facility condition assessment · 1/8/2018  · facility condition assessment report (fca report)...

219
FACILITY CONDITION ASSESSMENT © 2016 4tell™ Solutions, LP. All Rights Reserved. 4tell, iPlan (patent pending) Building Blocks, and Innovation for the Built Environment are trademarks of 4tell™ Solutions, LP. Tyler Elementary School 1001 G STREET SE Washington, DC January 08, 2018 Submitted by: 3715 Martin Luther King Jr. Avenue, SE Washington, DC 20032 Submitted to: Mr. Stephen A. Campbell Senior Planner, Planning Office Department of General Services – Construction Division 2000 14th Street NW, 5th Floor Washington, DC 20009

Upload: others

Post on 16-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

FACILITY CONDITION

ASSESSMENT

© 2016 4tell™ Solutions, LP. All Rights Reserved. 4tell, iPlan (patent pending) Building Blocks, and Innovation for the Built Environment are trademarks of 4tell™ Solutions, LP.

Tyler Elementary School

1001 G STREET SE Washington, DC

January 08, 2018

Submitted by:

3715 Martin Luther King Jr. Avenue, SE Washington, DC 20032

Submitted to: Mr. Stephen A. Campbell

Senior Planner, Planning Office Department of General Services – Construction Division

2000 14th Street NW, 5th Floor Washington, DC 20009

Page 2: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

Hayat Brown LLC Page 2 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

T A B L E O F C O N T E N T S

 

Table of Contents ................................................................................................................ 2 Executive Summary ............................................................................................................. 3 

1.1  General Description ..................................................................................................................... 3 1.2  Scope of Work ............................................................................................................................... 3 1.3  Definitions ....................................................................................................................................... 5 1.4  Limiting Conditions ..................................................................................................................... 7 1.5  Building Summary ........................................................................................................................ 8 1.6  Summary of Findings .................................................................................................................. 8 1.7  Facility Condition Index ............................................................................................................. 9 1.8  Building System Needs: Immediate ....................................................................................11 

A SubStructure Systems................................................................................................ 12 A10 Foundat ions .........................................................................................................................12 

B Shell Systems .............................................................................................................. 14 B10 SuperStructure ..................................................................................................................14 B30 Roof ing ....................................................................................................................................21 

C Interiors Systems ........................................................................................................ 25 C10 Inter ior Construct ion ...................................................................................................25 C20 Stairs ........................................................................................................................................30 C30 Inter ior Finishes ..............................................................................................................33 

D Services Systems ........................................................................................................ 51 D20 Plumbing ................................................................................................................................51 D30 HVAC ........................................................................................................................................63 D40 F i re Protect ion Systems ...........................................................................................95 D50 Electr ical Systems .........................................................................................................97 

E Equipment & Furnishing Systems .......................................................................... 122 E10 Equipment .......................................................................................................................... 122 

G Building Sitework Systems ..................................................................................... 124 G20 Si te Improvements ..................................................................................................... 124 G30 Si te Civ i l /Mechanical Ut i l i t ies .......................................................................... 143 

   Appendices   Appendix A: Expenditure Forecast   Appendix B: Photographic Record   Appendix C: Survey Information Resulting In Plant Adaptation Recommendations      

Page 3: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

0726.0

Hayat Brown LLC Page 3 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

E X E C U T I V E S U M M A R Y

1.1 GENERAL DESCRIPTION

Hayat Brown LLC was retained by  the District of Columbia Department of General Services (DGS) to undertake  Facility Condition Assessments (FCAs) for District of Columbia Public Schools (DCPS) facilities. The purpose of the FCAs are to inventory  the elemental components  in the  buildings,  identify key attributes  of those components, determine estimated remaining  useful  lives (RULs) and replacement costs of those components for  inclusion  in DCPS’ 6‐year capital plan.  The FCA will also identify physical deficiencies needing immediate attention.  The FCA data  was  collected  by  Hayat  Brown  LLC’s  assessment  teams  into  the  iPlan™  Sustainable  Facility  Governance  Solution  (iPlan)  platform  and  will  function  as  the  source  for  DGS’  development  of  a  comprehensive  repair, alteration, and improvement program for DCPS facilities. The FCA and analytical data will enable the District  to plan, manage and analyze data utilizing a single platform. This will enhance the District's ability  to  develop  short‐ ,  intermediate‐,  and  long‐term  capital  improvement  strategies  based  on  stakeholder needs and will provide for a cost‐effective  operation  of  the  facility  based  upon  the  prioritization  code  for  each  identified  element  or  component  in  the  FCA.  The  iPlan  platform  calculated  the  RULs  and  estimated replacement costs, and generated this draft Facility Condition Assessment Report  (FCA Report)  for DGS review.  The  iPlan platform also  allows  the  FCA data  and  the  FCA Report  to  be  accessible  via  a web‐based dashboard.  

Note: This report was issued in January 2018 and is based on current iPlan information which was the source of the 10 Year FCI projections provided in October 2017. The FCA reporting engine can only be run on current year assessments  and  because  these  assessments  happened  in  a  previous  year,  2017  data  would  not  normally  be  shown however this FCA Report content has been augmented with standard iPlan reports to include 2017 data. 

1.2 SCOPE OF WORK

The FCAs were carried out by Hayat Brown LLC (Contractor) and included a complete and thorough visual, non‐destructive  assessment  of  each  facility.  The  Contractor  followed  ASTM  standards  ("ASTM  E2018‐08")  for conducting property condition assessments, as well as guidance from DGS regarding additional survey information and cost estimates for possible plant adaptations. The FCA Report summarizes the FCA process, which included the following: 

Review of  existing documentation provided by  the District  and  interviews with DCPS personnel  regarding

aspects of each facility.

Physical  assessment  to  include  a  limited  non‐intrusive  visual  assessment  of  the  buildings  and  their

components.

Identify  and  categorize  each  major  component  for  predictive  maintenance,  testing  and/or  inspection,

preventative maintenance, emergency maintenance and/or routine maintenance needs.

Based on provided templates surveyed elements included:

o Core and shell: These elements  include superstructure,  floors, bearing walls, columns, beams, and

exterior envelope components.

o Interiors: These elements include interior finishes of floors, walls, ceilings, stairways, etc.

Page 4: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 4 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

o Building equipment and systems: These elements include HVAC systems, and electrical systems, fire 

protection systems, and conveyor systems.  

o Fixed  equipment  and  non‐movable  furnishings:  These  elements  include  fixed  equipment  such  as 

kitchen equipment’s, audio equipment, public address systems, etc.  

o Building site Improvements: These elements include paved surfaces, playground equipment, fencing, 

recreational elements, site lighting, general site drainage and landscaping. 

 

Evaluated  additional  elements  based  on  questionnaires  provided  by  DGS.  These  questionnaires  were 

answered based on interviewing the facility staff and visual surveys: 

o ADA accessibility: included questions relating to accessibility barriers of interior and exterior elements 

o Safety  and  security:  included  questions  relating  to  safety  and  security  of  the  facility  such  as  fire 

protection systems 

o Access control: included questions relating to controlled access to the facility such intrusion detection 

systems and component hardware 

o Hazardous materials: included questions relating to the existence hazardous materials at each facility  

o LEED  opportunities:  included  questions  relating  to  existing  components  and  improving  LEED 

certification points  

o Additional space considerations:  included additional questions relating to space allocation and the 

existence of special features  

Page 5: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 5 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

1.3 DEFINITIONS

Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report incorporates the information obtained during the Walk‐Through Site Assessment Survey, the Document Review, and Interviews to support the iPlan cost estimates for components at their RUL. 

Document Reviews and Interviews ‐ Includes document reviews, research, and interviews to augment the walk‐through survey so as to assist the consultant's understanding of the subject property and identification of physical deficiencies.  

Walk Through Site Assessment  Survey  ‐  The walk‐through  survey  identifies  the  subject  property's  elemental components, conditions, RULs, and replacement costs at RUL.  Costing  ‐ Costing  is reported following the ASTM 2018‐08 Guidelines Section 9, “Opinions of Costs to Remedy Physical Deficiencies.     As such, they  include general‐scope opinions of costs to assist the user  in developing a general understanding of the physical condition of the subject property. As outlined in ASTM 2018‐08, the opinion of probable costs should only be construed as preliminary, order of magnitude budgets.  Actual costs will vary based on design, quality of materials,  field conditions and several other  factors as outlined  in ASTM 2018‐08. Generally, costing does not include project management, contingency, permits, hazardous material remediation (unless specifically stated on a case by case basis) and other overhead costs such as Architect and Engineering fees, profit, or other markups. 

  Replacement  and  repair  costs  herein  are  based  on  the  two major North American  Standards  for  facility  cost estimating:  Whitestone  Facility  Maintenance  and  Repair  Cost  Library  (Costlabs);  and  RSMeans.   Whitestone visualizes costing from a Facility Maintenance viewpoint while RSMeans approaches costing from a construction viewpoint.  Using industry best practices, the relative strengths of each costing approach has been integrated into a unified costing guide for the condition assessment process.   The quantities associated with each item have been estimated  during  a  walk‐through  during  the  site  assessment  and  do  not  represent  exact  measurements  or quantities.  Costs have been adjusted to the local Washington DC area and are stated in constant 2017 dollars.  The cost guide has been utilized by  the assessment  team as a starting point  for costing and supplemented by  the assessors adjusting costs based upon experience and  facility  factors  (such as  installation design)  to determine maintenance and replacement costs.  Physical Deficiencies ‐ In defining good commercial and customary practice for conducting a baseline FCAs, the goal  is  to  identify  and  communicate  physical  deficiencies  to  a  user.  The  term physical  deficiencies mean  the presence  of  conspicuous  defects  or material  deferred maintenance  of  a  subject  property's material  systems, components, or equipment as observed during  the assessor’s walk‐through  survey.  This definition  specifically excludes  deficiencies  that may  be  remedied  with  routine maintenance,  miscellaneous minor  repairs,  normal operating maintenance, etc., and excludes conditions that generally do not present material physical deficiencies of the subject property.  

Survey Information Resulting in Plant Adaptation Recommendations - These are methodical questions based upon defined industry or Owner standards resulting in a general costing amount that gives an Owner a cash expenditure to plan on within proformas.  

