 SF
- 2001 20 G- 14.0 120,000 SF $429,768
D502003001 Interior Lighting, Fluorescent, T8 orT12, 5 fixtures per 1000 SF
- 2001 20 G- 14.0 15,000 SF $53,721
D502003004 Interior Lighting, Incandescent,Recessed Mounted, 12 fixtures per 1000 SF
- 2001 20 G 18.0 50,000 SF $334,875
D502004 Lighting Fixtures, Exterior
D502004001 Surface Mounted ExteriorIncandescent, 150W, single spot
Soffit, recessed 2001 20 G 18.0 67 EA $6,566
D5030 Communications, Security and Alarms
D503001 Fire Detection Communications and Alarm System Assemblies (detectors, outlets, boxers, conduit, wiring)
D503001003 Fire Detection Communicationsand Alarm Systems (5 to 10 stories, 50,000 to100,000 SF)
2001 20 G- 14.0 189,525 FSF $243,180
D503011 Access Control System Components (various types)
D503011002 Access control, processor for cardkey access system
2001 20 G- 14.0 42 EA $55,667
D503011011 Closed circuit television system(CCTV), surveillance cameras
2010 20 G- 14.0 11 EA $7,771
D5090 Other Electrical Services
D509002 Emergency Lighting and Power
D509002014 Generator - Diesel, 250 kW, inclbattery, charger, muffler, & day tank
2001 30 G- 21.0 1 EA $78,946
D509002062 Uninterruptible Power Supply(UPS), 480 kVA, three phase, includes charger,inverter, and alarm
1000-AMP 2001 25 G- 17.5 1 EA $261,545
D509004 Building Lightning Protection System (roof area)
D509004002 Commercial Building LightningProtection System, multi-story (roof area)
- 2001 15 G- 10.5 30,000 SF $65,142
D509006 Variable Frequency Motor Controllers
63Inventory Summary 07/25/2019
4 - OU Physicians BuildingUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D509006005 Variable Frequency Drive (VFD),15 HP motor size
- 2001 20 G- 14.0 5 EA $28,341
D509007008 Variable Frequency Drive (VFD),40 HP motor size
- 2001 20 G- 14.0 2 EA $25,592
D509007008 Variable Frequency Drive (VFD),40 HP motor size
2001 20 G- 14.0 1 EA $12,796
D509007008 Variable Frequency Drive (VFD),40 HP motor size
2001 20 G- 14.0 1 EA $12,796
64Inventory Summary 07/25/2019
B201019 Sun Control Devices
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
A10 Foundations
A1010 Standard Foundations
A101001 Foundation Assemblies
A101001003 Basement Foundation (foundationassembly, with concrete basement floor slab)
- 2009 100 G 90.0 20,863 SF $716,594
A101001004 Deep Foundation (foundationassembly, up to 50' pile, with slab)
- 2009 100 G 90.0 20,863 SF $615,105
B10 Superstructure
B1010 Floor Construction
B101001 Cast in Place (CIP) Concrete, Raised Floor Structural Assembly
B101001001 CIP Concrete Beams and Slab,with columns, slab depth varies
Building roof framing, roof mechanicalpenthouse roof framing
- 2009 100 G 90.0 19,069 SF $599,048
B101001001 CIP Concrete Beams and Slab,with columns, slab depth varies
2009 100 G 90.0 292,082 SF $9,175,698
B101003 Structural Steel, Raised Floor Structural Assembly
B101003 Structural Steel, Raised FloorStructural Assembly
- 2009 100 G 90.0 5,072 SF $173,639
B1020 Roof Construction
B102003 Steel Roof Framing Assemblies, with 1.5" galvanized metal deck
B102003 Steel Roof Framing Assemblies, with1.5" galvanized metal deck
- 2009 100 G- 70.0 2,060 SF $25,154
B20 Exterior Enclosure
B2010 Exterior Walls
B201002 Brick Veneer Wall Systems
B201002 Brick Veneer Wall Systems Interior brick finish. 2009 75 G 67.5 450 SF $9,867
B201002 Brick Veneer Wall Systems - 2009 75 G 67.5 63,895 SF $1,400,929
B201003 Stone Veneer Systems
B201003 Stone Veneer Systems - 2009 75 G 67.5 22,864 SF $728,584
B201007 Metal Siding Systems, type varies
B201007 Metal Siding Systems, type varies - 2009 35 G 31.5 16,028 SF $172,660
B201007 Metal Siding Systems, type varies Interior metal panels. 2009 35 G 31.5 75 SF $808
B201018 Exterior Louvers and Screens
B201018002 Metal Louvers - 2009 40 G 36.0 1,168 SF $48,302
65Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
B201019001 Metal Awning w/Wall Supports 2009 20 G 18.0 480 SF $59,085
B201021 Exterior Soffits
B201021002 Soffit, Aluminum 2009 40 G 36.0 1,280 SF $18,048
B201021004 Soffit, Stucco - 2009 30 G 27.0 18,000 SF $234,765
B201025 Exterior Stairs
B201025002 Stairs, Steel, grate type w/nosing &rails, w/o landing
- - 2009 65 G 58.5 20 Riser $18,264
B2020 Exterior Windows
B202008 Aluminum Fixed Window, various sizes
B202008 Aluminum Fixed Window, various sizes 2009 60 G- 42.0 7,108 SF $595,023
B202012 Storefronts
B202012 Storefronts - 2009 30 G 27.0 574 SF $48,965
B202013 Curtain Walls
B202013 Curtain Walls - 2009 60 G 54.0 912 SF $75,355
B202014 Exterior Glazing, Ribbon Windows
B202014 Exterior Glazing, Ribbon Windows 2009 75 G- 52.5 42,788 SF $2,090,472
B2030 Exterior Doors
B203006 Solid Doors
B203006 Solid Doors - 2009 30 G 27.0 133 SF $12,548
B203007 Glazed Doors
B203007 Glazed Doors 2009 35 G 31.5 48 SF $4,377
B203008 Revolving Doors
B203008003 Auto Sliding Doors (12'0" X 7'0") - 2009 30 G 27.0 3 EA $102,578
B30 Roofing
B3010 Roof Coverings
B301002 Low Slope Roof Assemblies (roof coverings and flashing, no insulation)
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
- 2009 20 G- 14.0 19,420 SF $67,633
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
2009 20 Y- 7.0 860 SF $2,995
B301009 Gutters & Downspouts
66Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
B301009010 Aluminum downspouts - 2009 20 G 18.0 52 LF $244
C10 Interior Construction
C1010 Interior Wall Partitions
C101001 Interior Partition Wall System with Gypsum Wallboard Finishes, 8' to 10' FTC height
C101001 Interior Partition Wall System withGypsum Wallboard Finishes, 8' to 10' FTC height
- 2009 50 G- 35.0 316,658 FloorArea
$7,094,691
C101006 Interior Glazed Partitions and Storefronts
C101006003 Interior Storefront w/ AluminumFrame with 3/8" Clear Glass
- 2009 30 G 27.0 96 SF $7,025
C101006004 Interior Glazing, 3/8" Clear Glass - 2009 30 G 27.0 40 SF $1,748
C101006004 Interior Glazing, 3/8" Clear Glass - 2009 30 G 27.0 5,985 SF $261,604
C101007 Interior Windows
C101007 Interior Windows - 2018 50 G 45.0 2,765 SF $192,710
C1020 Interior Doors (doors, frames, casings, finishes, hardware)
C102005 Metal door/Metal frame, flush, hollow core, w/ hinges and locksets
C102005 Metal door/Metal frame, flush, hollowcore, w/ hinges and locksets
- 2009 40 G- 28.0 1,825 SF $171,019
C102006 Wood door/Metal frame, flush or panel face, various core types and face materials, w/ hinges and locksets
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2009 30 G- 21.0 14,925 SF $964,037
C102010 Glazed Interior Doors
C102010 Glazed Interior Doors - 2009 35 G- 24.5 1,325 SF $120,820
C102010 Glazed Interior Doors - 2009 35 G- 24.5 6,550 SF $597,260
C102011 Sliding & Folding Doors
C102011 Sliding & Folding Doors Break away exam room door. 2009 30 G 27.0 32 SF $984
C102012 Interior Overhead and Rolling Doors, Manual
C102012 Interior Overhead and Rolling Doors,Manual
- 2009 30 G 27.0 20 SF $682
C1030 Fittings
C103001 Compartments, Cubicles & Toilet Partitions
C103001 Compartments, Cubicles & ToiletPartitions
Cubicles 2009 20 G 18.0 45 EA $54,849
67Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C103001 Compartments, Cubicles & ToiletPartitions
Cubicles 2018 20 G 18.0 25 EA $30,472
C103001 Compartments, Cubicles & ToiletPartitions
Toilet Partitions 2018 20 G 18.0 5 EA $6,094
C103001 Compartments, Cubicles & ToiletPartitions
- 2009 20 G 18.0 60 EA $73,131
C103001 Compartments, Cubicles & ToiletPartitions
- 2009 20 G- 14.0 197 EA $240,116
C103001 Compartments, Cubicles & ToiletPartitions
- 2009 20 G- 14.0 65 EA $79,226
C103002 Toilet & Bath Accessories
C103002 Toilet & Bath Accessories - 2018 20 G 18.0 4 BthRm
$4,003
C103002 Toilet & Bath Accessories - 2009 20 G 18.0 76 BthRm
$76,060
C103007 Cabinets and Countertops (assembly)
C103007005 Wood Cabinets, base and wall,with Solid Surface Countertops
- 2009 30 G 27.0 1,075 LF $870,799
C103007005 Wood Cabinets, base and wall,with Solid Surface Countertops
Custom countertop 2018 30 G 27.0 35 LF $28,352
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
Custom base 2018 30 G 27.0 68 LF $36,866
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
Quartz countertops. 2018 30 G 27.0 16 LF $8,674
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
Wood Cabinets, no counter. 2018 30 G 27.0 10 LF $5,421
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
- 2009 30 G- 21.0 1,295 LF $702,078
C103008 Counters
C103008001 Granite Counter Top Quartz countertop. 2018 40 G 36.0 12 LF $2,893
C103008002 Solid Surface Molded Counter Top - 2009 40 G 36.0 208 LF $41,059
C103008002 Solid Surface Molded Counter Top - 2009 40 G 36.0 1,200 LF $236,880
C20 Stairs
C2010 Stair Construction
C201004 Handrails And Balustrades (not part of stairs)
68Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C201004004 Ornamental Railing, aluminum withmetal posts, 42" high
Ramp hand rail with glass infill. 2019 30 G 27.0 48 LF $3,502
C30 Interior Finishes
C3010 Wall Finishes
C301003 Ceramic Tile Wall Finishes
C301003 Ceramic Tile Wall Finishes - 2009 75 G 67.5 14,320 SF $146,993
C301003 Ceramic Tile Wall Finishes - 2018 75 G 67.5 860 SF $8,828
C301003 Ceramic Tile Wall Finishes 3d Tile 2018 75 G 67.5 320 SF $3,285
C301003 Ceramic Tile Wall Finishes Accent tile 2018 75 G 67.5 212 SF $2,176
C3020 Floor Finishes
C302001 Carpeting
C302001 Carpeting - 2018 7 G 6.3 12,480 SF $109,453
C302001 Carpeting - 2014 7 G- 4.9 47,650 SF $417,900
C302001 Carpeting - 2009 7 R 0.7 47,650 SF $417,900
C302002 Ceramic Tile Flooring
C302002 Ceramic Tile Flooring - 2009 75 G- 52.5 62,400 SF $640,524
C302002 Ceramic Tile Flooring - 2018 75 G 67.5 500 SF $5,132
C302004 Vinyl and Linoleum Floor Finishes
C302004 Vinyl and Linoleum Floor Finishes - 2018 15 G 13.5 8,320 SF $56,896
C302004 Vinyl and Linoleum Floor Finishes - 2009 15 G- 10.5 95,300 SF $651,709
C302012 Painted and Stained Floor Finishes
C302012 Painted and Stained Floor Finishes - 2001 10 Y- 3.5 450 SF $546
C3030 Ceiling Finishes
C303001 Gypsum Wallboard Ceiling Finishes
C303001 Gypsum Wallboard Ceiling Finishes - 2018 25 G 22.5 1,040 SF $2,214
C303001 Gypsum Wallboard Ceiling Finishes - 2009 25 G 22.5 50,600 SF $107,732
C303003 Acoustical Ceiling Tiles & Panels
C303003001 Suspended Acoustical CeilingSystems
- 2009 60 G 54.0 202,400 SF $1,569,612
69Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C303003001 Suspended Acoustical CeilingSystems
- 2018 60 G 54.0 19,760 SF $153,239
C303003001 Suspended Acoustical CeilingSystems
2009 60 R 6.0 400 SF $3,102
D10 Conveying
D1010 Elevators and Lifts
D101002 Passenger Elevators
D101002023 Traction geared elevators,passenger, 3500 lb, 15 floors, 350 FPM
2009 25 G- 17.5 4 EA $1,847,100
D101003 Freight Elevators
D101003013 Traction geared elevators, freight,4000 lb, 15 floors, 200 FPM class'B'
5000-Lbs 2009 25 G- 17.5 1 EA $573,870
D20 Plumbing
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures 2009 25 G- 17.5 316,658 FSF $2,049,379
D2020 Domestic Water Distribution
D202001 Domestic Water Distribution Pipes and Fittings
D202001 Domestic Water Distribution Pipes andFittings
2009 50 G- 35.0 316,658 FSF $973,343
D202003 Domestic Water Equipment
D202003009 Water Booster Pump, 15HP 2009 20 G- 14.0 3 EA $63,450
D202006 Water Heater Storage Tanks
D202006002 Water Heater Storage Tank,galvanized steel, 30 gallon
2009 20 G 18.0 1 EA $2,618
D202006007 Water Heater Storage Tank,galvanized steel, 400 gallon
2009 20 G- 14.0 2 EA $39,926
D202006008 Water Heater Storage Tank,galvanized steel, 500 gallon
2009 20 G- 14.0 1 EA $24,691
D2030 Sanitary Waste
D203001 Sanitary Waste Pipes and Fittings
D203001 Sanitary Waste Pipes and Fittings 2009 50 G- 35.0 316,658 FSF $700,986
D203004 Sanitary and Vent Equipment
D203004008 Duplex Sewage Ejector, (3HP) 1-HP PUMPS 2009 25 G- 17.5 2 EA $34,122
70Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D203004008 Duplex Sewage Ejector, (3HP) 2009 25 G- 17.5 2 EA $34,122
D203004008 Duplex Sewage Ejector, (3HP) 2015 25 G 22.5 2 EA $34,122
D2040 Rain Water Drainage
D204001 Rain Water Drainage Pipes and Fittings
D204001 Rain Water Drainage Pipes andFittings
2009 50 G- 35.0 316,658 FSF $660,802
D2090 Other Plumbing Systems
D209001 Special Piping Systems
D209001001 Medical Gases Piping Per Outlet 2009 25 G- 17.5 25 EA $35,779
D209001001 Medical Gases Piping Per Outlet 2009 25 G- 17.5 25 EA $35,779
D209001001 Medical Gases Piping Per Outlet 2009 25 G- 17.5 135 EA $193,205
D209001001 Medical Gases Piping Per Outlet 2009 25 G- 17.5 25 EA $35,779
D209001002 Vacuum System Piping Per Outlet 2009 25 G- 17.5 28 EA $34,150
D209003 Interceptors
D209003016 Grease Trap, steel, 250 GPM 2009 25 G- 17.5 2 EA $64,536
D30 HVAC
D3020 Heat Generating Systems
D302003 Furnaces and Furnace Components
D302003017 Electric Unit Heater, 7.5 KW 2009 15 G- 10.5 1 EA $1,293
D302005 Heat Exchangers
D302005001 Heat Exchanger, steam to water,shell and tube type
2011 30 G- 21.0 96 GPM $22,786
D302005001 Heat Exchanger, steam to water,shell and tube type
2009 30 G- 21.0 100 GPM $23,735
D302005001 Heat Exchanger, steam to water,shell and tube type
2009 30 G- 21.0 200 GPM $47,469
D302005002 Heat Exchanger, liquid-to-liquid,plate type
2009 30 G- 21.0 150 GPM $18,847
D302008 Expansion Tanks, Hot Water Storage Tanks
D302008002 Expansion Tank, galvanized steel,15 to 400 gallon capacity
2009 30 G- 21.0 500 GAL $27,544
D302011 Steam Auxiliary Equipment
71Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D302011004 Pressure Reducing Valve, steam,2", 125 lb. flanges, iron body, pilot operated,
2009 15 G- 10.5 1 EA $4,512
D302011006 Pressure Reducing Valve, steam,4", 125 lb. flanges, iron body, pilot operated
- - 2009 15 G- 10.5 1 EA $8,361
D302011019 Steam Pump Package, condensatereturn w/ 2 pumps, 1 HP each, 25 GPM, 15 galstorage tank, w/ control panel
2009 20 G- 14.0 1 EA $15,989
D302011020 Steam Pump Package, condensatereturn w/ 2 pumps, 1.5 HP each, 60 GPM, 25 galstorage tank w/control panel
2011 20 G 18.0 1 EA $20,558
D3040 Distribution Systems
D304001 Air Distribution, Heating and Cooling
D304001002 VAV Terminal -0 to 600 CFM, HotWater Reheat
2009 15 G- 10.5 519 EA $623,485
D304003 Hot Water Distribution Systems
D304003048 Circulating Pump, cast iron, basemounted, bronze impeller, 10 HP, to 600 GPM, 5"size
2009 15 G 13.5 1 EA $22,800
D304006 Chilled Water Distribution Systems
D304006039 Circulating Pump, cast iron, bronzeimpeller, 20 HP to 1350 GPM, 5" size
2011 15 G 13.5 2 EA $18,358
D304006125 Pump, centrifugal, end suction,single stage, 750 GPM, 30 H.P., 4" discharge
2009 15 G- 10.5 2 EA $21,827
D304006126 Pump, centrifugal, end suction,single stage, 1,050 GPM, 40 H.P., 5" discharge
2009 15 G- 10.5 4 EA $62,153
D304007 Exhaust and Ventilation Systems
D304007039 Fan System, Wall Exhaust - WallExhaust, 19,800 CFM
2009 15 G- 10.5 1 EA $2,883
D304007039 Fan System, Wall Exhaust - WallExhaust, 19,800 CFM
2009 15 G 13.5 2 EA $5,767
D304007075 Industrial Exhauster Fan, 2,000CFM, 3 H.P.
2009 15 G 13.5 7 EA $40,911
D304007075 Industrial Exhauster Fan, 2,000CFM, 3 H.P.
2940 CFM 2009 15 G- 10.5 6 EA $35,067
D304008 Air Handling Units
D304008014 Central Station Packaged AirHandling Unit, 30,000 CFM, 20 HP, variable airvolume
AHU-F0 2009 25 G- 17.5 1 EA $138,603
72Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
AHU-F12 2009 30 G- 21.0 1 EA $309,495
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
AHU-F11 2009 30 G- 21.0 1 EA $309,495
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
AHU-F10 2009 30 G- 21.0 1 EA $309,495
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
AHU-F9 2009 30 G- 21.0 1 EA $309,495
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
AHU-F8 2009 30 G- 21.0 1 EA $309,495
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
AHU-F7 2009 30 G- 21.0 1 EA $309,495
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
AHU-F6 2009 30 G- 21.0 1 EA $309,495
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
AHU-F5 2009 30 G- 21.0 1 EA $309,495
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
AHU-F4 2009 30 G- 21.0 1 EA $309,495
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
AHU-F3 2009 30 G- 21.0 1 EA $309,495
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
AHU-F2 2009 30 G- 21.0 1 EA $309,495
D304008015 Central Station Packaged AirHandling Unit, 45,000 CFM, 30 HP, variable airvolume
AHU-F14 - 2009 30 G- 21.0 1 EA $309,495
D3050 Terminal and Package Units
D305002 Unit Heaters
73Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D305002002 Hydronic Unit Heater, cabinet, hotwater, horizontal, blower type, 60 MBH
2009 20 G 18.0 15 EA $42,713
D305003 Fan Coil Units
D305003009 Two Pipe Fan Coil Units - 2 ton 2009 15 G- 10.5 18 EA $34,390
D305003011 Two Pipe Fan Coil Units - 3 ton FCU-3 - 2011 15 G- 10.5 1 EA $2,855
D305006 Package Units
D305006012 Window/Thru-Wall Unit AirConditioner, 29,000 BTUH
- 2009 20 G- 14.0 1 EA $1,689
D305006012 Window/Thru-Wall Unit AirConditioner, 29,000 BTUH
- 2009 20 G- 14.0 3 EA $5,068
D305006012 Window/Thru-Wall Unit AirConditioner, 29,000 BTUH
2009 20 R+ 5.0 1 EA $1,689
D305006012 Window/Thru-Wall Unit AirConditioner, 29,000 BTUH
- 2009 20 R+ 5.0 1 EA $1,689
D305008 Split System Package Units
D305008001 Fan Coil DX A/C, 1.5 ton indoor aircooled condensing unit, with filters and controls
1-ton FCU 2009 20 G- 14.0 1 EA $1,045
D305008015 Split System Heat Pump, outdoorair cooled condensing unit, 1.5 ton cooling, 7MBH heat
Outdoor unit is rated at 1-ton - 2009 20 G- 14.0 1 EA $2,640
D3060 Controls and Instrumentation
D306008 Building Automation Systems
D306008001 Building Automation System,Complex System
- 2009 15 G 13.5 316,658 FSF $1,339,463
D40 Fire Protection
D4010 Sprinklers
D401001 Wet pipe sprinkler systems, steel, light hazard, black, sch 40 pipe
D401001006 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 10,000 to 50,000 SF
2009 75 G- 52.5 22,500 SF $82,802
D401001014 Wet pipe sprinkler systems, steel,light hazard, each additional floor, greater than50,000 SF
2009 75 G 67.5 275,000 SF $643,665
D401004 Dry pipe sprinkler systems, steel, light hazard
D401004006 Dry pipe sprinkler systems, steel,light hazard, 1 floor, 10,000 to 50,000 SF
2009 75 G 67.5 22,500 SF $98,030
D401016 Sprinkler Water Supply Backflow Preventers
74Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D401016001 Backflow Preventer, up to 2" Pipe 2009 25 G- 17.5 2 EA $1,929
D401016004 Backflow Preventer, 8" Pipe Fire protection BFP 2009 25 G 22.5 1 EA $11,315
D401017 Sprinkler System Fire Pumps
D401017014 Fire Pump, electric, 1500 GPM,139 HP, including controller, fittings and reliefvalve
125-HP 2009 25 G- 17.5 1 EA $42,441
D4020 Standpipe Systems and Equipment
D402008 Fire Pump Equipment
D402008001 Fire Pump, electric, 1" jockey pumpsystem, 3 HP
2009 25 G- 17.5 1 EA $5,393
D4030 Fire Protection Specialties
D403001 Fire Extinguisher Cabinets
D403001001 Fire Extinguisher Cabinets, singleextinguisher, steel door & frame
2009 20 G 18.0 131 EA $46,362
D50 Electrical
D5010 Electrical Service and Distribution
D501003 Main Switchboards
D501003012 Switchboard - 600 V, 2000 Amp 2500-AMP 2009 25 G- 17.5 1 EA $22,673
D501004 Interior Distribution Transformers
D501004003 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 15 kVA
2009 30 G- 21.0 10 EA $33,308
D501004004 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 25 kVA
2009 30 G- 21.0 1 EA $4,292
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
2009 30 G- 21.0 1 EA $7,015
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
2009 30 G- 21.0 28 EA $196,431
D501004006 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
2009 30 G- 21.0 6 EA $27,800
D501005 Panels
D501005004 Main Breaker Panel, 120/208/240V, 200 amp, three phase
2009 35 G- 24.5 26 EA $117,994
D501005004 Main Breaker Panel, 120/208/240V, 200 amp, three phase
2009 35 G- 24.5 1 EA $4,539
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 2009 35 G- 24.5 6 EA $12,982
75Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
60-AMP 2009 35 G- 24.5 10 EA $21,636
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
84-breakers 2009 35 G- 24.5 1 EA $4,865
D501005013 Main Breaker, 277/480 V, 125 amp 125-AMP 2009 35 G- 24.5 10 EA $24,999
D501005013 Main Breaker, 277/480 V, 125 amp 100-AMP 2009 35 G- 24.5 8 EA $19,999
D501005014 Main Breaker, 277/480 V, 200 amp 225-AMP 2009 35 G- 24.5 1 EA $4,406
D501005014 Main Breaker, 277/480 V, 200 amp 250-AMP 2009 35 G- 24.5 3 EA $13,219
D501005015 Main Breaker, 277/480 V, 400 amp 2009 35 G- 24.5 1 EA $6,750
D501005015 Main Breaker, 277/480 V, 400 amp HBPE 2009 35 G- 24.5 1 EA $6,750
D501005015 Main Breaker, 277/480 V, 400 amp HBN2 2009 35 G 31.5 1 EA $6,750
D501005015 Main Breaker, 277/480 V, 400 amp 2009 35 G- 24.5 1 EA $6,750
D501005015 Main Breaker, 277/480 V, 400 amp 2009 35 G 31.5 1 EA $6,750
D501005016 Main Breaker, 277/480 V, 600 amp EHB 2009 35 G- 24.5 1 EA $11,738
D501006 Enclosed Circuit Breakers
D501006012 Safety Switch, 600 V, 200 Amp 2009 25 G- 17.5 28 EA $43,625
D501006028 Automatic Transfer Switch, 3 pole,480 volt, 150 amp
ATS-CB 2009 25 G 22.5 1 EA $5,562
D501006029 Automatic Transfer Switch, 3 pole,480 volt, 225 amp
ATS-LS 2009 25 G 22.5 1 EA $7,057
D501006031 Automatic Transfer Switch, 3 pole,480 volt, 400 amp
ATS-EQ 2009 25 G 22.5 1 EA $15,534
D5020 Lighting and Branch Wiring
D502001 Branch Wiring
D502001 Branch Wiring 2009 60 G- 42.0 316,658 FSF $1,951,151
D502002 Lighting Fixtures, Interior (by fixture)
D502002040 High Intensity - High PressureSodium 150 W , surface mounted
Soffit, recessed 2009 20 G 18.0 20 EA $23,434
D502003 Lighting Fixtures, Interior (by lit floor area)
D502003002 Interior Lighting, Fluorescent, T8 orT12, 10 fixtures per 1000 SF
2009 20 G 18.0 25,000 SF $175,193
76Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D502003002 Interior Lighting, Fluorescent, T8 orT12, 10 fixtures per 1000 SF
2009 20 G- 14.0 275,000 SF $1,927,118
D502003009 Interior Lighting, LED 2019 20 G 18.0 22,500 SF $189,716
D502003009 Interior Lighting, LED 2009 20 G 18.0 4,000 SF $33,727
D502004 Lighting Fixtures, Exterior
D502004001 Surface Mounted ExteriorIncandescent, 150W, single spot
- 2009 20 G 18.0 30 EA $2,940
D502004001 Surface Mounted ExteriorIncandescent, 150W, single spot
2009 20 G 18.0 34 EA $3,332
D5030 Communications, Security and Alarms
D503001 Fire Detection Communications and Alarm System Assemblies (detectors, outlets, boxers, conduit, wiring)
D503001004 Fire Detection Communicationsand Alarm Systems (11 to 20 stories, greater than100,000 SF)
2009 20 G- 14.0 316,658 FSF $808,143
D503011 Access Control System Components (various types)
D503011002 Access control, processor for cardkey access system
2009 20 G- 14.0 123 EA $163,024
D503011011 Closed circuit television system(CCTV), surveillance cameras
2009 20 G 18.0 69 EA $48,742
D5090 Other Electrical Services
D509002 Emergency Lighting and Power
D509002018 Generator - Diesel, 400 kW, inclbattery, charger, muffler, & day tank
- 2017 30 G- 21.0 1 EA $138,772
D509004 Building Lightning Protection System (roof area)
D509004002 Commercial Building LightningProtection System, multi-story (roof area)
- 2009 15 G- 10.5 22,860 SF $49,638
D509006 Variable Frequency Motor Controllers
D509006001 Variable Frequency Drive (VFD), 3HP motor size
Fans are 3/4-HP, 1-HP & 2-HP 2009 20 G- 14.0 12 EA $39,593
D509007007 Variable Frequency Drive (VFD),30 HP motor size
2009 20 G- 14.0 14 EA $157,920
D509007007 Variable Frequency Drive (VFD),30 HP motor size
2009 20 G- 14.0 2 EA $22,560
D509007008 Variable Frequency Drive (VFD),40 HP motor size
2009 20 G- 14.0 4 EA $51,183
77Inventory Summary 07/25/2019
5 - OU Children's PhysiciansUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D509007016 Variable Frequency Drive (VFD),20 HP motor size
2009 20 G- 14.0 1 EA $7,501
D509007016 Variable Frequency Drive (VFD),20 HP motor size
2011 20 G- 14.0 2 EA $15,002
78Inventory Summary 07/25/2019
6 - Children's AtriumUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
A10 Foundations
A1010 Standard Foundations
A101001 Foundation Assemblies
A101001003 Basement Foundation (foundationassembly, with concrete basement floor slab)
2011 100 G 90.0 29,456 SF $1,011,743
A101001004 Deep Foundation (foundationassembly, up to 50' pile, with slab)
2011 100 G 90.0 29,456 SF $868,454
B10 Superstructure
B1010 Floor Construction
B101003 Structural Steel, Raised Floor Structural Assembly
B101003005 Composite Steel Beams and SteelDeck, with reinforced light weight concrete slab,depth varies
6th floor Children'sPlayground
2011 100 G 90.0 9,976 SF $332,243
B1020 Roof Construction
B102003 Steel Roof Framing Assemblies, with 1.5" galvanized metal deck
B102003 Steel Roof Framing Assemblies, with1.5" galvanized metal deck
- 2011 100 G 90.0 29,456 SF $359,675
B20 Exterior Enclosure
B2010 Exterior Walls
B201007 Metal Siding Systems, type varies
B201007 Metal Siding Systems, type varies 2011 35 G 31.5 19,140 SF $206,184
B201021 Exterior Soffits
B201021002 Soffit, Aluminum 2011 40 G 36.0 540 SF $7,614
B2020 Exterior Windows
B202008 Aluminum Fixed Window, various sizes
B202008 Aluminum Fixed Window, various sizes 2011 60 G 54.0 652 SF $54,580
B202013 Curtain Walls
B202013 Curtain Walls 2011 60 G 54.0 17,344 SF $1,433,065
B2030 Exterior Doors
B203007 Glazed Doors
B203007 Glazed Doors 2011 35 G 31.5 245 SF $22,340
B203008 Revolving Doors
B203008 Revolving Doors 2011 30 G 27.0 440 SF $254,439
79Inventory Summary 07/25/2019
6 - Children's AtriumUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
B30 Roofing
B3010 Roof Coverings
B301001 High Slope Roof Assemblies (roof coverings and flashing, no insulation)
B301001004 Steel Roofing Panels, standingseam, standard or zinc aluminum alloy finish
- 2011 40 G 36.0 29,456 SF $420,314
B301002 Low Slope Roof Assemblies (roof coverings and flashing, no insulation)
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
- 2011 20 G 18.0 660 SF $2,298
B3020 Roof Openings
B302001 Glazed Roof Openings
B302001004 Skylight, fixed, 48" x 48" - 2011 50 G 45.0 224 EA $271,446
C10 Interior Construction
C1010 Interior Wall Partitions
C101001 Interior Partition Wall System with Gypsum Wallboard Finishes, 8' to 10' FTC height
C101001 Interior Partition Wall System withGypsum Wallboard Finishes, 8' to 10' FTC height
- 2011 50 G 45.0 15,965 FloorArea
$357,694
C101006 Interior Glazed Partitions and Storefronts
C101006003 Interior Storefront w/ AluminumFrame with 3/8" Clear Glass
2011 30 G 27.0 375 SF $27,443
C101006004 Interior Glazing, 3/8" Clear Glass Glass panelhandrails
2011 30 G 27.0 4,144 SF $181,134
C101007 Interior Windows
C101007 Interior Windows 2011 50 G 45.0 460 SF $32,061
C1020 Interior Doors (doors, frames, casings, finishes, hardware)
C102006 Wood door/Metal frame, flush or panel face, various core types and face materials, w/ hinges and locksets
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
2011 30 G 27.0 1,386 SF $89,525
C102010 Glazed Interior Doors
C102010 Glazed Interior Doors 2011 35 G 31.5 182 SF $16,596
C1030 Fittings
C103001 Compartments, Cubicles & Toilet Partitions
C103001005 Toilet Partition, Wall Hung PlasticLaminate
- 2011 20 G 18.0 24 EA $24,872
C20 Stairs
80Inventory Summary 07/25/2019
6 - Children's AtriumUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C2010 Stair Construction
C201001 Regular Stairs Assemblies
C201001004 Stairs, CIP Concrete with TreadFinishes
Main stairwayassembly
2011 100 G 90.0 102 Riser $51,148
C201004 Handrails And Balustrades (not part of stairs)
C201004002 Pipe Railing steel, 2-rails, 42" high Main stairwayassembly
2011 20 G 18.0 535 LF $33,191
C201004008 Ornamental Railing, bronze orstainless steel with metal posts, and wood, glassor plexiglass panels, 42" high
- 2011 30 G 27.0 19 LF $11,587
C30 Interior Finishes
C3010 Wall Finishes
C301003 Ceramic Tile Wall Finishes
C301003 Ceramic Tile Wall Finishes - 2011 75 G 67.5 8,090 SF $83,042
C301004 Wood Wall Finishes
C301004 Wood Wall Finishes 2011 20 G 18.0 640 SF $3,601
C301009 Stone, Marble and Granite Wall Finishes
C301009 Stone, Marble and Granite WallFinishes
Stone wall finish - 2011 75 G 67.5 8,880 SF $653,085
C301009 Stone, Marble and Granite WallFinishes
Decorative granite partition wall - 2011 75 G 67.5 616 SF $45,305
C3020 Floor Finishes
C302001 Carpeting
C302001 Carpeting 2011 7 G 6.3 6,924 SF $60,724
C302002 Ceramic Tile Flooring
C302002 Ceramic Tile Flooring - 2011 75 G 67.5 6,768 SF $69,472
C302003 Wood Flooring
C302003 Wood Flooring 2011 30 G 27.0 10,309 SF $114,832
C302007 Terrazzo Floor Finishes
C302007 Terrazzo Floor Finishes 2011 75 G 67.5 14,588 SF $724,237
C3030 Ceiling Finishes
C303001 Gypsum Wallboard Ceiling Finishes
C303001 Gypsum Wallboard Ceiling Finishes - 2011 25 G 22.5 7,294 SF $15,530
81Inventory Summary 07/25/2019
D304001008 VAV Terminal, Fan Powered - 600CFM, Hot Water Reheat
6 - Children's AtriumUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C303003 Acoustical Ceiling Tiles & Panels
C303003001 Suspended Acoustical CeilingSystems
- 2011 60 G 54.0 15,965 SF $123,809
C303005 Metal Ceilings
C303005002 Metal Panel Ceiling - 2011 40 G 36.0 21,600 SF $243,648
D10 Conveying
D1010 Elevators and Lifts
D101002 Passenger Elevators
D101002017 Traction geared elevators,passenger, 3500 lb, 5 floors, 200 FPM
2011 25 G- 17.5 2 EA $434,844
D20 Plumbing
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures 2011 25 G- 17.5 107,757 FSF $697,393
D2020 Domestic Water Distribution
D202001 Domestic Water Distribution Pipes and Fittings
D202001 Domestic Water Distribution Pipes andFittings
2011 50 G- 35.0 107,757 FSF $331,223
D202005 Domestic Water Heating Equipment-Commercial
D202005006 Commercial Water Heater, Electric,208 V, 80 gallon tank
- 2011 15 G- 10.5 1 EA $19,224
D2030 Sanitary Waste
D203001 Sanitary Waste Pipes and Fittings
D203001 Sanitary Waste Pipes and Fittings 2011 50 G- 35.0 107,757 FSF $238,541
D2040 Rain Water Drainage
D204001 Rain Water Drainage Pipes and Fittings
D204001 Rain Water Drainage Pipes andFittings
- - 2011 50 G- 35.0 107,757 FSF $224,867
D30 HVAC
D3040 Distribution Systems
D304001 Air Distribution, Heating and Cooling
D304001003 VAV Terminal - 610 to 1000 CFM,Hot Water Reheat
- 2011 15 G- 10.5 26 EA $32,664
- - 2011 15 G 13.5 11 EA $18,395
82Inventory Summary 07/25/2019
6 - Children's AtriumUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304003 Hot Water Distribution Systems
D304003013 Circulating Pump, bronze, in line,1/4 HP, 2-1/2" size
Hot water pump 2011 15 G- 10.5 1 EA $2,962
D304003013 Circulating Pump, bronze, in line,1/4 HP, 2-1/2" size
Hot water pump 2011 15 G- 10.5 2 EA $5,925
D304007 Exhaust and Ventilation Systems
D304007077 Industrial Exhauster Fan, 8,000CFM, 15 H.P.