Page 6: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 6 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Life Cycle  ‐  There  are  various  approaches  for  determining  an  elemental  component’s  service  life  such  as  a “modeling” approach where an industry standard expected useful life (EUL) is added to a component’s date of installation resulting in a modeled or calculated expectation of replacement for that item.  The methodology used in Hayat Brown LLC’s reported value for the expected replacement of an elemental component is a field assessed opinion of  remaining useful  life  (RUL).   Observed RUL  takes  into account a  field assessor’s observation of  the elemental component along with other factors such as maintenance records or observed measurable parameters.  

Planning Horizon  –  Since  the  life  cycles of many elemental  components  exceed  industry  standard  cash  flow proformas, Hayat Brown LLC’s FCA Report only includes a timeframe of importance to an Owner’s immediate cash flow planning.   In the case of this report, DGS requested a planning horizon window of 10 years. The Planning Horizon years and remaining useful lives (RULs) as defined in this report’s approach are summarized in the table below:   

Planning Horizon Remaining Useful Life 

(RUL) 

Year 1 ‐ “Immediate” or “Current”  0 

Year 2  1 

Year 3  2 

Year 4 3 Year 5 4 Year 6 5 Year 7 6 Year 8 7 Year 9 8 Year 10 9

Page 7: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 7 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

1.4 LIMITING CONDITIONS

This report has been prepared for the exclusive and sole use of the Department of General Services. The report may not be relied upon by any other person or entity without the express written consent of Hayat Brown LLC.  Any reliance on this report by a third party, any decisions that a third party makes based on this report, or any use at  all  of  this  report  by  a  third  party  is  the  responsibility  of  such  third  parties.  Hayat  Brown  LLC  accepts  no responsibility for damages, if any, suffered by any third party as a result of decisions made, or actions taken, based on this report.  The  assessment  of  the  building/site  components  was  performed  using  methods  and  procedures  that  are consistent with standard commercial and customary practice as outlined in ASTM Standard E 2018‐08 for PCA assessments. As per this ASTM Standard, the assessment of the building/site components was based on a visual walk‐through site visit, which captured the overall condition of the site at that specific point in time only.  No  legal  surveys,  soil  tests,  environmental  assessments,  geotechnical  assessments,  detailed  barrier‐free compliance  assessments,  seismic  assessments,  detailed  engineering  calculations,  or  quantity  surveying compilations have been made. No responsibility, therefore, is assumed concerning these matters. Hayat Brown LLC did not design nor construct the building(s) or related structures and therefore will not be held responsible for the impact of any design or construction defects, whether or not described in this report. No guarantee or warranty, expressed or implied, with respect to the property, building components, building systems, property systems, or any other physical aspect of the property is made.  The recommendations and cost estimates associated with these recommendations, as presented in this report, are based on walk‐through non‐invasive observations of the parts of the building which were readily accessible during our  visual  review.  Conditions may exist  that  are not  as per  the  general  condition of  the  system being observed  and  reported  in  this  report.  Cost  estimates  presented  in  this  report  are  also  based  on  information received during interviews with operations and maintenance staff. In certain instances, Hayat Brown LLC has been required  to  assume  that  the  information  provided  is  accurate  and  cannot  be  held  responsible  for  incorrect information received during the interview process. Should additional information become available with respect to the condition of the building and/or site elements, Hayat Brown LLC requests that this information be brought to our attention so that we may reassess the conclusions presented herein.  The cost estimates are intended for global budgeting purposes only. The scope of work and the actual costs of the work  recommended  can  only  be  determined  after  a  detailed  examination  of  the  site  element  in  question, understanding of the site restrictions, understanding of the effects on the ongoing operations of the site/building, definition  of  the  construction  schedule,  and  preparation  of  tender  documents.  We  expressly  waive  any responsibilities for the effects of any action taken as a result of these endeavors unless we are specifically advised of prior to, and participate in the action, at which time, our responsibility will be negotiated.  Our  opinions  and  recommendations  presented  in  our  reports  will  be  rendered  in  accordance  with  generally accepted professional standards and are not to be construed as a warranty or guarantee regarding existing or future  physical  conditions  at  the  Site  or  regarding  compliance  of  Site  systems/components  and procedures/operations with the various regulating codes, standards, regulations, ordinances, etc.  

Page 8: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

0726.0

Hayat Brown LLC Page 8 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

1.5 BUILDING SUMMARY

Item  Description 

Project Name  Tyler Elementary School 

DCAM‐17‐NC‐0058 

Full Address  1001 G STREET SE Washington, DC  

Year Built  1949 

Gross Building Area (SF)  72,954 

Current Replacement Value  $ 16,885,933 

CRV/GSF ($/Sq Ft)  $231.46 / Sq Ft 

1.6 SUMMARY OF FINDINGS

This report represents summary‐level findings for the Facility Condition Assessment. The deficiencies identified in this assessment can be combined with potential new construction requirements to develop an overall Long‐Term Capital Needs Plan that can be the basis for a facility wide capital improvement funding strategy. Key findings from the Assessment include: 

Key Finding  Metric 

Current Year Facility Condition Index 

2.43% 

Property Replacement Value (in Current Dollars) 

$16,885,933 

Current Year Capital Needs  (included in FCI) 

$410,789 

Current Year Non‐Capital Needs (not included in FCI) 

$5,812 

Year 0 to Year 10 Capital Needs  $2,094,069 

10 Year FCI  12.40% 

Page 9: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 9 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

1.7 FACILITY CONDITION INDEX

The Facility Condition Index (FCI) gives an indication of a building’s or portfolio’s overall state of condition. It is a widely recognized metric for benchmarking in the real estate industry. By definition, THE FCI is defined as the ratio of Deferred Maintenance Cost to the Current Building Replacement Value (CRV) of the property.   

  

This CRV is based on the building type from the online Whitestone Facility Maintenance and Repair Cost Library (Costlabs) as of 1 September 2017 (a national recognized publication used in thousands on condition assessments throughout the country). Typically, the FCI is calculated using only the current condition values, not taking into account  the  future  needs  identified  in  the  life  cycle  evaluation  or  building  enhancements  or  programmatic upgrades that may be identified in a scoping or design process.   Accounting principles indicate that a value of 65%, or the “rule of two‐thirds”, be utilized for the FCI threshold for identifying potential replacement candidates. Once the current repair costs reach 65%, or roughly two‐thirds of the full replacement value of the estimated cost to replace a facility, it may not be prudent to continue to fund repairs. In cases where aggressive facilities planning is expected to be necessary, this threshold may be adjusted to address more pressing need. 

Tyler Elementary School Current Year FCI = 2.43% 

 

 

 

 

 

The Chart below indicates the cumulative effects of the FCI ratio over the study period assuming the required 

funds and expenditures are NOT provided to address the identified works and deferred maintenance each year. 

Page 10: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

0726.0

Hayat Brown LLC Page 10 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

DCPSAssessmentReview2017

Tyler Elementary School            69 Years Old Estimated Replacement Value: $16,885,933 

Cumulative FCI over the 10 Year Study Period

2017 2018 2019 2020 2021 2022 2023 2024 2025 2026

Deferred Maint. (Carried Forward)

$0 $410,789 $824,307 $1,467,402 $1,502,600 $1,573,490 $1,741,041 $1,887,377 $1,967,195 $2,063,633

Current Year Cost 

(Anticipated)$410,789 $413,518 $643,096 $35,198 $70,890 $167,551 $146,336 $79,818 $96,438 $30,436

Total Cost $410,789 $824,307 $1,467,402 $1,502,600 $1,573,490 $1,741,041 $1,887,377 $1,967,195 $2,063,633 $2,094,069

Funding Budgeted

$0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Total Deferred Maint.

$410,789 $824,307 $1,467,402 $1,502,600 $1,573,490 $1,741,041 $1,887,377 $1,967,195 $2,063,633 $2,094,069

FCI% 2.4% 4.9 % 8.7 % 8.9 % 9.3 % 10.3 % 11.2 % 11.6 % 12.2 % 12.4 %

Page 11: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 11 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

1.8 BUILDING SYSTEM NEEDS: IMMEDIATE

  

Building Systems  Estimated Costs  Percentage of Total Cost 

B Shell $4,036  1.0% 

C Interiors $18,689  4.5% 

D Services $374,976  90.0% 

Z General $18,900  4.5% 

Total  $416,601  100.0% 

 

Page 12: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 12 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

A S U B S T R U C T U R E S Y S T E M S

A10 FOUNDATIONS

Item  Description 

A1011 Wall Foundations   Standard Foundations 

Condition  Good 

RUL  25 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  22500 

Unit of Measure  SF 

Unit Cost  $17.16 

     

Page 13: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 13 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

A1031 Standard Slab on Grade  Slabs On Grade 

Condition  Good 

RUL  25 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  22500 

Unit of Measure  SF 

Unit Cost  $8.21 

 

       

Page 14: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 14 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

B S H E L L S Y S T E M S

B10 SUPERSTRUCTURE

Item  Description 

B10 SuperStructure  Superstructure  

Condition  Good 

RUL  20 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  SF 

Unit Cost  $13.40 

 

   

 

 

Page 15: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 15 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

B20 EXTERIOR ENCLOSURE Item  Description 

B2011 Exterior Wall Construction  Exterior Walls, Brick 

Condition  Good 

RUL  25 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  27400 

Unit of Measure  SF 

Unit Cost  $37.86 

 

Exterior wall  Exterior wall  

Exterior wall   Exterior   

Page 16: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 16 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

B2011  Replace/repair cracked/deteriorated exterior brick Deferred 

Maintenance 2017  $3,786 

    

Page 17: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 17 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

B2021 Windows  Exterior Windows  

Condition  Good 

RUL  23 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  392 

Unit of Measure  EA 

Unit Cost  $746.59 

 

Exterior windows   Exterior windows  

 

 

 

Page 18: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 18 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

B2021  Replace broken glass Routine 

Maint Minor Repairs 

2017  $250 

    

Page 19: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 19 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

B2023 Storefronts  Storefront facade 

Condition  Good 

RUL  29 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  120 

Unit of Measure  SF 

Unit Cost  $68.97 

 

Main Entrance  

 

    

Page 20: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 20 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

B2031 Glazed Doors & Entrances  Exterior Doors 

Condition  Good 

RUL  47 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  29 

Unit of Measure  EA 

Unit Cost  $1,273.14 

 

Exterior doors   Exterior wall  

Exterior doors  

 

    

Page 21: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 21 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

B30 ROOFING

Item  Description 

B3011 Roof Finishes  Main Roof 

Condition  Poor 

RUL  2 

Location  Roof 

Plan Type  Capital Replacement 

Quantity  22500 

Unit of Measure  SF 

Unit Cost  $7.09 

Comments   

   

 

 

 

Page 22: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 22 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

B3011  Replace Main Roof Capital 

Replacement 2019  $159,615 

    

Page 23: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 23 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

B3011 Roof Finishes  Lower Roof ‐ New 

Condition  Good 

RUL  35 

Location  Roof 

Plan Type  Capital Replacement 

Quantity  17892 

Unit of Measure  SF 

Unit Cost  $14.49 

Comments   

       

Page 24: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 24 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

B3022 Roof Hatches  Roof Hatch, Aluminum 

Condition  Good 

RUL  50 

Location  Roof 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $1,131.61 

Comments   

 

 

    

Page 25: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 25 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

C I N T E R I O R S S Y S T E M S

C10 INTERIOR CONSTRUCTION

Item  Description 

C1021 Interior Doors  Interior Door, Steel, Painted 

Condition  Good 

RUL  25 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  4 

Unit of Measure  EA 

Unit Cost  $857.53 

 

 

 

    

Page 26: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 26 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C1021 Interior Doors  Interior Door, Wood 

Condition  Good 

RUL  35 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  45 

Unit of Measure  EA 

Unit Cost  $1,343.55 

Comments   

 

 

    

Page 27: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 27 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C1021 Interior Doors  Interior Door, Steel, Painted, w/ Glass,  

Condition  Good 

RUL  45 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  6 

Unit of Measure  EA 

Unit Cost  $1,195.66 

 

Vestibule at Multi Purpose Room  

 

    

Page 28: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 28 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C1021 Interior Doors  Aluminum, Fully Glazed, Interior Door 

Condition  Good 

RUL  45 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  4 

Unit of Measure  EA 

Unit Cost  $2,004.26 

 

 

 

    

Page 29: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 29 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C1021 Interior Doors  Fire Doors 

Condition  Good 

RUL  35 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  14 

Unit of Measure  EA 

Unit Cost  $1,382.34 

 

Entrance to Multi Purpose Room  

 

    

Page 30: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 30 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

C20 STAIRS

Item  Description 

C2011 Regular Stairs  Metal, Painted, Interior Stairs 

Condition  Good 

RUL  25 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  4500 

Unit of Measure  SF 

Unit Cost  $35.88 

 

 

 

    

Page 31: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 31 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C2011 Regular Stairs  Concrete, Exterior Stairs 

Condition  Fair 

RUL  5 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  1376 

Unit of Measure  SF 

Unit Cost  $37.48 

 Eeeeeeeeeyrry  

Exterior Steps   Exterior stair  

 Exterior stair  

 

    

Page 32: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 32 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C2011 Regular Stairs  Concrete, Interior Stairs 

Condition  Good 

RUL  25 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  200 

Unit of Measure  SF 

Unit Cost  $33.25 

 

 

 

    

Page 33: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 33 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

C30 INTERIOR FINISHES

Item  Description 

C3012 Wall Finishes to Interior Walls  Plaster Interior Wall Finish 

Condition  Good 

RUL  25 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  35719 

Unit of Measure  SF 

Unit Cost  $12.56 

 

 Toilet Room  

    

Page 34: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 34 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

C3012  Replace/Repair plaster walls Deferred 

Maintenance 2017  $6,280 

    

Page 35: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 35 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3012 Wall Finishes to Interior Walls  Ceramic Tile, Interior Wall Finish 

Condition  Good 

RUL  45 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  3600 

Unit of Measure  SF 

Unit Cost  $12.70 

 

Toilet Room  

 

    

Page 36: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 36 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3012 Wall Finishes to Interior Walls  Concrete Block, Painted, Interior Wall Finish 

Condition  Good 

RUL  25 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  44382 

Unit of Measure  SF 

Unit Cost  $11.55 

 

 

 

    

Page 37: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 37 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3012 Wall Finishes to Interior Walls  Brick Interior Wall Finish 

Condition  Fair ‐ Good 

RUL  8 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  2000 

Unit of Measure  SF 

Unit Cost  $18.98 

 

 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

C3012  Replace Brick Interior Wall Finish Capital 

Replacement 2025  $37,958 

    

Page 38: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 38 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3012 Wall Finishes to Interior Walls  Wood, Finished, Interior Paneling 

Condition  Good 

RUL  35 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  2500 

Unit of Measure  SF 

Unit Cost  $18.29 

 

 

 

    

Page 39: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 39 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3024 Flooring  Quarry Tile Flooring 

Condition  Fair ‐ Good 

RUL  9 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  2250 

Unit of Measure  SF 

Unit Cost  $13.53 

 

 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

C3024  Replace Quarry Tile Flooring Capital 

Replacement 2026  $30,436 

    

Page 40: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 40 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3024 Flooring  Wood Flooring 

Condition  Good 

RUL  23 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  5885 

Unit of Measure  SF 

Unit Cost  $9.59 

 

     

Type  Component Description  Plan Type  Year Expenditures 

($) 

C3024  Refinish wood flooring Routine 

Maint Minor Repairs 

2017  $1,840 

    

Page 41: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 41 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3024 Flooring  Finishes ‐ Vinyl Tile 

Condition  Fair ‐ Good 

RUL  13 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  60000 

Unit of Measure  SF 

Unit Cost  $3.04 

 

 

 

    

Page 42: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 42 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3024 Flooring  Floor Finish, Tile, Marble 

Condition  Good 

RUL  45 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  575 

Unit of Measure  SF 

Unit Cost  $32.30 

 

 

 

    

Page 43: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 43 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3024 Flooring  Floor Finish, Tile, Ceramic 

Condition  Good 

RUL  20 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  1200 

Unit of Measure  SF 

Unit Cost  $13.97 

 

Staff Toilet Room  

 

    

Page 44: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 44 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3024 Flooring  Terrazzo Flooring 

Condition  Good 

RUL  25 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  2250 

Unit of Measure  Sq Ft 

Unit Cost  $9.75 

 

Toilet Room 

 

    

Page 45: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 45 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3025 Carpeting  Carpet 

Condition  Poor ‐ Fair 

RUL  3 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  3000 

Unit of Measure  SF 

Unit Cost  $5.98 

 

   

 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

C3025  Replace Carpet Capital 

Replacement 2020  $17,940 

Page 46: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 46 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3031 Ceiling Finishes  Concrete, Painted Ceiling 

Condition  Good 

RUL  25 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  4000 

Unit of Measure  SF 

Unit Cost  $25.84 

Comments   

Cafeteria   

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

C3031  Repair concrete ceiling  Deferred 

Maintenance 2017  $5,115 

    

Page 47: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 47 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3031 Ceiling Finishes  Gypsum Board, Finished Ceiling 

Condition  Good 

RUL  25 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  1000 

Unit of Measure  SF 

Unit Cost  $5.27 

 

Annex Room 144 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

C3031  Repair damaged gypsum board  Routine 

Maint Minor Repairs 

2017  $264 

    

Page 48: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 48 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3031 Ceiling Finishes  Plaster Ceiling 

Condition  Fair 

RUL  5 

Location  Interior  

Plan Type  Capital Replacement 

Quantity  5000 

Unit of Measure  SF 

Unit Cost  $12.57 

 

 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

C3031  Replace Plaster Ceiling Capital 

Replacement 2022  $62,825 

    

Page 49: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 49 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

C3032 Suspended Ceilings  Acoustical tile 

Condition  Good 

RUL  20 

Location  Interior  

Plan Type  Deferred Maintenance 

Quantity  60000 

Unit of Measure  SF 

Unit Cost  $5.19 

 

 2nd Floor Toilet Room  

2nd Floor Toilet Room  

 

Page 50: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 50 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

C3032  Replace deteriorated ceiling tiles  Deferred 

Maintenance 2017  $5,190 

    

Page 51: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 51 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

D S E R V I C E S S Y S T E M S

D20 PLUMBING

Item  Description 

D2010.0 Water_Fixtures  Plumbing Fixtures  

Condition  Fair 

RUL  13 

Location  Throughout 

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  SF 

Unit Cost  $4.96 

 

Page 52: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 52 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Two missing Urinals in 3rd Floor Boys Toilet Room 

Defective Drinking Fountain 

Broken Toilet in Toilet Room inside Room 134 

 

 

Page 53: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 53 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

D2010  Replace Drinking Fountains in various locations Deferred 

Maintenance 2017  $32,637 

D2010  Replace Toilet in Toilet Room inside Room 134 Routine 

Maint Minor Repairs 

2017  $400 

D2010  Replace/Install Urinals in 3rd Floor Boys Toilet Room Deferred 

Maintenance 2017  $889 

    

Page 54: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 54 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D2014 Sinks Commercial Grade Kitchen Sink, multiple compartments 

Condition  Fair ‐ Good 

RUL  10 

Location  Kitchen 

Plan Type  Capital Replacement 

Quantity  2 

Unit of Measure  Each 

Unit Cost  $1,007.80 

Comments   

Missing Indirect Waste   

Type  Component Description  Plan Type  Year Expenditures 

($) 

D2014  Provide indirect waste Plant 

Adaptation 2017  $1,000 

    

Page 55: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 55 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D2021 Cold Water Service  Domestic Water Distribution Piping 

Condition  Fair ‐ Good 

RUL  11 

Location  Throughout 

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  SF 

Unit Cost  $7.31 

Comments   

Water Main in Boiler Room 

 

    

Page 56: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 56 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D2023 Domestic Water Supply Equipment Domestic Hot Water Remote Storage Tank, ~1000 Gal. 