Roof mounted supply air intake - 2011 15 G- 10.5 1 EA $10,596
D304007078 Industrial Exhauster Fan, 12,000CFM, 30 H.P.
Roof mounted smoke purge fans (SEF-1 thru 6)
- 2011 15 G- 10.5 6 EA $97,205
D304008 Air Handling Units
D304008006 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, constant volume
AHU-G4 2011 25 G- 17.5 1 EA $26,367
D304008009 Central Station Packaged AirHandling Unit, 10,000 CFM, 7.5 HP, variable airvolume
AHU-G3 2011 25 G- 17.5 1 EA $61,229
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
AHU-G5 2011 25 G- 17.5 1 EA $88,689
D304008013 Central Station Packaged AirHandling Unit, 20,000 CFM, 15 HP, variable airvolume
AHU-G1 2011 25 G- 17.5 1 EA $113,928
D304008013 Central Station Packaged AirHandling Unit, 20,000 CFM, 15 HP, variable airvolume
AHU-G2 2011 25 G- 17.5 1 EA $113,928
D3050 Terminal and Package Units
D305003 Fan Coil Units
D305003002 Fan Coil Air Conditioning Unit, 3/4ton cooling, chilled water, includes filters andcontrols
2011 15 G- 10.5 1 EA $1,077
D305003009 Two Pipe Fan Coil Units - 2 ton 2011 15 G- 10.5 1 EA $1,911
D3060 Controls and Instrumentation
D306008 Building Automation Systems
D306008002 Building Automation System,Average System
- - 2011 15 G- 10.5 107,757 FSF $379,844
D40 Fire Protection
D4010 Sprinklers
83Inventory Summary 07/25/2019
6 - Children's AtriumUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D401001 Wet pipe sprinkler systems, steel, light hazard, black, sch 40 pipe
D401001005 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 5,000 to 10,000 SF
2011 75 G- 52.5 10,000 SF $50,196
D401001006 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 10,000 to 50,000 SF
2011 75 G- 52.5 20,000 SF $73,602
D401001006 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 10,000 to 50,000 SF
2011 75 G- 52.5 7,500 SF $27,601
D401001006 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 10,000 to 50,000 SF
2011 75 G- 52.5 45,000 SF $165,605
D401001006 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 10,000 to 50,000 SF
2011 75 G- 52.5 20,000 SF $73,602
D401016 Sprinkler Water Supply Backflow Preventers
D401016001 Backflow Preventer, up to 2" Pipe 2011 25 G- 17.5 1 EA $964
D4030 Fire Protection Specialties
D403001 Fire Extinguisher Cabinets
D403001001 Fire Extinguisher Cabinets, singleextinguisher, steel door & frame
2011 20 G- 14.0 19 EA $6,724
D50 Electrical
D5010 Electrical Service and Distribution
D501004 Interior Distribution Transformers
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
TLBA & TLSB 2011 30 G- 21.0 2 EA $14,031
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
TR-L3A & TR-L3B 2011 30 G- 21.0 2 EA $14,031
D501004007 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 45 kVA
TL2E 2011 30 G- 21.0 1 EA $9,644
D501004007 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 45 kVA
TL1A 2011 30 G- 21.0 1 EA $9,644
D501004010 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 112.5 kVA
TLS1 2011 30 G- 21.0 1 EA $16,159
D501005 Panels
D501005004 Main Breaker Panel, 120/208/240V, 200 amp, three phase
LSB 2011 35 G- 24.5 1 EA $4,539
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
LBA - 150 AMP 2011 35 G- 24.5 1 EA $2,164
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
L1A 2011 35 G- 24.5 1 EA $2,164
84Inventory Summary 07/25/2019
6 - Children's AtriumUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
L2E 2011 35 G- 24.5 1 EA $2,164
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
250-AMP, 84-breakers 2011 35 G- 24.5 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
L5A & L5RG 2011 35 G- 24.5 2 EA $9,729
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
LS1 2011 35 G- 24.5 1 EA $4,865
D501005013 Main Breaker, 277/480 V, 125 amp 100-AMP 2011 35 G- 24.5 1 EA $2,500
D501005014 Main Breaker, 277/480 V, 200 amp HPR 2011 35 G- 24.5 1 EA $4,406
D501005018 Main Lugs, 277/480 V, 225 amp H5A 2011 35 G- 24.5 1 EA $6,134
D501005018 Main Lugs, 277/480 V, 225 amp H1A 2011 35 G- 24.5 1 EA $6,134
D501005018 Main Lugs, 277/480 V, 225 amp 250-AMP 2011 35 G- 24.5 1 EA $6,134
D501005021 Main Breaker, 277/480 V, 800 amp HBA 2011 35 G- 24.5 1 EA $16,638
D501006 Enclosed Circuit Breakers
D501006006 Safety Switch, 240 V, 400 Amp DS-L3A 2011 25 G- 17.5 1 EA $3,328
D501006012 Safety Switch, 600 V, 200 Amp 2011 25 G- 17.5 1 EA $1,558
D501006012 Safety Switch, 600 V, 200 Amp ICE - Snow Melt 2011 25 G- 17.5 1 EA $1,558
D501007 Motor Control Centers
D501007005 Motor Control Center - Size 6, 400HP, 72" high
2011 25 G- 17.5 1 EA $26,473
D5020 Lighting and Branch Wiring
D502001 Branch Wiring
D502001 Branch Wiring 2011 60 G- 42.0 107,757 FSF $663,966
D502003 Lighting Fixtures, Interior (by lit floor area)
D502003002 Interior Lighting, Fluorescent, T8 orT12, 10 fixtures per 1000 SF
- 2011 20 G 18.0 7,452 SF $52,221
D502003002 Interior Lighting, Fluorescent, T8 orT12, 10 fixtures per 1000 SF
- 2011 20 G 18.0 8,513 SF $59,657
D502004 Lighting Fixtures, Exterior
D502004001 Surface Mounted ExteriorIncandescent, 150W, single spot
Parking garage under entire buildingwith 150-watts high bay fixtures.
2011 20 G 18.0 24 EA $2,352
85Inventory Summary 07/25/2019
6 - Children's AtriumUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D502004001 Surface Mounted ExteriorIncandescent, 150W, single spot
Parking garage under entire buildingwith 150-watts high bay fixtures.
- 2011 20 G 18.0 12 EA $1,176
D502004003 Wall Mounted ExteriorIncandescent Lantern, 60 watt
- 2011 20 G 18.0 35 EA $3,973
D5030 Communications, Security and Alarms
D503011 Access Control System Components (various types)
D503011002 Access control, processor for cardkey access system
2011 20 G 18.0 29 EA $38,437
D503011011 Closed circuit television system(CCTV), surveillance cameras
2011 20 G 18.0 38 EA $26,844
D5090 Other Electrical Services
D509004 Building Lightning Protection System (roof area)
D509004002 Commercial Building LightningProtection System, multi-story (roof area)
- 2011 15 G- 10.5 20,000 SF $43,428
D509006 Variable Frequency Motor Controllers
D509006002 Variable Frequency Drive (VFD), 5HP motor size
AHU-G4 VFD 2011 20 G- 14.0 1 EA $3,687
D509006004 Variable Frequency Drive (VFD),10 HP motor size
AHU-G3 VFD 2011 20 G- 14.0 1 EA $4,265
D509006005 Variable Frequency Drive (VFD),15 HP motor size
AHU-G5 VFD 2011 20 G- 14.0 1 EA $5,668
D509006005 Variable Frequency Drive (VFD),15 HP motor size
AHU-G1 & AHU-G2 VFDs 2011 20 G- 14.0 2 EA $11,336
G20 Site Improvements
G2030 Pedestrian Paving
G203003 Paving and Surfacing
G203003007 Concrete Paving Stone - 2011 50 G 45.0 2,065 SF $27,252
G2040 Site Development
G204001 Fencing and Gates
G204001006 Privacy Fence, Wood - 2011 50 G 45.0 225 SF $1,086
G2050 Landscaping
G205005 Plantings
G205005001 Lawn - 2011 25 G 22.5 1,960 SF $2,819
G205005002 Ground Cover Rubber mat - 2011 25 G 22.5 1,374 SF $11,372
86Inventory Summary 07/25/2019
7 - Samis Education CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
A10 Foundations
A1010 Standard Foundations
A101001 Foundation Assemblies
A101001003 Basement Foundation (foundationassembly, with concrete basement floor slab)
2012 100 G 90.0 16,256 SF $558,354
A101001004 Deep Foundation (foundationassembly, up to 50' pile, with slab)
2012 100 G 90.0 16,256 SF $479,277
B10 Superstructure
B1010 Floor Construction
B101001 Cast in Place (CIP) Concrete, Raised Floor Structural Assembly
B101001001 CIP Concrete Beams and Slab,with columns, slab depth varies
- 2012 100 G 90.0 48,768 SF $1,532,037
B101013 Wood Decking, 2" to 6" thick, various wood species
B101013001 Wood deck, 2" thick, various woodspecies
- 2012 60 G 54.0 2,800 SF $26,728
B1020 Roof Construction
B102004 Cast in Place (CIP) Concrete, Roof Structural Assembly
B102004001 CIP Concrete Beams and Slab,with columns, slab depth varies
- 2012 100 G- 70.0 16,265 SF $510,961
B20 Exterior Enclosure
B2010 Exterior Walls
B201003 Stone Veneer Systems
B201003 Stone Veneer Systems 2012 75 G 67.5 7,256 SF $231,220
B201007 Metal Siding Systems, type varies
B201007 Metal Siding Systems, type varies 2012 35 G 31.5 2,130 SF $22,945
B201007 Metal Siding Systems, type varies Interior metal panels. 2012 35 G 31.5 1,120 SF $12,065
B201010 Stucco Wall Finishes
B201010 Stucco Wall Finishes 2012 50 G 45.0 1,350 SF $18,560
B201018 Exterior Louvers and Screens
B201018002 Metal Louvers 2012 40 G 36.0 76 SF $3,143
B201021 Exterior Soffits
B201021002 Soffit, Aluminum 2012 40 G 36.0 276 SF $3,892
B201025 Exterior Stairs
87Inventory Summary 07/25/2019
7 - Samis Education CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
B201025001 Stairs, CIP Concrete Exterior stairsassembly
2012 100 G 90.0 30 Riser $14,828
B201025005 Stairs, Steel, metal pan withconcrete tread, picket rail, with landing
- 2012 65 G 58.5 9 Riser $50,075
B2020 Exterior Windows
B202013 Curtain Walls
B202013 Curtain Walls 2012 60 G 54.0 9,254 SF $764,620
B2030 Exterior Doors
B203006 Solid Doors
B203006 Solid Doors 2012 30 G 27.0 105 SF $9,907
B203007 Glazed Doors
B203007 Glazed Doors 2012 35 G 31.5 63 SF $5,744
B30 Roofing
B3010 Roof Coverings
B301002 Low Slope Roof Assemblies (roof coverings and flashing, no insulation)
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
- 2012 20 G 18.0 1,422 SF $4,952
B3020 Roof Openings
B302001 Glazed Roof Openings
B302001004 Skylight, fixed, 48" x 48" Glass canopy - 2012 50 G 45.0 1 EA $1,211
C10 Interior Construction
C1010 Interior Wall Partitions
C101006 Interior Glazed Partitions and Storefronts
C101006003 Interior Storefront w/ AluminumFrame with 3/8" Clear Glass
- 2012 30 G 27.0 400 SF $29,272
C101006003 Interior Storefront w/ AluminumFrame with 3/8" Clear Glass
- 2012 30 G 27.0 36 SF $2,634
C101006003 Interior Storefront w/ AluminumFrame with 3/8" Clear Glass
- 2012 30 G 27.0 1,025 SF $75,009
C101006004 Interior Glazing, 3/8" Clear Glass - 2012 30 G 27.0 325 SF $14,206
C101006004 Interior Glazing, 3/8" Clear Glass - 2012 30 G 27.0 415 SF $18,140
C101006004 Interior Glazing, 3/8" Clear Glass - 2012 30 G 27.0 160 SF $6,994
C101006004 Interior Glazing, 3/8" Clear Glass - 2012 30 G- 21.0 60 SF $2,623
88Inventory Summary 07/25/2019
7 - Samis Education CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C101010 Interior Guardrails & Screens
C101010001 Aluminum Balcony Rail Guard rail with brushed stainless steeltrim and mounting hardware.Tempered glass panels.
2012 20 G 18.0 24 LF $3,299
C101010001 Aluminum Balcony Rail Glass guard rail with brushedstainless steel trim and mountinghardware. Tempered glass panels.
2012 20 G 18.0 64 LF $8,798
C101010001 Aluminum Balcony Rail Stainless steel stair handrails. 2012 20 G 18.0 120 LF $16,497
C1020 Interior Doors (doors, frames, casings, finishes, hardware)
C102005 Metal door/Metal frame, flush, hollow core, w/ hinges and locksets
C102005 Metal door/Metal frame, flush, hollowcore, w/ hinges and locksets
- 2012 40 G 36.0 50 SF $4,685
C102006 Wood door/Metal frame, flush or panel face, various core types and face materials, w/ hinges and locksets
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2012 30 G 27.0 575 SF $37,141
C102010 Glazed Interior Doors
C102010 Glazed Interior Doors Wooden door with full vision light andstainless steel hardware.
2012 35 G 31.5 100 SF $9,118
C102010 Glazed Interior Doors - 2012 35 G 31.5 50 SF $4,560
C102011 Sliding & Folding Doors
C102011 Sliding & Folding Doors - 2012 30 G 27.0 32 SF $984
C102011 Sliding & Folding Doors Folding partition walls. - 2012 30 G 27.0 675 SF $20,768
C1030 Fittings
C103001 Compartments, Cubicles & Toilet Partitions
C103001 Compartments, Cubicles & ToiletPartitions
- 2012 20 G 18.0 28 EA $34,128
C103002 Toilet & Bath Accessories
C103002 Toilet & Bath Accessories - 2012 20 G 18.0 8 BthRm
$8,006
C103007 Cabinets and Countertops (assembly)
C103007005 Wood Cabinets, base and wall,with Solid Surface Countertops
Marble countertops. 2012 30 G 27.0 20 LF $16,201
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
Marble countertops. 2012 30 G 27.0 65 LF $35,240
89Inventory Summary 07/25/2019
7 - Samis Education CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C103008 Counters
C103008001 Granite Counter Top Marble. 2012 40 G 36.0 145 LF $34,961
C103008001 Granite Counter Top Wood and plastic laminate coveredcustom counters throughoutauditorium.
- 2012 40 G 36.0 200 LF $48,222
C20 Stairs
C2010 Stair Construction
C201001 Regular Stairs Assemblies
C201001004 Stairs, CIP Concrete with TreadFinishes
2012 100 G 90.0 96 Riser $48,139
C201001004 Stairs, CIP Concrete with TreadFinishes
2012 100 Y+ 55.0 96 Riser $48,139
C201004 Handrails And Balustrades (not part of stairs)
C201004005 Ornamental Railing, steel withmetal posts, 42" high
2012 30 G 27.0 170 LF $14,502
C201004005 Ornamental Railing, steel withmetal posts, 42" high
2012 30 G 27.0 170 LF $14,502
C30 Interior Finishes
C3010 Wall Finishes
C301003 Ceramic Tile Wall Finishes
C301003 Ceramic Tile Wall Finishes - 2012 75 G 67.5 1,120 SF $11,497
C301003 Ceramic Tile Wall Finishes - 2012 75 G 67.5 100 SF $1,026
C301003 Ceramic Tile Wall Finishes - 2012 75 G 67.5 80 SF $821
C301004 Wood Wall Finishes
C301004 Wood Wall Finishes - 2012 20 G 18.0 320 SF $1,801
C301004 Wood Wall Finishes - 2012 20 G 18.0 280 SF $1,575
C301004 Wood Wall Finishes - 2012 20 G 18.0 100 SF $563
C301004 Wood Wall Finishes - 2012 20 G 18.0 175 SF $984
C301004 Wood Wall Finishes - 2012 20 G 18.0 1,500 SF $8,439
C301005 Wall Coverings (paper and textiles)
C301005 Wall Coverings (paper and textiles) - 2012 20 G 18.0 450 SF $1,631
C301007 Acoustical Wall Finishes
90Inventory Summary 07/25/2019
7 - Samis Education CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C301007 Acoustical Wall Finishes - 2012 80 G 72.0 900 SF $9,086
C301007 Acoustical Wall Finishes - 2012 80 G 72.0 300 SF $3,029
C301007 Acoustical Wall Finishes - 2012 80 G 72.0 1,500 SF $15,143
C301009 Stone, Marble and Granite Wall Finishes
C301009 Stone, Marble and Granite WallFinishes
- 2012 75 G 67.5 3,210 SF $236,082
C3020 Floor Finishes
C302001 Carpeting
C302001 Carpeting - 2012 7 G 6.3 10,896 SF $95,560
C302001 Carpeting - 2012 7 G 6.3 18,642 SF $163,494
C302001 Carpeting - 2012 7 Y+ 3.9 5,000 SF $43,851
C302002 Ceramic Tile Flooring
C302002 Ceramic Tile Flooring - 2012 75 G 67.5 500 SF $5,132
C302002 Ceramic Tile Flooring - 2012 75 G 67.5 160 SF $1,643
C302004 Vinyl and Linoleum Floor Finishes
C302004 Vinyl and Linoleum Floor Finishes - 2012 15 G 13.5 2,724 SF $18,628
C302006 Stone, Marble and Granite Flooring
C302006 Stone, Marble and Granite Flooring - 2012 50 G 45.0 2,625 SF $64,180
C302007 Terrazzo Floor Finishes
C302007 Terrazzo Floor Finishes - 2012 75 G 67.5 9,772 SF $485,142
C302011 Entrance Floor Mats
C302011 Entrance Floor Mats - 2012 20 G 18.0 50 SF $5,089
C3030 Ceiling Finishes
C303001 Gypsum Wallboard Ceiling Finishes
C303001 Gypsum Wallboard Ceiling Finishes - 2012 25 G 22.5 5,198 SF $11,067
C303001 Gypsum Wallboard Ceiling Finishes 85% OF AUDITORIUM 2012 25 G 22.5 4,250 SF $9,049
C303003 Acoustical Ceiling Tiles & Panels
C303003001 Suspended Acoustical CeilingSystems
- 2012 60 G 54.0 44,032 SF $341,468
91Inventory Summary 07/25/2019
7 - Samis Education CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C303003001 Suspended Acoustical CeilingSystems
15% OF CEILING 2012 60 G 54.0 750 SF $5,816
C303004 Wood Ceiling
C303004001 Plywood Ceiling, 1/2" Thick - 2012 60 G 54.0 400 SF $4,269
C303004001 Plywood Ceiling, 1/2" Thick - 2012 60 G 54.0 800 SF $8,539
C303004002 Wood Slats, 4" to 6" wide, onsuspended grid system
- 2012 60 G 54.0 1,300 SF $52,112
C303005 Metal Ceilings
C303005002 Metal Panel Ceiling - 2012 40 G 36.0 700 SF $7,896
D20 Plumbing
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures 2012 25 G 22.5 65,063 FSF $421,081
D2020 Domestic Water Distribution
D202001 Domestic Water Distribution Pipes and Fittings
D202001 Domestic Water Distribution Pipes andFittings
2012 50 G 45.0 65,063 FSF $199,990
D202005 Domestic Water Heating Equipment-Commercial
D202005005 Commercial Water Heater, Electric,208 V, 50 gallon tank
45-gallon 2012 15 G 13.5 1 EA $17,336
D2030 Sanitary Waste
D203001 Sanitary Waste Pipes and Fittings
D203001 Sanitary Waste Pipes and Fittings 2012 50 G 45.0 65,063 FSF $144,030
D2040 Rain Water Drainage
D204001 Rain Water Drainage Pipes and Fittings
D204001 Rain Water Drainage Pipes andFittings
2012 50 G 45.0 15,000 FSF $31,302
D30 HVAC
D3040 Distribution Systems
D304001 Air Distribution, Heating and Cooling
D304001002 VAV Terminal -0 to 600 CFM, HotWater Reheat
- - 2012 15 G 13.5 47 EA $56,462
D304001008 VAV Terminal, Fan Powered - 600CFM, Hot Water Reheat
- 2012 15 G 13.5 6 EA $10,034
92Inventory Summary 07/25/2019
7 - Samis Education CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304003 Hot Water Distribution Systems
D304003002 Circulating Pump, cast iron, in line,1/12 HP, 3/4" to 1-1/2" size
2012 15 G 13.5 1 EA $747
D304003030 Circulating Pump, cast iron, bronzeimpeller, 1-1/2 HP, to 40 GPM, 1-1/2" size
- 2012 15 AIP-NF 0.0 2 EA $0
D304007 Exhaust and Ventilation Systems
D304007076 Industrial Exhauster Fan, 4,000CFM, 7-1/2 H.P.
EF-H2 2012 15 G 13.5 1 EA $8,199
D304008 Air Handling Units
D304008009 Central Station Packaged AirHandling Unit, 10,000 CFM, 7.5 HP, variable airvolume
AHU-H2 2012 25 G 22.5 1 EA $61,229
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
AHU-H5 2012 25 G 22.5 1 EA $88,689
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
AHU-H3 2012 25 G 22.5 1 EA $88,689
D304008011 Central Station Packaged AirHandling Unit, 15,000 CFM, 10 HP, variable airvolume
AHU-H4 2012 25 G 22.5 1 EA $88,689
D304008013 Central Station Packaged AirHandling Unit, 20,000 CFM, 15 HP, variable airvolume
AHU-H0 2012 25 G 22.5 1 EA $113,928
D304008013 Central Station Packaged AirHandling Unit, 20,000 CFM, 15 HP, variable airvolume
AHU-H1 2012 25 G 22.5 1 EA $113,928
D3060 Controls and Instrumentation
D306008 Building Automation Systems
D306008001 Building Automation System,Complex System
2012 15 G 13.5 65,063 FSF $275,216
D40 Fire Protection
D4010 Sprinklers
D401001 Wet pipe sprinkler systems, steel, light hazard, black, sch 40 pipe
D401001005 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 5,000 to 10,000 SF
2012 75 G- 52.5 8,500 SF $42,667
D401001005 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 5,000 to 10,000 SF
2012 75 G- 52.5 10,000 SF $50,196
93Inventory Summary 07/25/2019
7 - Samis Education CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D401001005 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 5,000 to 10,000 SF
2012 75 G- 52.5 12,500 SF $62,745
D401001005 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 5,000 to 10,000 SF
2012 75 G- 52.5 12,500 SF $62,745
D401004 Dry pipe sprinkler systems, steel, light hazard
D401004005 Dry pipe sprinkler systems, steel,light hazard, 1 floor, 5,000 to 10,000 SF
Stairs, loading Dock and parkinggarage
2012 75 G- 52.5 10,000 SF $56,823
D401016 Sprinkler Water Supply Backflow Preventers
D401016001 Backflow Preventer, up to 2" Pipe 2012 25 G 22.5 1 EA $964
D4030 Fire Protection Specialties
D403001 Fire Extinguisher Cabinets
D403001001 Fire Extinguisher Cabinets, singleextinguisher, steel door & frame
2012 20 G 18.0 24 EA $8,494
D50 Electrical
D5010 Electrical Service and Distribution
D501003 Main Switchboards
D501003024 Switchboard, fused switch,277/480 V, 800 amp
2012 25 G 22.5 1 EA $16,412
D501004 Interior Distribution Transformers
D501004005 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
TR-3LBA 2012 30 G 27.0 2 EA $14,031
D501004006 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
2012 30 G 27.0 7 EA $32,433
D501004007 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 45 kVA
TR-3IP1 2012 30 G 27.0 2 EA $19,289
D501004010 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 112.5 kVA
TR-3L1A 2012 30 G 27.0 1 EA $16,159
D501005 Panels
D501005005 Main Breaker Panel, 120/208/240V, 400 amp, three phase
3L1A, 2-sections, 84 breakers 2012 35 G 31.5 1 EA $6,399
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
3IP1 - 150-AMP 2012 35 G 31.5 2 EA $4,327
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
3IBP, 100-AMP - 2012 35 G 31.5 1 EA $2,164
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
200-AMP 2012 35 G 31.5 3 EA $14,594
94Inventory Summary 07/25/2019
7 - Samis Education CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
2012 35 G 31.5 2 EA $9,729
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
2012 35 G 31.5 3 EA $14,594
D501005013 Main Breaker, 277/480 V, 125 amp 100-AMP 2012 35 G 31.5 2 EA $5,000
D501005014 Main Breaker, 277/480 V, 200 amp 225-AMP 2012 35 G 31.5 3 EA $13,219
D5020 Lighting and Branch Wiring
D502001 Branch Wiring
D502001 Branch Wiring 2012 60 G 54.0 65,063 FSF $400,898
D502003 Lighting Fixtures, Interior (by lit floor area)
D502003001 Interior Lighting, Fluorescent, T8 orT12, 5 fixtures per 1000 SF
2015 20 G 18.0 5,000 SF $17,907
D502003002 Interior Lighting, Fluorescent, T8 orT12, 10 fixtures per 1000 SF
2012 20 G 18.0 20,000 SF $140,154
D502003004 Interior Lighting, Incandescent,Recessed Mounted, 12 fixtures per 1000 SF
2012 20 G 18.0 45,063 SF $301,809
D5030 Communications, Security and Alarms
D503001 Fire Detection Communications and Alarm System Assemblies (detectors, outlets, boxers, conduit, wiring)
D503001002 Fire Detection Communicationsand Alarm Systems (2 to 4 stories, 20,000 to40,000 SF)
2012 20 G 18.0 65,063 FSF $176,139
D503011 Access Control System Components (various types)
D503011002 Access control, processor for cardkey access system
2012 20 G 18.0 50 EA $66,270
D503011011 Closed circuit television system(CCTV), surveillance cameras
2012 20 G 18.0 21 EA $14,835
D5090 Other Electrical Services
D509006 Variable Frequency Motor Controllers
D509006003 Variable Frequency Drive (VFD),7.5 HP motor size
2012 20 G 18.0 1 EA $3,948
D509006004 Variable Frequency Drive (VFD),10 HP motor size
2012 20 G 18.0 3 EA $12,796
D509006005 Variable Frequency Drive (VFD),15 HP motor size
2012 20 G 18.0 2 EA $11,336
G20 Site Improvements
G2030 Pedestrian Paving
95Inventory Summary 07/25/2019
7 - Samis Education CenterUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
G203003 Paving and Surfacing
G203003007 Concrete Paving Stone - 2012 50 G 45.0 16,265 SF $214,658
G203007 Ramps
G203007002 Concrete Ramp, with 6" concretecurb, railing both sides
- 2012 80 G 72.0 174 SF $46,664
G203008 Railings
G203008004 Pipe Stair Railing, steel, 1 rail, 3'-6"high, posts @ 5' O.C., 1-1/4" to 1-1/2" dia
Exterior stairsassembly
2012 30 G 27.0 32 LF $1,578
G2040 Site Development
G204001 Fencing and Gates
G204001006 Privacy Fence, Wood - 2012 50 G 45.0 1,120 SF $5,400
G204009 Terrace and Perimeter Walls
G204009008 Brick Walls, common brick, 16"thick wall
- 2012 100 G 90.0 2,105 SF $105,217
96Inventory Summary 07/25/2019
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
A10 Foundations
A1010 Standard Foundations
A101001 Foundation Assemblies
A101001003 Basement Foundation (foundationassembly, with concrete basement floor slab)
- 2016 100 G 90.0 17,622 SF $605,274
A101001004 Deep Foundation (foundationassembly, up to 50' pile, with slab)
- 2016 100 G 90.0 17,622 SF $519,551
A20 Basement Construction
A2020 Basement Walls
A202001 Concrete Basement Wall Construction
A202001006 CIP Concrete Basement Wall, 16"thick, reinforced
- 2016 100 G 90.0 480 SF $14,476
B10 Superstructure
B1010 Floor Construction
B101003 Structural Steel, Raised Floor Structural Assembly
B101003005 Composite Steel Beams and SteelDeck, with reinforced light weight concrete slab,depth varies
- 2016 100 G 90.0 176,220 SF $5,868,866
B1020 Roof Construction
B102003 Steel Roof Framing Assemblies, with 1.5" galvanized metal deck
B102003 Steel Roof Framing Assemblies, with1.5" galvanized metal deck
- 2016 100 G 90.0 17,622 SF $215,176
B1030 Exterior Wall Construction
B103002 Exterior Wall Framing Systems, concrete/masonry, 6" - 8" thick
B103002 Exterior Wall Framing Systems,concrete/masonry, 6" - 8" thick
- 2016 100 G 90.0 28,201 SF $930,463
B20 Exterior Enclosure
B2010 Exterior Walls
B201003 Stone Veneer Systems
B201003 Stone Veneer Systems - 2016 75 G 67.5 28,201 SF $898,654
B201007 Metal Siding Systems, type varies
B201007 Metal Siding Systems, type varies - 2016 35 G 31.5 21,883 SF $235,732
B201007 Metal Siding Systems, type varies Architectural metal panels. 2016 35 G 31.5 195 SF $2,101
B201007 Metal Siding Systems, type varies Architectural metal panels. 2016 35 G 31.5 4,080 SF $43,951
97Inventory Summary 07/25/2019
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
B201019 Sun Control Devices
B201019001 Metal Awning w/Wall Supports 2016 20 G 18.0 6,534 SF $804,289
B201021 Exterior Soffits
B201021002 Soffit, Aluminum - 2016 40 G 36.0 840 SF $11,844
B2020 Exterior Windows
B202014 Exterior Glazing, Ribbon Windows
B202014 Exterior Glazing, Ribbon Windows - 2016 75 G 67.5 76,395 SF $3,732,393
B2030 Exterior Doors
B203006 Solid Doors
B203006 Solid Doors - 2016 30 G 27.0 21 SF $1,981
B203007 Glazed Doors
B203007 Glazed Doors - 2016 35 G 31.5 303 SF $27,629
B203008 Revolving Doors
B203008003 Auto Sliding Doors (12'0" X 7'0") - 2016 30 G 27.0 1 EA $34,193
B30 Roofing
B3010 Roof Coverings
B301002 Low Slope Roof Assemblies (roof coverings and flashing, no insulation)
B301002026 Thermoplastic-polyolefin roofing(TPO), unknown thickness
- 2016 20 G- 14.0 17,622 SF $61,372
B3020 Roof Openings
B302002 Roof Hatches
B302002001 Roof hatch, with curb, aluminum orsteel, 1" fiberglass insulation
- 2016 75 G- 52.5 48 SF $8,387
C10 Interior Construction
C1010 Interior Wall Partitions
C101001 Interior Partition Wall System with Gypsum Wallboard Finishes, 8' to 10' FTC height
C101001 Interior Partition Wall System withGypsum Wallboard Finishes, 8' to 10' FTC height
2016 50 G 45.0 191,966 FloorArea
$4,300,979
C101005 Interior Wall Partition, masonry, various materials and thickness
C101005004 Stone, Solid - 2016 75 G 67.5 260 SF $29,328
C101005004 Stone, Solid - 2016 75 G 67.5 450 SF $50,760
C101006 Interior Glazed Partitions and Storefronts
98Inventory Summary 07/25/2019
C103001 Compartments, Cubicles & Toilet Partitions
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C101006002 Interior Glass Curtain Wall, with3/8" Clear Glass
- 2016 30 G 27.0 5,000 SF $334,875
C101006002 Interior Glass Curtain Wall, with3/8" Clear Glass
Structural silicone glazing system. 2016 30 G 27.0 545 SF $36,502
C101007 Interior Windows
C101007 Interior Windows - 2016 50 G 45.0 432 SF $30,109
C101009 Retractable Partitions
C101009 Retractable Partitions - 2016 20 G 18.0 400 SF $27,128
C101010 Interior Guardrails & Screens
C101010001 Aluminum Balcony Rail Glass garden grill with stainless steelhandrail and hardware.
2016 20 G 18.0 18 LF $2,475
C1020 Interior Doors (doors, frames, casings, finishes, hardware)
C102006 Wood door/Metal frame, flush or panel face, various core types and face materials, w/ hinges and locksets
C102006 Wood door/Metal frame, flush or panelface, various core types and face materials, w/hinges and locksets
- 2016 30 G 27.0 3,402 SF $219,743
C102008 Fire Rated Metal door/Metal frame, hollow core, w/ panic devices and closers
C102008 Fire Rated Metal door/Metal frame,hollow core, w/ panic devices and closers
Various face finishes. 2016 40 G 36.0 64 SF $9,589
C102010 Glazed Interior Doors
C102010 Glazed Interior Doors - 2016 35 G 31.5 684 SF $62,370
C102010 Glazed Interior Doors Interior aluminum storefront door withsidelight. Door with a vision glass.
2016 35 G 31.5 1,470 SF $134,042
C102010 Glazed Interior Doors - 2016 35 G 31.5 1,701 SF $155,106
C102010 Glazed Interior Doors Sliding door with the barn doorhardware.
2016 35 G 31.5 84 SF $7,659
C102010 Glazed Interior Doors Glass storefront system. 2016 35 G 31.5 110 SF $10,031
C102010 Glazed Interior Doors Glass door with top and bottomstainless steel stiles.
2016 35 G 31.5 42 SF $3,830
C102010 Glazed Interior Doors 4, 9'-6" x 3‘ aluminum framed doorswith hardware. 1, 3' x 7'.