Condition  Poor ‐ Fair 

RUL  3 

Location  Boiler Room 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $4,421.07 

Comments   Original tank with damaged insulation.  Replace tank within 5 years.  

 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D2023 Replace Domestic Hot Water Remote Storage Tank, 

~1000 Gal. Capital 

Replacement 2020  $4,421 

    

Page 57: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 57 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D2023 Domestic Water Supply Equipment Gas Fired Domestic Water Heater, 154 MBH input, 81 Gals. 

Condition  Fair ‐ Good 

RUL  11 

Location  Boiler Room 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  Each 

Unit Cost  $11,890.32 

 

   

Defective Draft Fan 

 

 

Page 58: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 58 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

D2023  Replace draft fan at breeching Routine 

Maint Minor Repairs 

2017  $500 

    

Page 59: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 59 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D2031 Waste Piping  Waste Piping 

Condition  Fair 

RUL  14 

Location  Throughout 

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  SF 

Unit Cost  $6.51 

Comments   Piping service was partially was renovated, approximately within 10 years.  

 Leaky pipe above Gas Fired Domestic Water Heater 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D2031 Replace leaky piping in Boiler Room above Gas Fired Domestic Water Heater and other locations in Boiler 

Room 

Routine Maint Minor 

Repairs 2017  $309 

    

Page 60: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 60 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D2034 Sanitary Waste Equipment  Interceptors ‐ Grease Trap 

Condition  Poor 

RUL  0 

Location  Kitchen 

Plan Type  Deferred Maintenance 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $3,970.33 

 

 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D2034  Replace Interceptors ‐ Grease Trap Deferred 

Maintenance 2017  $3,970 

    

Page 61: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 61 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D2041 Pipe & Fittings  Rainwater Drainage Piping 

Condition  Fair ‐ Good 

RUL  14 

Location  Throughout 

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  Sq Ft 

Unit Cost  $4.02 

 

 

 

    

Page 62: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 62 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D2043 Rainwater Drainage Equipment  Sump Pump, submersible type 

Condition  Poor ‐ Fair 

RUL  3 

Location  Boiler Room 

Plan Type  Capital Replacement 

Quantity  3 

Unit of Measure  Each 

Unit Cost  $450.12 

 

Units next to Chiller Unit next to 

Feedwater/Condensate Return Pumping System 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D2043  Replace Sump Pump, submersible type Capital 

Replacement 2020  $1,350 

    

Page 63: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 63 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

D30 HVAC

Item  Description 

D3021 Boilers  Steam Boiler, 2678 MBH Gross 

Condition  Fair ‐ Good 

RUL  10 

Location  Boiler Room 

Plan Type  Capital Replacement 

Quantity  2 

Unit of Measure  Each 

Unit Cost  $39,626.53 

Comments Boilers are locked out but issues raised by boiler inspector (removal of scale build‐up and re‐cleaning of manholes) were already corrected, in addition to the replacement of boiler's bottom blowdowns. Pending re‐assembling of components and burner adjustments before startup.  

Page 64: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 64 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Gas burner, fuel oil lines disconnected  Piping Specialties ‐ Make‐up Line with RPZ 

Boilers Breeching  Boilers Fresh Air Louvers 

Piping Specialties ‐ Boiler Feedwater / Condensate Return Pumping System 

Piping Specialties ‐ Hydronic Hot Water Heat Exchangers 

 

Page 65: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 65 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

D3021  Install CO/Gas Leak Detection in Boiler Room Plant 

Adaptation 2017  $1,000 

D3021 Replace water level control at Boiler 

Feedwater/Condensate Return Pumping System in Boiler Room 

Routine Maint Minor 

Repairs 2017  $500 

    

Page 66: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 66 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3031 Chilled Water Systems  Cooling Tower, Fiberglass, ~150 Ton 

Condition  Good 

RUL  18 

Location  Main Roof 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $25,518.40 

 

Condenser Water Pumps in Boiler Room 

Condenser Water Piping in Boiler Room 

Page 67: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 67 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Chemical Treatment System in Boiler Room (1)  Chemical Treatment System in Boiler Room (2) 

    

Page 68: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 68 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3031 Chilled Water Systems  Water Cooled Chiller, Centrifugal, 150 Ton 

Condition  Good 

RUL  21 

Location  Boiler Room 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $245,339.23 

 

    

Page 69: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 69 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3032 Direct Expansion Systems DX Split Condensing Unit, Cafeteria Service, 7.5 Ton 

Condition  Fair ‐ Good 

RUL  8 

Location  Building Exterior 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $22,685.91 

 

     

Type  Component Description  Plan Type  Year Expenditures 

($) 

D3032 Replace DX Split Condensing Unit, Cafeteria Service, 

7.5 Ton Capital 

Replacement 2025  $22,686 

    

Page 70: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 70 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3032 Direct Expansion Systems  DX Split Condensing Unit 

Condition  Fair ‐ Good 

RUL  11 

Location  Main Roof and Annex Roof 

Plan Type  Capital Replacement 

Quantity  3 

Unit of Measure  EA 

Unit Cost  $9,655.63 

 

Unit on Main Roof (1)  Unit on Main Roof (2) 

Unit on Annex Roof 

 

    

Page 71: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 71 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3041 Air Distribution Systems  Heating and Ventilating Unit 

Condition  Poor 

RUL  0 

Location Fan Rooms above Multipurpose Room Stage, MER inside Kitchen 

Plan Type  Deferred Maintenance 

Quantity  3 

Unit of Measure  EA 

Unit Cost  $18,215.45 

Comments   Original units not operational with abandoned pneumatic control elements.  Replace units.  

Unit in Multipurpose Room Stage Fan Room (1)  Unit in Multipurpose Room Stage Fan Room (2) 

Page 72: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 72 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Unit in Kitchen Mechanical Rom 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D3041  Replace Heating and Ventilating Unit Deferred 

Maintenance 2017  $54,646 

    

Page 73: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 73 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3041 Air Distribution Systems  DX Split Indoor Unit, ducted, 100% return air 

Condition  Good 

RUL  23 

Location  Cafeteria 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $10,861.13 

Comments     

 

 

    

Page 74: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 74 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3041 Air Distribution Systems  Ductwork, for HV Units and Exhaust Fans 

Condition  Fair 

RUL  5 

Location  Various locations 

Plan Type  Capital Replacement 

Quantity  20000 

Unit of Measure  SF 

Unit Cost  $4.54 

 

 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D3041  Replace Ductwork, for HV Units and Exhaust Fans Capital 

Replacement 2022  $90,800 

    

Page 75: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 75 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3041 Air Distribution Systems Ductwork, for DX Split Indoor Unit in Cafeteria and for overhead Fan Coil Units 

Condition  Good 

RUL  28 

Location  Various locations 

Plan Type  Capital Replacement 

Quantity  20000 

Unit of Measure  SF 

Unit Cost  $4.54 

 

 

 

    

Page 76: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 76 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3041 Air Distribution Systems  Unit Heater/Cabinet Heater, Steam 

Condition  Fair ‐ Good 

RUL  7 

Location  Cafeteria 

Plan Type  Capital Replacement 

Quantity  10 

Unit of Measure  EA 

Unit Cost  $4,986.01 

Comments     

Ducted cabinet heater serving adjacent rooms to Cafeteria 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D3041 Replace Cabinet Heater serving adjacent room to 

Cafeteria Deferred 

Maintenance 2017  $4,986 

D3041  Replace Unit Heater/Cabinet Heater, Steam Capital 

Replacement 2024  $49,860 

    

Page 77: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 77 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3041 Air Distribution Systems  Unit Ventilator, Steam 

Condition  Poor 

RUL  0 

Location  Cafeteria 

Plan Type  Deferred Maintenance 

Quantity  4 

Unit of Measure  EA 

Unit Cost  $4,986.01 

Comments Units are deteriorated/not operational, and there is not an alternative source of fresh air intake in Cafeteria.  Poor  Replace units.  

 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D3041  Replace Unit Ventilator, Steam Deferred 

Maintenance 2017  $19,944 

    

Page 78: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 78 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3041 Air Distribution Systems  DX Split Indoor Unit, ductless, various sizes 

Condition  Fair ‐ Good 

RUL  11 

Location Electrical Room 138, IT Room inside Room 206, IT Room 303 

Plan Type  Capital Replacement 

Quantity  3 

Unit of Measure  EA 

Unit Cost  $2,717.51 

 

Unit in IT Room 303  Unit in IT Room inside Room 206 

Unit in Electrical Room 138 

 

    

Page 79: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 79 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3041 Air Distribution Systems  Fan Coil Units, 1 Coil, HW and/or CHW 

Condition  Fair ‐ Good 

RUL  13 

Location Thorughout except Multipurpose Room, Cafeteria and Kitchen 

Plan Type  Capital Replacement 

Quantity  68087 

Unit of Measure  SF 

Unit Cost  $7.17 

 

Typical fan coil unit by Exits and other locations  Typical fan coil unit in Classroom 

Typical overhead fan coil unit in Toilet Rooms, Corridors and other locations 

Typical fan coil unit in various rooms 

Page 80: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 80 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Temporary A/C unit in Classroom installed because of defective Fan Coil Unit 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D3041 Replace automatic control valves in Room 311 and 

2nd Floor Girls Toilet Room 

Routine Maint Minor 

Repairs 2017  $250 

D3041  Replace fan motor in Room 116 Routine 

Maint Minor Repairs 

2017  $250 

D3041  Replace units in Annex Rooms 125, 135 Deferred 

Maintenance 2017  $2,997 

    

Page 81: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 81 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3042 Exhaust Ventilation Systems  Kitchen Exhaust Hood, Commercial 

Condition  Fair ‐ Good 

RUL  8 

Location  Kitchen 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $7,629.74 

 

     

Type  Component Description  Plan Type  Year Expenditures 

($) 

D3042  Replace Kitchen Exhaust Hood, Commercial Capital 

Replacement 2025  $7,630 

    

Page 82: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 82 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3042 Exhaust Ventilation Systems  Exhaust Fan, Rooftop, Newer 

Condition  Fair ‐ Good 

RUL  14 

Location  Main Roof and Annex Roof 

Plan Type  Capital Replacement 

Quantity  8 

Unit of Measure  Each 

Unit Cost  $1,338.77 

 

Defective Exhaust Fan, Main Roof  

Page 83: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 83 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

D3042 Repair Exhaust Fans (unknown issue), Main Roof and 

Annex Roof Deferred 

Maintenance 2017  $4,166 

    

Page 84: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 84 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3042 Exhaust Ventilation Systems  Exhaust Fan, Rooftop, Older 

Condition  Poor 

RUL  0 

Location  Kitchen Roof 

Plan Type  Deferred Maintenance 

Quantity  3 

Unit of Measure  Each 

Unit Cost  $1,338.77 

 Fans beyond their useful life and not operational  Replace units.  

 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D3042  Replace Exhaust Fan, Rooftop, Older Deferred 

Maintenance 2017  $4,016 

    

Page 85: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 85 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3043 Steam Distribution Systems  Convector, Steam 

Condition  Fair ‐ Good 

RUL  10 

Location  Various locations 

Plan Type  Capital Replacement 

Quantity  20 

Unit of Measure   

Unit Cost  $947.52 

 

 

    

Page 86: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 86 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3043 Steam Distribution Systems  Steam and Condensate Piping ‐ Distribution 

Condition  Fair ‐ Good 

RUL  10 

Location  Various locations 

Plan Type  Capital Replacement 

Quantity  30000 

Unit of Measure  SF 

Unit Cost  $20.10 

 

 

Condensate Return Pumping System in Kitchen MER 

Page 87: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 87 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

    

Page 88: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 88 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3046 Change‐over Distribution System  Dual Temperature Piping, HW/CHW 

Condition  Fair ‐ Good 

RUL  14 

Location Thorughout except Multipurpose Room, Cafeteria and Kitchen 

Plan Type  Capital Replacement 

Quantity  68087 

Unit of Measure  SF 

Unit Cost  $7.07 

 

Dual Temperature Pumps in Boiler Room   Damaged insulating because pipe moisture condensation, basement room (1) 

Damaged insulating because pipe moisture condensation, basement room (2), damaged ceiling 

Dual temperature piping and moisture condensation piping feeding fan coil above 

 

Page 89: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 89 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

D3046  Replace pipe insulation in several locations, ~300 LF Deferred 

Maintenance 2017  $ 

D3046 

Replace piping throughout the Annex Building, piping is old and conveys insufficient water flow through terminal units. Temporary Electric Unit Heaters were installed to supplement insufficient 

heating. 

Deferred Maintenance 

2018  $126,496 

    

Page 90: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 90 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3051 Terminal Self‐Contained Units  Electric Unit Heater 

Condition  Good 

RUL  19 

Location  Various locations 

Plan Type  Capital Replacement 

Quantity  12 

Unit of Measure  EA 

Unit Cost  $2,017.36 

Comments Electric unit heaters were installed in various locations to compensate insufficient heating provided by fan coil units.  

 

 

    

Page 91: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 91 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3051 Terminal Self‐Contained Units  Air Conditioner, Window 

Condition  Fair ‐ Good 

RUL  14 

Location  Various locations 

Plan Type  Capital Replacement 

Quantity  10 

Unit of Measure  EA 

Unit Cost  $1,569.72 

 

 

 

    

Page 92: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 92 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3067 Energy Monitoring & Control  Meter, Natural Gas ‐ Unknown Capacity 

Condition  Good 

RUL  25 

Location  Building Exterior 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  Each 

Unit Cost  $274.64 

 

 

 

    

Page 93: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 93 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3068 Building Automation Systems  Building Controls (SF), Pneumatic, Basic 

Condition  Poor 

RUL  0 

Location  Multipurpose Room and Kitchen 

Plan Type  Deferred Maintenance 

Quantity  10000 

Unit of Measure  SF 

Unit Cost  $2.90 

Comments Old H&V units with abandoned pneumatic control elements. No other means of climate control exist for the areas served.  Poor  Install DDC controls as part of recommended replacement of old H&V units.  

Typical pneumatic control elements at H&V unit 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D3068  Replace Building Controls (SF), Pneumatic, Basic Deferred 

Maintenance 2017  $29,000 

    

Page 94: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 94 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D3068 Building Automation Systems  Building Controls, Variable Frequency Drive (VFD) 

Condition  Fair ‐ Good 

RUL  13 

Location  Main Roof and Boiler Room 

Plan Type  Capital Replacement 

Quantity  3 

Unit of Measure  EA 

Unit Cost  $1,517.89 

 

VFD at Dual Temperature Pump (1) 

VFD at Dual Temperature Pump (2) 

VFD at Cooling Tower 

 

    

Page 95: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 95 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

D40 FIRE PROTECTION SYSTEMS

Item  Description 

D4031 Fire Extinguishers  Fire Extinguisher 

Condition  Fair ‐ Good 

RUL  14 

Location  Throughout 

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  SF 

Unit Cost  $0.37 

 

 

 

    

Page 96: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 96 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D4095 Hood & Duct Fire Protection  Kitchen Fire Suppression System 

Condition  Fair ‐ Good 

RUL  14 

Location  Kitchen 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $6,410.56 

Comments Fire suppression nozzles capped, no open flame appliances below hood.  

Fire suppression nozzles capped, no open flame appliances below hood 

    

Page 97: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 97 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

D50 ELECTRICAL SYSTEMS

Item  Description 

D5012 Low Tension Service & Dist.  Panel Board ‐ Newer (Corridor) 

Condition  Good 

RUL  21 

Location  Corridors 

Plan Type  Capital Replacement 

Quantity  6 

Unit of Measure  Each 

Unit Cost  $10,664.25 

 

Newer Panelboard 

 

    

Page 98: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 98 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5012 Low Tension Service & Dist.  Panel Board 

Condition  Fair 

RUL  5 

Location  Boiler Room 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  Each 

Unit Cost  $10,664.25 

 

Panel Board 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5012 Circuit breaker for cooling tower pump #1 is not 

operational. Replace. 

Routine Maint Minor 

Repairs 2017  $250 

D5012  Replace Panel Board Capital 

Replacement 2022  $10,664 

    

Page 99: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 99 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5012 Low Tension Service & Dist.  Panel Board ‐ Older 

Condition  Poor 

RUL  2 

Location  Boiler Room, Kitchen, Corridor 

Plan Type  Capital Replacement 

Quantity  6 

Unit of Measure  Each 

Unit Cost  $10,664.25 

 

Older Panelboard 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5012  Replace Panel Board ‐ Older Capital 

Replacement 2019  $63,986 

    

Page 100: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 100 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5012 Low Tension Service & Dist. Panel Board ‐ Newer (Corridor and Multipurpose Rooms) 

Condition  Good 

RUL  26 

Location  Corridor and Multipurpose Room 

Plan Type  Capital Replacement 

Quantity  4 

Unit of Measure  Each 

Unit Cost  $10,664.25 

 

Newer Panelboard 

 

    

Page 101: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 101 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5012 Low Tension Service & Dist.  Motor Starter, Older 

Condition  Poor 

RUL  1 

Location Boiler Room, Fan Rooms Above Multipurpose Room Stage 

Plan Type  Capital Replacement 

Quantity  4 

Unit of Measure  EA 

Unit Cost  $1,128.90 

 

Motor Starter Older Motor Starter Older 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5012  Replace Motor Starter, Older Capital 

Replacement 2018  $4,516 

    

Page 102: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 102 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5012 Low Tension Service & Dist.  Motor Starter, 2.000 HP, 208 V 

Condition  Poor 

RUL  1 

Location  Boiler Room 

Plan Type  Deferred Maintenance 

Quantity  2 

Unit of Measure  EA 

Unit Cost  $1,128.90 

 

Motor Starter 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5012  Replace Motor Starter, 2.000 HP, 208 V Deferred 

Maintenance 2018  $2,258 

    

Page 103: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 103 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5012 Low Tension Service & Dist.  Disconnect Switch for Cooling Tower 

Condition  Good 

RUL  48 

Location  Roof 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $1,359.11 

 

Disconnect Switch for Cooling Tower 

 

    

Page 104: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 104 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5012 Low Tension Service & Dist.  Switchboard, 1200 Amps, 1 section 

Condition  Poor 

RUL  2 

Location  Electrical Room 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  Each 

Unit Cost  $388,185.54 

 

Main Switchboard 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5012  Replace Switchboard, 1200 Amps, 1 section Capital 

Replacement 2019  $388,186 

    

Page 105: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 105 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5012 Low Tension Service & Dist.   Main Service Switch 

Condition  Poor 

RUL  0 

Location  Electrical Room 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $212,265.31 

Comments There is an additional service switch and switchboard in the electrical room, dated 2010 that are not connected to anything. In addition there is a separate service feeding a main distribution panel, dated 2008,with all breakers turned to the off position. Recommend evaluation of this situation.  

Main Service Switch 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5012  Replace  Main Service Switch Capital 

Replacement 2017  $212,265 

D5012 

Evaluate the additional service switch and panels that have been installed and not connected to 

anything. It appears that an upgrade began and was not completed. 

Engineering Study 

2018  $5,000 

    

Page 106: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 106 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5021 Branch Wiring Devices  Branch Wiring Peripheral Devices 

Condition  Fair ‐ Good 

RUL  14 

Location  Throughout 

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  SF 

Unit Cost  $3.75 

     

Page 107: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 107 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5021 Branch Wiring Devices  Occupancy Sensors, Indoor Lighting 

Condition  Fair ‐ Good 

RUL  6 

Location  Throughout 

Plan Type  Capital Replacement 

Quantity  45 

Unit of Measure  EA 

Unit Cost  $1,139.41 

 

Occupancy Sensors  Occupancy Sensors   

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5021 Occupancy sensors are not operational in various 

locations. Replace. Deferred 

Maintenance 2018  $6,836 

D5021  Replace Occupancy Sensors, Indoor Lighting Capital 

Replacement 2023  $51,274 

    

Page 108: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 108 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5022 Lighting Equipment  Flood Light, Exterior ‐ Older 

Condition  Poor ‐ Fair 

RUL  3 

Location  Roof and Building Perimeter 

Plan Type  Capital Replacement 

Quantity  20 

Unit of Measure  EA 

Unit Cost  $574.32 

 

Exterior Security Lighting 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5022 Replace non operational exterior security lighting 

photocells. 