2016 35 G- 24.5 115 SF $10,486
C102011 Sliding & Folding Doors
C102011 Sliding & Folding Doors Automatic sliding entry door. 2016 30 G 27.0 65 SF $1,999
C1030 Fittings
99Inventory Summary 07/25/2019
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C103001 Compartments, Cubicles & ToiletPartitions
Cubicles 2016 20 G 18.0 12 EA $14,626
C103001 Compartments, Cubicles & ToiletPartitions
Cubicles 2016 20 G 18.0 20 EA $24,377
C103001 Compartments, Cubicles & ToiletPartitions
Cubicles 2016 20 G 18.0 20 EA $24,377
C103001 Compartments, Cubicles & ToiletPartitions
Cubicles 2016 20 G 18.0 32 EA $39,003
C103001 Compartments, Cubicles & ToiletPartitions
Cubicles 2016 20 G 18.0 12 EA $14,626
C103001 Compartments, Cubicles & ToiletPartitions
Cubicles 2016 20 G 18.0 25 EA $30,472
C103001 Compartments, Cubicles & ToiletPartitions
Floor and wall mounted toiletpartitions.
2016 20 G 18.0 5 EA $6,094
C103001 Compartments, Cubicles & ToiletPartitions
- 2016 20 G 18.0 15 EA $18,283
C103007 Cabinets and Countertops (assembly)
C103007001 Wood Cabinets, base and wall,with Plastic Laminate Countertops
- 2016 30 G 27.0 288 LF $195,467
C103007005 Wood Cabinets, base and wall,with Solid Surface Countertops
- 2016 30 G 27.0 216 LF $174,970
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
2016 30 G 27.0 108 LF $58,552
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
Change to rest room vanity, solidsurface.
- 2016 30 G 27.0 16 LF $8,674
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
- 2016 30 G 27.0 29 LF $15,723
C103007006 Wood Cabinets, base only, withSolid Surface Countertops
Custom 2016 30 G 27.0 16 LF $8,674
C103008 Counters
C103008002 Solid Surface Molded Counter Top - 2016 40 G 36.0 63 LF $12,436
C20 Stairs
C2010 Stair Construction
C201001 Regular Stairs Assemblies
C201001008 Stairs, Steel, metal pan withconcrete tread, picket rail, with landing
- 2016 65 G 58.5 514 Riser $2,859,861
C201004 Handrails And Balustrades (not part of stairs)
100Inventory Summary 07/25/2019
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C201004008 Ornamental Railing, bronze orstainless steel with metal posts, and wood, glassor plexiglass panels, 42" high
- 2016 30 G 27.0 136 LF $82,936
C30 Interior Finishes
C3010 Wall Finishes
C301003 Ceramic Tile Wall Finishes
C301003 Ceramic Tile Wall Finishes Marble wall panels at elevator interiorelevation.
2016 75 G 67.5 285 SF $2,926
C301003 Ceramic Tile Wall Finishes - 2016 75 G 67.5 7,920 SF $81,298
C301003 Ceramic Tile Wall Finishes Small circular tiles. 2016 75 G 67.5 140 SF $1,437
C301004 Wood Wall Finishes
C301004 Wood Wall Finishes - 2016 20 G 18.0 12,015 SF $67,595
C301004 Wood Wall Finishes - 2016 20 G 18.0 60 SF $337
C3020 Floor Finishes
C302001 Carpeting
C302001 Carpeting Entry vestibule walk off carpet. 2016 7 G 6.3 96 SF $842
C302001 Carpeting - 2016 7 G 6.3 109,035 SF $956,259
C302001 Carpeting Entry vestibule walk off carpet. 2016 7 G 6.3 180 SF $1,579
C302001 Carpeting Entry vestibule walk off carpet. 2016 7 G 6.3 160 SF $1,403
C302001 Carpeting - 2016 7 Y+ 3.9 3,270 SF $28,678
C302002 Ceramic Tile Flooring
C302002 Ceramic Tile Flooring - 2016 75 G 67.5 2,070 SF $21,249
C302002 Ceramic Tile Flooring - 2016 75 G 67.5 512 SF $5,255
C302004 Vinyl and Linoleum Floor Finishes
C302004 Vinyl and Linoleum Floor Finishes - 2016 15 G 13.5 2,700 SF $18,464
C302006 Stone, Marble and Granite Flooring
C302006 Stone, Marble and Granite Flooring - 2016 50 G 45.0 12,600 SF $308,062
C302006 Stone, Marble and Granite Flooring 4' x 2' granite tile. 2016 50 G 45.0 3,300 SF $80,683
C3030 Ceiling Finishes
C303001 Gypsum Wallboard Ceiling Finishes
101Inventory Summary 07/25/2019
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
C303001 Gypsum Wallboard Ceiling Finishes - 2016 25 G 22.5 6,300 SF $13,413
C303003 Acoustical Ceiling Tiles & Panels
C303003001 Suspended Acoustical CeilingSystems
Large format ceiling tile. Aluminumtrim around perimeter.
2016 60 G 54.0 3,300 SF $25,592
C303003001 Suspended Acoustical CeilingSystems
- 2016 60 G 54.0 128,250 SF $994,579
C303003001 Suspended Acoustical CeilingSystems
- 2016 60 G 54.0 480 SF $3,722
C303004 Wood Ceiling
C303004002 Wood Slats, 4" to 6" wide, onsuspended grid system
Grooved and perforated ceiling plankswith wood perimeter trim.
2016 60 G 54.0 360 SF $14,431
C303005 Metal Ceilings
C303005002 Metal Panel Ceiling - 2016 40 G 36.0 380 SF $4,286
C303005002 Metal Panel Ceiling - 2016 40 G 36.0 165 SF $1,861
D10 Conveying
D1010 Elevators and Lifts
D101003 Freight Elevators
D101003009 Traction geared elevators, freight,4000 lb, 5 floors, 50 FPM class'B'
CAR 04 - 2016 25 G 22.5 1 EA $241,251
D101003009 Traction geared elevators, freight,4000 lb, 5 floors, 50 FPM class'B'
CAR 01, 02 & 03 - 3500 Lbs. - 2016 25 G 22.5 3 EA $723,753
D20 Plumbing
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures
D2010 Plumbing Fixtures 2016 25 G 22.5 191,966 FSF $1,242,385
D2020 Domestic Water Distribution
D202001 Domestic Water Distribution Pipes and Fittings
D202001 Domestic Water Distribution Pipes andFittings
2016 50 G 45.0 191,966 FSF $590,065
D202003 Domestic Water Equipment
D202003008 Water Booster Pump, 10HP Pumps are at 5-HP. 2016 20 G 18.0 2 EA $26,649
D202005 Domestic Water Heating Equipment-Commercial
D202005003 Commercial Water Heater, Electric,208 V, 30 gallon tank
19-Gallon 2016 15 G 13.5 6 EA $81,072
102Inventory Summary 07/25/2019
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D202006 Water Heater Storage Tanks
D202006004 Water Heater Storage Tank,galvanized steel, 135 gallon
Domestic cold water storage tank. 132-Gallon
2016 20 G 18.0 1 EA $5,864
D2030 Sanitary Waste
D203001 Sanitary Waste Pipes and Fittings
D203001 Sanitary Waste Pipes and Fittings 2016 50 G 45.0 191,966 FSF $424,956
D2040 Rain Water Drainage
D204001 Rain Water Drainage Pipes and Fittings
D204001 Rain Water Drainage Pipes andFittings
2016 50 G 45.0 191,966 FSF $400,595
D30 HVAC
D3020 Heat Generating Systems
D302005 Heat Exchangers
D302005001 Heat Exchanger, steam to water,shell and tube type
2016 30 G 27.0 250 GPM $59,337
D302005001 Heat Exchanger, steam to water,shell and tube type
2016 30 G 27.0 250 GPM $59,337
D302008 Expansion Tanks, Hot Water Storage Tanks
D302008001 Expansion Tank, painted steel, 15to 400 gallon capacity
2016 30 G 27.0 350 GAL $10,744
D302011 Steam Auxiliary Equipment
D302011004 Pressure Reducing Valve, steam,2", 125 lb. flanges, iron body, pilot operated,
2016 15 G 13.5 1 EA $4,512
D302011006 Pressure Reducing Valve, steam,4", 125 lb. flanges, iron body, pilot operated
2016 15 G 13.5 1 EA $8,361
D302011019 Steam Pump Package, condensatereturn w/ 2 pumps, 1 HP each, 25 GPM, 15 galstorage tank, w/ control panel
2016 20 G 18.0 1 EA $15,989
D3040 Distribution Systems
D304001 Air Distribution, Heating and Cooling
D304001003 VAV Terminal - 610 to 1000 CFM,Hot Water Reheat
- - 2016 15 G 13.5 103 EA $129,400
D304001009 VAV Terminal, Fan Powered - 1250CFM, Hot Water Reheat
- - 2016 15 G 13.5 180 EA $438,820
D304003 Hot Water Distribution Systems
103Inventory Summary 07/25/2019
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D304003027 Circulating Pump, cast iron, highhead, bronze impeller, 3/4 HP, 1-1/2" size
2016 15 G- 10.5 1 EA $2,152
D304006 Chilled Water Distribution Systems
D304006040 Circulating Pump, cast iron, bronzeimpeller, 25 HP, to 1550 GPM, 5" size
HWP-2 2016 15 G 13.5 1 EA $12,211
D304006040 Circulating Pump, cast iron, bronzeimpeller, 25 HP, to 1550 GPM, 5" size
HWP-1 2016 15 G 13.5 1 EA $12,211
D304006125 Pump, centrifugal, end suction,single stage, 750 GPM, 30 H.P., 4" discharge
Chilled water pump 2016 15 G- 10.5 1 EA $10,913
D304006125 Pump, centrifugal, end suction,single stage, 750 GPM, 30 H.P., 4" discharge
Chilled water pump 2016 15 G- 10.5 1 EA $10,913
D304007 Exhaust and Ventilation Systems
D304007051 Roof Exhaust Fan, 2 HP, 5,000CFM
- 2016 15 G 13.5 4 EA $73,574
D304007052 Roof Exhaust Fan, 3 HP, 8,000CFM
- 2016 15 G 13.5 1 EA $22,807
D304007056 Centrifugal Fan, airfoil, motor anddrive complete, 8,000 CFM, 7-1/2 H.P.
2016 15 G 13.5 1 EA $6,824
D304008 Air Handling Units
D304008006 Central Station Packaged AirHandling Unit, 5,000 CFM, 5 HP, constant volume
Supply fan SF-3. Supply fan isequipped with chilled water typecooling coil.
2016 25 G 22.5 1 EA $26,367
D304008017 Central Station Packaged AirHandling Unit, 85,000 CFM, 60 HP, variable airvolume
AHU-1 is fan wall type and has 12 @8HP supply fans and 12 @ 4.5 HPreturn fans. Total of 70,000 CFM.80ft.X25ft box. (2) 25ftX6ft coolingcoils and (2) 25ftX6ft heating coils.
2016 30 G 27.0 1 EA $685,683
D304008017 Central Station Packaged AirHandling Unit, 85,000 CFM, 60 HP, variable airvolume
AHU-2 is fan wall type and has 12 @8HP supply fans and 12 @ 4.5 HPreturn fans. Total of 70,000 CFM.80ft.X25ft box. (2) 25ftX6ft coolingcoils and (2) 25ftX6ft heating coils.
2016 30 G 27.0 1 EA $685,683
D3050 Terminal and Package Units
D305002 Unit Heaters
D305002002 Hydronic Unit Heater, cabinet, hotwater, horizontal, blower type, 60 MBH
2016 20 G 18.0 11 EA $31,323
D305003 Fan Coil Units
D305003009 Two Pipe Fan Coil Units - 2 ton - 2016 15 G 13.5 9 EA $17,195
104Inventory Summary 07/25/2019
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D305003011 Two Pipe Fan Coil Units - 3 ton 2016 15 G 13.5 1 EA $2,855
D305003011 Two Pipe Fan Coil Units - 3 ton 2016 15 G 13.5 1 EA $2,855
D305003011 Two Pipe Fan Coil Units - 3 ton 2016 15 G 13.5 1 EA $2,855
D305006 Package Units
D305006088 Computer Room A/C Unit, ChilledWater, 15-20 ton, for connection to existing chillersystem
2016 20 G 18.0 2 EA $62,710
D3060 Controls and Instrumentation
D306008 Building Automation Systems
D306008001 Building Automation System,Complex System
2016 15 G 13.5 191,966 FSF $812,016
D40 Fire Protection
D4010 Sprinklers
D401001 Wet pipe sprinkler systems, steel, light hazard, black, sch 40 pipe
D401001006 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 10,000 to 50,000 SF
2016 75 G 67.5 20,000 SF $73,602
D401001006 Wet pipe sprinkler systems, steel,light hazard, 1 floor, 10,000 to 50,000 SF
2016 75 G 67.5 20,000 SF $73,602
D401001009 Wet pipe sprinkler systems, steel,light hazard, each additional floor, 500 to 1,000SF
2016 75 G 67.5 160,000 SF $688,080
D401004 Dry pipe sprinkler systems, steel, light hazard
D401004004 Dry pipe sprinkler systems, steel,light hazard, 1 floor, 2,000 to 5,000 SF
2016 75 G 67.5 5,000 SF $44,556
D401016 Sprinkler Water Supply Backflow Preventers
D401016001 Backflow Preventer, up to 2" Pipe 2016 25 G 22.5 1 EA $964
D401016002 Backflow Preventer, 3 - 4" Pipe 2016 25 G 22.5 1 EA $4,255
D401016003 Backflow Preventer, 6" Pipe 2016 25 G 22.5 1 EA $6,331
D401017 Sprinkler System Fire Pumps
D401017012 Fire Pump, electric, 1250 GPM, 75HP, including controller, fittings and relief valve
2016 25 G 22.5 1 EA $35,180
D4020 Standpipe Systems and Equipment
D402008 Fire Pump Equipment
105Inventory Summary 07/25/2019
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D402008001 Fire Pump, electric, 1" jockey pumpsystem, 3 HP
2016 25 G 22.5 1 EA $5,393
D4030 Fire Protection Specialties
D403001 Fire Extinguisher Cabinets
D403001001 Fire Extinguisher Cabinets, singleextinguisher, steel door & frame
2016 20 G 18.0 73 EA $25,835
D50 Electrical
D5010 Electrical Service and Distribution
D501003 Main Switchboards
D501003007 Switchboard - 600 V, 400 Amp 2016 25 G 22.5 1 EA $7,348
D501003012 Switchboard - 600 V, 2000 Amp 2016 25 G 22.5 1 EA $22,673
D501004 Interior Distribution Transformers
D501004003 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 15 kVA
9-KVA 2016 30 G 27.0 2 EA $6,662
D501004003 Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 15 kVA
TPASL-1 2016 30 G 27.0 4 EA $13,323
D501004006 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
2016 30 G 27.0 1 EA $4,633
D501004006 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 30 kVA
2016 30 G 27.0 2 EA $9,267
D501004008 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 75 kVA
TNOC 2016 30 G 27.0 1 EA $12,951
D501004008 Dry-Type Transformer, 480 VPrimary 120/208 V Secondary, 75 kVA
2016 30 G 27.0 9 EA $116,558
D501005 Panels
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
100-AMP 2016 35 G 31.5 1 EA $2,164
D501005002 Main Breaker Panel, 120/208/240V, 125 amp, three phase
PASL1 - 50 AMP 2016 35 G 31.5 1 EA $2,164
D501005007 Main Lug Load Center,120/208/240 V, 125 amp, single phase
PANL1 - 50 AMP 2016 35 G 31.5 1 EA $1,755
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP, 60 breakers 2016 35 G 31.5 10 EA $21,636
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 2016 35 G 31.5 2 EA $4,327
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
30-AMP 2016 35 G 31.5 1 EA $2,164
106Inventory Summary 07/25/2019
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP 2016 35 G 31.5 2 EA $4,327
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
BAEL1 2016 35 G 31.5 1 EA $2,164
D501005008 Main Lug Load Center,120/208/240 V, 125 amp, three phase
100-AMP OSNOC 2016 35 G 31.5 1 EA $2,164
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
DPNOC 2016 35 G 31.5 1 EA $4,865
D501005010 Main Lug Load Center,120/208/240 V, 225 amp, three phase
60 Breakers 2016 35 G 31.5 9 EA $43,781
D501005013 Main Breaker, 277/480 V, 125 amp 100-AMP 2016 35 G 31.5 13 EA $32,499
D501005013 Main Breaker, 277/480 V, 125 amp 2016 35 G 31.5 1 EA $2,500
D501005013 Main Breaker, 277/480 V, 125 amp 100-AMP 2016 35 G 31.5 2 EA $5,000
D501005013 Main Breaker, 277/480 V, 125 amp PASH1 - 100-AMP 2016 35 G 31.5 2 EA $5,000
D501005013 Main Breaker, 277/480 V, 125 amp 100 AMP - BAOSH1 2016 35 G 31.5 1 EA $2,500
D501005014 Main Breaker, 277/480 V, 200 amp 225-AMP 2016 35 G 31.5 1 EA $4,406
D501005015 Main Breaker, 277/480 V, 400 amp DPEL 2016 35 G 31.5 1 EA $6,750
D501005015 Main Breaker, 277/480 V, 400 amp BANH1 2016 35 G 31.5 1 EA $6,750
D501006 Enclosed Circuit Breakers
D501006012 Safety Switch, 600 V, 200 Amp 2016 25 G 22.5 1 EA $1,558
D501006012 Safety Switch, 600 V, 200 Amp 2016 25 G 22.5 2 EA $3,116
D501006012 Safety Switch, 600 V, 200 Amp 2016 25 G 22.5 2 EA $3,116
D501006012 Safety Switch, 600 V, 200 Amp 2019 25 G 22.5 10 EA $15,581
D501006013 Safety Switch, 600 V, 400 Amp 2016 25 G 22.5 1 EA $3,010
D501006013 Safety Switch, 600 V, 400 Amp 2016 25 G 22.5 1 EA $3,010
D501006025 Automatic Transfer Switch, 3 pole,480 volt, 30 amp
40-AMP 2016 25 G 22.5 1 EA $4,377
D501006027 Automatic Transfer Switch, 3 pole,480 volt, 100 amp
2016 25 G 22.5 1 EA $4,543
D501006027 Automatic Transfer Switch, 3 pole,480 volt, 100 amp
2016 25 G 22.5 1 EA $4,543
107Inventory Summary 07/25/2019
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D501006031 Automatic Transfer Switch, 3 pole,480 volt, 400 amp
2016 25 G 22.5 1 EA $15,534
D501006031 Automatic Transfer Switch, 3 pole,480 volt, 400 amp
2016 25 G 22.5 1 EA $15,534
D5020 Lighting and Branch Wiring
D502001 Branch Wiring
D502001 Branch Wiring 2016 60 G 54.0 191,966 FSF $1,182,836
D502003 Lighting Fixtures, Interior (by lit floor area)
D502003001 Interior Lighting, Fluorescent, T8 orT12, 5 fixtures per 1000 SF
Suspended fluorescent strip lights. - 2016 20 G 18.0 14,000 SF $50,140
D502003009 Interior Lighting, LED Pendent Lighting 2016 20 G 18.0 3,000 SF $25,295
D502003009 Interior Lighting, LED - 2016 20 G 18.0 175,000 SF $1,475,565
D502004 Lighting Fixtures, Exterior
D502004001 Surface Mounted ExteriorIncandescent, 150W, single spot
Ground uplight - 2016 20 G 18.0 37 EA $3,627
D502004001 Surface Mounted ExteriorIncandescent, 150W, single spot
Bollard type - 2016 20 G 18.0 25 EA $2,451
D502004001 Surface Mounted ExteriorIncandescent, 150W, single spot
- 2016 20 G 18.0 12 EA $1,176
D502004003 Wall Mounted ExteriorIncandescent Lantern, 60 watt
LED - 2016 20 G 18.0 2 EA $227
D502004003 Wall Mounted ExteriorIncandescent Lantern, 60 watt
Soffit recessed. - 2016 20 G- 14.0 12 EA $1,362
D5030 Communications, Security and Alarms
D503001 Fire Detection Communications and Alarm System Assemblies (detectors, outlets, boxers, conduit, wiring)
D503001003 Fire Detection Communicationsand Alarm Systems (5 to 10 stories, 50,000 to100,000 SF)
2016 20 G 18.0 191,966 FSF $246,311
D503011 Access Control System Components (various types)
D503011002 Access control, processor for cardkey access system
2016 20 G 18.0 69 EA $91,453
D503011011 Closed circuit television system(CCTV), surveillance cameras
2016 20 G 18.0 54 EA $38,146
D5090 Other Electrical Services
D509002 Emergency Lighting and Power
108Inventory Summary 07/25/2019
8 - College of MedicineUHAT
Inventory Summary
UOMQTYRSLDCRESLYear InstalledSectionDescriptionClassification CRV
D509002019 Generator - Diesel, 500 kW, inclbattery, charger, muffler, & day tank
450-KW - 2016 30 G 27.0 1 EA $176,997
D509004 Building Lightning Protection System (roof area)
D509004002 Commercial Building LightningProtection System, multi-story (roof area)
- 2016 15 G 13.5 10,000 SF $21,714
D509006 Variable Frequency Motor Controllers
D509006002 Variable Frequency Drive (VFD), 5HP motor size
4.5 HP return fans for AHU-1 2016 20 G 18.0 12 EA $44,246
D509006002 Variable Frequency Drive (VFD), 5HP motor size
4.5 HP return fans for AHU-2 2016 20 G 18.0 12 EA $44,246
D509006002 Variable Frequency Drive (VFD), 5HP motor size
2016 20 G 18.0 2 EA $7,374
D509006002 Variable Frequency Drive (VFD), 5HP motor size
2016 20 G 18.0 1 EA $3,687
D509006003 Variable Frequency Drive (VFD),7.5 HP motor size
VFDs are for AHU-1 fans. 2016 20 G 18.0 12 EA $47,376
D509006003 Variable Frequency Drive (VFD),7.5 HP motor size
SF-3 VFD 2016 20 G 18.0 1 EA $3,948
D509006003 Variable Frequency Drive (VFD),7.5 HP motor size
VFDs are for AHU-2 fans. 2016 20 G 18.0 12 EA $47,376
D509007006 Variable Frequency Drive (VFD),25 HP motor size
2016 20 G- 14.0 2 EA $18,612
D509007007 Variable Frequency Drive (VFD),30 HP motor size
2016 20 G 18.0 2 EA $22,560
G20 Site Improvements
G2030 Pedestrian Paving
G203003 Paving and Surfacing
G203003008 Concrete Patio Blocks 2016 50 G 45.0 4,488 SF $135,105
109Inventory Summary 07/25/2019
Appendix E
Work Item Summary
Appendix E - Work Item Summary
Asset Work Item # Work Item NameBudget
CategoryBudget Account
Current Cost
with Burden
1 Garrison Tower B301002001-102237 Replace BUR membrane. Sustainment Deficiency Repairs/Replacements $24,774.39
1 Garrison Tower B301002002-102238 Replace BUR membrane. Sustainment Deficiency Repairs/Replacements $8,258.13
1 Garrison Tower B301002002-102239 Replace BUR membrane. Sustainment Deficiency Repairs/Replacements $9,437.86
1 Garrison Tower B301002026-102018 Replace BUR membrane. Sustainment Deficiency Repairs/Replacements $14,156.79
1 Garrison Tower B301002026-102240 Replace TPO membrane. Sustainment Deficiency Repairs/Replacements $6,830.53
1 Garrison Tower B301009003-102019 Replace gutter. Sustainment Deficiency Repairs/Replacements $831.90
1 Garrison Tower C303003001-102279 Replace ceiling tile Sustainment Deficiency Repairs/Replacements $219.96
1 Garrison Tower C303003001-102370 Replace ceiling tile and fix water intrusion issues. Sustainment Deficiency Repairs/Replacements $1,210.49
1 Garrison Tower C303003001-102371Replace ceiling tile and identify cause of water
damage. Sustainment Deficiency Repairs/Replacements $146.64
1 Garrison Tower D101002023-102004 Replace cab, controls, & equipment for elevator G4. Sustainment Deficiency Repairs/Replacements $664,110.00
1 Garrison Tower D101002023-102005 Replace cab, controls, & equipment for elevator G3. Sustainment Deficiency Repairs/Replacements $664,110.00
1 Garrison Tower D101002023-102006Replace elevator cab, controls, & equipment Elevator
#7.Sustainment Deficiency Repairs/Replacements $627,450.00
1 Garrison Tower D101003002-102031Replace hydraulic equipment and controls for freight
elevator.Sustainment Deficiency Repairs/Replacements $187,530.00
1 Garrison Tower D101004009-102082 Demolish and dispose of elevator equipment. Sustainment Deficiency Repairs/Replacements $16,920.00
1 Garrison Tower D203001-102030Investigation required for Sanitary Waste piping due
to flood through clean-out.Sustainment Deficiency Repairs/Replacements $70,500.00
1 Garrison Tower D203004007-102022 Replace Sump pumps. Sustainment Deficiency Repairs/Replacements $5,922.00
1 Garrison Tower D209005009-102085Demolish and dispose of exisitng abandoned air
compressor and tank.Sustainment Deficiency Repairs/Replacements $7,050.00
1 Garrison Tower D302001015-102086 Demolish and dispose of existing incinerator. Sustainment Deficiency Repairs/Replacements $3,525.00
1 Garrison Tower D302005003-102087Demolish and dispose of existing abandoned heat
exchanger.Sustainment Deficiency Repairs/Replacements $2,115.00
1 Garrison Tower D302008002-102061 Demolish and dispose expansion tank. Sustainment Deficiency Repairs/Replacements $4,935.00
1 Garrison Tower D302008002-102088Demolish and dispose of existing abandoned
expansion tank.Sustainment Deficiency Repairs/Replacements $3,525.00
1 Garrison Tower D302011004-102060 Replace 2" steam pressure reducing valve station Sustainment Deficiency Repairs/Replacements $7,332.00
1 Garrison Tower D302011006-102059 Replace 4" steam pressure reducing station Sustainment Deficiency Repairs/Replacements $9,870.00
1 Garrison Tower D304003004-102089 Demolish and dispose of existing abandoned pump Sustainment Deficiency Repairs/Replacements $1,692.00
1 Garrison Tower D304007034-102007 Replace roof mounted exhaust fan. Sustainment Deficiency Repairs/Replacements $3,102.00
1 Garrison Tower D304007040-102090 Demolish and dispose of existing/abandoned fan Sustainment Deficiency Repairs/Replacements $5,358.00
1 Garrison Tower D304007076-102091 Demolish and dispose of existing/abandoned fans. Sustainment Deficiency Repairs/Replacements $8,460.00
1 Garrison Tower D304008007-102020 Replace central station AHU-B-G-1. Sustainment Deficiency Repairs/Replacements $61,546.50
1 Garrison Tower D304008007-102021 Replace central station AHU B-G-2. Sustainment Deficiency Repairs/Replacements $61,546.50
1 Garrison Tower D304008014-102092 Demoilsh and dispose of existing/abandoned AHU. Sustainment Deficiency Repairs/Replacements $35,250.00
1 Garrison Tower D305001004-102093 Demolish and dispose of existing/abandoned fan. Sustainment Deficiency Repairs/Replacements $9,165.00
1 Garrison Tower D306003001-102094Demolish and dispose of existing/abandoned
pneumatic control systemSustainment Deficiency Repairs/Replacements $19,740.00
1 Garrison Tower D501006012-102095Demolish and dispose of existing/abandoned 600 amp
disconnect switch.Sustainment Deficiency Repairs/Replacements $2,115.00
1 Garrison Tower D501006031-102084 Demolish and dispose of ATS. Sustainment Deficiency Repairs/Replacements $3,525.00
1 Garrison Tower G306004011-102083 Demolish and dispose of the storage tanks. Sustainment Deficiency Repairs/Replacements $70,500.00
2 Nicholsen Tower B301001004-102229 Clean and repaint metal panels. Sustainment Deficiency Repairs/Replacements $1,057.50
2 Nicholsen Tower B301002001-102231 Repair BUR membrane. Sustainment Deficiency Repairs/Replacements $62,300.85
2 Nicholsen Tower B301002026-102230Clean roof membrane and remove vegetation and
debris.Sustainment Deficiency Repairs/Replacements $1,964.84
2 Nicholsen Tower C302001-102278 Replace carpet. Sustainment Deficiency Repairs/Replacements $1,762.50
2 Nicholsen Tower C302001-102326 Repair water leak and damaged ceiling Sustainment Deficiency Repairs/Replacements $2,008.55
2 Nicholsen Tower C303003001-102325 Repair water leak and damaged ceiling. Sustainment Deficiency Repairs/Replacements $1,100.51
2 Nicholsen Tower C303003001-102384 Replace broken and stained ceiling tile Sustainment Deficiency Repairs/Replacements $366.60
2 Nicholsen Tower C303003002-102385 Replace adhered ceiling tile Sustainment Deficiency Repairs/Replacements $1,410.00
2 Nicholsen Tower D101002003-102100Demolish and dispose existing/abandoned elevator
equipmentSustainment Deficiency Repairs/Replacements $14,100.00
2 Nicholsen Tower D109001002-102101Demolish and dispose existing/abandoned pneumatic
tube systemSustainment Deficiency Repairs/Replacements $14,100.00
2 Nicholsen Tower D209005004-102102Demolish and dispose existing/abandoned air
compressor and tankSustainment Deficiency Repairs/Replacements $1,692.00
2 Nicholsen Tower D302005001-102043 Replace steam to water tube type heat exchanger. Sustainment Deficiency Repairs/Replacements $29,046.00
2 Nicholsen Tower D302005001-102044 Replace steam to water tube type heat exchanger. Sustainment Deficiency Repairs/Replacements $29,046.00
2 Nicholsen Tower D302005001-102103Demolish and dispose existing/abandoned heat
exchanger.Sustainment Deficiency Repairs/Replacements $3,525.00
Appendix E - Work Item Summary
Asset Work Item # Work Item NameBudget
CategoryBudget Account
Current Cost
with Burden
2 Nicholsen Tower D302008001-102104Demolish and dispose of existing/abandoned
expansion tankSustainment Deficiency Repairs/Replacements $3,525.00
2 Nicholsen Tower D302011004-102074 Replace 2" steam pressure reducing valve Sustainment Deficiency Repairs/Replacements $5,217.00
2 Nicholsen Tower D302011006-102075 Replace 4" steam pressure reducing valve Sustainment Deficiency Repairs/Replacements $8,178.00
2 Nicholsen Tower D304001002-102105 Demolish and dispose existing/abandoned VAV boxes Sustainment Deficiency Repairs/Replacements $16,920.00
2 Nicholsen Tower D304001009-102106Demolish and dispose existing/abandoned fan
powered VAV boxesSustainment Deficiency Repairs/Replacements $42,300.00
2 Nicholsen Tower D304007035-102107 Demolish and disposs of existing/abandoned fan Sustainment Deficiency Repairs/Replacements $1,410.00
2 Nicholsen Tower D304007054-102108 Demolish and dispose of existing/abandoned fan Sustainment Deficiency Repairs/Replacements $4,230.00
2 Nicholsen Tower D304008007-102109 Demolish and dispose of existing/abandoned AHU Sustainment Deficiency Repairs/Replacements $8,460.00
2 Nicholsen Tower D304008011-102110 Demolish and dispose of existing/abandoned AHUs Sustainment Deficiency Repairs/Replacements $42,300.00
2 Nicholsen Tower D305002002-102117 Demolish and dispose of existing unit heater Sustainment Deficiency Repairs/Replacements $3,525.00
2 Nicholsen Tower D306003001-102118Demolish and dispose of existing pneumatic control
systemSustainment Deficiency Repairs/Replacements $25,380.00
2 Nicholsen Tower D401017013-102041 Replace 1600-amp main elec. panelboard. Sustainment Deficiency Repairs/Replacements $21,399.32
2 Nicholsen Tower D501003010-102042 Replace 1200-amp main service panel. Sustainment Deficiency Repairs/Replacements $13,643.50
2 Nicholsen Tower D501003012-102040 Replace 2000-amp main switchboard. Sustainment Deficiency Repairs/Replacements $22,672.59
2 Nicholsen Tower D501004005-102116Demolish and dispose of existing 75-kva transformer
aftre renovation workSustainment Deficiency Repairs/Replacements $6,345.00
2 Nicholsen Tower D501004011-102038 Replace 150-kva transformer. Sustainment Deficiency Repairs/Replacements $19,422.75
2 Nicholsen Tower D501005005-102036 Replace 400-amp electric panelboard. Sustainment Deficiency Repairs/Replacements $5,957.25
2 Nicholsen Tower D501005010-102115 Demolish and dispose of 225-amp elec. panel Sustainment Deficiency Repairs/Replacements $3,525.00
2 Nicholsen Tower D501005012-102037 Replace 600-amp electric Panelboard. Sustainment Deficiency Repairs/Replacements $9,024.00
2 Nicholsen Tower D501005014-102114 Demolish and dispose of 200-amp breaker Sustainment Deficiency Repairs/Replacements $3,525.00
2 Nicholsen Tower D501005015-102039 Replace six 400-amp Elec. panel board Sustainment Deficiency Repairs/Replacements $40,498.02
2 Nicholsen Tower D501005016-102113Demolish and dispose of 600-amp main breaker after
renovation workSustainment Deficiency Repairs/Replacements $7,050.00
2 Nicholsen Tower D501006031-102112Demolish and dispose of existing ATS devices after
renovation work.Sustainment Deficiency Repairs/Replacements $16,920.00
2 Nicholsen Tower D509006005-102111 Demolish and dispose of existing/abandoned VFDs Sustainment Deficiency Repairs/Replacements $6,345.00
3 Oklahoma Transplant Center B202012-101989Replace north elevation perimeter sealant at
storefront windows.Sustainment Deficiency Repairs/Replacements $338.40
3 Oklahoma Transplant Center B203006-101990 Replace hollow metal door, west elevation Sustainment Deficiency Repairs/Replacements $705.00
3 Oklahoma Transplant Center B301002001-101985 Replace parapet membrane Sustainment Deficiency Repairs/Replacements $2,115.00
3 Oklahoma Transplant Center D304007030-102133 Repair exhaust fan Sustainment Deficiency Repairs/Replacements $601.37
3 Oklahoma Transplant Center D304007030-102134 Repair exhaust fan Sustainment Deficiency Repairs/Replacements $601.37
4 OU Physicians Building C102006-102029 Damage to doorstop wall protection. Sustainment Deficiency Repairs/Replacements $126.90
4 OU Physicians Building C103007005-102028 Repair pipe leak at hand sink at base cabinet. Sustainment Deficiency Repairs/Replacements $239.70
4 OU Physicians Building C302001-102024 Carpet stains and wear. Sustainment Deficiency Repairs/Replacements $705.00
4 OU Physicians Building C303003001-102025 Replace ceiling tile Sustainment Deficiency Repairs/Replacements $256.62
5 OU Children's Physicians A101001003-102002 Repair wall leak Sustainment Deficiency Repairs/Replacements $1,410.00
5 OU Children's Physicians B102003-102001 Repair peeling paint and corrosion on steel beams Sustainment Deficiency Repairs/Replacements $2,115.00
5 OU Children's Physicians B301002026-102000 Replace mechanical penthouse roof membrane Sustainment Deficiency Repairs/Replacements $3,894.56
5 OU Children's Physicians C101001-102344Repair causes for water intrusion and repair damaged
walls and ceilings.Sustainment Deficiency Repairs/Replacements $18,958.86
5 OU Children's Physicians C302012-102045 Repaint helipad penthouse floor finish. Sustainment Deficiency Repairs/Replacements $1,110.38
5 OU Children's Physicians C303003001-102343 Replace ceiling tiles and stop water intrusion. Sustainment Deficiency Repairs/Replacements $146.64
5 OU Children's Physicians D305006012-101996 Replace wall pack A/C unit. Sustainment Deficiency Repairs/Replacements $1,868.25
5 OU Children's Physicians D305006012-101997 Replace Wall Pack A/C unit. Sustainment Deficiency Repairs/Replacements $1,868.25
7 Samis Education Center B101001001-102009 Repair leak in roof Sustainment Deficiency Repairs/Replacements $109.98
7 Samis Education Center B201025001-102035 Repair water intrusion in stairwell Sustainment Deficiency Repairs/Replacements $1,027.19
7 Samis Education Center C302001-102034 Replace carpet on 3rd floor Sustainment Deficiency Repairs/Replacements $176.25
7 Samis Education Center D304003030-102081 Demolish and dispose of the pumps. Sustainment Deficiency Repairs/Replacements $626.04
8 College of Medicine C302001-101999 Replace carpet stains Sustainment Deficiency Repairs/Replacements $1,269.00
Totals: $3,164,283.23
Appendix F
Work Item Detail Reports
UHAT
Solution Statement
Code Reference
Roof system at ESL
Problem Statement
North 5th and 4thSection
Description
B301002001 - Built-up Roof (BUR), asphalt flood coatw/gravel
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace BUR membrane.
Work Item NameWork Item Number
B301002001-102237
Replace BUR membrane.
1 - Garrison Tower
Priority Rating 4-Necessary, Not Yet Critical
Impact Score 2.5
Distress Type Damaged
Recommend Full Component Replacement Yes
High Emphasis No
Severity Deferable
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 4-Significant 6.40
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
BSLY
G+
Assigned to Work Package? No
Deferable
OtherUOMQty
Total BUR roof replacement $0.00 $0.00 $17,570.00 $7,204.00 $24,774.00$0.00SQ21Assembly Number RepairId Code Defect Repair Description UOM Unit Cost EULB30131050700 1720 Total BUR roof replacement Sq. $836.69 28
Total Cost with Burden $24,774.00
Additional Photos
1Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
BUR at ESL.
Problem Statement
South 5th floorSection
Description
B301002002 - Built-up Roof (BUR), asphalt flood coat,smooth
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace BUR membrane.
Work Item NameWork Item Number
B301002002-102238
Replace BUR membrane
1 - Garrison Tower
Priority Rating 4-Necessary, Not Yet Critical
Impact Score 2.5
Distress Type Damaged
Recommend Full Component Replacement Yes
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 4-Significant 6.40
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
BSLY
G+
Assigned to Work Package? No
Deferable
OtherUOMQty
Total BUR roof replacement $0.00 $0.00 $5,857.00 $2,401.00 $8,258.00$0.00SQ7Assembly Number RepairId Code Defect Repair Description UOM Unit Cost EULB30131050700 1720 Total BUR roof replacement Sq. $836.69 28
Total Cost with Burden $8,258.00
Additional Photos
2Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
BUR at ESL.
Problem Statement
North 2nd floorSection
Description
B301002002 - Built-up Roof (BUR), asphalt flood coat,smooth
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace BUR membrane.
Work Item NameWork Item Number
B301002002-102239
Replace BUR membrane.
1 - Garrison Tower
Priority Rating 4-Necessary, Not Yet Critical
Impact Score 2.5
Distress Type Damaged
Recommend Full Component Replacement Yes
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 4-Significant 6.40
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
BSLY
G+
Assigned to Work Package? No
Deferable
OtherUOMQty
Total BUR roof replacement $0.00 $0.00 $6,694.00 $2,744.00 $9,439.00$0.00SQ8Assembly Number RepairId Code Defect Repair Description UOM Unit Cost EULB30131050700 1720 Total BUR roof replacement Sq. $836.69 28
Total Cost with Burden $9,439.00
Additional Photos
3Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Roof membrane at ESL
Problem Statement
Southwest 7th floorSection
Description
B301002026 - Thermoplastic-polyolefin roofing (TPO),unknown thickness
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace BUR membrane.
Work Item NameWork Item Number
B301002026-102018
Replace roof membrane.
1 - Garrison Tower
Priority Rating 4-Necessary, Not Yet Critical
Impact Score 2.5
Distress Type Damaged
Recommend Full Component Replacement Yes
High Emphasis No
Severity Deferable
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 4-Significant 6.40
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
BSLY
G+
Assigned to Work Package? No
Deferable
OtherUOMQty
Total BUR roof replacement $0.00 $0.00 $10,040.00 $4,117.00 $14,156.00$0.00SQ12Assembly Number RepairId Code Defect Repair Description UOM Unit Cost EULB30131050700 1720 Total BUR roof replacement Sq. $836.69 28
Total Cost with Burden $14,156.00
Additional Photos
4Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
TPO roof at ESL.
Problem Statement
South 8th floorSection
Description
B301002026 - Thermoplastic-polyolefin roofing (TPO),unknown thickness
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace TPO membrane.
Work Item NameWork Item Number
B301002026-102240
Replace TPO membrane.
1 - Garrison Tower
Priority Rating 4-Necessary, Not Yet Critical
Impact Score 2.5
Distress Type Damaged
Recommend Full Component Replacement Yes
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 4-Significant 6.40
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
BSLY
G+
Assigned to Work Package? No
Deferable
OtherUOMQty
Total roof replacement, modifiedbituminous / thermoplastic
$0.00 $0.00 $4,844.00 $1,986.00 $6,830.00$0.00SQ7
Assembly Number RepairId Code Defect Repair Description UOM Unit Cost EULB30131200700 1726 Total roof replacement, modified bituminous / thermoplastic Sq. $692.05 25
Total Cost with Burden $6,830.00
Additional Photos
5Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Deteriorated gutters.
Problem Statement
South 3rd floorSection
Description
B301009003 - Aluminum gutters, 5" boxInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace gutter.
Work Item NameWork Item Number
B301009003-102019
Replace gutter.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Deteriorated
Recommend Full Component Replacement Yes
High Emphasis No
Severity Deferable
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y
G+
Assigned to Work Package? No
Deferable
OtherUOMQty
Replace aluminum gutter, enameled, 5" Ktype, .032 " thick
$0.00 $0.00 $590.00 $242.00 $832.00$0.00LF50
Assembly Number RepairId Code Defect Repair Description UOM Unit Cost EULB30136201020 838 Replace aluminum gutter, enameled, 5" K type, .032 " thick LF. $11.80 40
Total Cost with Burden $832.00
Additional Photos
6Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Stained ceiling tile from water intrusion.
Problem Statement
Section
-Description
C303003001 - Suspended Acoustical Ceiling SystemsInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace ceiling tile
Work Item NameWork Item Number
C303003001-102279
Replace 24 sf of ceiling tile.
1 - Garrison Tower
Priority Rating 5-Potentially Critical
Impact Score 8.5
Distress Type Stained
Recommend Full Component Replacement No
High Emphasis No
Severity Category II - Critical
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 1-Low 3.74
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G-
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace stained ceiling tile $0.00 $0.00 $0.00 $64.00 $220.00$156.00SF24C3033108002T Replace lay-in acoustical ceiling tile. 10 $3.50 SF. EUL: 10-15 Range: $3.50-6.50 (tile only) Assume$6.50 / SF for low quantity
Total Cost with Burden $220.00
Additional Photos
7Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Water intrusion and leak causing moisture damage to ceiling tile.
Problem Statement
Section
-Description
C303003001 - Suspended Acoustical Ceiling SystemsInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace ceiling tile and fix water intrusion issues.
Work Item NameWork Item Number
C303003001-102370
Fix leaks and water intrusion issues and replace 36 SF of tile.
1 - Garrison Tower
Priority Rating 5-Potentially Critical
Impact Score 8.5
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Category II - Critical
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 1-Low 3.74
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G-
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace ceiling tile $0.00 $0.00 $0.00 $96.00 $330.00$234.00SF36C3033108002T Replace lay-in acoustical ceiling tile. 10 $3.50 SF. EUL: 10-15 Range: $3.50-6.50 (tile only) Assume$6.50 due to low quantity
Repair cracks in concrete roof decking $0.00 $0.00 $0.00 $256.00 $881.00$625.00LF50Repair Cracking - Deep Clean-prepare affected are and inject crack with epoxy material. Ln Ft 12.49
RS Means030130711110 Clean/grid concrete surface free of contaminants Ln Ft 0.74030130711115 Rout crack with v-notch crack chaser if needed Ln Ft 1.46030130711120 Blow out crack with oil-free dry compressed air Ln Ft 0.11030130711130 Install surface mounted entry ports Ln Ft 2.44030130711750 Pneumatic injection up to 12 in deep w 2part Epoxy Ln Ft 5.18030130711140 Cap crack at surface with epoxy gel Ln Ft 1.07003130711150 Snap off ports, grind off epoxy cap residue after injection Ln Ft 1.49
Total Cost with Burden $1,211.00
Additional Photos
8Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Stained ceiling tiles.
Problem Statement
Section
-Description
C303003001 - Suspended Acoustical Ceiling SystemsInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace ceiling tile and identify cause of water damage.
Work Item NameWork Item Number
C303003001-102371
Replace 24 sf of ceiling tiles and identify cause for moisture damage.
1 - Garrison Tower
Priority Rating 5-Potentially Critical
Impact Score 2.5
Distress Type Stained
Recommend Full Component Replacement No
High Emphasis No
Severity Category III - Marginal
Failure Probability Subcategory C-Failure is likely to occur before next scheduled inspection (3 years).
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 1-Low 3.74
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G-
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace ceiling tile $0.00 $0.00 $0.00 $43.00 $147.00$104.00SF16C3033108002T Replace lay-in acoustical ceiling tile. 10 $3.50 SF. EUL: 10-15 Range: $3.50-6.50 (tile only) Assume$6.50/Sf due to low quantity
Total Cost with Burden $147.00
Additional Photos
9Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Elevator is reported to be broken from unknown date.
Problem Statement
Section
G4, 8 floorsDescription
D101004014 - Traction geared elevators, hospital,4000 lb, 15 floors, 350 FPM
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace cab, controls, & equipment for elevator G4.
Work Item NameWork Item Number
D101002023-102004
Replace elevator, traction system and controls.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 6.0
Distress Type Broken
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 3 - Relevant 4-Significant 5.83
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
R+
G+
Assigned to Work Package? No
Safety
OtherUOMQty
Modernize and replace elevator G4. $122,000.00 $0.00 $249,000.00
$152,110.00
$523,110.00$0.00Each1
Demolish and dispose existing elevatorcab, controls, & equipment
$0.00 $0.00 $0.00 $41,000.00
$141,000.00$100,000.00
LS1
Total Cost with Burden $664,110.00
Additional Photos
10Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Elevator is reported to be broken from unknown date.
Problem Statement
Section
Description
D101004014 - Traction geared elevators, hospital,4000 lb, 15 floors, 350 FPM
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component RepairsWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace cab, controls, & equipment for elevator G3.
Work Item NameWork Item Number
D101002023-102005
Replace elevator cab, control, & equipment for elevator G3.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 4.0
Distress Type Broken
Recommend Full Component Replacement No
High Emphasis No
Severity Category II - Critical
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 3 - Relevant 3-Relevant 5.20
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
Y-
G
Assigned to Work Package? No
Safety
OtherUOMQty
Modernize G3 elevator. $122,000.00 $0.00 $249,000.00
$152,110.00
$523,110.00$0.00Each1
Demolish and dispose of existing elevatorcab, controls, and equipment.
$0.00 $0.00 $0.00 $41,000.00
$141,000.00$100,000.00
LS1
Total Cost with Burden $664,110.00
Additional Photos
11Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Elevator is out of service for unknown date.
Problem Statement
-Section
Elev-7, 10 floorsDescription
D101004020 - Traction gearless elevators, hospital,5000 lb, 10 floors, 200 FPM
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace elevator cab, controls, & equipment Elevator #7.
Work Item NameWork Item Number
D101002023-102006
Replace elevator cab, controls, & equipment for Elev. 7
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 10.0
Distress Type Broken
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category II - Critical
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 3 - Relevant 3-Relevant 5.20
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
Y-
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace and modernize Elev. 7. $105,000.00 $0.00 $255,000.00
$147,600.00
$507,600.00$0.00Each1
Demolish and dispose of existing elevatorcab, controls, & equipment
$0.00 $0.00 $0.00 $34,850.00
$119,850.00$85,000.00
LS1
Total Cost with Burden $627,450.00
Additional Photos
12Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Elevator works but vibrates and leaking hydraulic oil in the pit.
Problem Statement
Section
5000-Lbs, 2 floorsDescription
D101003002 - Hydraulic freight elevators (class"B"),4000 lb, 2 floors, 50 FPM
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component RepairsWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace hydraulic equipment and controls for freight elevator.
Work Item NameWork Item Number
D101003002-102031
Modernize Freight elevator
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.0
Distress Type Excessive Vibration
Recommend Full Component Replacement No
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 3 - Relevant 3-Relevant 5.20
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
Y-
G
Assigned to Work Package? No
Safety
OtherUOMQty
Modernize hydraulic freight elevator. $20,400.00 $0.00 $100,600.00
$49,610.00
$170,610.00$0.00Each1
Demolish and dispose of existing freightelevator equipment.
$0.00 $0.00 $0.00 $4,920.00 $16,920.00$12,000.00
LS1
Total Cost with Burden $187,530.00
Additional Photos
13Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that the elevator is abandoned over period of time.
Problem Statement
Section
Description
D101004009 - Traction geared elevators, hospital,3500 lb, 5 floors, 200 FPM
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of elevator equipment.
Work Item NameWork Item Number
D101004009-102082
Demolish and dispose of elevator equipment.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 3 - Relevant 3-Relevant 5.20
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of elevatorequipment.
$0.00 $0.00 $0.00 $4,920.00 $16,920.00$12,000.00
LS1
Total Cost with Burden $16,920.00
Additional Photos
14Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Sanitary waste cleanout on first floor flooding due to rain. Assume under ground pipes are cracked.
Problem Statement
Section
Description
D203001 - Sanitary Waste Pipes and FittingsInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Engineering InvestigationWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Investigation required for Sanitary Waste piping due to flood through clean-out.
Work Item NameWork Item Number
D203001-102030
Engineering evaluation to determine flooding at underground sanitary sewer piping when it floods.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 1.5
Distress Type Cracked
Recommend Full Component Replacement No
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 3 - Relevant 3-Relevant 5.20
Green Opportunity Materials & Construction
OtherGreen Evaluation
Current DCR
Estimated Improved DCR
BSLG-
BSLG-
Assigned to Work Package? No
Environmental
OtherUOMQty
Additional investigation is required forunderground Sanitary Waste Water pipingdue to flooding when it rains throughcleanout.
$50,000.00 $0.00 $0.00 $20,500.00
$70,500.00$0.00LS1
Total Cost with Burden $70,500.00
Additional Photos
15Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Sump pumps are beyond its service life.
Problem Statement
Section
Description
D203004007 - Sump Pump, Cast Iron, 1 HPInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace Sump pumps.
Work Item NameWork Item Number
D203004007-102022
Replace sump pumps
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 0.5
Distress Type Deteriorated
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 3 - Relevant 3-Relevant 5.20
Green Opportunity Site Sustainability
Stormwater ManagementGreen Evaluation
Current DCR
Estimated Improved DCR
Y-
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace Sump pumps. $1,200.00 $0.00 $3,000.00 $1,722.00 $5,922.00$0.00Each1
Total Cost with Burden $5,922.00
Additional Photos
16Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that exisitng air compressor and tank are abandoned over period of time.
Problem Statement
Section
Description
D209005009 - Air Compressor, 7.5 H.P., 80 gallontank
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of exisitng abandoned air compressor and tank.
Work Item NameWork Item Number
D209005009-102085
Demolish and dispose of existing abandoned air compressor and tank.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 3-Relevant 4.69
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of exisitngabandoned air compressor and tank.
$0.00 $0.00 $0.00 $2,050.00 $7,050.00$5,000.00LS1
Total Cost with Burden $7,050.00
Additional Photos
17Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that existing incinerator is abandoned over period of time.
Problem Statement
Section
IncineratorDescription
D302001015 - 450-1000 MBH, Gas Fired, Cast Iron,Steam Boiler
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing incinerator.
Work Item NameWork Item Number
D302001015-102086
Demolish and dispose of exisitng incinerator.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of existingincinerator.
$0.00 $0.00 $0.00 $1,025.00 $3,525.00$2,500.00LS1
Total Cost with Burden $3,525.00
Additional Photos
18Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that existing heat exchanger is abandoned over period of time.
Problem Statement
Section
Description
D302005003 - Heat Exchanger, liquid-to-liquid, shelland tube type
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing abandoned heat exchanger.
Work Item NameWork Item Number
D302005003-102087
Demolish and dispose existing abandoned heat exchanger.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of existingabandoned heat exchanger.
$0.00 $0.00 $0.00 $615.00 $2,115.00$1,500.00LS1
Total Cost with Burden $2,115.00
Additional Photos
19Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Expansion tank is out of service.
Problem Statement
Section
Description
D202006008 - Water Heater Storage Tank, galvanizedsteel, 500 gallon
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose expansion tank.
Work Item NameWork Item Number
D302008002-102061
Demolish and dispose the tank.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 6.0
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Category III - Marginal
Failure Probability Subcategory B-Failure is predicted within a year after the inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 3 - Relevant 3-Relevant 5.20
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Safety
OtherUOMQty
Demolish and dispose expansion tank. $0.00 $0.00 $0.00 $1,435.00 $4,935.00$3,500.00LS1
Total Cost with Burden $4,935.00
Additional Photos
20Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that existing expansion tank is abandoned over period of time.
Problem Statement
Section
Description
D302008002 - Expansion Tank, galvanized steel, 15 to400 gallon capacity
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing abandoned expansion tank.
Work Item NameWork Item Number
D302008002-102088
Demolish and dispose of tank.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of existingabandoned expansion tank.
$0.00 $0.00 $0.00 $1,025.00 $3,525.00$2,500.00LS1
Total Cost with Burden $3,525.00
Additional Photos
21Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
PRV is beyond its service life and it leaks.
Problem Statement
Section
Description
D302011004 - Pressure Reducing Valve, steam, 2",125 lb. flanges, iron body, pilot operated,
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace 2" steam pressure reducing valve station
Work Item NameWork Item Number
D302011004-102060
Replace 2" steam PRV
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.0
Distress Type Deteriorated
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
Y
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace 2" steam pressure reducing valvestation
$1,200.00 $0.00 $4,000.00 $2,132.00 $7,332.00$0.00Each1
Total Cost with Burden $7,332.00
Additional Photos
22Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
PRV is beyond its service life and it leaks.
Problem Statement
Section
Description
D302011006 - Pressure Reducing Valve, steam, 4",125 lb. flanges, iron body, pilot operated
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace 4" steam pressure reducing station
Work Item NameWork Item Number
D302011006-102059
Replace 4" steam PRV station.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.0
Distress Type Deteriorated
Recommend Full Component Replacement No
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
Y
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace 4" steam pressure reducingstation.
$1,500.00 $0.00 $5,500.00 $2,870.00 $9,870.00$0.00Each1
Total Cost with Burden $9,870.00
Additional Photos
23Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that the pump is abandoned over period of time.
Problem Statement
Section
Description
D304003004 - Circulating Pump, cast iron, in line, 1/2HP, 3" size
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing abandoned pump
Work Item NameWork Item Number
D304003004-102089
Demolish and dispose of existing abandoned pump
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of existingabandoned pump.
$0.00 $0.00 $0.00 $492.00 $1,692.00$1,200.00LS1
Total Cost with Burden $1,692.00
Additional Photos
24Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Exhaust fan is not working
Problem Statement
Section
Description
D304007034 - Roof Exhaust Fan, Centrifugal,Aluminum Housing, 2050 CFM
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace roof mounted exhaust fan.
Work Item NameWork Item Number
D304007034-102007
Replace exhaust fan.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 4.5
Distress Type Broken
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 4-Significant 6.40
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
R
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace roof mounted exhaust fan. $500.00 $0.00 $1,700.00 $902.00 $3,102.00$0.00Each1
Total Cost with Burden $3,102.00
Additional Photos
25Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that the fan is abandoned over period of time.
Problem Statement
Section
Description
D304007040 - Fan System, Wall Exhaust - WallExhaust, 26,250 CFM
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing/abandoned fan
Work Item NameWork Item Number
D304007040-102090
Demolish and dispose of existing/abandoned fan
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose ofexisting/abandoned fan.
$0.00 $0.00 $0.00 $1,558.00 $5,358.00$3,800.00LS1
Total Cost with Burden $5,358.00
Additional Photos
26Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that the fans are abandoned over period of time.
Problem Statement
Section
Description
D304007076 - Industrial Exhauster Fan, 4,000 CFM, 7-1/2 H.P.
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing/abandoned fans.
Work Item NameWork Item Number
D304007076-102091
Demolish and dispose of fans.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose ofexisting/abandoned fans.
$0.00 $0.00 $0.00 $2,460.00 $8,460.00$6,000.00LS2
Total Cost with Burden $8,460.00
Additional Photos
27Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
AHU is beyond its service life.
Problem Statement
Section
B-G-1Description
D304008007 - Central Station Packaged Air HandlingUnit, 5,000 CFM, 5 HP, variable air volume
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace central station AHU-B-G-1.
Work Item NameWork Item Number
D304008007-102020
Replace central station AHU-B-G-1.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 0.5
Distress Type Deteriorated
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 4-Significant 6.40
Green Opportunity Energy Efficiency
Mechanical EquipmentGreen Evaluation
Current DCR
Estimated Improved DCR
BSLY
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace central station AHU-B-G-1. $7,150.00 $0.00 $29,000.00 $14,822.00
$50,972.00$0.00Each1
Demolish and dispose of existing AHU. $0.00 $0.00 $0.00 $3,075.00 $10,575.00$7,500.00LS1
Total Cost with Burden $61,547.00
Additional Photos
28Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
AHU is beyond its service life.
Problem Statement
Section
Description
D304008007 - Central Station Packaged Air HandlingUnit, 5,000 CFM, 5 HP, variable air volume
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace central station AHU B-G-2.
Work Item NameWork Item Number
D304008007-102021
Replace central station AHU
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 0.5
Distress Type Deteriorated
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 4-Significant 6.40
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
BSLY-
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace central station AHU B-G-2. $7,150.00 $0.00 $29,000.00 $14,822.00
$50,972.00$0.00Each1
Demolish and dispose of existing AHU. $0.00 $0.00 $0.00 $3,075.00 $10,575.00$7,500.00LS1
Total Cost with Burden $61,547.00
Additional Photos
29Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that the AHU is abandoned over period of time.
Problem Statement
Section
Description
D304008014 - Central Station Packaged Air HandlingUnit, 30,000 CFM, 20 HP, variable air volume
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demoilsh and dispose of existing/abandoned AHU.
Work Item NameWork Item Number
D304008014-102092
Demolish and dispose of existing AHU
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demoilsh and dispose ofexisting/abandoned AHU.
$0.00 $0.00 $0.00 $10,250.00
$35,250.00$25,000.00
LS1
Total Cost with Burden $35,250.00
Additional Photos
30Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that existing abandoned fan is out of service.
Problem Statement
Section
Description
D305001004 - Fan System, Utility Set - 10,000 CFMInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing/abandoned fan.
Work Item NameWork Item Number
D305001004-102093
Demolish and dispose of existing/abandoned fan.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose ofexisting/abandoned fan.
$0.00 $0.00 $0.00 $2,665.00 $9,165.00$6,500.00LS1
Total Cost with Burden $9,165.00
Additional Photos
31Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that existing pneumatic system is abandoned and replaced with DDC control system.
Problem Statement
Section
Description
D306003001 - Pneumatic Control for Single UnitInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing/abandoned pneumatic control system
Work Item NameWork Item Number
D306003001-102094
Demolish and dispose of existing/abandoned pneumatic control system.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose ofexisting/abandoned pneumatic controlsystem.
$0.00 $0.00 $0.00 $5,740.00 $19,740.00$14,000.00
LS7
Total Cost with Burden $19,740.00
Additional Photos
32Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that existing disconnect switch is abandoned.
Problem Statement
Section
Description
D501006012 - Safety Switch, 600 V, 200 AmpInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing/abandoned 600 amp disconnect switch.
Work Item NameWork Item Number
D501006012-102095
Demolish and dispose of existing/abandoned disconnect switch.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose ofexisting/abandoned disconnect switch.
$0.00 $0.00 $0.00 $615.00 $2,115.00$1,500.00LS1
Total Cost with Burden $2,115.00
Additional Photos
33Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that existing ATS is abandoned over period of time.
Problem Statement
Section
Description
D501006031 - Automatic Transfer Switch, 3 pole, 480volt, 400 amp
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of ATS.
Work Item NameWork Item Number
D501006031-102084
Demolish and dispose of existing ATS.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of ATS. $0.00 $0.00 $0.00 $1,025.00 $3,525.00$2,500.00LS1
Total Cost with Burden $3,525.00
Additional Photos
34Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that the storage tanks are abandoned over period of time.
Problem Statement
Section
Description
G306004011 - Aboveground Fuel Storage Tank, 30000Gal, Steel, Single Wall,
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of the storage tanks.
Work Item NameWork Item Number
G306004011-102083
Demolish and dispose of storage tanks.
1 - Garrison Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of roof mountedstorage tanks.
$0.00 $0.00 $0.00 $20,500.00
$70,500.00$50,000.00
LS2
Total Cost with Burden $70,500.00
Additional Photos
35Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Deteriorated paint finish and surface corrosion on metal panels.
Problem Statement
Section
Description
B301001004 - Steel Roofing Panels, standing seam,standard or zinc aluminum alloy finish
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Clean and repaint metal panels.
Work Item NameWork Item Number
B301001004-102229
Clean and repaint 100% metal panels.
2 - Nicholsen Tower
Priority Rating 2-Appearance
Impact Score 2.5
Distress Type Deteriorated
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y
G
Assigned to Work Package? No
Deferable
OtherUOMQty
Coat the metal roofing. $0.00 $0.00 $750.00 $308.00 $1,058.00$0.00SF300Assembly Number Status Repair Id Code Defect Repair Description UOM Unit Cost EULB3013130504T Active 5546 Coat the metal roofing. SF. $2.50 10
Total Cost with Burden $1,058.00
Additional Photos
36Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Worn gravel surfaces on various roof areas.
Problem Statement
Section
Description
B301002001 - Built-up Roof (BUR), asphalt flood coatw/gravel
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Repair BUR membrane.
Work Item NameWork Item Number
B301002001-102231
Repair 25% roof membrane.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Deteriorated
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 4-Significant 6.40
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
BSLY
G-
Assigned to Work Package? No
Deferable
OtherUOMQty
Minor BUR membrane replacement, 25%of roof area
$0.00 $0.00 $44,185.00 $18,116.00
$62,301.00$0.00SQ50
Assembly Number RepairId Code Defect Repair Description UOM Unit Cost EULB30131050500 795 Minor BUR membrane replacement, 25% of roof area Sq. $883.70 15
Total Cost with Burden $62,301.00
Additional Photos
37Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Vegetation and debris observed on roof membrane.
Problem Statement
-Section
Description
B301002026 - Thermoplastic-polyolefin roofing (TPO),unknown thickness
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Clean roof membrane and remove vegetation and debris.
Work Item NameWork Item Number
B301002026-102230
Clean roof membrane and remove vegetation and debris.
2 - Nicholsen Tower
Priority Rating 2-Appearance
Impact Score 2.5
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 2-Moderate 5.39
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y+
G
Assigned to Work Package? No
Deferable
OtherUOMQty
Debris removal by hand & visualinspection,modified bitum/thermoplstc
$0.00 $0.00 $1,394.00 $571.00 $1,966.00$0.00MSF30
Assembly Number RepairId Code Defect Repair Description UOM Unit Cost EULB30131200100 1721 Debris removal by hand & visual inspection,modified bitum/thermoplstc M.S.F. $46.45 1
Total Cost with Burden $1,966.00
Additional Photos
38Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Wear and staining typical of age.
Problem Statement
-Section
-Description
C302001 - CarpetingInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component RepairsWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace carpet.
Work Item NameWork Item Number
C302001-102278
Replace 250sf of carpet.
2 - Nicholsen Tower
Priority Rating 2-Appearance
Impact Score 0.5
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory C-Failure is likely to occur before next scheduled inspection (3 years).
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 2-Moderate 4.12
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y+
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace damaged carpet $0.00 $0.00 $0.00 $513.00 $1,763.00$1,250.00SF250C3023510021T Replacement of the common area carpet. 7 $4.00 SF. Range: $3-$5 : EUL: 7-10Assume $5 / Sf for low quantity
Total Cost with Burden $1,763.00
Additional Photos
39Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Water leak damaging carpet and ceiling.
Problem Statement
-Section
-Description
C302001 - CarpetingInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Repair water leak and damaged ceiling
Work Item NameWork Item Number
C302001-102326
Repair leak and 50 SF of ceiling
2 - Nicholsen Tower
Priority Rating 6-Currently Critical
Impact Score 9.0
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Category I - Catastrophic
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 4-Significant 5.39
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
R
G
Assigned to Work Package? No
Mission
OtherUOMQty
Repair damaged drywall ceiling and paint $0.00 $0.00 $0.00 $328.00 $1,128.00$800.00SF50C3013214005T Repaint common area walls. 7 $0.75 SF. EUL: 5-7; Assume minimum of $800 to repair wallC3013010101T Paint common area interiors. 7 $1.00 S.F. Range is $.75 to $1.50. Add .10/SF for brushwork. Multi-color or glazed finished use $1.75/SF : EUL: 5-7
Assume minimum of $800 to repair ceiling.
Repair cracking in concrete roof decking $0.00 $0.00 $0.00 $256.00 $881.00$625.00SF50Repair Cracking - Deep Clean-prepare affected are and inject crack with epoxy material. Ln Ft 12.49
RS Means030130711110 Clean/grid concrete surface free of contaminants Ln Ft 0.74030130711115 Rout crack with v-notch crack chaser if needed Ln Ft 1.46030130711120 Blow out crack with oil-free dry compressed air Ln Ft 0.11030130711130 Install surface mounted entry ports Ln Ft 2.44030130711750 Pneumatic injection up to 12 in deep w 2part Epoxy Ln Ft 5.18030130711140 Cap crack at surface with epoxy gel Ln Ft 1.07003130711150 Snap off ports, grind off epoxy cap residue after injection Ln Ft 1.49
Total Cost with Burden $2,009.00
Additional Photos
40Work Item Detail 07/25/2019
41Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Water leak at pipe penetration through concrete floor on to ceiling tiles and carpet.
Problem Statement
Section
-Description
C303003001 - Suspended Acoustical Ceiling SystemsInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Repair water leak and damaged ceiling.
Work Item NameWork Item Number
C303003001-102325
Repair leak and ceiling 25 SF
2 - Nicholsen Tower
Priority Rating 6-Currently Critical
Impact Score 9.0
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Category I - Catastrophic
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 1-Low 3.74
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G
G
Assigned to Work Package? No
Mission
OtherUOMQty
Replace damaged ceiling tile $0.00 $0.00 $0.00 $64.00 $220.00$156.00SF24C3033108002T Replace lay-in acoustical ceiling tile. 10 $3.50 SF. EUL: 10-15 Range: $3.50-6.50 (tile only) Assume$6.50 / SF for low quantity
Repair cracking in concrete roof decking $0.00 $0.00 $0.00 $256.00 $881.00$625.00LF50Repair Cracking - Deep Clean-prepare affected are and inject crack with epoxy material. Ln Ft 12.49
RS Means030130711110 Clean/grid concrete surface free of contaminants Ln Ft 0.74030130711115 Rout crack with v-notch crack chaser if needed Ln Ft 1.46030130711120 Blow out crack with oil-free dry compressed air Ln Ft 0.11030130711130 Install surface mounted entry ports Ln Ft 2.44030130711750 Pneumatic injection up to 12 in deep w 2part Epoxy Ln Ft 5.18030130711140 Cap crack at surface with epoxy gel Ln Ft 1.07003130711150 Snap off ports, grind off epoxy cap residue after injection Ln Ft 1.49
Total Cost with Burden $1,101.00
Additional Photos
42Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Suspended ceiling tile is broken, stained, and missing
Problem Statement
Section
Description
C303003001 - Suspended Acoustical Ceiling SystemsInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace broken and stained ceiling tile
Work Item NameWork Item Number
C303003001-102384
Replace broken, stained, and missing suspended ceiling tile.
2 - Nicholsen Tower
Priority Rating 5-Potentially Critical
Impact Score 8.5
Distress Type Broken
Recommend Full Component Replacement No
High Emphasis No
Severity Category II - Critical
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 4-Significant 5.39
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
R
G+
Assigned to Work Package? No
Quality
OtherUOMQty
Replace ceiling tile $0.00 $0.00 $0.00 $107.00 $367.00$260.00SF40C3033108002T Replace lay-in acoustical ceiling tile. 10 $3.50 SF. EUL: 10-15 Range: $3.50-6.50 (tile only) Assume$6.50/SF due to small quantity
Total Cost with Burden $367.00
Additional Photos
43Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Adhered ceiling tile is delaminating, stained, and missing
Problem Statement
Section
Description
C303003002 - Fiberglass Acoustic Ceiling Tile, directglued
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace adhered ceiling tile
Work Item NameWork Item Number
C303003002-102385
Replace delaminting, stained, and missing adhered ceiling tile
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Broken
Recommend Full Component Replacement No
High Emphasis No
Severity Category III - Marginal
Failure Probability Subcategory C-Failure is likely to occur before next scheduled inspection (3 years).
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 3-Relevant 4.69
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y-
G-
Assigned to Work Package? No
Quality
OtherUOMQty
Replace fully adhered vertical parapetmembrane, EPDM
$0.00 $0.00 $0.00 $410.00 $1,410.00$1,000.00SF20
Replace EPDM membrane roof system. 20 $7.00 SF. 8.50 may be good for a 60-mil roof plus additional such as parapetand misc. fees include warranty.: Range: $5.5-$8.5
Minimum cost for coming out and replacing roof would be $1,000.00 regardless of unit cost.
Total Cost with Burden $1,410.00
Additional Photos
44Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that the elevator is abandoned and out of service.
Problem Statement
Section
Description
D101002003 - Hydraulic passenger elevator, 2500 lb,2 floors, 100 FPM
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose existing/abandoned elevator equipment
Work Item NameWork Item Number
D101002003-102100
Demolish and dispose existing/abandoned elevator equipment
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 3 - Relevant 3-Relevant 5.20
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose existing/abandonedelevator equipment
$0.00 $0.00 $0.00 $4,100.00 $14,100.00$10,000.00
LS1
Total Cost with Burden $14,100.00
Additional Photos
45Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that existing pneumatic tube system is out of service and abandoned.
Problem Statement
Section
Description
D109001002 - Pneumatic Tube System, Single tube,100', 2 station, 4" diameter
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose existing/abandoned pneumatic tube system
Work Item NameWork Item Number
D109001002-102101
Demolish and dispose exisitng/abandoned pneumatic tube system.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 3-Relevant 4.69
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose existing/abandonedpneumatic tube system
$0.00 $0.00 $0.00 $4,100.00 $14,100.00$10,000.00
LS4
Total Cost with Burden $14,100.00
Additional Photos
46Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
It was observed that existing air compressor out of service and abandoned.