Routine Maint Minor 

Repairs 2017  $500 

D5022  Replace Flood Light, Exterior ‐ Older Capital 

Replacement 2020  $11,486 

    

Page 109: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 109 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5022 Lighting Equipment  Flood Light, Exterior ‐ Newer 

Condition  Good 

RUL  19 

Location  Roof and Building Perimeter 

Plan Type  Capital Replacement 

Quantity  9 

Unit of Measure  EA 

Unit Cost  $574.32 

 

Exterior Security Lights 

 

    

Page 110: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 110 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5022 Lighting Equipment  Lighting Equipment ‐ Fluorescent 

Condition  Fair ‐ Good 

RUL  11 

Location  Throughout 

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  SF 

Unit Cost  $4.54 

 

Fluorescent Lighting  Fluorescent Lighting     

Page 111: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 111 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5022 Lighting Equipment  Incandescent Lighting Fixture 

Condition  Poor 

RUL  2 

Location  Mechanical and Storage Spaces 

Plan Type  Capital Replacement 

Quantity  25 

Unit of Measure  EA 

Unit Cost  $143.58 

 

Incandescent Lighting 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5022  Replace Incandescent Lighting Fixture Capital 

Replacement 2019  $3,590 

    

Page 112: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 112 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5031 Public Address & Music Systems  Public Address System 

Condition  Fair ‐ Good 

RUL  6 

Location  Closet in Room 206 

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  SF 

Unit Cost  $1.24 

 

Public Address System 

Public Address System 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5031  Replace Public Address System Capital 

Replacement 2023  $90,463 

    

Page 113: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 113 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5031 Public Address & Music Systems  Sound System, 7 Channel 

Condition  Fair ‐ Good 

RUL  10 

Location  Multipurpose Room 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $2,067.61 

 

Local Sound System 

 

    

Page 114: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 114 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5037 Fire Alarm Systems  Fire Alarm Systems 

Condition  Fair ‐ Good 

RUL  11 

Location  Electrical Room 

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  SF 

Unit Cost  $4.02 

 

Fire Alarm System 

 

    

Page 115: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 115 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5038 Security and Detection Systems  Card Reader 

Condition  Fair ‐ Good 

RUL  6 

Location  Exits 

Plan Type  Capital Replacement 

Quantity  4 

Unit of Measure  Each 

Unit Cost  $1,149.90 

 

Card Reader 

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5038  Replace Card Reader Capital 

Replacement 2023  $4,600 

    

Page 116: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 116 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5038 Security and Detection Systems   Security and Detection Systems ‐ CCTV 

Condition  Fair ‐ Good 

RUL  7 

Location  Throughout 

Plan Type  Capital Replacement 

Quantity  16 

Unit of Measure  EA 

Unit Cost  $1,872.38 

 

CCTV System  CCTV System   

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5038  Replace  Security and Detection Systems ‐ CCTV Capital 

Replacement 2024  $29,958 

    

Page 117: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 117 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5038 Security and Detection Systems  Intrusion Detection 

Condition  Poor ‐ Fair 

RUL  1 

Location  Boiler Room Office 

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  SF 

Unit Cost  $3.64 

 

Intrusion Alarm System 

Intrusion Alarm System 

Intrusion Alarm System 

 

 

Page 118: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 118 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5038  Replace Intrusion Detection Capital 

Replacement 2018  $265,553 

    

Page 119: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 119 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5091 Grounding Systems  Lightning Protection System 

Condition  Fair ‐ Good 

RUL  5 

Location  Chimney Stack 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  Each 

Unit Cost  $3,261.74 

 

Lightning Protection System  Lightning Protection Detached Ground Conductors 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

D5091 Replace detached ground conductors for lightning 

protection.   

Routine Maint Minor 

Repairs 2017  $500 

D5091  Replace Lightning Protection System Capital 

Replacement 2022  $3,262 

    

Page 120: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 120 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5092 Emergency Light & Power Systems   Emergency Lights 

Condition  Fair ‐ Good 

RUL  11 

Location  Throughout 

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  SF 

Unit Cost  $1.06 

 

Emergency Lighting 

 

    

Page 121: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 121 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

D5092 Emergency Light & Power Systems  Exit Lighting Fixture 

Condition  Fair ‐ Good 

RUL  11 

Location  Throughout 

Plan Type  Capital Replacement 

Quantity  72954 

Unit of Measure  SF 

Unit Cost  $0.66 

 

Exit Lighting 

 

    

Page 122: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 122 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

E E Q U I P M E N T & F U R N I S H I N G S Y S T E M S

E10 EQUIPMENT

Item  Description 

E1093 Food Service Equipment  Kitchen Food Service Equipment, various types 

Condition  Fair ‐ Good 

RUL  13 

Location  Kitchen 

Plan Type  Capital Replacement 

Quantity  1200 

Unit of Measure  SF 

Unit Cost  $104.41 

Comments   

   

Page 123: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 123 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

       

Page 124: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 124 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

G B U I L D I N G S I T E W O R K S Y S T E M S

G20 SITE IMPROVEMENTS

Item  Description 

G2022 Paving & Surfacing  Parking Lot, Asphalt Paved, Basic 

Condition  Fair ‐ Good 

RUL  13 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  10000 

Unit of Measure  SF 

Unit Cost  $4.50 

 

Parking lots   Parking lots  

Parking lots  

 

Page 125: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 125 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Item  Description 

G2022 Paving & Surfacing  Concrete walkways 

Condition  Good 

RUL  18 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  7500 

Unit of Measure  SF 

Unit Cost  $16.43 

 

Concrete walkway   Concrete walkway  

Concrete walkway  

 

 

Page 126: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 126 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

G2022  Replace/repair concrete walkways Deferred 

Maintenance 2018  $6,161 

    

Page 127: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 127 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

G2022 Paving & Surfacing  Parking Lot, Paving, Concrete, Driveways 

Condition  Good 

RUL  33 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  4700 

Unit of Measure  SF 

Unit Cost  $8.48 

 

Concrete driveway   Concrete driveway  

Concrete driveway  

 

 

Page 128: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 128 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

G2022  Replace/repair cracked concrete Deferred 

Maintenance 2018  $1,698 

    

Page 129: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 129 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

G2031 Paving & Surfacing  Pedestrian Paving, Pavers, Brick 

Condition  Good 

RUL  18 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  1780 

Unit of Measure  SF 

Unit Cost  $12.05 

 

Paving brick  Paving bricks  

Paving bricks 

 

    

Page 130: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 130 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

G2033 Exterior Steps  Pedestrian Paving, Exterior Ramp, Concrete 

Condition  Good 

RUL  28 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  112 

Unit of Measure  LF 

Unit Cost  $804 

 

ADA ramp  ADA ramp    

Type  Component Description  Plan Type  Year Expenditures 

($) 

G2033  Repair/patch deteriorated concrete at ramps Routine 

Maint Minor Repairs 

2018  $528 

    

Page 131: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 131 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

G2041 Fences & Gates  Fence, 8' Chain Link 

Condition  Fair ‐ Good 

RUL  8 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  650 

Unit of Measure  LF 

Unit Cost  $43.33 

 

Fence 8 '  Fence 8 ' 

Fence 8' 

 

 

Page 132: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 132 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

G2041  Replace damaged fence section Routine 

Maint Minor Repairs 

2018  $258 

G2041  Replace Fence, 8' Chain Link Capital 

Replacement 2025  $28,165 

    

Page 133: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 133 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

G2042 Retaining Walls  Retaining Wall, Stone 

Condition  Good 

RUL  23 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  160 

Unit of Measure  SF 

Unit Cost  $196.76 

Comments   

Retaining wall  Retaining wall  

Retaining wall 

 

    

Page 134: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 134 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

G2047 Playing Fields  Play Structure ‐ Large 

Condition  Poor ‐ Fair 

RUL  4 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $42,840 

Comments   

Playground  

 

  

Type  Component Description  Plan Type  Year Expenditures 

($) 

G2047  Replace Play Structure ‐ Large Capital 

Replacement 2021  $42,840 

    

Page 135: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 135 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

G2047 Playing Fields  Safety Surface 

Condition  Poor 

RUL  2 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  6000 

Unit of Measure  SF 

Unit Cost  $4.62 

Comments   

Playground   Playground  

Playground   Playground   

Page 136: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 136 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

G2047  Replace Safety Surface Capital 

Replacement 2019  $27,720 

    

Page 137: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 137 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

G2047 Playing Fields  Play Structure ‐ Medium 

Condition  Poor ‐ Fair 

RUL  4 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $28,050 

 

Playground   Playground  

Playground   Playground   

Page 138: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 138 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

G2047  Replace Play Structure ‐ Medium Capital 

Replacement 2021  $28,050 

    

Page 139: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 139 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

G2047 Playing Fields  Schoolyard  

Condition  Fair ‐ Good 

RUL  13 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  1 

Unit of Measure  EA 

Unit Cost  $84,372.12 

 

Playground   Asphalt playground  

Asphalt playground  

 

    

Page 140: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 140 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

G2054 Seeding and Sodding  Landscaping 

Condition  Good 

RUL  18 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  6600 

Unit of Measure  SF 

Unit Cost  $1.57 

 

Landscaping   Landscaping  

Landscaping  

 

 

Page 141: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 141 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

 

Type  Component Description  Plan Type  Year Expenditures 

($) 

G2054  Regrade/Establish Landscaping, Sod at Eroded Areas Routine 

Maint Minor Repairs 

2018  $471 

    

Page 142: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 142 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

G2056 Planters  Garden 

Condition  Fair ‐ Good 

RUL  13 

Location  Exterior 

Plan Type  Capital Replacement 

Quantity  1200 

Unit of Measure  SF 

Unit Cost  $20.18 

 

Garden   Garden  

Garden  

 

    

Page 143: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 143 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