Problem Statement
Section
Description
D209005004 - Air Compressor, 2 H.P., 30 gallon tankInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose existing/abandoned air compressor and tank
Work Item NameWork Item Number
D209005004-102102
Demolish and dispose of existing/abandoned air compressor and tank.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 3-Relevant 4.69
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose existing/abandonedair compressor and tank
$0.00 $0.00 $0.00 $492.00 $1,692.00$1,200.00LS1
Total Cost with Burden $1,692.00
Additional Photos
47Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Heat exchanger is beyond its service life.
Problem Statement
Section
Description
D302005001 - Heat Exchanger, steam to water, shelland tube type
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace steam to water tube type heat exchanger.
Work Item NameWork Item Number
D302005001-102043
Replace Heat exchanger
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 0.5
Distress Type Deteriorated
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 4-Significant 7.07
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
BSLY+
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace steaam to water tube type heatexchanger.
$1,200.00 $0.00 $19,400.00 $8,446.00 $29,046.00$0.00per gallon120
Total Cost with Burden $29,046.00
Additional Photos
48Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Heat exchanger is beyond its service life.
Problem Statement
Section
Description
D302005001 - Heat Exchanger, steam to water, shelland tube type
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace steam to water tube type heat exchanger.
Work Item NameWork Item Number
D302005001-102044
Replace the heat exchanger.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.0
Distress Type Deteriorated
Recommend Full Component Replacement No
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 4-Significant 7.07
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
BSLY+
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace steaam to water tube type heatexchanger.
$1,200.00 $0.00 $19,400.00 $8,446.00 $29,046.00$0.00Gallon120
Total Cost with Burden $29,046.00
Additional Photos
49Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing heat exchanger is disconnected and abandened in place.
Problem Statement
Section
Description
D302005001 - Heat Exchanger, steam to water, shelland tube type
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose existing/abandoned heat exchanger.
Work Item NameWork Item Number
D302005001-102103
Demolish and dispose existing/abandoned heat exchanger
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose existing/abandonedheat exchanger.
$0.00 $0.00 $0.00 $1,025.00 $3,525.00$2,500.00LS1
Total Cost with Burden $3,525.00
Additional Photos
50Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing expansion tank is out of service and abandoned.
Problem Statement
Section
Description
D302008001 - Expansion Tank, painted steel, 15 to400 gallon capacity
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing/abandoned expansion tank
Work Item NameWork Item Number
D302008001-102104
Demolish and dispose of existing/abandoned expansion tank.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose ofexisting/abandoned expansion tank
$0.00 $0.00 $0.00 $1,025.00 $3,525.00$2,500.00LS1
Total Cost with Burden $3,525.00
Additional Photos
51Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
PRV is beyond its service life and it leaks.
Problem Statement
Section
Description
D302011004 - Pressure Reducing Valve, steam, 2",125 lb. flanges, iron body, pilot operated,
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace 2" steam pressure reducing valve
Work Item NameWork Item Number
D302011004-102074
Replace 2" steam PRV.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.0
Distress Type Deteriorated
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
Y-
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace 2" steam pressure reducing valve $1,200.00 $0.00 $2,500.00 $1,517.00 $5,217.00$0.00Each1
Total Cost with Burden $5,217.00
Additional Photos
52Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
PRV is beyond its service life and it leaks.
Problem Statement
Section
Description
D302011006 - Pressure Reducing Valve, steam, 4",125 lb. flanges, iron body, pilot operated
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace 4" steam pressure reducing valve
Work Item NameWork Item Number
D302011006-102075
Replace 4" steam PRV.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.0
Distress Type Deteriorated
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
Y-
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace 4" steam pressure reducing valve $1,800.00 $0.00 $4,000.00 $2,378.00 $8,178.00$0.00Each1
Total Cost with Burden $8,178.00
Additional Photos
53Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing VAV boxes are out of service and abandoned.
Problem Statement
Section
Description
D304001002 - VAV Terminal -0 to 600 CFM, Hot WaterReheat
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose existing/abandoned VAV boxes
Work Item NameWork Item Number
D304001002-102105
Demolish and dispose of existing/abandoned VAV boxes
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose existing/abandonedVAV boxes
$0.00 $0.00 $0.00 $4,920.00 $16,920.00$12,000.00
LS25
Total Cost with Burden $16,920.00
Additional Photos
54Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing fan powered VAV boces are out of service and abandoned.
Problem Statement
Section
Description
D304001009 - VAV Terminal, Fan Powered - 1250CFM, Hot Water Reheat
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose existing/abandoned fan powered VAV boxes
Work Item NameWork Item Number
D304001009-102106
Demolish and dispose existing/abandoned fan powered VAV boxes
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose existing/abandonedfan powered VAV boxes
$0.00 $0.00 $0.00 $12,300.00
$42,300.00$30,000.00
LS30
Total Cost with Burden $42,300.00
Additional Photos
55Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing fan is out of service and abandoned.
Problem Statement
-Section
-Description
D304007035 - Fan System, Wall Exhaust - WallExhaust, 6,175 CFM
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and disposs of existing/abandoned fan
Work Item NameWork Item Number
D304007035-102107
Demolish and dispose existing/abandoned fan
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and disposs ofexisting/abandoned fan
$0.00 $0.00 $0.00 $410.00 $1,410.00$1,000.00LS1
Total Cost with Burden $1,410.00
Additional Photos
56Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing fan is out of service and abandoned.
Problem Statement
Section
Description
D304007054 - Centrifugal Fan, airfoil, motor and drivecomplete, 2,000 CFM, 1 H.P.
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing/abandoned fan
Work Item NameWork Item Number
D304007054-102108
Demolish and dispose of existing/abandoned fan
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose ofexisting/abandoned fan
$0.00 $0.00 $0.00 $1,230.00 $4,230.00$3,000.00LS1
Total Cost with Burden $4,230.00
Additional Photos
57Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing AHU is out of service and abandoned.
Problem Statement
-Section
Description
D304008007 - Central Station Packaged Air HandlingUnit, 5,000 CFM, 5 HP, variable air volume
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing/abandoned AHU
Work Item NameWork Item Number
D304008007-102109
Demolish and dispose of existing/abandoned AHU
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose ofexisting/abandoned AHU
$0.00 $0.00 $0.00 $2,460.00 $8,460.00$6,000.00LS1
Total Cost with Burden $8,460.00
Additional Photos
58Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing AHUs are out of service and abandoned.
Problem Statement
Section
Description
D304008011 - Central Station Packaged Air HandlingUnit, 15,000 CFM, 10 HP, variable air volume
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing/abandoned AHUs
Work Item NameWork Item Number
D304008011-102110
Demolish and dispose of existing/abandoned AHUs
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose ofexisting/abandoned AHUs
$0.00 $0.00 $0.00 $12,300.00
$42,300.00$30,000.00
LS3
Total Cost with Burden $42,300.00
Additional Photos
59Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing unit heater is out of service and abandoned.
Problem Statement
-Section
Description
D305002002 - Hydronic Unit Heater, cabinet, hotwater, horizontal, blower type, 60 MBH
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing unit heater
Work Item NameWork Item Number
D305002002-102117
Demolish and dispose of existing/abandoned unit heater
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of existing unitheater
$0.00 $0.00 $0.00 $1,025.00 $3,525.00$2,500.00LS1
Total Cost with Burden $3,525.00
Additional Photos
60Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing Pneumatic control system is replaced with DDC control system.
Problem Statement
Section
Description
D306003001 - Pneumatic Control for Single UnitInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing pneumatic control system
Work Item NameWork Item Number
D306003001-102118
Demolish and dispose of existing/abandoned pneumatic control system
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of existingpneumatic control system
$0.00 $0.00 $0.00 $7,380.00 $25,380.00$18,000.00
LS18
Total Cost with Burden $25,380.00
Additional Photos
61Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Panel is beyond its service life.
Problem Statement
Section
60-HPDescription
D401017013 - Fire Pump, electric, 1500 GPM, 66 HP,including controller, fittings and relief valve
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace 1600-amp main elec. panelboard.
Work Item NameWork Item Number
D401017013-102041
Replace 1600-amp panel.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.0
Distress Type Deteriorated
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 1-Low 5.92
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
G-
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace 1600-amp main elec. panelboard. $1,075.00 $0.00 $14,102.00 $6,222.00 $21,400.00$0.00Each1
Total Cost with Burden $21,400.00
Additional Photos
62Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Panel is beyond its service life.
Problem Statement
-Section
Description
D501003010 - Switchboard - 600 V, 1200 AmpInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace 1200-amp main service panel.
Work Item NameWork Item Number
D501003010-102042
Replace 1200- amp panel.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.0
Distress Type Deteriorated
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 4-Significant 7.07
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
BSLY+
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace 1200-amp main service panel. $1,025.00 $0.00 $8,651.00 $3,967.00 $13,643.00$0.00Each1
Total Cost with Burden $13,643.00
Additional Photos
63Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Main elec. panel is beyond its life service.
Problem Statement
Section
Description
D501003012 - Switchboard - 600 V, 2000 AmpInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace 2000-amp main switchboard.
Work Item NameWork Item Number
D501003012-102040
Replace 2000-amp panel
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.0
Distress Type Deteriorated
Recommend Full Component Replacement No
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 4-Significant 7.07
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
BSLY+
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace 2000-amp main switchboard. $1,200.00 $0.00 $14,880.00 $6,593.00 $22,673.00$0.00Each1
Total Cost with Burden $22,673.00
Additional Photos
64Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing 75-kva transformer will be removed after renovation work.
Problem Statement
Section
Description
D501004005 - Dry-Type Transformer, 240/480 VPrimary 120/240 V Secondary, 75 kVA
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing 75-kva transformer aftre renovation work
Work Item NameWork Item Number
D501004005-102116
Demolish and dispose of existing 75-kva transformer.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of existing 75-kvatransformer aftre renovation work
$0.00 $0.00 $0.00 $1,845.00 $6,345.00$4,500.00LS1
Total Cost with Burden $6,345.00
Additional Photos
65Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Transformer is old and at its end life. Transformer is making loud noise.
Problem Statement
-Section
-Description
D501004011 - Dry-Type Transformer, 480 V Primary120/208 V Secondary, 150 kVA
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace 150-kva transformer.
Work Item NameWork Item Number
D501004011-102038
Replace Transformer
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.0
Distress Type Excessive Noise
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
Y-
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace 150-kva transformer. $1,275.00 $0.00 $12,500.00 $5,648.00 $19,423.00$0.00Each1
Total Cost with Burden $19,423.00
Additional Photos
66Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Missing parts on elec. panel
Problem Statement
-Section
-Description
D501005005 - Main Breaker Panel, 120/208/240 V,400 amp, three phase
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace 400-amp electric panelboard.
Work Item NameWork Item Number
D501005005-102036
Replace 400-amp elec. panelboard.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.0
Distress Type Deteriorated
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 4-Significant 7.07
Green Opportunity Energy Efficiency
Energy PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
BSLR+
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace 400-amp electric panelboard. $1,350.00 $0.00 $2,875.00 $1,732.00 $5,957.00$0.00Each1
Total Cost with Burden $5,957.00
Additional Photos
67Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing 225-amp breaker will be removed after renovation work.
Problem Statement
-Section
Description
D501005010 - Main Lug Load Center, 120/208/240 V,225 amp, three phase
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of 225-amp elec. panel
Work Item NameWork Item Number
D501005010-102115
Demolish and dispose of existing 225-amp panel.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of 225-amp elec.panel
$0.00 $0.00 $0.00 $1,025.00 $3,525.00$2,500.00LS1
Total Cost with Burden $3,525.00
Additional Photos
68Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Broken parts on panel
Problem Statement
-Section
-Description
D501005012 - Main Lug Load Center, 120/208/240 V,600 amp, three phase
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace 600-amp electric Panelboard.
Work Item NameWork Item Number
D501005012-102037
Replace 600-amp elec. panelboard.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.0
Distress Type Broken
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 4-Significant 7.07
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
R+
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace 600-amp electric Panelboard. $1,675.00 $0.00 $4,725.00 $2,624.00 $9,024.00$0.00Each1
Total Cost with Burden $9,024.00
Additional Photos
69Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing 200-amp breaker will be removed after renovation work.
Problem Statement
Section
225-AMPDescription
D501005014 - Main Breaker, 277/480 V, 200 ampInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of 200-amp breaker
Work Item NameWork Item Number
D501005014-102114
Demolish and dispose of 200-amp breaker.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of 200-amp breaker $0.00 $0.00 $0.00 $1,025.00 $3,525.00$2,500.00LS1
Total Cost with Burden $3,525.00
Additional Photos
70Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Elec. panels are at their beyond life service.
Problem Statement
Section
Description
D501005015 - Main Breaker, 277/480 V, 400 ampInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace six 400-amp Elec. panel board
Work Item NameWork Item Number
D501005015-102039
Replace five 400-amp panels
2 - Nicholsen Tower
Priority Rating 4-Necessary, Not Yet Critical
Impact Score 6.0
Distress Type Deteriorated
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 4-Significant 7.07
Green Opportunity Energy Efficiency
System PerformanceGreen Evaluation
Current DCR
Estimated Improved DCR
BSLY-
G
Assigned to Work Package? No
Safety
OtherUOMQty
Replace six 400-amp electric panelboard. $8,700.00 $0.00 $20,022.00 $11,776.00
$40,498.00$0.00Each6
Total Cost with Burden $40,498.00
Additional Photos
71Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing 600-amp breaker will be removed after renovation work.
Problem Statement
Section
Description
D501005016 - Main Breaker, 277/480 V, 600 ampInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of 600-amp main breaker after renovation work
Work Item NameWork Item Number
D501005016-102113
Demolish and dispose of existing 600-amp beaker.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of 600-amp mainbreaker after renovation work
$0.00 $0.00 $0.00 $2,050.00 $7,050.00$5,000.00LS1
Total Cost with Burden $7,050.00
Additional Photos
72Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing ATS devices are used as by-pass and will be removed after renovTion work.
Problem Statement
Section
Description
D501006031 - Automatic Transfer Switch, 3 pole, 480volt, 400 amp
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing ATS devices after renovation work.
Work Item NameWork Item Number
D501006031-102112
Demolish and dispose of existing ATS devices.
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose of existing ATSdevices after renovation work.
$0.00 $0.00 $0.00 $4,920.00 $16,920.00$12,000.00
LS4
Total Cost with Burden $16,920.00
Additional Photos
73Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Existing VFDs are out of service and abandoned.
Problem Statement
Section
Description
D509006005 - Variable Frequency Drive (VFD), 15 HPmotor size
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of existing/abandoned VFDs
Work Item NameWork Item Number
D509006005-102111
Demolish and dispose of existing/abandoned VFDs
2 - Nicholsen Tower
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 5 - Critical 3-Relevant 6.56
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Demolish and dispose ofexisting/abandoned VFDs
$0.00 $0.00 $0.00 $1,845.00 $6,345.00$4,500.00LS3
Total Cost with Burden $6,345.00
Additional Photos
74Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Lack of adhesion at perimeter sealant joint.
Problem Statement
-Section
-Description
B202012 - StorefrontsInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace north elevation perimeter sealant at storefront windows.
Work Item NameWork Item Number
B202012-101989
Install new perimeter sealant joints.
3 - Oklahoma Transplant Center
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Delamination
Recommend Full Component Replacement No
High Emphasis No
Severity Category III - Marginal
Failure Probability Subcategory C-Failure is likely to occur before next scheduled inspection (3 years).
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 2-Moderate 5.39
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y+
G-
Assigned to Work Package? No
Quality
OtherUOMQty
Remove and replace de-laminatingsealant.
$0.00 $0.00 $0.00 $98.00 $338.00$240.00LF40
B2013158101T Replace sealant joints in masonry and around window and door openings. 12 $6.00 LF. Range: $5-$7{P}EUL: 10-15
Total Cost with Burden $338.00
Additional Photos
75Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Rust observed at steel exterior door.
Problem Statement
-Section
3 steel doors with steel frames.Description
B203006 - Solid DoorsInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace hollow metal door, west elevation
Work Item NameWork Item Number
B203006-101990
Replace hollow metal door
3 - Oklahoma Transplant Center
Priority Rating 2-Appearance
Impact Score 2.5
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Category III - Marginal
Failure Probability Subcategory C-Failure is likely to occur before next scheduled inspection (3 years).
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 2-Moderate 5.39
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y+
G-
Assigned to Work Package? No
Quality
OtherUOMQty
Replace hollow metal door $0.00 $0.00 $0.00 $205.00 $705.00$500.00Each1B2033221101T Replace hollow-metal personnel doors. 20 $500.00 Ea. Range: $500-$750{P}EUL: 20-25
Total Cost with Burden $705.00
Additional Photos
76Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Parapet membrane is not adhered to substrate. Cracks forming in roof membrane in isolated areas.
Problem Statement
-Section
-Description
B301002001 - Built-up Roof (BUR), asphalt flood coatw/gravel
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component RepairsWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace parapet membrane
Work Item NameWork Item Number
B301002001-101985
Replace 20 sf section of parapet membrane. Patch vertical memrane roofing at cracking.
3 - Oklahoma Transplant Center
Priority Rating 4-Necessary, Not Yet Critical
Impact Score 2.5
Distress Type Delamination
Recommend Full Component Replacement No
High Emphasis No
Severity Category III - Marginal
Failure Probability Subcategory C-Failure is likely to occur before next scheduled inspection (3 years).
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 2-Moderate 5.39
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y+
G-
Assigned to Work Package? No
Quality
OtherUOMQty
Replace 20 SF of EPDM Membrane, fullyadhered on vertical parapet wall
$0.00 $0.00 $0.00 $615.00 $2,115.00$1,500.00SF20
Replace EPDM membrane roof system. 20 $7.00 SF. 8.50 may be good for a 60-mil roof plus additional such as parapetand misc. fees include warranty.: Range: $5.5-$8.5
Minimum cost for roofing contractor will be $1500 regardless of quantity replaced.
Total Cost with Burden $2,115.00
Additional Photos
77Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Shell worn and dented from exposure. It is secure but bolts are rusting.
Problem Statement
-Section
Description
D304007030 - Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component RepairsWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Repair exhaust fan
Work Item NameWork Item Number
D304007030-102133
Replace fan cover and replace with stainless steel screws. Replace motor unit.
3 - Oklahoma Transplant Center
Priority Rating 4-Necessary, Not Yet Critical
Impact Score 0.5
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 2-Moderate 5.39
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y+
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace fan & motor, propeller exhaust,375 CFM exhaust fan
$218.00 $0.00 $209.00 $175.00 $602.00$0.00Each1
RS Means FMR D30432201010 Repair Replace fan & motor, propeller exhaust, 375 CFM exhaustfan Ea. Material:209 Labor:217.5
Total Cost with Burden $602.00
Additional Photos
78Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
System showing signs of age and exposure to elements. Motors not replaced.
Problem Statement
-Section
2500 RPM, 1/2 HP, BiohazardDescription
D304007030 - Roof Exhaust Fan, Centrifugal,Aluminum Housing, 320 CFM
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component RepairsWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Repair exhaust fan
Work Item NameWork Item Number
D304007030-102134
Replace fan motors
3 - Oklahoma Transplant Center
Priority Rating 3-Recommended
Impact Score 0.5
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 2-Moderate 5.39
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y+
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace fan & motor, propeller exhaust,375 CFM exhaust fan
$218.00 $0.00 $209.00 $175.00 $602.00$0.00Each1
RS Means FMR D30432201010 Repair Replace fan & motor, propeller exhaust, 375 CFM exhaust fan Ea. Material:209 Labor:217.50
Total Cost with Burden $602.00
Additional Photos
79Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Door accessory damaged and pushed into drywall. Parts loose on floor.
Problem Statement
Section
-Description
C102006 - Wood door/Metal frame, flush or panelface, various core types and face materials, w/ hingesand locksets
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Damage to doorstop wall protection.
Work Item NameWork Item Number
C102006-102029
Reinstall door accessory.
4 - OU Physicians Building
Priority Rating 6-Currently Critical
Impact Score 6.5
Distress Type Broken
Recommend Full Component Replacement No
High Emphasis No
Severity Category III - Marginal
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 1-Low 3.74
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G-
G
Assigned to Work Package? No
Quality
OtherUOMQty
Repair damaged wall and replace missingdoor stop
$65.00 $0.00 $25.00 $37.00 $127.00$0.00Each1
Total Cost with Burden $127.00
Additional Photos
80Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Water leak at plumbing under cabinet.
Problem Statement
Section
Quartz counters. Plastic laminate faces.Description
C103007005 - Wood Cabinets, base and wall, withSolid Surface Countertops
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Repair pipe leak at hand sink at base cabinet.
Work Item NameWork Item Number
C103007005-102028
Repair plumbing leak
4 - OU Physicians Building
Priority Rating 5-Potentially Critical
Impact Score 4.5
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Category II - Critical
Failure Probability Subcategory C-Failure is likely to occur before next scheduled inspection (3 years).
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 1-Low 3.74
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G-
G
Assigned to Work Package? No
Quality
OtherUOMQty
Repair leak under sink $170.00 $0.00 $0.00 $70.00 $240.00$0.00HR2Assume $85/Hr for in-house plumber
Total Cost with Burden $240.00
Additional Photos
81Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Stains and wear of carpet. Seams coming unraveled.
Problem Statement
Section
-Description
C302001 - CarpetingInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Carpet stains and wear.
Work Item NameWork Item Number
C302001-102024
Replace carpet. 100 sf.
4 - OU Physicians Building
Priority Rating 2-Appearance
Impact Score 0.5
Distress Type Stained
Recommend Full Component Replacement No
High Emphasis No
Severity Category III - Marginal
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 2-Moderate 4.12
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y+
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace carpet tile $0.00 $0.00 $0.00 $205.00 $705.00$500.00SF100C3023510021T Replacement of the common area carpet. 7 $4.00 SF. Range: $3-$5 : EUL: 7-10 Assume $5 / SF for lowquantity.
Total Cost with Burden $705.00
Additional Photos
82Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Stains on ceiling tiles.
Problem Statement
Section
-Description
C303003001 - Suspended Acoustical Ceiling SystemsInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace ceiling tile
Work Item NameWork Item Number
C303003001-102025
Replace ceiling tiles. 28 sf.
4 - OU Physicians Building
Priority Rating 2-Appearance
Impact Score 0.5
Distress Type Stained
Recommend Full Component Replacement No
High Emphasis No
Severity Category III - Marginal
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 1-Low 3.74
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace stained ceiling tile $0.00 $0.00 $0.00 $75.00 $257.00$182.00SF28C3033108002T Replace lay-in acoustical ceiling tile. 10 $3.50 SF. EUL: 10-15 Range: $3.50-6.50 (tile only) Assume$6.50 / SF for low quantity
Total Cost with Burden $257.00
Additional Photos
83Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Repair wall leak
Problem Statement
-Section
Description
A101001003 - Basement Foundation (foundationassembly, with concrete basement floor slab)
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Repair wall leak
Work Item NameWork Item Number
A101001003-102002
Identify and repair source of leak
5 - OU Children's Physicians
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory C-Failure is likely to occur before next scheduled inspection (3 years).
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 3 - Relevant 1-Low 4.36
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G
G
Assigned to Work Package? No
Deferable
OtherUOMQty
Repair wall leak $0.00 $0.00 $1,000.00 $410.00 $1,410.00$0.00Allow.1Assembly Number Status Repair Id Code Defect Repair Description UOM Unit Cost EULA20200000000 Active 6281 Allowance to repair basement walls. Allow. $- 20
Total Cost with Burden $1,410.00
Additional Photos
84Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Peeling paint and corrosion on steel beams
Problem Statement
-Section
Description
B102003 - Steel Roof Framing Assemblies, with 1.5"galvanized metal deck
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component RepairsWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Repair peeling paint and corrosion on steel beams
Work Item NameWork Item Number
B102003-102001
Clean and repaint 5% steel beams
5 - OU Children's Physicians
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Deteriorated
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 3 - Relevant 1-Low 4.36
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G-
G
Assigned to Work Package? No
Deferable
OtherUOMQty
Repair peeling paint and corrosion on steelbeams
$0.00 $0.00 $1,500.00 $615.00 $2,115.00$0.00Allow.1
Assembly Number RepairId Code Defect Repair Description UOM Unit Cost EULB10201000000 6049 Frame Repair Allowance Allow. $- 25
Total Cost with Burden $2,115.00
Additional Photos
85Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Detached roof membrane.
Problem Statement
Section
Description
B301002026 - Thermoplastic-polyolefin roofing (TPO),unknown thickness
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace mechanical penthouse roof membrane
Work Item NameWork Item Number
B301002026-102000
Replace detached roof membrane corner.
5 - OU Children's Physicians
Priority Rating 5-Potentially Critical
Impact Score 2.5
Distress Type Delamination
Recommend Full Component Replacement Yes
High Emphasis No
Severity Deferable
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y-
G+
Assigned to Work Package? No
Deferable
OtherUOMQty
Replace mechanical penthouse roofmembrane
$0.00 $0.00 $2,762.00 $1,132.00 $3,894.00$0.00SQ3
Assembly Number RepairId Code Defect Repair Description UOM Unit CostEULB30131200600 802 Membrane replacement-(25% of roof area),modified bitum/thermoplastic Sq. $920.70
20
Total Cost with Burden $3,894.00
Additional Photos
86Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Water intrusion from roof and curtainwall windows causing damage to ceilings, drywall and flooring.
Problem Statement
Section
-Description
C101001 - Interior Partition Wall System with GypsumWallboard Finishes, 8' to 10' FTC height
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Repair causes for water intrusion and repair damaged walls and ceilings.
Work Item NameWork Item Number
C101001-102344
Repair windows and damaged adjacent walls and ceilings.
5 - OU Children's Physicians
Priority Rating 6-Currently Critical
Impact Score 8.5
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Category I - Catastrophic
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 1-Low 3.74
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G-
G+
Assigned to Work Package? No
Quality
OtherUOMQty
Repair glazing $0.00 $5,000.00 $0.00 $5,257.00 $18,078.00$7,821.00LF1422B2023400102T Wet seal window glazing. 15 $5.00 L.F. Range: $4.50-$5.50{P} Add 5,000 for crane/lift
Repair adjacent drywall finishes. $0.00 $0.00 $0.00 $256.00 $881.00$625.00SF250C3013010101T Paint common area interiors. 7 $1.00 S.F. Range is $.75 to $1.50. Add .10/SF for brushwork. Multi-color or glazed finished use $1.75/SF : EUL: 5-7Assume 2.50/sf for repairs.
Total Cost with Burden $18,959.00
Additional Photos
87Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Painted floor finish his chips and wearing away.
Problem Statement
Section
-Description
C302012 - Painted and Stained Floor FinishesInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Repaint helipad penthouse floor finish.
Work Item NameWork Item Number
C302012-102045
Refinish concrete floor.
5 - OU Children's Physicians
Priority Rating 2-Appearance
Impact Score 0.5
Distress Type Stained
Recommend Full Component Replacement No
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 3-Relevant 4.69
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y-
G-
Assigned to Work Package? No
Quality
OtherUOMQty
Repaint helipad penthouse floor finish. $0.00 $0.00 $788.00 $323.00 $1,111.00$0.00SF450Assembly Number RepairId Code Defect Repair Description UOM Unit Cost EULC3013010101T 6224 Paint common area interiors. S.F. $1.75 7
Total Cost with Burden $1,111.00
Additional Photos
88Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Water intrusion at stair wells is causing damage to ceiling tiles and grid.
Problem Statement
Section
Description
C303003001 - Suspended Acoustical Ceiling SystemsInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace ceiling tiles and stop water intrusion.
Work Item NameWork Item Number
C303003001-102343
Identify and fix sources of water intrusion and replace ceiling tiles and grid as needed.
5 - OU Children's Physicians
Priority Rating 6-Currently Critical
Impact Score 8.5
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Category I - Catastrophic
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 4-Significant 5.39
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
R
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace ceiling tile $0.00 $0.00 $0.00 $43.00 $147.00$104.00SF16C3033108002T Replace lay-in acoustical ceiling tile. 10 $3.50 SF. EUL: 10-15 Range: $3.50-6.50 (tile only) Assume6.50/SF due to low quantity
Total Cost with Burden $147.00
Additional Photos
89Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Tag on the A/C indicated that the motor is bad and the unit is out of service.
Problem Statement
-Section
Description
D305006012 - Window/Thru-Wall Unit Air Conditioner,29,000 BTUH
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace wall pack A/C unit.
Work Item NameWork Item Number
D305006012-101996
Replace wall pack A/C unit
5 - OU Children's Physicians
Priority Rating 4-Necessary, Not Yet Critical
Impact Score 2.5
Distress Type Broken
Recommend Full Component Replacement Yes
High Emphasis No
Severity Deferable
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 1-Low 5.10
Green Opportunity Indoor Air Quality & Environment
Ventilation and Exhaust SystemsGreen Evaluation
Current DCR
Estimated Improved DCR
G-
G
Assigned to Work Package? No
Deferable
OtherUOMQty
Replace wall pack A/C unit. $250.00 $0.00 $1,075.00 $543.00 $1,868.00$0.00Each1
Total Cost with Burden $1,868.00
Additional Photos
90Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
A/C compressor is out service.
Problem Statement
Section
Description
D305006012 - Window/Thru-Wall Unit Air Conditioner,29,000 BTUH
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component ReplacementWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace Wall Pack A/C unit.
Work Item NameWork Item Number
D305006012-101997
Replace wall pack A/C unit
5 - OU Children's Physicians
Priority Rating 3-Recommended
Impact Score 4.5
Distress Type Broken
Recommend Full Component Replacement Yes
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 4-Significant 6.40
Green Opportunity Indoor Air Quality & Environment
Ventilation and Exhaust SystemsGreen Evaluation
Current DCR
Estimated Improved DCR
R+
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace Wall Pack A/C unit. $250.00 $0.00 $1,075.00 $543.00 $1,868.00$0.00Each1
Total Cost with Burden $1,868.00
Additional Photos
91Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Roof leaks observed from rooftop garden and stairwell.
Problem Statement
-Section
Description
B102004001 - CIP Concrete Beams and Slab, withcolumns, slab depth varies
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component RepairsWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Repair leak in roof
Work Item NameWork Item Number
B101001001-102009
Repair roof leak and ceiling 10 SF
7 - Samis Education Center
Priority Rating 4-Necessary, Not Yet Critical
Impact Score 2.5
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 3 - Relevant 1-Low 4.36
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G-
G
Assigned to Work Package? No
Deferable
OtherUOMQty
Replace damaged ceiling tile $0.00 $0.00 $0.00 $32.00 $110.00$78.00SF12C3033108002T Replace lay-in acoustical ceiling tile. 10 $3.50 SF. EUL: 10-15 Range: $3.50-6.50 (tile only) Assume6.50/sf due to low quantity
Total Cost with Burden $110.00
Additional Photos
92Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Water intrusion from roof above.
Problem Statement
Exterior stairs assemblySection
Description
B201025001 - Stairs, CIP ConcreteInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Component RepairsWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Repair water intrusion in stairwell
Work Item NameWork Item Number
B201025001-102035
Repair water intrusion and repair ceiling 10 SF
7 - Samis Education Center
Priority Rating 6-Currently Critical
Impact Score 2.5
Distress Type Damaged
Recommend Full Component Replacement No
High Emphasis No
Severity Category II - Critical
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 1-Low 5.10
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace damaged ceiling tile $0.00 $0.00 $0.00 $43.00 $147.00$104.00SF16C3033108002T Replace lay-in acoustical ceiling tile. 10 $3.50 SF. EUL: 10-15 Range: $3.50-6.50 (tile only) Assume$6.50/SF due to small quantity.
Repair cracking in concrete roof $0.00 $0.00 $0.00 $256.00 $881.00$625.00LF50Repair Cracking - Deep Clean-prepare affected are and inject crack with epoxy material. Ln Ft 12.49
RS Means030130711110 Clean/grid concrete surface free of contaminants Ln Ft 0.74030130711115 Rout crack with v-notch crack chaser if needed Ln Ft 1.46030130711120 Blow out crack with oil-free dry compressed air Ln Ft 0.11030130711130 Install surface mounted entry ports Ln Ft 2.44030130711750 Pneumatic injection up to 12 in deep w 2part Epoxy Ln Ft 5.18030130711140 Cap crack at surface with epoxy gel Ln Ft 1.07003130711150 Snap off ports, grind off epoxy cap residue after injection Ln Ft 1.49
Total Cost with Burden $1,028.00
Additional Photos
93Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
moisture stains on carpet from water intrusion.
Problem Statement
Section
-Description
C302001 - CarpetingInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace carpet on 3rd floor
Work Item NameWork Item Number
C302001-102034
replace carpet tile. 25 sf
7 - Samis Education Center
Priority Rating 6-Currently Critical
Impact Score 8.5
Distress Type Stained
Recommend Full Component Replacement No
High Emphasis No
Severity Category I - Catastrophic
Failure Probability Subcategory A-System is in a state of failure.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 1-Low 3.74
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
G
G+
Assigned to Work Package? No
Quality
OtherUOMQty
Replace water damaged carpet tile $0.00 $0.00 $0.00 $51.00 $176.00$125.00SF25C3023510021T Replacement of the common area carpet. 7 $4.00 SF. Range: $3-$5 : EUL: 7-10Assume $5 / SF for low quantity
Total Cost with Burden $176.00
Additional Photos
94Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Site escort indicated that pumps are not use for awhile.
Problem Statement
-Section
Description
D304003030 - Circulating Pump, cast iron, bronzeimpeller, 1-1/2 HP, to 40 GPM, 1-1/2" size
Inventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
Demolition and DisposalWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Demolish and dispose of the pumps.
Work Item NameWork Item Number
D304003030-102081
Demolish and dispose the pumps.
7 - Samis Education Center
Priority Rating 3-Recommended
Impact Score 2.5
Distress Type Abandoned in Place, Non Functional
Recommend Full Component Replacement No
High Emphasis No
Severity Deferable
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 4 - Significant 3-Relevant 5.83
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
AIP-NF
AIP-NF
Assigned to Work Package? No
Deferable
OtherUOMQty
Remove and dispose of 1-1/2HPcirculating pumps
$444.00 $0.00 $0.00 $182.00 $626.00$0.00Each2
Half cost of labor to install per RS Means - D20232670040; Labor to isntall is $444 per pump. Cost to remove 2 pumps is $444.
Total Cost with Burden $626.00
Additional Photos
95Work Item Detail 07/25/2019
UHAT
Solution Statement
Code Reference
Stains on 45 carpet tile
Problem Statement
Section
-Description
C302001 - CarpetingInventory Classification
Sustainment-Deficiency Repairs/ReplacementsBudget Category/Account
MaintenenceWork Category
ActiveStatus
-Work Package ID
2019
Year Observed
Replace carpet stains
Work Item NameWork Item Number
C302001-101999
Replace 180 sf of carpet tile
8 - College of Medicine
Priority Rating 2-Appearance
Impact Score 0.5
Distress Type Stained
Recommend Full Component Replacement No
High Emphasis No
Severity Category IV - Negligible
Failure Probability Subcategory D-System is near the end of its "Life Cycle." Failure may occur prior to next scheduled inspection.
Work Item Detail
Cost Description Labor Equip Material Burden Total
Impact Type
ACI Priority SCI Priority DCR Priority Risk Reduction Index3-Relevant 2 - Moderate 2-Moderate 4.12
Green Opportunity
Green Evaluation
Current DCR
Estimated Improved DCR
Y+
G
Assigned to Work Package? No
Quality
OtherUOMQty
Replace damaged carpet tile $0.00 $0.00 $0.00 $369.00 $1,269.00$900.00SF180C3023510021T Replacement of the common area carpet. 7 $4.00 SF. Range: $3-$5 : EUL: 7-10 - Assume $5 for lowquantity.
Total Cost with Burden $1,269.00
Additional Photos
96Work Item Detail 07/25/2019
Appendix G
Work Item Drawings
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – GARRISON TOWER – BASEMENT
1 – One work item
D203001-102030: Investigation required for Sanitary Waste
piping due to flood through clean-out.
2 – Seven work items
D304008007-102020: Replace central station AHU-B-G-1.
D304008007-102021: Replace central station AHU B-G-2.
D302011006-102059: Replace 4" steam pressure reducing
station.
D302011004-102060: Replace 2" steam pressure reducing
valve station.
D302008002-102061: Demolish and dispose expansion
tank.
D302005003-102087: Demolish and dispose of existing
abandoned heat exchanger.
D304007040-102090: Demolish and dispose of
existing/abandoned fan.
3 – Two work items
D203004007-102022: Replace Sump pumps.
D304003004-102089: Demolish and dispose of existing
abandoned pump.
4 – One work item
D501006012-102095: Demolish and dispose of
existing/abandoned 600 amp disconnect switch.
5 – One work item
D101003002-102031: Replace hydraulic equipment and
controls for freight elevator.
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – GARRISON TOWER – 5TH FLOOR
1 – Five work items
D101004009-102082: Demolish and dispose of elevator
equipment.
D209005009-102085: Demolish and dispose of existing
abandoned air compressor and tank.
D302001015-102086: Demolish and dispose of existing
incinerator.
D302008002-102088: Demolish and dispose of existing
abandoned expansion tank.
D306003001-102094: Demolish and dispose of
existing/abandoned pneumatic control system.
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – GARRISON TOWER – 6TH FLOOR
1 – One Work Item
C303003001-102370: Replace ceiling tile and fix water
intrusion issues.
2 – One Work Item
C303003001-102371: Replace ceiling tile and identify
cause of water damage.
Other – One Work Item
C303003001-102279: Replace ceiling tile in various
isolated locations throughout the 6th floor.
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – GARRISON TOWER – 7TH FLOOR
1 – One Work Item
D305001004-102093: Demolish and dispose of
existing/abandoned fan.
2 – One Work Item
D304007034-102007 (ROOF): Replace roof mounted
exhaust fan.
3 – One Work Item
D304008014-102092 (ROOF): Demolish and dispose of
existing/abandoned AHU.
4 – One Work Item
D50100603-102084: Demolish and dispose of ATS.
5 – One Work Item
D304007076-102091: Demolish and dispose of
existing/abandoned fans.
6 – One Work Item
G306004011-102083: Demolish and dispose of the storage
tanks.
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – GARRISON TOWER – 9TH FLOOR
1 – One Work Item
D101002023-102006: Replace elevator cab, controls, &
equipment Elevator #7.
2 – Two Work Items
D101002023-102004: Replace cab, controls, & equipment
for elevator G4.
D101002023-102005: Replace cab, controls, & equipment
for elevator G3.
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – GARRISON TOWER – ROOF
1 – One Work Item
B301009003-102019: Replace gutter.
2 – One Work Item
B301002026-102018: Replace TPO membrane.
3 – One Work Item
B301002002-102238: Replace BUR membrane.
4 – One Work Item
B301002026-102240: Replace TPO membrane.
5 – One Work Item
B301002001-102237: Replace BUR membrane.
6 – One Work Item
B301002002-102239: Replace BUR membrane.
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – NICHOLSEN TOWER – BASEMENT
The following Work Items are in the basement and scheduled for renovation / replacement / removal at time of inspections. Due to renovations no current existing drawing is available.
Work Item Number Work Item Description Work Item Location
D501005014-102114 Demolish and dispose of 200-amp breaker BASEMENT ELECTRICAL ROOM NEAR RENOVATION PROJECT
D501004005-102116 Demolish and dispose of existing 75-kva transformer aftre renovation work BASEMENT ELECTRICAL ROOM WITHIN RENOVATION PROJECT
D101002003-102100 Demolish and dispose existing/abandoned elevator equipment BASEMENT ELEVATOR MACHINE ROOM
D304008011-102110 Demolish and dispose of existing/abandoned AHUs BASEMENT EXISTING /ABANDONED MECHANICAL ROOM
D509006005-102111 Demolish and dispose of existing/abandoned VFDs BASEMENT EXISTING /ABANDONED MECHANICAL ROOM
D304001002-102105 Demolish and dispose existing/abandoned VAV boxes BASEMENT LEVEL OPEN AREA NEXT TO RENOVATION PROJECT
D304001009-102106 Demolish and dispose existing/abandoned fan powered VAV boxes BASEMENT LEVEL OPEN AREA NEXT TO RENOVATION PROJECT
D304007035-102107 Demolish and disposs of existing/abandoned fan BASEMENT MAIN ELECTRICAL ROOM NORTHWEST OF BUILDING
D401017013-102041 Replace 1600-amp main elec. panelboard. BASEMENT MAIN ELECTRICAL ROOM NORTHWEST OF BUILDING
D501003010-102042 Replace 1200-amp main service panel. BASEMENT MAIN ELECTRICAL ROOM NORTHWEST OF BUILDING
D501003012-102040 Replace 2000-amp main switchboard. BASEMENT MAIN ELECTRICAL ROOM NORTHWEST OF BUILDING
D501004011-102038 Replace 150-kva transformer. BASEMENT MAIN ELECTRICAL ROOM NORTHWEST OF BUILDING
D501005005-102036 Replace 400-amp electric panelboard. BASEMENT MAIN ELECTRICAL ROOM NORTHWEST OF BUILDING
D501005012-102037 Replace 600-amp electric Panelboard. BASEMENT MAIN ELECTRICAL ROOM NORTHWEST OF BUILDING
D501005015-102039 Replace six 400-amp Elec. panel board BASEMENT MAIN ELECTRICAL ROOM NORTHWEST OF BUILDING
D501005016-102113 Demolish and dispose of 600-amp main breaker after renovation work BASEMENT MAIN ELECTRICAL ROOM NORTHWEST OF BUILDING
D501006031-102112 Demolish and dispose of existing ATS devices after renovation work. BASEMENT MAIN ELECTRICAL ROOM NORTHWEST OF BUILDING
D209005004-102102 Demolish and dispose existing/abandoned air compressor and tank BASEMENT MECHANICAL ROOM NEXT TO MAIN ELECTRICAL ROOM
D302005001-102043 Replace steam to water tube type heat exchanger. BASEMENT MECHANICAL ROOM NEXT TO MAIN ELECTRICAL ROOM
D302005001-102044 Replace steam to water tube type heat exchanger. BASEMENT MECHANICAL ROOM NEXT TO MAIN ELECTRICAL ROOM
D302005001-102103 Demolish and dispose existing/abandoned heat exchanger. BASEMENT MECHANICAL ROOM NEXT TO MAIN ELECTRICAL ROOM
D302008001-102104 Demolish and dispose of existing/abandoned expansion tank BASEMENT MECHANICAL ROOM NEXT TO MAIN ELECTRICAL ROOM
D302011004-102074 Replace 2" steam pressure reducing valve BASEMENT MECHANICAL ROOM NEXT TO MAIN ELECTRICAL ROOM
D302011006-102075 Replace 4" steam pressure reducing valve BASEMENT MECHANICAL ROOM NEXT TO MAIN ELECTRICAL ROOM
D304007054-102108 Demolish and dispose of existing/abandoned fan BASEMENT MECHANICAL ROOM NEXT TO MAIN ELECTRICAL ROOM
D305002002-102117 Demolish and dispose of existing unit heater BASEMENT NORTH SIDE OF BUILDING
D304008007-102109 Demolish and dispose of existing/abandoned AHU BASEMENT OPEN AREA NEXT TO RENOVATION PROJECT
D501005010-102115 Demolish and dispose of 225-amp elec. panel BASEMENT OPEN AREA NEXT TO RENOVATION PROJECT
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – NICHOLSEN TOWER –3RD FLOOR (PARTIAL)
1 – One Work Item
C303003002-102385: Replace adhered ceiling tile.
2 – One Work Item
C302001-102326: Repair water leak and damaged ceiling.
3 – One Work Item
C303003001-102325: Repair water leak and damaged
ceiling.
4 – One Work Item
D109001002-102101: Demolish and dispose existing /
abandoned pneumatic tube system.
Entire Floor
C302001-102278: Replace carpet.
Various isolated locations throughout floor
C303003001-102384: Replace broken and stained ceiling
tile.
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – NICHOLSEN TOWER – ROOF
1 – One Work Item
B301001004-102229: Clean and repaint metal panels.
2 – One Work Item
B301002001-102231: Repair BUR membrane.
3 – One Work Item
B301002026-102230: Clean roof membrane and remove
vegetation and debris.
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – OKLAHOMA TRANSPLANT CENTER – ROOF & EXTERIOR
1 – One Work Item
B2020012-101989: Replace north elevation perimeter
sealant at storefront windows.
2 – One Work Item
B203006-101990: Replace hollow metal door, west
elevation
3 – One Work Item
B301002001-101985: Replace parapet membrane
4 – Two Work Items
D304007030-102134: Repair exhaust fan
D304007030-102133: Repair exhaust fan
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – OU PHYSICIANS BUILDING – 5th FLOOR (PARTIAL)
GENERAL – One Work Item
C302001-102024: Carpet stains and wear on all floors in
various isolated areas.
1 – One Work Item
C303003001-102025: Replace Ceiling Tile
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – OU CHILDRENS PHYSICIANS BUILDING – BASEMENT, 7TH FLOOR, & ROOF (PARTIAL)
1 – One Work Item
A101001003-102002: Replace wall leak
2 – One Work Item
D305006012-101997: Replace Wall Pack A/C Unit
3 – One Work Item
B301002026-102000: Replace mechanical penthouse roof
membrane.
4 – One Work Item
B102003-102001: Repair peeling paint and corrosion on
steel beams.
7TH FLOOR (PARTIAL)
BASEMENT (PARTIAL)
ROOF (PARTIAL)
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – OU CHILDRENS PHYSICIANS BUILDING – 14TH FLOOR & ROOF (PARTIAL)
14TH FLOOR (PARTIAL)
ROOF (PARTIAL)
1 – One Work Item
C101001-102344: Repair causes for water intrusion and
repair damaged walls and ceilings on 14th, 12th, and 10th
floors, West Elevation.
2 – One Work Item
C303003001-102343: Replace ceiling tiles and stop water
intrusion
3 – One Work Item
C302012-102045: Repaint helipad penthouse floor finish
4 – One Work Item
D305006012-101996: Replace Wall Pack A/C unit.
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – SAMIS EDUCATION CENTER – 3RD FLOOR (PARTIAL)
1 – One Work Item
C304003030-102081: Replace carpet on 3rd floor
2 – Two Work Items
B101001001-102009: Repair roof leak
B201025001-102035: Repair damage from water intrusion
in stairwell.
Roof General – One Work Item
D3044003030-102081: Demolish and dispose of the
pumps.
Note: Cross hatches, shading, and room numbers original to drawing. Drawing provided by UHAT. Aerial photographs from Google Earth.
UHAT WORK ITEM LOCATIONS – COLLEGE OF MEDICINE – 1ST FLOOR (PARTIAL)
1 – One Work Item
C302001-101999: Replace stained carpet.
Appendix H
Work Package Detail Reports
Work Package Detail
UHAT
1 - Garrison Tower
Work Package Number
B30-95931
Work Package Title
B30 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.83
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
B30-RoofingPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI 1.4 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 6.31
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
B301002026-102018 Replace BUR membrane. $10,040.00 $14,157.00 $14,157.002019
B301009003-102019 Replace gutter. $590.00 $832.00 $832.002019
B301002001-102237 Replace BUR membrane. $17,570.00 $24,774.00 $24,774.002019
B301002002-102238 Replace BUR membrane. $5,857.00 $8,258.00 $8,258.002019
B301002002-102239 Replace BUR membrane. $6,694.00 $9,438.00 $9,438.002019
B301002026-102240 Replace TPO membrane. $4,844.00 $6,831.00 $6,831.002019
Total Work Package Cost $45,595.00 $64,290.00 $64,290.00
Work Package Detail 107/25/2019
Work Package Detail
UHAT
1 - Garrison Tower
Work Package Number
C30-95932
Work Package Title
C30 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 6.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 5.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
C30-Interior FinishesPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI 145.3 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 3.74
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
C303003001-102279 Replace ceiling tile $156.00 $220.00 $220.002019
C303003001-102370 Replace ceiling tile and fix waterintrusion issues.
$859.00 $1,210.00 $1,210.002019
C303003001-102371 Replace ceiling tile and identifycause of water damage.
$104.00 $147.00 $147.002019
Total Work Package Cost $1,119.00 $1,577.00 $1,577.00
Work Package Detail 207/25/2019
Work Package Detail
UHAT
1 - Garrison Tower
Work Package Number
D10-95926
Work Package Title
D10 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 4.90
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
D10-ConveyingPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -0.4 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 5.33
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
D101002023-102004 Replace cab, controls, &equipment for elevator G4.
$471,000.00 $664,110.00 $664,110.002019
D101002023-102005 Replace cab, controls, &equipment for elevator G3.
$471,000.00 $664,110.00 $664,110.002019
D101002023-102006 Replace elevator cab, controls, &equipment Elevator #7.
$445,000.00 $627,450.00 $627,450.002019
D101003002-102031 Replace hydraulic equipmentand controls for freight elevator.
$133,000.00 $187,530.00 $187,530.002019
D101004009-102082 Demolish and dispose of elevatorequipment.
$12,000.00 $16,920.00 $16,920.002019
Total Work Package Cost $1,532,000.00 $2,160,120.00 $2,160,120.00
Work Package Detail 307/25/2019
Work Package Detail
UHAT
1 - Garrison Tower
Work Package Number
D20-95930
Work Package Title
D20 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 2.63
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
D20-PlumbingPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -0.2 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 5.07
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
D203004007-102022 Replace Sump pumps. $4,200.00 $5,922.00 $5,922.002019
D203001-102030 Investigation required forSanitary Waste piping due toflood through clean-out.
$50,000.00 $70,500.00 $70,500.002019
D302008002-102061 Demolish and dispose expansiontank.
$3,500.00 $4,935.00 $4,935.002019
D209005009-102085 Demolish and dispose of exisitngabandoned air compressor andtank.
$5,000.00 $7,050.00 $7,050.002019
Total Work Package Cost $62,700.00 $88,407.00 $88,407.00
Work Package Detail 407/25/2019
Work Package Detail
UHAT
1 - Garrison Tower
Work Package Number
D30-95927
Work Package Title
D30 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 2.29
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
D30-HVACPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -0.3 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 6.21
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
D304007034-102007 Replace roof mounted exhaustfan.
$2,200.00 $3,102.00 $3,102.002019
D304008007-102020 Replace central station AHU-B-G-1.
$43,650.00 $61,547.00 $61,547.002019
D304008007-102021 Replace central station AHU B-G-2.
$43,650.00 $61,547.00 $61,547.002019
D302011006-102059 Replace 4" steam pressurereducing station
$7,000.00 $9,870.00 $9,870.002019
D302011004-102060 Replace 2" steam pressurereducing valve station
$5,200.00 $7,332.00 $7,332.002019
D302001015-102086 Demolish and dispose of existingincinerator.
$2,500.00 $3,525.00 $3,525.002019
D302005003-102087 Demolish and dispose of existingabandoned heat exchanger.
$1,500.00 $2,115.00 $2,115.002019
D302008002-102088 Demolish and dispose of existingabandoned expansion tank.
$2,500.00 $3,525.00 $3,525.002019
D304003004-102089 Demolish and dispose of existingabandoned pump
$1,200.00 $1,692.00 $1,692.002019
D304007040-102090 Demolish and dispose ofexisting/abandoned fan
$3,800.00 $5,358.00 $5,358.002019
D304007076-102091 Demolish and dispose ofexisting/abandoned fans.
$6,000.00 $8,460.00 $8,460.002019
D304008014-102092 Demoilsh and dispose ofexisting/abandoned AHU.
$25,000.00 $35,250.00 $35,250.002019
D305001004-102093 Demolish and dispose ofexisting/abandoned fan.
$6,500.00 $9,165.00 $9,165.002019
D306003001-102094 Demolish and dispose ofexisting/abandoned pneumaticcontrol system
$14,000.00 $19,740.00 $19,740.002019
Total Work Package Cost $164,700.00 $232,228.00 $232,228.00
Work Package Detail 507/25/2019
Work Package Detail
UHAT
1 - Garrison Tower
Work Package Number
D50-95929
Work Package Title
D50 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
D50-ElectricalPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -1.0 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 6.56
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
D501006031-102084 Demolish and dispose of ATS. $2,500.00 $3,525.00 $3,525.002019
D501006012-102095 Demolish and dispose ofexisting/abandoned 600 ampdisconnect switch.
$1,500.00 $2,115.00 $2,115.002019
Total Work Package Cost $4,000.00 $5,640.00 $5,640.00
Work Package Detail 607/25/2019
Work Package Detail
UHAT
1 - Garrison Tower
Work Package Number
G30-95928
Work Package Title
Demolish and dispose of the storage tanks.
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
G30-Site Civil/Mechanical UtilitiesPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -1.0 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 6.56
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
G306004011-102083 Demolish and dispose of thestorage tanks.
$50,000.00 $70,500.00 $70,500.002019
Total Work Package Cost $50,000.00 $70,500.00 $70,500.00
Work Package Detail 707/25/2019
Work Package Detail
UHAT
2 - Nicholsen Tower
Work Package Number
B30-95938
Work Package Title
B30 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 2.33
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
B30-RoofingPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI 0.8 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 5.87
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
B301001004-102229 Clean and repaint metal panels. $750.00 $1,058.00 $1,058.002019
B301002026-102230 Clean roof membrane andremove vegetation and debris.
$1,394.00 $1,965.00 $1,965.002019
B301002001-102231 Repair BUR membrane. $44,185.00 $62,301.00 $62,301.002019
Total Work Package Cost $46,329.00 $65,324.00 $65,324.00
Work Package Detail 807/25/2019
Work Package Detail
UHAT
2 - Nicholsen Tower
Work Package Number
C30-95939
Work Package Title
C30 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 5.90
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 4.40
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
C30-Interior FinishesPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -0.5 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 4.67
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
C302001-102278 Replace carpet. $1,250.00 $1,763.00 $1,763.002019
C303003001-102325 Repair water leak and damagedceiling.
$781.00 $1,101.00 $1,101.002019
C302001-102326 Repair water leak and damagedceiling
$1,425.00 $2,009.00 $2,009.002019
C303003001-102384 Replace broken and stainedceiling tile
$260.00 $367.00 $367.002019
C303003002-102385 Replace adhered ceiling tile $1,000.00 $1,410.00 $1,410.002019
Total Work Package Cost $4,716.00 $6,650.00 $6,650.00
Work Package Detail 907/25/2019
Work Package Detail
UHAT
2 - Nicholsen Tower
Work Package Number
D10-95934
Work Package Title
D10 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
D10-ConveyingPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -1.0 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 4.95
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
D101002003-102100 Demolish and disposeexisting/abandoned elevatorequipment
$10,000.00 $14,100.00 $14,100.002019
D109001002-102101 Demolish and disposeexisting/abandoned pneumatictube system
$10,000.00 $14,100.00 $14,100.002019
Total Work Package Cost $20,000.00 $28,200.00 $28,200.00
Work Package Detail 1007/25/2019
Work Package Detail
UHAT
2 - Nicholsen Tower
Work Package Number
D20-95936
Work Package Title
Demolish and dispose existing/abandoned air compressor and tank
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
D20-PlumbingPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -1.0 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 4.69
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
D209005004-102102 Demolish and disposeexisting/abandoned aircompressor and tank
$1,200.00 $1,692.00 $1,692.002019
Total Work Package Cost $1,200.00 $1,692.00 $1,692.00
Work Package Detail 1107/25/2019
Work Package Detail
UHAT
2 - Nicholsen Tower
Work Package Number
D30-95933
Work Package Title
D30 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 2.25
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
D30-HVACPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -0.4 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 6.22
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
D302005001-102043 Replace steam to water tubetype heat exchanger.
$20,600.00 $29,046.00 $29,046.002019
D302005001-102044 Replace steam to water tubetype heat exchanger.
$20,600.00 $29,046.00 $29,046.002019
D302011004-102074 Replace 2" steam pressurereducing valve
$3,700.00 $5,217.00 $5,217.002019
D302011006-102075 Replace 4" steam pressurereducing valve
$5,800.00 $8,178.00 $8,178.002019
D302005001-102103 Demolish and disposeexisting/abandoned heatexchanger.
$2,500.00 $3,525.00 $3,525.002019
D302008001-102104 Demolish and dispose ofexisting/abandoned expansiontank
$2,500.00 $3,525.00 $3,525.002019
D304001002-102105 Demolish and disposeexisting/abandoned VAV boxes
$12,000.00 $16,920.00 $16,920.002019
D304001009-102106 Demolish and disposeexisting/abandoned fan poweredVAV boxes
$30,000.00 $42,300.00 $42,300.002019
D304007035-102107 Demolish and disposs ofexisting/abandoned fan
$1,000.00 $1,410.00 $1,410.002019
D304007054-102108 Demolish and dispose ofexisting/abandoned fan
$3,000.00 $4,230.00 $4,230.002019
D304008007-102109 Demolish and dispose ofexisting/abandoned AHU
$6,000.00 $8,460.00 $8,460.002019
D304008011-102110 Demolish and dispose ofexisting/abandoned AHUs
$30,000.00 $42,300.00 $42,300.002019
D305002002-102117 Demolish and dispose of existingunit heater
$2,500.00 $3,525.00 $3,525.002019
D306003001-102118 Demolish and dispose of existingpneumatic control system
$18,000.00 $25,380.00 $25,380.002019
Total Work Package Cost $158,200.00 $223,062.00 $223,062.00
Work Package Detail 1207/25/2019
Work Package Detail
UHAT
2 - Nicholsen Tower
Work Package Number
D40-95937
Work Package Title
Replace 1600-amp main elec. panelboard.
2019
Project ID -
Impact Score 2.00
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
D40-Fire ProtectionPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -0.7 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 5.92
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
D401017013-102041 Replace 1600-amp main elec.panelboard.
$15,177.00 $21,399.00 $21,399.002019
Total Work Package Cost $15,177.00 $21,399.00 $21,399.00
Work Package Detail 1307/25/2019
Work Package Detail
UHAT
2 - Nicholsen Tower
Work Package Number
D50-95935
Work Package Title
D50 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 2.58
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.08
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
D50-ElectricalPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -0.2 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 6.77
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
D501005005-102036 Replace 400-amp electricpanelboard.
$4,225.00 $5,957.00 $5,957.002019
D501005012-102037 Replace 600-amp electricPanelboard.
$6,400.00 $9,024.00 $9,024.002019
D501004011-102038 Replace 150-kva transformer. $13,775.00 $19,423.00 $19,423.002019
D501005015-102039 Replace six 400-amp Elec. panelboard
$28,722.00 $40,498.00 $40,498.002019
D501003012-102040 Replace 2000-amp mainswitchboard.
$16,080.00 $22,673.00 $22,673.002019
D501003010-102042 Replace 1200-amp main servicepanel.
$9,676.00 $13,644.00 $13,644.002019
D509006005-102111 Demolish and dispose ofexisting/abandoned VFDs
$4,500.00 $6,345.00 $6,345.002019
D501006031-102112 Demolish and dispose of existingATS devices after renovationwork.
$12,000.00 $16,920.00 $16,920.002019
D501005016-102113 Demolish and dispose of 600-amp main breaker afterrenovation work
$5,000.00 $7,050.00 $7,050.002019
D501005014-102114 Demolish and dispose of 200-amp breaker
$2,500.00 $3,525.00 $3,525.002019
D501005010-102115 Demolish and dispose of 225-amp elec. panel
$2,500.00 $3,525.00 $3,525.002019
D501004005-102116 Demolish and dispose of existing75-kva transformer aftrerenovation work
$4,500.00 $6,345.00 $6,345.002019
Total Work Package Cost $109,878.00 $154,929.00 $154,929.00
Work Package Detail 1407/25/2019
Work Package Detail
UHAT
3 - Oklahoma Transplant Center
Work Package Number
B20-95942
Work Package Title
B20 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 2.50
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
B20-Exterior EnclosurePrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI 15.8 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 5.39
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
B202012-101989 Replace north elevationperimeter sealant at storefrontwindows.
$240.00 $338.00 $338.002019
B203006-101990 Replace hollow metal door, westelevation
$500.00 $705.00 $705.002019
Total Work Package Cost $740.00 $1,043.00 $1,043.00
Work Package Detail 1507/25/2019
Work Package Detail
UHAT
3 - Oklahoma Transplant Center
Work Package Number
B30-95940
Work Package Title
Replace parapet membrane
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 4.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
B30-RoofingPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI 5.1 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 5.39
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
B301002001-101985 Replace parapet membrane $1,500.00 $2,115.00 $2,115.002019
Total Work Package Cost $1,500.00 $2,115.00 $2,115.00
Work Package Detail 1607/25/2019
Work Package Detail
UHAT
3 - Oklahoma Transplant Center
Work Package Number
D30-95941
Work Package Title
D30 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 0.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.50
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
D30-HVACPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -0.3 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 5.39
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
D304007030-102133 Repair exhaust fan $427.00 $601.00 $601.002019
D304007030-102134 Repair exhaust fan $427.00 $601.00 $601.002019
Total Work Package Cost $854.00 $1,202.00 $1,202.00
Work Package Detail 1707/25/2019
Work Package Detail
UHAT
4 - OU Physicians Building
Work Package Number
C10-95944
Work Package Title
C10 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 5.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 5.50
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
C10-Interior ConstructionPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI 1,033.1 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 3.74
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
C103007005-102028 Repair pipe leak at hand sink atbase cabinet.
$170.00 $240.00 $240.002019
C102006-102029 Damage to doorstop wallprotection.
$90.00 $127.00 $127.002019
Total Work Package Cost $260.00 $367.00 $367.00
Work Package Detail 1807/25/2019
Work Package Detail
UHAT
4 - OU Physicians Building
Work Package Number
C30-95943
Work Package Title
C30 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 0.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 2.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
C30-Interior FinishesPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI 111.0 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 3.93
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
C302001-102024 Carpet stains and wear. $500.00 $705.00 $705.002019
C303003001-102025 Replace ceiling tile $182.00 $257.00 $257.002019
Total Work Package Cost $682.00 $962.00 $962.00
Work Package Detail 1907/25/2019
Work Package Detail
UHAT
5 - OU Children's Physicians
Work Package Number
A10-95949
Work Package Title
Repair wall leak
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
A10-FoundationsPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -1.0 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 4.36
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
A101001003-102002 Repair wall leak $1,000.00 $1,410.00 $1,410.002019
Total Work Package Cost $1,000.00 $1,410.00 $1,410.00
Work Package Detail 2007/25/2019
Work Package Detail
UHAT
5 - OU Children's Physicians
Work Package Number
B10-95948
Work Package Title
Repair peeling paint and corrosion on steel beams
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
B10-SuperstructurePrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI 1.4 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 4.36
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
B102003-102001 Repair peeling paint andcorrosion on steel beams
$1,500.00 $2,115.00 $2,115.002019
Total Work Package Cost $1,500.00 $2,115.00 $2,115.00
Work Package Detail 2107/25/2019
Work Package Detail
UHAT
5 - OU Children's Physicians
Work Package Number
B30-95947
Work Package Title
Replace mechanical penthouse roof membrane
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 5.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
B30-RoofingPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -0.5 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 5.83
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
B301002026-102000 Replace mechanical penthouseroof membrane
$2,762.00 $3,895.00 $3,895.002019
Total Work Package Cost $2,762.00 $3,895.00 $3,895.00
Work Package Detail 2207/25/2019
Work Package Detail
UHAT
5 - OU Children's Physicians
Work Package Number
C10-95950
Work Package Title
Repair causes for water intrusion and repair damaged walls and ceilings.
2019
Project ID -
Impact Score 8.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 6.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
C10-Interior ConstructionPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI 111.3 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 3.74
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
C101001-102344 Repair causes for water intrusionand repair damaged walls andceilings.
$13,446.00 $18,959.00 $18,959.002019
Total Work Package Cost $13,446.00 $18,959.00 $18,959.00
Work Package Detail 2307/25/2019
Work Package Detail
UHAT
5 - OU Children's Physicians
Work Package Number
C30-95946
Work Package Title
C30 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 4.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 4.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
C30-Interior FinishesPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -0.8 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 5.04
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
C302012-102045 Repaint helipad penthouse floorfinish.
$788.00 $1,110.00 $1,110.002019
C303003001-102343 Replace ceiling tiles and stopwater intrusion.
$104.00 $147.00 $147.002019
Total Work Package Cost $892.00 $1,257.00 $1,257.00
Work Package Detail 2407/25/2019
Work Package Detail
UHAT
5 - OU Children's Physicians
Work Package Number
D30-95945
Work Package Title
D30 - Deficiency Repairs/Replacements
2019
Project ID -
Impact Score 3.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.50
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
D30-HVACPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -0.5 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 5.75
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
D305006012-101996 Replace wall pack A/C unit. $1,325.00 $1,868.00 $1,868.002019
D305006012-101997 Replace Wall Pack A/C unit. $1,325.00 $1,868.00 $1,868.002019
Total Work Package Cost $2,650.00 $3,736.00 $3,736.00
Work Package Detail 2507/25/2019
Work Package Detail
UHAT
7 - Samis Education Center
Work Package Number
B10-95951
Work Package Title
Repair leak in roof
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 4.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
B10-SuperstructurePrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI 928.2 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 4.36
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
B101001001-102009 Repair leak in roof $78.00 $110.00 $110.002019
Total Work Package Cost $78.00 $110.00 $110.00
Work Package Detail 2607/25/2019
Work Package Detail
UHAT
7 - Samis Education Center
Work Package Number
B20-95952
Work Package Title
Repair water intrusion in stairwell
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 6.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
B20-Exterior EnclosurePrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -1.0 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 5.10
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
B201025001-102035 Repair water intrusion in stairwell $729.00 $1,027.00 $1,027.002019
Total Work Package Cost $729.00 $1,027.00 $1,027.00
Work Package Detail 2707/25/2019
Work Package Detail
UHAT
7 - Samis Education Center
Work Package Number
C30-95954
Work Package Title
Replace carpet on 3rd floor
2019
Project ID -
Impact Score 8.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 6.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
C30-Interior FinishesPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI 76.5 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 3.74
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
C302001-102034 Replace carpet on 3rd floor $125.00 $176.00 $176.002019
Total Work Package Cost $125.00 $176.00 $176.00
Work Package Detail 2807/25/2019
Work Package Detail
UHAT
7 - Samis Education Center
Work Package Number
D30-95953
Work Package Title
Demolish and dispose of the pumps.
2019
Project ID -
Impact Score 2.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 3.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
D30-HVACPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI -1.0 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 5.83
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
D304003030-102081 Demolish and dispose of thepumps.