G30 SITE CIVIL/MECHANICAL UTILITIES

Item  Description 

G3061 Fuel Piping  Gas Distribution Piping, Kitchen Service 

Condition  Fair ‐ Good 

RUL  10 

Location  From Basement to Kitchen 

Plan Type  Capital Replacement 

Quantity  250 

Unit of Measure  LF 

Unit Cost  $304.64 

 

 

 

    

Page 144: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 144 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Item  Description 

G3061 Fuel Piping Gas Distribution Piping, Boilers and Gas Fired Domestic Water Heater Service 

Condition  Fair ‐ Good 

RUL  10 

Location  Boiler Room 

Plan Type  Capital Replacement 

Quantity  200 

Unit of Measure  LF 

Unit Cost  $6.21 

 

 

 

    

Page 145: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 145 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

                       

THIS PAGE INTENTIONALLY LEFT BLANK 

Page 146: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 146 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

APPENDICES   Appendix A:  Expenditure Forecast  Appendix B:  Photographic Record  Appendix C:  Survey Information Resulting In Plant Adaptation   Recommendations  

Page 147: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 147 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Appendix A: Expenditure Forecast 

Page 148: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

Plan Item Report

1/8/2018 1:00:52 PM District of Columbia DGS Page 1 of 4

Tyler Elementary SchoolGSF (building): 72954

Year Built: 1949 Renew Year :

Replacement Cost: $16,885,933

Materials

Fiscal Year $ CSI Type Name Description Qty Units Cost Assessed Cost

Add. Cost $

2017 $416,601 B2010 Deferred Maintenance

Replace/repair cracked/deteriorated exterior brick

100 SF $38 $3,786 $3,786

B2020 Routine Maint Minor Repairs

Replace broken glass 1 LS $250 $250 $250

C3010 Deferred Maintenance

Replace/Repair plaster walls 500 SF $13 $6,280 $6,280

C3020 Routine Maint Minor Repairs

Refinish wood flooring 500 SF $4 $1,840 $1,840

C3030 Deferred Maintenance

Repair concrete ceiling 500 SF $10 $5,115 $5,115

C3030 Deferred Maintenance

Replace deteriorated ceiling tiles 1000 SF $5 $5,190 $5,190

C3030 Routine Maint Minor Repairs

Repair damaged gypsum board 50 SF $5 $264 $264

D2010 Routine Maint Minor Repairs

Replace Toilet in Toilet Room inside Room 134 1 EA $400 $400 $400

D2010 Deferred Maintenance

Replace Drinking Fountains in various locations 6 EA $5,440 $32,637 $32,637

D2010 Deferred Maintenance

Replace/Install Urinals in 3rd Floor Boys Toilet Room

1 EA $889 $889 $889

D2010 Plant Adaptation Provide indirect waste 2 LS $500 $1,000 $1,000

D2020 Routine Maint Minor Repairs

Replace draft fan at breeching 1 LS $500 $500 $500

D2030 Deferred Maintenance

Replace Interceptors - Grease Trap 1 EA $3,970 $3,970 $3,970

D2030 Routine Maint Minor Repairs

Replace leaky piping in Boiler Room above Gas Fired Domestic Water Heater and other locations in Boiler Room

30 LF $10 $309 $309

D3020 Routine Maint Minor Repairs

Replace water level control at Boiler Feedwater/Condensate Return Pumping System in Boiler Room

1 LS $500 $500 $500

D3020 Plant Adaptation Install CO/Gas Leak Detection in Boiler Room 1 LS $1,000 $1,000 $1,000

D3040 Deferred Maintenance

Replace Heating and Ventilating Unit 3 EA $18,215 $54,646 $54,646

D3040 Deferred Maintenance

Repair Exhaust Fans (unknown issue), Main Roof and Annex Roof

3 EA $1,389 $4,166 $4,166

Note: This plan item list contains all plan item types for the facility. Only Deferred Maintenance, Plant Adaptation and Capital Replacement plan types contribute to the FCI calculations. Plan types Routine Maint Minor Repairs, Energy, Engineering Study, and Predictive Maint Test Inspec do not contribute to the FCI calculation.

Page 149: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

Plan Item Report

1/8/2018 1:00:52 PM

District of Columbia DGS

Page 2 of 4

D3040 Deferred Maintenance

Replace Exhaust Fan, Rooftop, Older 3 Each $1,339 $4,016 $4,016

D3040 Deferred Maintenance

Replace Unit Ventilator, Steam 4 EA $4,986 $19,944 $19,944

D3040 Deferred Maintenance

Replace Cabinet Heater serving adjacent room to Cafeteria

1 EA $4,986 $4,986 $4,986

D3040 Routine Maint Minor Repairs

Replace fan motor in Room 116 1 LS $250 $250 $250

D3040 Deferred Maintenance

Replace units in Annex Rooms 125, 135 2 EA $1,499 $2,997 $2,997

D3040 Routine Maint Minor Repairs

Replace automatic control valves in Room 311 and 2nd Floor Girls Toilet Room

1 LS $250 $250 $250

D3040 Deferred Maintenance

Replace pipe insulation in several locations, ~300 LF

300 LF $0 $0 $0

D3060 Deferred Maintenance

Replace Building Controls (SF), Pneumatic, Basic

10000 SF $3 $29,000 $29,000

D5010 Capital Replacement Replace Main Service Switch 1 EA $212,265 $212,265 $212,265

D5010 Routine Maint Minor Repairs

Circuit breaker for cooling tower pump #1 is not operational. Replace.

1 EA $250 $250 $250

D5020 Routine Maint Minor Repairs

Replace non operational exterior security lighting photocells.

5 LS $100 $500 $500

D5090 Routine Maint Minor Repairs

Replace detached ground conductors for lightning protection.

2 LS $250 $500 $500

Z1010 Capital Replacement Replace Consider: ADA Investments 1 LS $18,900 $18,900 $18,900

2018 $419,775 D3040 Deferred Maintenance

Replace piping throughout the Annex Building, piping is old and conveys insufficient water flow through terminal units. Temporary Electric Unit Heaters were installed to supplement insufficient heating.

17892 SF $7 $126,496 $126,496

D5010 Capital Replacement Replace Motor Starter, Older 4 EA $1,129 $4,516 $4,516

D5010 Deferred Maintenance

Replace Motor Starter, 2.000 HP, 208 V 2 EA $1,129 $2,258 $2,258

D5010 Engineering Study Evaluate the additional service switch and panels that have been installed and not connected to anything. It appears that an upgrade began and was not completed.

1 LS $5,000 $5,000 $5,000

D5020 Deferred Maintenance

Occupancy sensors are not operational in various locations. Replace.

6 EA $1,139 $6,836 $6,836

D5030 Capital Replacement Replace Intrusion Detection 72954 SF $4 $265,553 $265,553

G2020 Deferred Maintenance

Replace/repair cracked concrete 200 SF $8 $1,698 $1,698

G2020 Deferred Maintenance

Replace/repair concrete walkways 375 SF $16 $6,161 $6,161

G2030 Routine Maint Minor Repairs

Repair/patch deteriorated concrete at ramps 50 SF $11 $528 $528

G2040 Routine Maint Minor Repairs

Replace damaged fence section 6 LF $43 $258 $258

G2050 Routine Maint Minor Repairs

Regrade/Establish Landscaping, Sod at Eroded Areas

300 SF $2 $471 $471

Page 150: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

Plan Item Report

1/8/2018 1:00:52 PM

District of Columbia DGS

Page 3 of 4

2019 $643,096 B3010 Capital Replacement Replace Main Roof 22500 SF $7 $159,615 $159,615

D5010 Capital Replacement Replace Switchboard, 1200 Amps, 1 section 1 Each $388,186 $388,186 $388,186

D5010 Capital Replacement Replace Panel Board - Older 6 Each $10,664 $63,986 $63,986

D5020 Capital Replacement Replace Incandescent Lighting Fixture 25 EA $144 $3,590 $3,590

G2040 Capital Replacement Replace Safety Surface 6000 SF $5 $27,720 $27,720

2020 $35,198 C3020 Capital Replacement Replace Carpet 3000 SF $6 $17,940 $17,940

D2020 Capital Replacement Replace Domestic Hot Water Remote Storage Tank, ~1000 Gal.

1 EA $4,421 $4,421 $4,421

D2040 Capital Replacement Replace Sump Pump, submersible type 3 Each $450 $1,350 $1,350

D5020 Capital Replacement Replace Flood Light, Exterior - Older 20 EA $574 $11,486 $11,486

2021 $70,890 G2040 Capital Replacement Replace Play Structure - Large 1 EA $42,840 $42,840 $42,840

G2040 Capital Replacement Replace Play Structure - Medium 1 EA $28,050 $28,050 $28,050

2022 $167,551 C3030 Capital Replacement Replace Plaster Ceiling 5000 SF $13 $62,825 $62,825

D3040 Capital Replacement Replace Ductwork, for HV Units and Exhaust Fans

20000 SF $5 $90,800 $90,800

D5010 Capital Replacement Replace Panel Board 1 Each $10,664 $10,664 $10,664

D5090 Capital Replacement Replace Lightning Protection System 1 Each $3,262 $3,262 $3,262

2023 $146,336 D5020 Capital Replacement Replace Occupancy Sensors, Indoor Lighting 45 EA $1,139 $51,274 $51,274

D5030 Capital Replacement Replace Public Address System 72954 SF $1 $90,463 $90,463

D5030 Capital Replacement Replace Card Reader 4 Each $1,150 $4,600 $4,600

2024 $79,818 D3040 Capital Replacement Replace Unit Heater/Cabinet Heater, Steam 10 EA $4,986 $49,860 $49,860

D5030 Capital Replacement Replace Security and Detection Systems - CCTV

16 EA $1,872 $29,958 $29,958

2025 $96,438 C3010 Capital Replacement Replace Brick Interior Wall Finish 2000 SF $19 $37,958 $37,958

D3030 Capital Replacement Replace DX Split Condensing Unit, Cafeteria Service, 7.5 Ton

1 EA $22,686 $22,686 $22,686

D3040 Capital Replacement Replace Kitchen Exhaust Hood, Commercial 1 EA $7,630 $7,630 $7,630

G2040 Capital Replacement Replace Fence, 8' Chain Link 650 LF $43 $28,165 $28,165