$444.00 $626.00 $626.002019
Total Work Package Cost $444.00 $626.00 $626.00
Work Package Detail 2907/25/2019
Work Package Detail
UHAT
8 - College of Medicine
Work Package Number
C30-95955
Work Package Title
Replace carpet stains
2019
Project ID -
Impact Score 0.50
Budget Category/Account Sustainment-Deficiency Repairs/Replacements
Priority Rating 2.00
Work Execution Method Contractor
Work Execution Status Active - Pre Work Reception Board
Package Description
-
Work Items Included In Work Package
Work Item ID Work Item Name(OEY)
Direct Cost Current Year Cost
(w/Burden & Inflation)
Oldest Work Item Observed
C30-Interior FinishesPrimary Work Classification
Work Execution Status Date 07/25/2019
Estimated ROI 8.7 %
Work Package Links
CMMS ID
Other ID
Average Priority Ratings
Risk Reduction Index 4.12
Direct Cost
w/Burden (OEY)
Original Estimate
Year (OEY)
C302001-101999 Replace carpet stains $900.00 $1,269.00 $1,269.002019
Total Work Package Cost $900.00 $1,269.00 $1,269.00
Work Package Detail 3007/25/2019
Appendix I
Ten Year Inventory Recapitalization List
Appendix I - Ten Year Inventory Recapitalization List
Asset
Number
Asset
Name
Inventory
Code
Inventory
Classification Name
Inventory
QuantityUOM
Inventory
CRV (2019)
Year
InstalledESL DCR
DCR
Index
PM
Service
Life
Factor
Inventory
RSL
Included
As Work
Item
Requirement
Year
Cost At
Requirement
Year
4OU
Physicians C302001 Carpeting 55,100 SF $483,238 2001 7 R 0.1 1.00 0.7 No 2020 $497,735
5OU
Children's C302001 Carpeting 47,650 SF $417,900 2009 7 R 0.1 1.00 0.7 No 2020 $430,437
1Garrison
TowerC302001 Carpeting 11,545 SF $101,252 1974 7 R 0.1 1.00 0.7 No 2020 $104,290
1Garrison
TowerC302001 Carpeting 11,512 SF $100,963 1974 7 R 0.1 1.00 0.7 No 2020 $103,992
2Nicholsen
TowerD304001009
VAV Terminal, Fan
Powered - 1250 CFM, 30 EA $73,137 1978 15 AIP-NF 0 1.00 -26 Yes 2020 $75,331
1Garrison
TowerC302001 Carpeting 6,400 SF $56,129 2000 7 R 0.1 1.00 0.7 No 2020 $57,813
2Nicholsen
TowerB201002
Brick Veneer Wall
Systems22,500 SF $493,324 2018 75 R- 0.01 1.00 0.8 No 2020 $50,812
1Garrison
TowerC302001 Carpeting 4,500 SF $39,466 2010 7 R 0.1 1.00 0.7 No 2020 $40,650
1Garrison
TowerC302001 Carpeting 2,000 SF $17,540 1974 7 R 0.1 1.00 0.7 No 2020 $18,066
2Nicholsen
TowerB301002026
Thermoplastic-polyolefin
roofing (TPO), unknown 3,080 SF $10,727 2018 20 R- 0.01 1.00 0.2 No 2020 $11,049
1Garrison
TowerC302001 Carpeting 1,200 SF $10,524 2000 7 R 0.1 1.00 0.7 No 2020 $10,840
1Garrison
TowerD305001004
Fan System, Utility Set -
10,000 CFM1 EA $8,636 1974 15 AIP-NF 0 1.00 -30 Yes 2020 $8,895
3Oklahoma
Transplant D502004003
Wall Mounted Exterior
Incandescent Lantern, 20 EA $2,270 1985 20 R- 0.01 1.00 0.2 No 2020 $2,338
2Nicholsen
TowerD304007035
Fan System, Wall
Exhaust - Wall Exhaust, 1 EA $1,688 1978 15 AIP-NF 0 1.00 -26 Yes 2020 $1,739
2Nicholsen
TowerD501005010
Main Lug Load Center,
120/208/240 V, 225 2 EA $- 1978 35 AIP-NF 0 1.00 -6 Yes 2020 $-
2Nicholsen
TowerD501004005
Dry-Type Transformer,
240/480 V Primary 1 EA $- 1978 30 AIP-NF 0 1.00 -11 Yes 2020 $-
2Nicholsen
TowerD304008011
Central Station
Packaged Air Handling 3 EA $- 1978 25 AIP-NF 0 1.00 -16 Yes 2020 $-
2Nicholsen
TowerD305002002
Hydronic Unit Heater,
cabinet, hot water, 1 EA $- 1978 20 AIP-NF 0 1.00 -21 Yes 2020 $-
2Nicholsen
TowerD306003001
Pneumatic Control for
Single Unit18 EA $- 1978 15 AIP-NF 0 1.00 -26 Yes 2020 $-
2Nicholsen
TowerD304008007
Central Station
Packaged Air Handling 1 EA $- 1978 25 AIP-NF 0 1.00 -16 Yes 2020 $-
2Nicholsen
TowerD304007054
Centrifugal Fan, airfoil,
motor and drive 1 EA $- 1993 15 AIP-NF 0 1.00 -11 Yes 2020 $-
2Nicholsen
TowerD501005016
Main Breaker, 277/480
V, 600 amp1 EA $- 1978 35 AIP-NF 0 1.00 -6 Yes 2020 $-
2Nicholsen
TowerD501005014
Main Breaker, 277/480
V, 200 amp1 EA $- 1978 35 AIP-NF 0 1.00 -6 Yes 2020 $-
2Nicholsen
TowerD501006031
Automatic Transfer
Switch, 3 pole, 480 volt, 4 EA $- 1992 25 AIP-NF 0 1.00 -2 Yes 2020 $-
2Nicholsen
TowerD509006005
Variable Frequency
Drive (VFD), 15 HP 3 EA $- 1978 20 AIP-NF 0 1.00 -21 Yes 2020 $-
2Nicholsen
TowerD302005001
Heat Exchanger, steam
to water, shell and tube 60 GPM $- 1978 30 AIP-NF 0 1.00 -11 Yes 2020 $-
2Nicholsen
TowerD209005004
Air Compressor, 2 H.P.,
30 gallon tank1 EA $- 1993 25 AIP-NF 0 1.00 -1 Yes 2020 $-
2Nicholsen
TowerD109001002
Pneumatic Tube
System, Single tube, 4 EA $- 1978 35 AIP-NF 0 1.00 -6 Yes 2020 $-
2Nicholsen
TowerD101002003
Hydraulic passenger
elevator, 2500 lb, 2 1 EA $- 1978 25 AIP-NF 0 1.00 -16 Yes 2020 $-
2Nicholsen
TowerD302008001
Expansion Tank,
painted steel, 15 to 400 60 GAL $- 1978 30 AIP-NF 0 1.00 -11 Yes 2020 $-
2Nicholsen
TowerD304001002
VAV Terminal -0 to 600
CFM, Hot Water 25 EA $- 1978 15 AIP-NF 0 1.00 -26 Yes 2020 $-
1Garrison
TowerD304007076
Industrial Exhauster
Fan, 4,000 CFM, 7-1/2 2 EA $- 1974 15 AIP-NF 0 1.00 -30 Yes 2020 $-
1Garrison
TowerD304007040
Fan System, Wall
Exhaust - Wall Exhaust, 1 EA $- 1974 15 AIP-NF 0 1.00 -30 Yes 2020 $-
1Garrison
TowerD302008002
Expansion Tank,
galvanized steel, 15 to 500 GAL $- 1974 30 AIP-NF 0 1.00 -15 Yes 2020 $-
1Garrison
TowerD304003004
Circulating Pump, cast
iron, in line, 1/2 HP, 3" 1 EA $- 1974 15 AIP-NF 0 1.00 -30 Yes 2020 $-
1Garrison
TowerD306003001
Pneumatic Control for
Single Unit7 EA $- 1975 15 AIP-NF 0 1.00 -29 Yes 2020 $-
1Garrison
TowerD304008014
Central Station
Packaged Air Handling 1 EA $- 1974 25 AIP-NF 0 1.00 -20 Yes 2020 $-
1Garrison
TowerG306004011
Aboveground Fuel
Storage Tank, 30000 2 EA $- 1974 25 AIP-NF 0 1.00 -20 Yes 2020 $-
1Garrison
TowerD501006031
Automatic Transfer
Switch, 3 pole, 480 volt, 1 EA $- 1974 25 AIP-NF 0 1.00 -20 Yes 2020 $-
1Garrison
TowerD202006008
Water Heater Storage
Tank, galvanized steel, 1 EA $- 1974 20 AIP-NF 0 1.00 -25 Yes 2020 $-
1Garrison
TowerD302001015
450-1000 MBH, Gas
Fired, Cast Iron, Steam 1 EA $- 1974 30 AIP-NF 0 1.00 -15 Yes 2020 $-
1Garrison
TowerD209005009
Air Compressor, 7.5
H.P., 80 gallon tank2 EA $- 1974 25 AIP-NF 0 1.00 -20 Yes 2020 $-
1Garrison
TowerD302005003
Heat Exchanger, liquid-
to-liquid, shell and tube 50 GPM $- 1974 30 AIP-NF 0 1.00 -15 Yes 2020 $-
1Garrison
TowerD101004009
Traction geared
elevators, hospital, 2 EA $- 1974 25 AIP-NF 0 1.00 -20 Yes 2020 $-
4OU
Physicians C302001 Carpeting 23,610 SF $207,064 2010 7 R+ 0.25 1.00 1.8 No 2021 $219,674
1Garrison
TowerC302004
Vinyl and Linoleum
Floor Finishes25,155 SF $172,023 1974 15 R 0.1 1.00 1.5 No 2021 $182,499
2Nicholsen
TowerC302001 Carpeting 18,000 SF $157,864 2000 7 R+ 0.25 1.00 1.8 No 2021 $167,478
2Nicholsen
TowerC302001 Carpeting 14,685 SF $128,791 2000 7 R+ 0.25 1.00 1.8 No 2021 $136,634
1Garrison
TowerC302004
Vinyl and Linoleum
Floor Finishes11,512 SF $78,725 1974 15 R 0.1 1.00 1.5 No 2021 $83,519
1Garrison
TowerC302004
Vinyl and Linoleum
Floor Finishes10,390 SF $71,053 1995 15 R 0.1 1.00 1.5 No 2021 $75,380
1Garrison
TowerC302004
Vinyl and Linoleum
Floor Finishes900 SF $6,155 1974 15 R 0.1 1.00 1.5 No 2021 $6,530
Appendix I - Ten Year Inventory Recapitalization List
Asset
Number
Asset
Name
Inventory
Code
Inventory
Classification Name
Inventory
QuantityUOM
Inventory
CRV (2019)
Year
InstalledESL DCR
DCR
Index
PM
Service
Life
Factor
Inventory
RSL
Included
As Work
Item
Requirement
Year
Cost At
Requirement
Year
4OU
Physicians C302004
Vinyl and Linoleum
Floor Finishes100 SF $684 2001 15 R 0.1 1.00 1.5 No 2021 $726
1Garrison
TowerC103002
Toilet & Bath
Accessories29 BthRm $29,022 1974 20 R 0.1 1.00 2 No 2022 $31,713
1Garrison
TowerC103001
Compartments,
Cubicles & Toilet 8 EA $9,752 1974 20 R 0.1 1.00 2 No 2022 $10,656
1Garrison
TowerC303001
Gypsum Wallboard
Ceiling Finishes14,966 SF $31,865 1974 25 R 0.1 1.00 2.5 No 2022 $8,705
1Garrison
TowerC103001
Compartments,
Cubicles & Toilet 6 EA $7,314 1974 20 R 0.1 1.00 2 No 2022 $7,992
1Garrison
TowerC103002
Toilet & Bath
Accessories2 BthRm $2,002 1974 20 R 0.1 1.00 2 No 2022 $2,188
4OU
Physicians C302004
Vinyl and Linoleum
Floor Finishes43,728 SF $299,034 2001 15 R+ 0.25 1.00 3.8 No 2023 $336,565
1Garrison
TowerC302001 Carpeting 23,750 SF $208,292 2010 7 Y+ 0.55 1.00 3.9 No 2023 $234,434
2Nicholsen
TowerC302004
Vinyl and Linoleum
Floor Finishes21,575 SF $147,541 1995 15 R+ 0.25 1.00 3.8 No 2023 $166,059
1Garrison
TowerC102006
Wood door/Metal frame,
flush or panel face, 1,475 SF $95,274 1974 30 R 0.1 1.00 3 No 2023 $107,232
1Garrison
TowerC102006
Wood door/Metal frame,
flush or panel face, 1,250 SF $80,741 1974 30 R 0.1 1.00 3 No 2023 $90,875
1Garrison
TowerC103007002
Wood Cabinets, base
only, with Plastic 164 LF $67,371 1974 30 R 0.1 1.00 3 No 2023 $75,827
1Garrison
TowerC102006
Wood door/Metal frame,
flush or panel face, 800 SF $51,674 1974 30 R 0.1 1.00 3 No 2023 $58,160
1Garrison
TowerC103007001
Wood Cabinets, base
and wall, with Plastic 72 LF $48,866 2000 30 R 0.1 1.00 3 No 2023 $54,999
1Garrison
TowerC103007002
Wood Cabinets, base
only, with Plastic 110 LF $45,189 1974 30 R 0.1 1.00 3 No 2023 $50,861
7Samis
Education C302001 Carpeting 5,000 SF $43,851 2012 7 Y+ 0.55 1.00 3.9 No 2023 $49,355
3Oklahoma
Transplant D304007030
Roof Exhaust Fan,
Centrifugal, Aluminum 1 EA $1,244 1994 15 BSL Y 0.225 1.00 3.5 No 2023 $1,400
1Garrison
TowerD501006012
Safety Switch, 600 V,
200 Amp1 EA $- 1997 25 AIP-NF 0 1.00 3 Yes 2023 $-
5OU
Children's C302001 Carpeting 47,650 SF $417,900 2014 7 G- 0.7 1.00 4.9 No 2024 $484,461
1Garrison
TowerC102005
Metal door/Metal frame,
flush, hollow core, w/ 1,475 SF $138,221 1974 40 R 0.1 1.00 4 No 2024 $160,236
1Garrison
TowerC102005
Metal door/Metal frame,
flush, hollow core, w/ 1,250 SF $117,136 1974 40 R 0.1 1.00 4 No 2024 $135,793
1Garrison
TowerC302001 Carpeting 8,000 SF $70,162 2018 7 G- 0.7 1.00 4.9 No 2024 $81,337
3Oklahoma
Transplant C302001 Carpeting 5,415 SF $47,490 2010 7 G- 0.7 1.00 4.9 No 2024 $55,054
3Oklahoma
Transplant C302001 Carpeting 1,902 SF $16,680 1995 7 G- 0.7 1.00 4.9 No 2024 $19,337
2Nicholsen
TowerC103008002
Solid Surface Molded
Counter Top48 LF $9,475 1978 40 R 0.1 1.00 4 No 2024 $10,984
3Oklahoma
Transplant C302001 Carpeting 962 SF $8,437 2010 7 G- 0.7 1.00 4.9 No 2024 $9,781
1Garrison
TowerC101001
Interior Partition Wall
System with Gypsum 23,025 FloorArea $515,872 1974 50 R 0.1 1.00 5 No 2025 $123,196
1Garrison
TowerD509004002
Commercial Building
Lightning Protection 25,000 SF $54,285 1990 15 BSL G- 0.35 1.00 5.3 No 2025 $64,819
1Garrison
TowerC101007 Interior Windows 620 SF $43,212 1974 50 R 0.1 1.00 5 No 2025 $51,597
3Oklahoma
Transplant D302011008
Steam Regulator Valve,
1-1/2" diameter1 EA $6,470 2010 6 G 0.9 1.00 5.4 No 2025 $7,726
1Garrison
TowerD304007055
Centrifugal Fan, airfoil,
motor and drive 1 EA $4,709 1977 15 BSL G- 0.35 1.00 5.3 No 2025 $5,623
1Garrison
TowerD304007034
Roof Exhaust Fan,
Centrifugal, Aluminum 1 EA $2,675 1974 15 BSL G- 0.35 1.00 5.3 No 2025 $3,194
2Nicholsen
TowerD304007030
Roof Exhaust Fan,
Centrifugal, Aluminum 2 EA $2,487 1997 15 BSL G- 0.35 1.00 5.3 No 2025 $2,970
1Garrison
TowerD304007036
Fan System, Wall
Exhaust - Wall Exhaust, 1 EA $1,758 1974 15 BSL G- 0.35 1.00 5.3 No 2025 $2,099
5OU
Children's D305006012
Window/Thru-Wall Unit
Air Conditioner, 29,000 1 EA $1,689 2009 20 R+ 0.25 1.00 5 No 2025 $2,017
1Garrison
TowerD304007035
Fan System, Wall
Exhaust - Wall Exhaust, 1 EA $1,688 1990 15 BSL G- 0.35 1.00 5.3 No 2025 $2,016
1Garrison
TowerB301009010 Aluminum downspouts 33 LF $155 2000 20 BSL Y+ 0.275 1.00 5.6 No 2025 $185
8College of
MedicineC302001 Carpeting 109,035 SF $956,259 2016 7 G 0.9 1.00 6.3 No 2026 $1,176,078
2Nicholsen
TowerC302001 Carpeting 21,575 SF $189,218 1995 7 R 0.1 1.00 6.3 Yes 2026 $232,714
4OU
Physicians C302001 Carpeting 21,000 SF $184,174 2010 7 Y+ 0.55 1.00 6.3 Yes 2026 $226,511
2Nicholsen
TowerC302001 Carpeting 20,000 SF $175,404 2018 7 G 0.9 1.00 6.3 No 2026 $215,725
7Samis
Education C302001 Carpeting 18,642 SF $163,494 2012 7 G 0.9 1.00 6.3 No 2026 $201,077
5OU
Children's C302001 Carpeting 12,480 SF $109,453 2018 7 G 0.9 1.00 6.3 No 2026 $134,613
2Nicholsen
TowerC302001 Carpeting 8,500 SF $74,547 2019 7 G 0.9 1.00 6.3 No 2026 $91,683
6Children's
AtriumC302001 Carpeting 6,924 SF $60,724 2011 7 G 0.9 1.00 6.3 No 2026 $74,683
4OU
Physicians C302001 Carpeting 6,600 SF $57,883 2018 7 G 0.9 1.00 6.3 No 2026 $71,189
1Garrison
TowerC303003001
Suspended Acoustical
Ceiling Systems23,500 SF $182,243 1974 60 R 0.1 1.00 6 No 2026 $56,034
2Nicholsen
TowerC302001 Carpeting 4,500 SF $39,466 2019 7 G 0.9 1.00 6.3 No 2026 $48,538
1Garrison
TowerC302001 Carpeting 4,200 SF $36,835 2019 7 G 0.9 1.00 6.3 No 2026 $45,302
8College of
MedicineC302001 Carpeting 3,270 SF $28,678 2016 7 Y+ 0.55 1.00 6.3 Yes 2026 $35,270
3Oklahoma
Transplant C302001 Carpeting 3,175 SF $27,846 2016 7 G 0.9 1.00 6.3 No 2026 $34,247
Appendix I - Ten Year Inventory Recapitalization List
Asset
Number
Asset
Name
Inventory
Code
Inventory
Classification Name
Inventory
QuantityUOM
Inventory
CRV (2019)
Year
InstalledESL DCR
DCR
Index
PM
Service
Life
Factor
Inventory
RSL
Included
As Work
Item
Requirement
Year
Cost At
Requirement
Year
1Garrison
TowerC303003001
Suspended Acoustical
Ceiling Systems8,058 SF $62,490 1974 60 R 0.1 1.00 6 No 2026 $19,214
1Garrison
TowerD304007058
Centrifugal Fan, airfoil,
single width, V-belt 2 EA $14,462 1997 15 BSL G 0.45 1.00 6.8 No 2026 $17,786
1Garrison
TowerC303003001
Suspended Acoustical
Ceiling Systems4,620 SF $35,828 1974 60 R 0.1 1.00 6 No 2026 $11,016
2Nicholsen
TowerD304007032
Roof Exhaust Fan,
Centrifugal, Aluminum 4 EA $7,569 1978 15 BSL G 0.45 1.00 6.8 No 2026 $9,309
1Garrison
TowerD304007058
Centrifugal Fan, airfoil,
single width, V-belt 1 EA $7,232 1974 15 BSL G 0.45 1.00 6.8 No 2026 $8,894
1Garrison
TowerD304007075
Industrial Exhauster
Fan, 2,000 CFM, 3 H.P.1 EA $5,844 1974 15 BSL G 0.45 1.00 6.8 No 2026 $7,187
1Garrison
TowerC302001 Carpeting 600 SF $5,262 2019 7 G 0.9 1.00 6.3 No 2026 $6,472
1Garrison
TowerD304007055
Centrifugal Fan, airfoil,
motor and drive 1 EA $4,709 2000 15 BSL G 0.45 1.00 6.8 No 2026 $5,791
1Garrison
TowerD304007055
Centrifugal Fan, airfoil,
motor and drive 1 EA $4,709 1974 15 BSL G 0.45 1.00 6.8 No 2026 $5,791
1Garrison
TowerC302001 Carpeting 350 SF $3,070 2016 7 G 0.9 1.00 6.3 No 2026 $3,776
1Garrison
TowerD304007034
Roof Exhaust Fan,
Centrifugal, Aluminum 1 EA $2,675 1990 15 BSL G 0.45 1.00 6.8 No 2026 $3,290
2Nicholsen
TowerC302001 Carpeting 250 SF $2,193 2000 7 Y+ 0.55 1.00 6.3 Yes 2026 $2,697
1Garrison
TowerD304007033
Roof Exhaust Fan,
Centrifugal, Aluminum 1 EA $2,132 1985 15 BSL G 0.45 1.00 6.8 No 2026 $2,622
2Nicholsen
TowerD304007035
Fan System, Wall
Exhaust - Wall Exhaust, 1 EA $1,688 1978 15 BSL G 0.45 1.00 6.8 No 2026 $2,076
8College of
MedicineC302001 Carpeting 180 SF $1,579 2016 7 G 0.9 1.00 6.3 No 2026 $1,942
8College of
MedicineC302001 Carpeting 160 SF $1,403 2016 7 G 0.9 1.00 6.3 No 2026 $1,726
8College of
MedicineC302001 Carpeting 96 SF $842 2016 7 G 0.9 1.00 6.3 No 2026 $1,036
4OU
Physicians C302001 Carpeting 55,100 SF $483,238 2001 7 R 0.1 1.00 0.7 No 2027 $612,151
5OU
Children's C302001 Carpeting 47,650 SF $417,900 2009 7 R 0.1 1.00 0.7 No 2027 $529,383
1Garrison
TowerC302001 Carpeting 11,545 SF $101,252 1974 7 R 0.1 1.00 0.7 No 2027 $128,263
1Garrison
TowerC302001 Carpeting 11,512 SF $100,963 1974 7 R 0.1 1.00 0.7 No 2027 $127,897
7Samis
Education C302001 Carpeting 10,896 SF $95,560 2012 7 G 0.9 1.00 7 Yes 2027 $121,053
1Garrison
TowerC302001 Carpeting 6,400 SF $56,129 2000 7 R 0.1 1.00 0.7 No 2027 $71,103
1Garrison
TowerC302001 Carpeting 4,500 SF $39,466 2010 7 R 0.1 1.00 0.7 No 2027 $49,994
1Garrison
TowerD509007009
Variable Frequency
Drive (VFD), 50HP 2 EA $32,783 1974 20 BSL G- 0.35 1.00 7 No 2027 $41,529
2Nicholsen
TowerD501003011
Switchboard - 600 V,
1600 Amp1 EA $21,400 1978 25 BSL Y+ 0.275 1.00 7 No 2027 $27,109
1Garrison
TowerD509007010
Variable Frequency
Drive (VFD), 60 HP 1 EA $20,030 1974 20 BSL G- 0.35 1.00 7 No 2027 $25,373
1Garrison
TowerC302001 Carpeting 2,000 SF $17,540 1974 7 R 0.1 1.00 0.7 No 2027 $22,219
1Garrison
TowerC302002 Ceramic Tile Flooring 1,600 SF $16,424 2010 75 R 0.1 1.00 7.5 No 2027 $20,805
1Garrison
TowerC302007 Terrazzo Floor Finishes 940 SF $46,667 1974 75 R 0.1 1.00 7.5 No 2027 $14,779
1Garrison
TowerC302001 Carpeting 1,200 SF $10,524 2000 7 R 0.1 1.00 0.7 No 2027 $13,331
1Garrison
TowerD403001001
Fire Extinguisher
Cabinets, single 25 EA $8,848 1974 20 BSL G- 0.35 1.00 7 No 2027 $11,208
1Garrison
TowerC302002 Ceramic Tile Flooring 600 SF $6,159 1974 75 R 0.1 1.00 7.5 No 2027 $7,802
1Garrison
TowerD509006005
Variable Frequency
Drive (VFD), 15 HP 1 EA $5,668 1990 20 BSL G- 0.35 1.00 7 No 2027 $7,180
1Garrison
TowerD502004001
Surface Mounted
Exterior Incandescent, 19 EA $1,863 1993 20 BSL G- 0.35 1.00 7 No 2027 $2,360
1Garrison
TowerC302007 Terrazzo Floor Finishes 60 SF $2,979 1974 75 R 0.1 1.00 7.5 No 2027 $943
5OU
Children's C302012
Painted and Stained
Floor Finishes450 SF $546 2001 10 Y- 0.35 1.00 7 Yes 2027 $692
1Garrison
TowerC302007 Terrazzo Floor Finishes 25 SF $1,241 1974 75 R 0.1 1.00 7.5 No 2027 $393
1Garrison
TowerB301009010 Aluminum downspouts 24 LF $113 1993 20 BSL G- 0.35 1.00 7 No 2027 $143
4OU
Physicians C302004
Vinyl and Linoleum
Floor Finishes43,728 SF $299,034 2010 15 Y+ 0.55 1.00 8.3 No 2028 $390,172
4OU
Physicians C302001 Carpeting 23,610 SF $207,064 2010 7 R+ 0.25 1.00 1.8 No 2028 $270,172
2Nicholsen
TowerC302001 Carpeting 18,000 SF $157,864 2000 7 R+ 0.25 1.00 1.8 No 2028 $205,977
2Nicholsen
TowerC302001 Carpeting 14,685 SF $128,791 2000 7 R+ 0.25 1.00 1.8 No 2028 $168,043
1Garrison
TowerD304008013
Central Station
Packaged Air Handling 1 EA $113,928 1974 25 BSL G- 0.35 1.00 8.8 No 2028 $148,650
1Garrison
TowerD304008007
Central Station
Packaged Air Handling 1 EA $32,113 1974 25 BSL G- 0.35 1.00 8.8 No 2028 $41,900
1Garrison
TowerD304008006
Central Station
Packaged Air Handling 1 EA $26,367 1975 25 BSL G- 0.35 1.00 8.8 No 2028 $34,403
3Oklahoma
Transplant D304007031
Roof Exhaust Fan,
Centrifugal, Aluminum 2 EA $3,147 1994 15 Y+ 0.55 1.00 8.3 No 2028 $4,106
2Nicholsen
TowerC302004
Vinyl and Linoleum
Floor Finishes250 SF $1,710 2010 15 Y+ 0.55 1.00 8.3 No 2028 $2,231
3Oklahoma
Transplant D304007030
Roof Exhaust Fan,
Centrifugal, Aluminum 1 EA $1,244 1994 15 Y+ 0.55 1.00 8.3 No 2028 $1,623
3Oklahoma
Transplant D304007030
Roof Exhaust Fan,
Centrifugal, Aluminum 1 EA $1,244 1994 15 Y+ 0.55 1.00 8.3 No 2028 $1,623
3Oklahoma
Transplant D304007030
Roof Exhaust Fan,
Centrifugal, Aluminum 1 EA $1,244 1994 15 Y+ 0.55 1.00 8.3 No 2028 $1,623
Appendix I - Ten Year Inventory Recapitalization List
Asset
Number
Asset
Name
Inventory
Code
Inventory
Classification Name
Inventory
QuantityUOM
Inventory
CRV (2019)
Year
InstalledESL DCR
DCR
Index
PM
Service
Life
Factor
Inventory
RSL
Included
As Work
Item
Requirement
Year
Cost At
Requirement
Year
3Oklahoma
Transplant D304007030
Roof Exhaust Fan,
Centrifugal, Aluminum 1 EA $1,244 1994 15 Y+ 0.55 1.00 8.3 No 2028 $1,623
7Samis
Education D304003030
Circulating Pump, cast
iron, bronze impeller, 1-2 EA $- 2012 15 AIP-NF 0 1.00 8 Yes 2028 $-
1Garrison
TowerD509006002
Variable Frequency
Drive (VFD), 5 HP motor 3 EA $11,061 2000 20 BSL G 0.45 1.00 9 No 2029 $14,865
1Garrison
TowerD502004001
Surface Mounted
Exterior Incandescent, 2 EA $196 1974 20 BSL G 0.45 1.00 9 No 2029 $263
Appendix J
Facility Asset Management Glossary of Terms
Glossary of Terms
Facility Asset Management Definitions
Adaption
Alterations in physical plant to address changes in use, codes, or standards. Such changes
include those required under the American Disabilities Act and those made to keep up with
technology as well as facilities that become obsolete for program reasons.
Other terms for adaption are code-driven obsolescence and functional (or program)
obsolescence; they are separate in character. Code-driven are usually prescriptive; academic of
program obsolescence refers to the inability of a facility to function well for its intended use.
Funding may vary such that functional/program renovation is funded separately from a strict code
upgrade, depending upon the scale of work needed. Often the two are combined and done at the
same time on a building-wide basis.
Adaptation/Renovation/Modernization
The improvement, addition or expansion of facilities by work performed to change the interior
alignment of space or the physical characteristics of an existing facility so it can be used more
effectively, be adapted for new use, or comply with existing codes. Includes the total amount of
expenditures required to meet evolving technological, programmatic or regulatory demands.
(Asset Lifecycle Model for Total Cost of Ownership Management)
Alterations
Work performed to change the interior arrangements or other physical characteristics of an
existing facility or fixed equipment so that it can be used more effectively for its current designated
purpose or adapted to a new use. Alterations may include work referred to as improvement,
conversion, remodeling, and modernization but are not maintenance.
Annual Maintenance and Repair Budget
In principle, any building owner must establish an annual maintenance and repair (M&R) budget.
An annual maintenance and repair budget will in general be the sum of two components: (1)
routine expenditures for maintenance, repairs, and planned replacement and (2) expenditures for
correction of deferred deficiencies (i.e., backlog reduction). An M&R budget should not include
operations or alterations expenditures.
The scale and scope of routine expenditures, the first component, are related to the physical
nature of the inventory of buildings and building uses, including design, age, intensity of use, and
climate of the region where a building is located. These factors influence the rate at which a
building deteriorates through normal aging and use.
The second component, backlog reduction, is related to the level of funding available for routine
maintenance and repair and the effectiveness of the owner's maintenance efforts. If maintenance
and repair needs that should be addressed on an ongoing basis are neglected, the backlog of
deferred deficiencies grows. When physical consequences of deferred deficiencies lead to more
serious repair or replacement needs than might otherwise have been anticipated, the rate of
backlog growth may accelerate.
Taken together, M&R expenses are an important element of the costs of ownership. Many factors-
financial, political, and social as well as technical, influence a building owner's assessment of
what should be done to control the costs of ownership while assuring that the facilities provide
the shelter and services for which they were designed.
Building Service Life
A building's service lifetime is the period of years over which the building provides shelter and an
environment supportive of the activities it houses. Buildings can have lifetimes that last centuries,
although parts of the building may change greatly during that period. Building owners, designers,
and managers generally make decisions about maintenance, repairs, operations, and alterations
with an assumed design service life in mind, typically between 10 and 55 years.
Capital Asset Management
The identification and prioritization of facility and infrastructure physical, functional, and budgetary
needs, spanning a multi-year timeframe. Also includes the process of reinvesting funds into
physical assets in support of the organizational mission, above and beyond normal routine
operations and maintenance.
Capital Renewal (CR)/ Replacement
The systematic management process of planning and budgeting for known future cyclical repair
and replacement requirements that extend the life and retain the usable condition of facilities and
systems, not normally contained in the annual operating budget. Capital renewal is a planned
investment program that ensures that facilities will function at levels commensurate with the
academic priorities and missions of an institution. Included are major building and infrastructure
systems and components that have a maintenance cycle in excess of one year. (e.g., replace
roofs, paint buildings, resurface roads, etc.).
The cyclical replacement may be for all or a significant portion (e.g., the replacement of 50% or
more of a building system component (lighting system, roof system, etc.) as it reaches the end of
its useful life, of major components or infrastructure systems, at or near the end of their useful
service life. These activities may extend the useful life and retain the usable condition of an
associated capital asset (e.g., replacement of an HVAC system, extending the usable life of a
facility).
Replacement may be capitalized based on the Governmental Accounting Standards
Board/Financial Accounting Standards Board (GASB/FASB) definition. A depreciation model
calculates a sinking fund for this maintenance activity. Costs are estimated by a current
replacement value that is derived by industry standard cost databases, (e.g., Building News,
Craftsman Book Company, Richardson General Construction Estimating Standards, RSMeans).
(Asset Lifecycle Model for Total Cost of Ownership Management)
Renewal and replacement is an accounting term used to distinguish a subgroup of plant fund
assets from capitalized plant additions and improvements. However, institutional accounting
practices vary; decisions are sometimes made to capitalize portions of major maintenance and
renewal and replacement. Replacements in the form of new construction are routinely designated
as capitalized and are grouped together with renewals as capital renewal and replacement
programs. As a form of capitalized construction, replacements are interchangeable with new
construction, whether they are actually replacing an existing facility or are an addition to plant.
Linking capital renewals with replacements is a more accurate way to describe a program for
renewal of existing plant assets as distinguished from totally new additions to plant assets.
Component Renewal at ESL
Includes the regular replacement of building components when they reach the end of their
estimated service life (ESL), including regular roof replacement, refinishing wall surfaces,
repairing and replacing electrical, heating, and cooling systems, replacing tile and carpeting, and
similar types of work.
Often called Capital Renewal and Replacement, it is defined as a systematic management
process to plan and budget for known cyclic repair and replacement requirements that extend the
life and retain usable condition of facilities and systems and are not normally contained in the
annual operating budget. Capital renewal is a planned investment program that ensures that
facilities will function at levels commensurate with the priorities and missions of an institution.
Included are major building and infrastructure systems and components that have a maintenance
cycle in excess of one year.
Computerized Maintenance Management System (CMMS)
An information technology system used to store, and process information related to preventive
maintenance or daily operations checks, and non-routine work, often called non-recurring
identifying, tracking, reporting, etc. (i.e. “manage”) discrete jobs of work. Work is usually but not
necessarily broken into two basic categories of work: recurring work and non-recurring work.
Current Replacement Value (CRV)
The total expenditure in current dollars required to replace any facility at the institution, inclusive
of construction costs, design costs, project management costs and project administrative costs.
Construction costs are calculated as replacement in function vs. in-kind. The value of design (6%),
project management (10-12%), and administrative costs (4%) can be estimated at 20% of the
construction cost. The value of property/land however is excluded, and insurance replacement
values or book values should not be used to define the current replacement value. Costs for the
replacement value are typically generated using a cost models based upon the use of reference
cost databases using the building construction type, user and use categories, quality level,
buildings systems and or subsystems/components/units, and local experience. The property
owner/manager may decide, for internal purposes, to base the current replacement value (CRV)
on “replacement in kind” (duplicate constructions techniques), vs. “replacement in function” (e.g.,
six story office space). The CRV’s for associated infrastructure, such as utility systems, and
generating plants, roadways, non-building structures (e.g., dam, bridges, etc.) are developed in a
similar manner. (Asset Lifecycle Model for Total Cost of Ownership Management)
Deferred Maintenance
Deferred maintenance is maintenance that was not performed when it should have been or was
scheduled to be and which, therefore, is put off or delayed for a future period (SSFAS No. 6, Par.
77)
The accumulation of a backlog of pending physical plant improvements to correct the influence of
age, use and normal wear and tear. Continued underfunding of on-going maintenance and
facilities renewal increases the total backlog of deferred maintenance.
Deferred maintenance is defined as maintenance work that has been deferred on a planned or
unplanned basis to a future budget cycle or postponed until funds are available. Roof
replacements, major building component repairs, mechanical equipment, underground utilities,
and roads and walkways are projects that are often deferred to the next annual funding cycle.
This definition could serve just as well for major maintenance and offers a temptation to bypass
the use of annual operating budgets and fund major maintenance through a deferred maintenance
reduction program. The difference is that a deferred maintenance program is a comprehensive,
one-time approach, often extended over several years, to control a massive backlog of
maintenance work.
Deferred Maintenance/Deferred Maintenance Backlog/Accumulated Deferred Maintenance
Backlog
The total dollar amount of existing maintenance repairs and required replacements (capital
renewal), not accomplished when they should have been, not funded in the current fiscal year or
otherwise delayed to the future. Typically identified by a comprehensive facilities condition
assessment/audit of buildings, grounds, fixed equipment and infrastructure. These needs have
not been scheduled to be accomplished in the current budget cycle and thereby are postponed
until future funding budget cycles. The projects have received a lower priority status than those
to be completed in the current budget cycle. For calculation of facility condition index (FCI) values,
deferred maintenance does not include grand fathered items (e.g., ADA), or programmatic
requirements (e.g., adaptation). (Asset Lifecycle Model for Total Cost of Ownership Management)
Deferred Maintenance Backlog Deterioration/Plant (Facilities) Deterioration Rate
Facilities and equipment are in a constant state of degradation. While identified
deficiencies/requirements are being corrected, other deficiencies/requirements are continuously
being created over time. The rate of deterioration may be expressed as a percentage of current
replacement value per year.
While degradation rates vary as a function of multiple variables such as building type, current
conditions, geographic location, etc., a benchmark deterioration rate for a reasonably well-
maintained facility is approximately 2.5% per annum. Varying annual capital reinvestments into
the physical plant and equipment may alter the degradation rate. The facility condition index (FCI)
can be used as comparative metric to help monitor degradation rates. (Asset Lifecycle Model for
Total Cost of Ownership Management)
Deficiencies
Deficiencies occur when maintenance and repair tasks are not performed in a timely manner.
Deficiencies may or may not have immediately observable physical consequences, but when
allowed to accumulate uncorrected, they inevitably lead to deterioration of performance, loss of
asset value, or both. An accumulation of such uncorrected or deferred deficiencies is a backlog
that represents a liability (in both physical and financial terms) for a building. When a backlog is
permitted to exist from year to year, some deficiencies in it may threaten public health or safety
or result in major long-term economic losses. Such deficiencies are critical and require urgent
attention. Until deficiencies reach this state of urgency, building owners and the public at large
may fail to recognize or may choose to ignore the problem, but it remains a problem nevertheless,
a problem of growing proportions.
The total dollar amount of existing major maintenance repairs and replacements, identified by a
comprehensive facilities audit of buildings, grounds, fixed equipment, and infrastructure. The
amount does not include projected maintenance and replacements or other types of work, such
as program improvements or new construction. Those items should be treated as separate capital
needs.
Deficiency Repairs/Replacements
Repairs include work to restore damaged or worn-out facilities to normal operating condition.
Repairs are curative, whereas maintenance is preventative. Replacements are an exchange of
one fixed asset for another that has the same capacity to perform the same function. In contrast
to repair, replacement generally involves a complete identifiable item of reinvestment (i.e., a major
building component or subsystem).
Deficiency/Requirement (Facility/Structure/Asset)
The quantitative difference, typically in terms of dollars amount and associated physical
requirements, between an asset’s current physical or functional condition, and an established
minimum level of condition/performance. Any problem or defect with materials or equipment.
(Asset Lifecycle Model for Total Cost of Ownership Management)
Direct Condition Ratings
Scoring method used to rate the physical and or operational condition of inventoried components.
The Rating Index % is multiplied by the Expected Service Life (ESL) of the component to calculate
its Remaining Service Life (RSL).
Direct Cost Burden Factors.
Burden Factors are used to calculate the soft costs associated with repair and replacement work
as part of a construction activity. Burden Factors are used to calculate the Current Replacement
Value (CRV) of inventoried components shown in the Inventory detail form. Based on the
definition of CRV, no inflation has been applied to the total cost. Burden Factors are also applied
against cost estimates generated for Work Items, which are ultimately compiled to generate cost
estimates for Work Packages.
Definitions of key terms for Burden Factors are listed below:
General Factors
▪ Geography – Used to adjust costs based on the geographic area of the proposed
construction. Enter a factor here. Example: 1.05 represents a five percent increase
over the U.S average cost index.
▪ Inflation Rate – Used to account for the cost of funds for work estimated in future
years. This field is used to establish inflation rates throughout the entire application.
Contractor Burden
▪ Markup - Includes Contractor’s field overhead costs such as Superintendent Labor,
Project Trailer, Site Electrical, Clean- up, etc.
▪ G&A Overhead - Includes General and Administrative overhead such as office costs,
administrative costs, office expenses, etc.
▪ Profit - Profit margin calculated against Contractor's marked-up costs and overhead.
Owner Burden
▪ Planning & Design - Owner's cost for project planning, design, and contract
document preparation
▪ SIOH - Owner's costs for construction management, including Supervision, Inspection
and Overhead
▪ Contingencies - Owner's costs associated with the risk associated with Design and
Construction unknowns
▪ Other - Any additional project soft cost
Emergency Maintenance
Unscheduled work that requires immediate action to restore services, to remove problems that
could interrupt activities, or to protect life and property. (Asset Lifecycle Model for Total Cost of
Ownership Management)
Emergency Repairs
Requests for system or equipment repairs that are unscheduled and unanticipated. Service calls
generally are received when a system or component has failed and/or perceived to be working
improperly. If the problem has created a hazard or involves an essential service, an emergency
response may be necessary. Conversely, if the problem is not critical, a routine response is
adequate. (Asset Lifecycle Model for Total Cost of Ownership Management)
Facilities Portfolio
The broad array of housing, laboratories, offices, classrooms, and other diverse facilities
necessary to fulfill an institution’s mission and objectives. (2004 Department of the Interior
Facilities and Asset Management Conference)
Facility Condition Assessment
A structured analysis of the comprehensive database established from a facility condition
inspection. The assessment is used to identify specific data areas and items to support individual
requirements. (2004 Department of the Interior Facilities and Asset Management Conference)
A systematic approach to the inventory of the current maintenance and current capital renewal
requirements of a facility. A typical facility condition assessment provides a list of all deficiencies.
Facility Condition Assessment Program
Sometimes called a Facility Capital Planning and Management Program. A continuous systematic
approach of identifying, assessing, prioritizing, and maintaining the specific maintenance, repair,
renewal, and replacement requirements for all facility assets to provide valid documentation,
reporting mechanisms, and budgetary information in a detailed database of facility issues. (Asset
Lifecycle Model for Total Cost of Ownership Management)
Facility Condition Index (FCI)
A comparative industry indicator/benchmark used to indicate the relative physical condition of a
facility, group of buildings, or entire portfolio “independent” of building type, construction type,
location or cost. The facility condition index (FCI) is expressed as a ratio of the cost of remedying
existing deficiencies/requirements, and capital renewal requirements to the current replacement
value (i.e., FCI=(Deferred Maintenance + Capital Renewals)/Current Replacement Value).
The FCI provides a corresponding rule of thumb for the annual reinvestment rate (funding
percentage) to prevent further accumulation of deferred maintenance deficiencies. The FCI value
is a snapshot in time, calculated on an annual basis. Forecasted FCI values for a building in the
future, for example, would include the current deferred maintenance items, plus projected values
of capital renewal requirements.
A method for measuring the relative condition of a single facility or group of facilities is useful in
setting annual funding targets and the duration of deferred maintenance reduction. The Facility
Condition Index (FCI) serves this purpose. The FCI is the ratio of the cost of remedying facilities
deficiencies compared against the current replacement value. The higher the FCI, the worse the
condition.
The FCI was developed through the efforts of the U.S. Navy, private companies such as Applied
Management Engineering, and several nonprofit organizations such as APPA and the National
Association of College and University Business Officers (NACUBO) attempting to develop a
numeric correlation of the FCI with actual building conditions. The FCI was first published in 1991
by NACUBO.
In its simplest term, the FCI for a facility is defined as the cost of remedying facilities deficiencies
divided by the current replacement value.
FCI = Cost of Correcting Deficiencies
Current Replacement Value
The FCI does not take into account future deficiencies and does not account for capital investment
projects or modernization work. Only “active” Work items are included in the calculation.
For example, after conducting an inspection of buildings and infrastructure, a campus with 3.5
million gross sq. ft. finds it has $60 million in deferred maintenance costs. Thus, using an example
current replacement value of $100 per square foot ($350,000,000), the FCI is 0.171, an indication
of poor conditions. Similar calculations for individual buildings can provide comparisons of relative
conditions.
The following definitions are used in calculating an FCI. (Capital Renewal and Deferred
Maintenance Programs, APPA)
a.) Deficiencies: The total dollar amount of existing major maintenance repairs and
replacements, identified by a comprehensive facilities audit of buildings, grounds, fixed
equipment, and infrastructure. The amount does not include projected maintenance and
replacements or other types of work, such as program improvements or new construction.
Those items should be treated as separate capital needs.
The Classification of Accounts jointly developed by APPA and NACUBO provides the
following definition for major repairs and renovations: "expenditures for those major jobs
or projects that must be accomplished but are not funded by normal maintenance
resources received in the annual operating budget cycle." The distinction between major
repairs and minor repairs should be defined by the institution. The key ingredients in this
definition are the source of funds and the institutionally set cost limits for the lowest value
of major maintenance and highest value for minor repairs.
Major maintenance is sometimes included as a routine part of current fund operations and
maintenance. However, an institutional limit for the cost of maintenance work can shift the
designation to the category of a capitalized project. Thus, an accounting decision can
distinguish capital renewal from major maintenance. Rules are not fixed on the distinctions
between the two categories, which can lead to confusion in allocating projects for selection
of funding priorities.
b.) Maintenance: Work necessary to realize the originally anticipated life of a fixed asset,
including buildings, fixed equipment, and infrastructure.
c.) Repairs: Work to restore damaged or worn-out facilities to normal operating condition.
Repairs are curative, whereas maintenance is preventative.
d.) Replacements: An exchange of one fixed asset for another that has the same capacity
to perform the same function. In contrast to repair, replacement generally involves a
complete identifiable item of reinvestment (i.e., a major building component or subsystem).
e.) Current Replacement Value: The estimated cost of constructing a new facility containing
an equal amount of space that is designed and equipped for the same use as the original
building, meets the current commonly accepted standards of construction, and also
complies with environmental and regulatory requirements.
The CRV is an assessment by the owner or its representative of what it would cost to replace
the building in question. These assessments come in many forms, such as cost per square foot
estimates, professionally detailed replacement plans, and insurance replacement values.
In its publication called Managing the Facilities Portfolio, NACUBO defined a set of ratings based
on its evaluation of FCI data from various clients at the time the metric was first published. The
FCI is represented on a scale of zero to one, or 0% to 100%, with higher FCI values, representing
poorer facility’s condition. General industry guidelines are: 0-5% is good; 5.01-10% is fair; and
greater than 10% is poor.
▪ Under 5% = Good
▪ 5% to 10% = Fair
▪ Over 10% = Poor
“Today, many organizations are determining an appropriate FCI range for these ratings based
upon their mission and strategic goals. The Higher Education Facilities Officers, APPA, use the
FCI as part of their Strategic Assessment Model, and as a key Facilities Performance Indicator.
Recommendation #6 in the National Research Council publication entitled "Stewardship of
Federal Facilities” states that performance indicators should be used to evaluate the effectiveness
of facilities maintenance and repair programs. (The American Public Works Association
publication, Special Report #62, describes the use and value of facility condition rating systems
in Chapter 3.6.)
Within the US Federal Government, the "condition index" (CI) is a general measure of the
constructed asset’s condition at a specific point in time. Within the US Federal Government, CI is
calculated using the same formula of the ratio of Repair Needs to Plant Replacement Value (PRV)
but results are presented as a percentage where higher values mean better conditions. "Repair
Needs" is the amount necessary to ensure that a constructed asset (i.e. building or structure) is
restored to a condition substantially equivalent to the originally intended and designed capacity,
efficiency, or capability. "Plant Replacement Value" (or "Functional Replacement Value") is the
cost of replacing an existing building or structure at today’s standards”. (Wikipedia).
Facility Deficiencies
An itemized listing of individual facility components requiring some type of corrective action to
satisfy a desired level of maintenance. (2004 Department of the Interior Facilities and Asset
Management Conference)
Facilities Renewal
A systematic approach to repairing or replacing major building subsystems such as roofs, HVAC,
electrical, and plumbing systems, which have predictable life-cycles, to maintain and extend the
life of the facility. This category is sometimes referred to as Planned Maintenance or Capital
Repair. Normally funded by an institution’s capital budget.
Improvements
A change or addition to an asset that improves its performance or appearance and/or extends its
useful life. (Asset Lifecycle Model for Total Cost of Ownership Management)
Life Cycle Costing
An estimating procedure used to determine the cost of a facility component renewal based on the
average useful life of an individual component. (2004 Department of the Interior Facilities and
Asset Management Conference)
Maintenance is the upkeep of property and equipment, work necessary to realize the originally
anticipated useful life of a fixed asset. Maintenance includes periodic or occasional inspection;
adjustment, lubrication, and cleaning (nonjanitorial) of equipment; replacement of parts; painting;
resurfacing; and other actions to assure continuing service and to prevent breakdown.
Maintenance does not prolong the design service life of the property or equipment, nor does it
add to the asset's value.
Maintenance can be defined as the act of keeping fixed assets in useable condition. It includes
preventative maintenance, normal repairs, replacement of parts and structural components, and
other activities needed to preserve the asset so that it continues to provide acceptable services
and achieves its expected life. Maintenance excludes activities aimed at expanding the capacity
of an asset or otherwise upgrading it in order to serve needs different than, or significantly greater
than, those originally intended. (Federal Accounting Standards Advisory Board (FASAB),
Accounting for Property, Plant and Equipment, Statement of Federal Financial Accounting
Standards (SFAAS) No. 6)
a). Unscheduled Maintenance
Fixing a device or facility sub-element should it become out of order or broken. Often
called “breakdown maintenance”. Unscheduled work that requires reactive corrective
work to restore services, to remove problems that could interrupt activities, or to protect
life and property.
b). Preventative Maintenance
Maintenance, including tests, measurements, adjustments, parts replacements and
cleaning, typically performed specifically to prevent faults and failures from occurring.
Preventative maintenance is typically performed on a planned or scheduled recurring
basis. It can be further subdivided into periodic maintenance and predictive maintenance.
New Construction
Site preparation for, and construction of, entirely new structures and/or extensions to existing
structures, whether or not the site was previously occupied. (OECD Glossary of Statistical Terms)
a). Demolition
In the context of new construction, demolition refers to site preparation that involves the
demolition or wrecking of buildings and other structures, clearing of building sites and the
sale or disposal of materials from demolished structures. In the case of the demolition or
removal of an existing facility sub-element for purposes of replacement with a new or in-
kind sub-element, costs for component demolition are typically included as part of the
component replacement, and not as New Construction. (OECD Glossary of Statistical
Terms)
b). Additions
New construction of an extension to an existing structure. (OECD Glossary of Statistical
Terms)
c). New Building Construction
Site preparation and construction of a new structure.
On-going Maintenance
Routine upkeep such as lubrication of moving parts, checking electrical systems, patching roofs,
and so forth. Failure to attend to these tasks speeds up deterioration of facilities and increases
the likelihood of expensive emergency repairs. Normally on-going maintenance is funded by an
institution’s operating budget.
Operations
Activities related to normal performance of the functions for which a building is used (i.e., utilities,
janitorial services, waste treatment).
Operations are the services necessary to realize the productive value of non-residential assets.
With the exception of recapitalization (renovations due to change in use or obsolescence), this
definition includes most, if not all, of the annual expenses incurred by the facility owner.
(Whitestone Facility Operation Cost Reference)
a). Custodial
Custodial services include the cleaning of offices, work areas, restrooms and common
areas. Trash removal is not included.
b). Energy
Energy includes all expenses related to the purchase, generation, distribution, and
conservation of energy and source fuels necessary to operate an asset and its typical
programmatic equipment. Not included are utilities maintenance or supervision.
c). Grounds/Landscape Maintenance
Grounds include the maintenance of exterior landscaped areas. It does not include street
sweeping or snow removal, the maintenance of parking lots or roadways, or the
maintenance of signage. Also, not included is the maintenance of semi-improved and
unimproved areas.
d). Management
Management includes management services common to a large commercial facility or
campus: project management, material procurement, facility IT support, business
services, planning and engineering. It does not include leasing commissions or direct
supervision of M&R, grounds, or utilities.
e). Pest and Rodent Control
Pest Control includes rodent control and insect abatement procedures and inspections,
both indoors and outdoors. Use of herbicides is not included.
f). Refuse Collection and Recycling
Refuse service includes trash collection and disposal, pick-up services, fees, recycling
operations and administration. Not included are the handling and disposal of hazardous
materials and investment in recycling programs or facilities.
g). Road and Pavement Clearance
Road and Pavement Clearance includes sweeping sand and debris and removing snow
and ice from paved areas including roads, sidewalks, walkways, and parking lots.
h). Security
Security services insure the physical security of assets and occupants, and include
monitoring equipment, guards, and patrol services.
i). Telecommunications
Telecommunications (Telecom) includes voice and data equipment and service.
j). Water and Sewage
Water and Sewage includes potable water, irrigation water, and sewage service.
Planned or Programmed Maintenance
Includes those maintenance tasks whose cycle exceeds one year. Examples of planned or
programmed maintenance are painting, flood coating of roofs, overlays and seal coating of roads
and parking lots, pigging of constricted utility lines and similar functions. (Asset Lifecycle Model
for Total Cost of Ownership Management)
Plant Replacement Value (PRV) (or "Functional Replacement Value") is the cost of replacing an
existing building or structure at today’s standards”. (Wikipedia).
Predictive Maintenance/Testing/Inspection
Routine maintenance, testing, or inspection performed to anticipate failure using specific methods
and equipment, such as vibration analysis, thermographs, x-ray or acoustic systems to aid in
determining future maintenance needs. For example, tests to locate thinning piping, fractures or
excessive vibration that are indicative of maintenance requirements. (Asset Lifecycle Model for
Total Cost of Ownership Management)
Preventive Maintenance
A planned, controlled program of periodic inspection, adjustment, cleaning, lubrication and/or
selective parts replacement of components, and minor repair, as well as performance testing and
analysis intended to maximize the reliability, performance, and lifecycle of building systems,
equipment, etc. Preventive maintenance consists of many check point activities on items, that if
disabled, may interfere with an essential installation operation, endanger life or property, or
involve high cost or long lead time for replacement. (Asset Lifecycle Model for Total Cost of
Ownership Management)
Program Improvements
Space modifications to accommodate program needs, sometimes called program improvements
or alterations, are often overlooked in budgeting for facility’s needs.
Programmed Major Maintenance
Includes those maintenance tasks whose cycle exceeds one year. Examples of programmed
major maintenance are painting, roof maintenance, (flood coating), road and parking lot
maintenance (overlays and seal coating), utility system maintenance (pigging of constricted lines)
and similar functions. (Asset Lifecycle Model for Total Cost of Ownership Management)
Recapitalization
Recapitalization is the replacement of building subsystems, which include among other things
roofs, electrical distribution equipment, HVAC equipment (air handlers, compressors, chillers,
boilers), building control systems, paving, and fire protection apparatus.
Recapitalization typically includes Restoration and Modernization (R&M) activities that improve
facilities. Modernization includes alteration of facilities solely to implement new or higher
standards (including regulatory changes), or to accommodate new functions. Restoration and
modernization does not include recurring sustainment tasks or certain environmental measures
which are funded elsewhere. Other tasks associated with facilities operations (such as custodial
services, grounds services, waste disposal, and the provision of central utilities) are also not
included. (Uniform Facilities Criteria, DoD Facilities Pricing Guide)
a). Long Lived Component Replacement
The renewal of building components that typically last more than 50 years (such as
foundations and structural members).
b). Restoration Due to Neglect
Restoration includes repair and replacement work to restore facilities damaged by
inadequate sustainment, excessive age, disaster, accident, or other causes.
c). Replacement Due to Obsolescence
This includes the replacement of existing facility equipment and/or sub-element
components when a new product has more advantages than the cost and inconvenience
of maintaining the in-place equipment or component. Obsolescence may be attributed to
technical, functional or style issues, and often includes consideration for extended life-
cycle periods, improved performance and/or reduced operating costs, especially as it
relates to mechanical equipment. To replace an item that is unacceptable, inefficient, or
for which spare parts can no longer be obtained.
d). Renovation
Often called adaptation or alteration. Renovation includes the improvement, addition or
expansion of facilities by work performed to change the interior alignment of space or the
physical characteristics of an existing facility so that it can be used more effectively, be
adapted for new use, or comply with existing codes. Renovation is the process of
improving a broken, damaged or outdated structure. (Asset Lifecycle Model for Total Cost
of Ownership Management)
e). Policy Mandated Modernization
Describes work undertaken to bring a component or system into compliance with new
codes, policies or safety regulations.
Recommendations for Routine Maintenance and Capital Renewal
The Building Research Council's conclusions and recommendations are based on the finding that
underfunding of maintenance and repair is a widespread and persistent problem. To overcome
this problem, maintenance and repair budgets should be structured to explicitly identify the
expenditures associated with routine maintenance and repair and activities to reduce the backlog
of deferred maintenance. The council concluded that an appropriate total budget allocation for
routine maintenance and capital renewal is in the range of 2 to 4 percent of the aggregate current
replacement value of those facilities (excluding major infrastructure). When a backlog of deferred
maintenance has been allowed to accumulate, spending must exceed this minimum level until
the backlog has been eliminated.
The specific percentage for a facility depends on a wide range of factors, and the relationship
between maintenance and repair requirements and current replacement value may vary widely,
for any one building may be outside the proposed range (Figure 3). The 2 to 4 percent range is
most valid as a budget guide for a large inventory of buildings and over periods of several years.
However, even with small inventories, the 2 to 4 percent rule of thumb may be applied over a
longer period, such as five to ten years. An important and often misunderstood point is that this
range does not include "one-time" funding to reduce deferred maintenance backlogs.
In addition to the council's conclusions regarding overall routine maintenance and capital renewal
annual funding, the results of empirical studies of the life cycles of individual components provide
general parameters for annual capital renewal allowances, separate from maintenance.
Acknowledging variances for ages and types of facilities, a recommended range for the annual
capital renewal component of total is 1.5 to 3 percent of the total replacement value of plant. Some
evaluations of plant conditions and needs recommend higher ranges. For example, a research-
intensive institution will have a high rate of obsolescence and deterioration owing to changing
technologies and usage of facilities. Institutions that have implemented a deferred maintenance
reduction program will see benefits in lower capital renewal and replacement needs.
In summary, the range of 2 to 4 percent for total funding includes components of 0.5 to 2.5 percent
for maintenance and repairs and 1.5 to 3 percent for capital renewal. These ranges heighten the
importance of an accurate forecast for annual capital renewal allowance and accurate condition
assessments to determine additional needs for deferred maintenance. (Building Research
Council)
Repairs
Work that is performed to return equipment to service after a failure, or to make its operation more
efficient. The restoration of a facility or component thereof to such condition that it may be
effectively utilized for its designated purposes by overhaul, reprocessing, or replacement of
constituent parts or materials that have deteriorated by action of the elements or usage and have
not been corrected through maintenance. (Asset Lifecycle Model for Total Cost of Ownership
Management)
Work to restore damaged or worn-out facilities to normal operating condition. Repairs are curative,
whereas maintenance is preventative.
Replacement
Replacement of an item that is part of the permanent investment of plant and equipment is an
exchange or substitution of one fixed asset for another having the capacity to perform the same
function. Replacement may arise from obsolescence, cumulative effect of wear and tear
throughout the anticipated service lifetime, premature service failure, or destruction through
exposure to fire or other hazard. In contrast to repair, replacement generally involves a complete
identifiable item of investment (i.e., a major building component or subsystem). When major
building subsystems fail, a building owner may sometimes have a choice of repair or replacement
of that subsystem. Replacement is typically funded in maintenance and repair budgets.
Replacement of Obsolete Items
Refers to work undertaken to bring a component or system into compliance with new codes or
safety regulations or to replace an item that is unacceptable, inefficient, or for which spare parts
can no longer be obtained. (Asset Lifecycle Model for Total Cost of Ownership Management)
Routine Repairs
Actions taken to restore a system or piece of equipment to its original capacity, efficiency or
capability. Routine repairs are not intended to increase significantly the capacity of the item
involved. For example, the replacement of a failed boiler with a new unit of similar capacity would
be a routine repair project. However, if the capacity of the new unit were double the capacity of
the original unit, the cost of the extra capacity would have to be capitalized and would not be
considered routine repair work. (Asset Lifecycle Model for Total Cost of Ownership Management)
Plant Replacement Value (PRV)
The estimated cost of constructing a new facility containing an equal amount of space that is
designed and equipped for the same use as the original building, meets the current commonly
accepted standards of construction, and complies with environmental and regulatory
requirements. These assessments come in many forms, such as cost per square foot estimates,
professionally detailed replacement plans, and insurance replacement values.
Replacements
An exchange of one fixed asset for another that has the same capacity to perform the same
function. In contrast to repair, replacement generally involves a complete identifiable item of
reinvestment (i.e., a major building component or subsystem).
Sustainment
“Sustainment provides for maintenance and repair activities necessary to keep a typical inventory
of facilities in good working order over a 50-year service life. It includes:
• regularly scheduled adjustments and inspections, including maintenance inspections (fire
sprinkler heads, HVAC systems) and regulatory inspections (elevators, bridges),
• preventative maintenance tasks,
• emergency response and service calls for minor repairs, and
• major repair or replacement of facility components (usually accomplished by contract) that
are expected to occur periodically throughout the facility service life.
Sustainment includes regular roof replacement, refinishing wall surfaces, repairing and replacing
electrical, heating, and cooling systems, replacing tile and carpeting, and similar types of work. It
does not include repairing or replacing non-attached equipment or furniture or building
components that typically last more than 50 years (such as foundations and structural members).
Sustainment does not include restoration, modernization, environmental compliance, specialized
historical preservation, general facility condition inspections and assessments, planning and
design (other than shop drawings), or costs related to acts of God, which are funded elsewhere.
Other tasks associated with facilities operations (such as custodial services, grass cutting,
landscaping, waste disposal, and the provision of central utilities) are also not included.” (Uniform
Facilities Criteria, DoD Facilities Pricing Guide).
Total Cost of Ownership
Cost of ownership of a building is the total of all expenditures an owner will make over the course
of the building's service lifetime. How these expenditures are measured and reported may vary
from owner to owner, depending on such factors as whether the owner is a private individual,
business enterprise, or a public agency as well as relevant accounting procedures and current
tax laws. Regardless of the specific accounting methods, the cost of ownership will generally
include not only planning, design, and construction but also maintenance, repairs, replacements,
alterations, and normal operations such as heating, cooling, and lighting as well as ultimate
disposal. A building owner should recognize at the outset that the cost of ownership is not fully
paid when construction is complete or when a building is purchased but instead continues for
many years. Failure to recognize this can lead to short-sighted decisions that increase the overall
cost of ownership.
Total Cost of Ownership (TCO)/Lifecycle Cost Management
Total cost of ownership (TCO) is a dollar per square foot value ($#/square foot) associated with
a facility. It is a calculation of all facilities-specific costs (not including furnishings or non-facility
specific equipment) divided by estimated lifespan of the building (30 or 50 years), and the total
gross area. Facilities specific costs include all construction, preservation, maintenance, and
operations costs. A strategic asset management practice that considers all costs of operations
and maintenance, and other costs, in addition to acquisition costs. TCO, therefore includes the
representation of the sum total of the present value of all direct, indirect, recurring and non-
recurring costs incurred or estimated to be incurred in the design, development, production,
operation, maintenance of a facility/structure/asset over its anticipated lifespan. (Inclusive of
site/utilities, new construction, deferred maintenance, preventive/routine maintenance,
renovation, compliance, capital renewal, and occupancy costs.) Again, note that land values are
specifically excluded. (Asset Lifecycle Model for Total Cost of Ownership Management)
Unscheduled/Unplanned Maintenance
Requests for system or equipment repairs that - unlike preventive maintenance work - are
unscheduled and unanticipated. Service calls generally are received when a system or
component has failed and/or perceived to be working improperly. If the problem has created a
hazard or involves an essential service, an emergency response may be necessary. Conversely,
if the problem is not critical, a routine response is adequate.
Reactive and/or emergency corrective work activities that occur in the current budget cycle or
annual program. Activities may range from unplanned maintenance of a nuisance nature requiring
low levels of skill for correction, to non-emergency tasks involving a moderate to major repair or
correction requiring skilled labor, to emergency unscheduled work that requires immediate action
to restore services, to remove problems that could interrupt activities, or to protect life and
property. (Asset Lifecycle Model for Total Cost of Ownership Management)
UNIFORMAT II
ASTM Designation: E 1557 – 09, Standard Classification for Building Elements and Related
Sitework—UNIFORMAT II
1.1 This standard establishes a classification of building elements and related sitework.
Elements, as defined here, are major components common to most buildings. Elements
usually perform a given function, regardless of the design specification, construction
method, or materials used. The classification serves as a consistent reference for analysis,
evaluation, and monitoring during the feasibility, planning, and design stages of buildings.
Using UNIFORMAT II ensures consistency in the economic evaluation of buildings projects
over time and from project to project. It also enhances reporting at all stages in
construction—from feasibility and planning through the preparation of working documents,
construction, maintenance, rehabilitation, and disposal.
1.2 This classification applies to buildings and related sitework. It excludes specialized process
equipment related to a building’s functional use but does include furnishings and equipment.
1.3 The classification incorporates three hierarchical levels described as Levels 1, 2, and 3.
Appendix X1 presents a more detailed suggested Level 4 classification of sub-elements.
Visual Inspection
An evaluation of the physical condition of building components to determine maintenance and
repair requirements by visual inspection and interview methods. This type of inspection does not
include specialized metering, destructive testing, or disassembly of building components. (2004
Department of the Interior Facilities and Asset Management Conference)
Paragon Software Terms and Definitions
Actual Age (yrs) – Display-only field that shows the calculated age of the component, in years,
based on the current year and the Year Installed data entered above. If no data is entered for
Date Installed, the system uses the Year Built data for the Asset to calculate the installation year
of the component.
Asset
In the context of a facility condition assessment, an asset is typically a building, but it can also be
a site, a site infrastructure system, structure, or other real property item owned, leased or
maintained by the subscriber.
Asset Criticality Index Priority (ACI Priority)
ACI Priority is a scale from 1 (low) to 5 (high) that defines the relative importance of one Asset
compared against other Assets in the subscriber’s portfolio. ACI Priority is used in the overall
prioritization of Work Packages and the renewal of inventory components at the end of their
service life using the Risk Reduction prioritization method.
Burden Factor – Displays the total calculated factor to be applied to the baseline catalog unit
cost (or the override unit cost, if used) with all of its burden factors applied (geography, SIOH,
contingencies, planning and design, contractor mark-up, contractor profit, contractor G&A, other)
except for inflation.
Burden Factor = Adjusted Unit Cost ÷ Baseline (or Override) Unit Cost.
Since the factor is being used to calculate the Current Replacement Value, and it is assumed the
cost came from a current year cost catalog, there is no need to apply inflation as part of the burden
factors to arrive at the Adjustment Factor. Burden factors are calculated against baseline unit
cost as currently calculated and as set up in the Burden Factors form in the System Configuration
tables under the Administration tab.
Burdened Unit Cost
Catalog (or override) Unit Cost multiplied by the Burden Factor.
Campus Condition Index (CCI)
A summary of the Facility Condition Indexes for each of the assets in the hierarchy, combined.
The CCI is the total FCI for the selected site. The index is calculated as the total of all the facilities’
deferred maintenance divided by Plant Replacement Value (PRV). This designation was chosen
to differentiate it from FCI, which is the condition index for a single asset.
CCI (100-1)
Displays the alternative view of CCI, calculated as (1-CCI) x 100.
Condition Based Age (CB Age)
The calculated age of the component based on its Direct Condition Rating. The equation used to
calculate CB Age is:
CB Age = ESL – (ESL * DCR Index)
Cost Catalog
A look-up table in Paragon used to store critical information that describes inventory systems, sub-
systems, elements and components. It is the foundation from which inventory components are
classified and recorded in the field. Cost Catalog records are displayed in Classification drop
down fields in both the Paragon web application as well as the Mobile application. For an assessor
to define an inventory classification in the field, it must first exist in the Cost Catalog.
Cost Catalog inventory line items are arranged by Major Group following the Paragon coding
structure. For the first four levels of the Catalog, classification codes generally follow the structure
and classification numbering published in ASTM Standard E-1557-15, Standard Classification for
Building Elements and Related Sitework – UNIFORMAT II. Coding for Level 5 Sub-Elements is
defined by Terracon.
Current Replacement Value (CRV) for Assets
An indicator of the total amount of money invested in a facility since initial construction. CRV is
represents the original acquisition cost of a facility plus capital improvements occurring after the
original construction, multiplied by an inflation factor to calculate the present value of the
investment.
Current Replacement Value (CRV) for Inventory
Calculated as the Burdened Unit Cost times the quantity of the inventoried component.
DCR Index
Display-only field that indicates the rating factor associated with the Direct Condition Rating code.
This factor is multiplied against the Estimated Service Life of the component to calculate the
Remaining Service Life (RSL) of the component at the time it was rated.
Detailed Replacement Value (DRV)
The DRV is the total replacement value of all component quantities included in the asset inventory
for an asset or group of assets.
Direct Condition Rating (DCR)
Code used to categorize the physical and operating condition of a facility component.
Direct Condition Rating Priority (DCR Priority)
DCR Priority is a scale from 1 (low) to 5 (high) that describes the relative impact of the DCR on
the risk of failure of the component compared to other components included in the inventory. DCR
Priority is used in the overall prioritization of Work Packages and the renewal of inventory
components at the end of their service life using the Risk Reduction prioritization method.
Estimated Service Life (ESL)
The average amount of time, in years, that an item, component or system is estimated to function
when installed new and assuming routine maintenance is practiced. ESL values are pre-defined
in the subscriber’s Cost Catalog. Also called Expected Useful Life.
Estimated Remaining Service Life (Est RSL)
Calculated number of years remaining for a component before it reaches the end of its service
life.
If the component has a Direct Condition Rating, then:
EST RSL = ESL × Direct Rating Index × PM Factor.
Example Calculation: ESL = 20, DCR = Y+, Direct Rating Index = .55, PM Factor = .90
Then: EST RSL = 20 × .55 × .90 EST RSL = 9.9
If no Direct Condition Rating data is present, then:
EST RSL = (ESL – Age) × PM Factor.
Example Calculation: ESL = 20, Age = 5, No DCR, No Direct Rating Index, PM Factor = .90
Then: EST RSL = (20 – 5) × .90 EST RSL = 13.5
Expected Useful Life
Defines what is often referred to as the “design life” or the “estimated service life” of a system,
sub-system, element, sub-element or component. This is the number of years that an average
catalog item within the classification is expected to serve its original intended function and be
serviceable. When a component reaches the limit of its Expected Useful Life, Paragon forecasts
a requirement for renewal of the sub-element by in-kind replacement. Data is derived from various
industry publications and cost estimating sources.
Facility Analysis Category (FAC) Code
Four-digit code and description of real property categories used to classify real property based on
a hierarchy of grouping. Published by the Department of Defense
Green Opportunity
Drop-down selector used to document Work Items that may be associated with environment or
sustainment projects. This drop down is organized along with USGBC’s 2009 EB (Existing
Building) LEED Credits. This will help categorize potential opportunities for LEED certification.
Options include Energy Efficiency, Water Conservation, Indoor Air Quality and Environment, Site
Sustainability, and Materials and Construction.
Green Evaluation
Drop-down options will vary depending on the selection made under “Green Opportunity” to
further describe the LEED opportunity. Note that drop-down options will not be available unless a
selection has been made under “Green Opportunity.”
Percent Replaced at ESL
Data column in the Paragon Cost Catalog used to define the typical quantity of an inventoried
component that will be calculated for replacement in analysis forecasts when the component
reaches the end of its estimated service life. The quantity is calculated as a percentage of the
total quantity of the inventoried component.
Preventative Maintenance Factor (PM Factor)
Numerical factor stored in Paragon’s system configuration tables used in calculating the Estimated
Remaining Service Life of an inventoried component or building element.
Remaining Service Life (RSL)
The RSL describes the estimated remaining useful economic service life of a building component,
expressed in years. The RSL is calculated based on a factor associated with the DCR rating,
multiplied by the ESL. If no DCR is made, the RSL is calculated based on a percentage calculated
as the age of the component divided by its ESL.
Repair vs Replacement Ratio (RVRR)
The Repair vs Replacement Ratio (RVRR) represents the ratio of cost per year to repair a
component versus the cost per year to replace the same component.
Repair vs Replacement Ratio (RVRR) = Repair Costs per Year
Replacement Costs per Year
Replacement Values
Current Replacement Value for the combination of Assets included in the selected hierarchy, as
defined by the user in each Asset detail form. Options to define Replacement Value on the Asset
page include Plant Replacement Value (PRV), Detailed Replacement value (DRV), Current
Replacement value (CRV) and Custom CRV.
Risk Reduction Index (RRI)
The RRI is a calculated field combining the attributes of SCI Priority, ACI Priority, and the DCR
Priority of the inventoried component. This index describes the relative importance of one
component over another based on risk. The RRI is used in the overall prioritization of Work
Packages and the renewal of inventory components at the end of their service life using the Risk
Reduction prioritization method.
Section
A unique section or sub-area of the inventoried component when the user wants to differentiate
one section of a component inventory from another section with the same classification code.
System Criticality Index Priority (SCI Priority)
SCI Priority is a scale from 1 (low) to 5 (high) that describes the relative criticality of the system
associated with the inventoried component compared to other components and their systems.
SCI Priority is used in the overall prioritization of Work Packages and the renewal of inventory
components at the end of their service life using the Risk Reduction prioritization method.
UOM
Defines the Unit of Measure for inventory line items.
Work Items
Data records describing deficiencies with inventoried facility components, together with cost
estimates for work to eliminate the deficiency, typically a repair or full component replacement.
Work Packages