2026 $30,436 C3020 Capital Replacement Replace Quarry Tile Flooring 2250 SF $14 $30,436 $30,436

Page 151: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

Plan Item Report

1/8/2018 1:00:52 PM

District of Columbia DGS

Page 4 of 4

Total: $2,106,138

Page 152: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 149 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Appendix B: Photographic Record 

Page 153: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 150 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

 

 

  

 

 

  

 

 

  

 

 

   

Page 154: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 151 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Slabs On Grade  

 

  

Slabs On Grade 

 

  

Superstructure   

 

  

Superstructure  

 

Page 155: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 152 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Superstructure   

 

  

Exterior Walls, Brick:‐ Exterior wall 

 

  

Exterior Walls, Brick :‐ Exterior wall  

 

  

Exterior Walls, Brick:‐ Exterior wall  

 

Page 156: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 153 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Exterior Walls, Brick :‐ Exterior  

 

  

Exterior Windows :‐ Exterior windows  

 

  

Exterior Windows  :‐ Exterior windows  

 

  

Exterior Windows  

 

Page 157: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 154 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Storefront facade :‐ Main Entrance  

 

  

Exterior Doors:‐ Exterior doors  

 

  

Exterior Doors :‐ Exterior wall  

 

  

Exterior Doors:‐ Exterior doors  

 

Page 158: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 155 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Lower Roof ‐ New  

 

  

Lower Roof ‐ New 

 

  

Main Roof  

 

  

Main Roof 

 

Page 159: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 156 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Main Roof  

 

  

Roof Hatch, Aluminum 

 

  

Aluminum, Fully Glazed, Interior Door  

 

  

Fire Doors:‐ Entrance to Multi Purpose Room  

 

Page 160: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 157 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Interior Door, Steel, Painted  

 

  

Interior Door, Steel, Painted, w/ Glass, :‐ Vestibule at Multi Purpose Room  

 

  

Interior Door, Wood  

 

  

Concrete, Exterior Stairs:‐ Exterior Steps  

 

Page 161: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 158 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Concrete, Exterior Stairs :‐ Exterior stair  

 

  

Concrete, Exterior Stairs:‐  Exterior stair  

 

  

Concrete, Interior Stairs  

 

  

Metal, Painted, Interior Stairs 

 

Page 162: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 159 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Brick Interior Wall Finish  

 

  

Ceramic Tile, Interior Wall Finish:‐ Toilet Room  

 

  

Concrete Block, Painted, Interior Wall Finish  

 

  

Plaster Interior Wall Finish 

 

Page 163: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 160 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Plaster Interior Wall Finish :‐ Toilet Room  

 

  

Plaster Interior Wall Finish 

 

  

Plaster Interior Wall Finish  

 

  

Wood, Finished, Interior Paneling 

 

Page 164: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 161 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Finishes ‐ Vinyl Tile  

 

  

Floor Finish, Tile, Ceramic:‐ Staff Toilet Room  

 

  

Floor Finish, Tile, Marble  

 

  

Quarry Tile Flooring 

 

Page 165: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 162 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Terrazzo Flooring :‐ Toilet Room 

 

  

Wood Flooring 

 

  

Wood Flooring  

 

  

Carpet 

 

Page 166: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 163 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Carpet  

 

  

Carpet 

 

  

Concrete, Painted Ceiling :‐ Cafeteria  

 

  

Concrete, Painted Ceiling 

 

Page 167: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 164 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Gypsum Board, Finished Ceiling :‐ Annex Room 144 

 

  

Plaster Ceiling 

 

  

Acoustical tile  

 

  

Acoustical tile:‐ 2nd Floor Toilet Room  

 

Page 168: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 165 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Acoustical tile :‐ 2nd Floor Toilet Room 

 

  

Acoustical tile 

 

  

Plumbing Fixtures   

 

  

Plumbing Fixtures  

 

Page 169: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 166 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Plumbing Fixtures  :‐ Two missing Urinals in 3rd Floor Boys Toilet Room 

 

  

Plumbing Fixtures  

 

  

Plumbing Fixtures  :‐ Defective Drinking Fountain 

 

  

Plumbing Fixtures  

 

Page 170: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 167 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Plumbing Fixtures  :‐ Broken Toilet in Toilet Room inside Room 134 

 

  

Commercial Grade Kitchen Sink, multiple compartments 

 

  

Commercial Grade Kitchen Sink, multiple compartments :‐ Missing Indirect Waste 

 

  

Domestic Water Distribution Piping:‐ Water Main in Boiler Room 

 

Page 171: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 168 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Domestic Hot Water Remote Storage Tank, ~1000 Gal.  

 

  

Gas Fired Domestic Water Heater, 154 MBH input, 81 Gals. 

 

  

Gas Fired Domestic Water Heater, 154 MBH input, 81 Gals.  

 

  

Gas Fired Domestic Water Heater, 154 MBH input, 81 Gals.:‐ Defective Draft Fan 

 

Page 172: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 169 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Waste Piping  

 

  

Waste Piping:‐ Leaky pipe above Gas Fired Domestic Water Heater 

 

  

Interceptors ‐ Grease Trap  

 

  

Rainwater Drainage Piping 

 

Page 173: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 170 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Sump Pump, submersible type :‐ Units next to Chiller 

 

  

Sump Pump, submersible type:‐ Unit next to Feedwater/Condensate Return Pumping System 

 

  

Steam Boiler, 2678 MBH Gross  

 

  

Steam Boiler, 2678 MBH Gross 

 

Page 174: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 171 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Steam Boiler, 2678 MBH Gross :‐ Gas burner, fuel oil lines disconnected 

 

  

Steam Boiler, 2678 MBH Gross:‐ Piping Specialties ‐ Make‐up Line with RPZ 

 

  

Steam Boiler, 2678 MBH Gross :‐ Boilers Breeching 

 

  

Steam Boiler, 2678 MBH Gross:‐ Boilers Fresh Air Louvers 

 

Page 175: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 172 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Steam Boiler, 2678 MBH Gross :‐ Piping Specialties ‐ Boiler Feedwater / Condensate Return Pumping 

System 

 

  

Steam Boiler, 2678 MBH Gross:‐ Piping Specialties ‐ Hydronic Hot Water Heat Exchangers 

 

  

Cooling Tower, Fiberglass, ~150 Ton  

 

  

Cooling Tower, Fiberglass, ~150 Ton 

 

Page 176: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 173 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Cooling Tower, Fiberglass, ~150 Ton :‐ Condenser Water Pumps in Boiler Room 

 

  

Cooling Tower, Fiberglass, ~150 Ton:‐ Condenser Water Piping in Boiler Room 

 

  

Cooling Tower, Fiberglass, ~150 Ton :‐ Chemical Treatment System in Boiler Room (1) 

 

  

Cooling Tower, Fiberglass, ~150 Ton:‐ Chemical Treatment System in Boiler Room (2) 

 

Page 177: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 174 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Water Cooled Chiller, Centrifugal, 150 Ton  

 

  

Water Cooled Chiller, Centrifugal, 150 Ton 

 

  

Water Cooled Chiller, Centrifugal, 150 Ton  

 

  

Water Cooled Chiller, Centrifugal, 150 Ton 

 

Page 178: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 175 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

DX Split Condensing Unit :‐ Unit on Main Roof (1) 

 

  

DX Split Condensing Unit:‐ Unit on Main Roof (2) 

 

  

DX Split Condensing Unit :‐ Unit on Annex Roof 

 

  

DX Split Condensing Unit, Cafeteria Service, 7.5 Ton 

 

Page 179: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 176 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

DX Split Condensing Unit, Cafeteria Service, 7.5 Ton  

 

  

Ductwork, for DX Split Indoor Unit in Cafeteria and for overhead Fan Coil Units 

 

  

Ductwork, for HV Units and Exhaust Fans  

 

  

DX Split Indoor Unit, ducted, 100% return air 

 

Page 180: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 177 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

DX Split Indoor Unit, ductless, various sizes :‐ Unit in IT Room 303 

 

  

DX Split Indoor Unit, ductless, various sizes:‐ Unit in IT Room inside Room 206 

 

  

DX Split Indoor Unit, ductless, various sizes :‐ Unit in Electrical Room 138 

 

  

Fan Coil Units, 1 Coil, HW and/or CHW:‐ Typical fan coil unit by Exits and other locations 

 

Page 181: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 178 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Fan Coil Units, 1 Coil, HW and/or CHW :‐ Typical fan coil unit in Classroom 

 

  

Fan Coil Units, 1 Coil, HW and/or CHW:‐ Typical overhead fan coil unit in Toilet Rooms, Corridors 

and other locations 

 

  

Fan Coil Units, 1 Coil, HW and/or CHW :‐ Typical fan coil unit in various rooms 

 

  

Fan Coil Units, 1 Coil, HW and/or CHW:‐ Temporary A/C unit in Classroom installed because 

of defective Fan Coil Unit 

 

Page 182: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 179 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Heating and Ventilating Unit :‐ Unit in Multipurpose Room Stage Fan Room (1) 

 

  

Heating and Ventilating Unit:‐ Unit in Multipurpose Room Stage Fan Room (2) 

 

  

Heating and Ventilating Unit :‐ Unit in Kitchen Mechanical Rom 

 

  

Unit Heater/Cabinet Heater, Steam 

 

Page 183: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 180 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Unit Heater/Cabinet Heater, Steam :‐ Ducted cabinet heater serving adjacent rooms to Cafeteria 

 

  

Unit Ventilator, Steam 

 

  

Exhaust Fan, Rooftop, Newer  

 

  

Exhaust Fan, Rooftop, Newer 

 

Page 184: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 181 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Exhaust Fan, Rooftop, Newer :‐ Defective Exhaust Fan, Main Roof 

 

  

Exhaust Fan, Rooftop, Newer 

 

  

Exhaust Fan, Rooftop, Older  

 

  

Kitchen Exhaust Hood, Commercial 

 

Page 185: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 182 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Kitchen Exhaust Hood, Commercial  

 

  

Convector, Steam 

 

  

Convector, Steam  

 

  

Convector, Steam 

 

Page 186: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 183 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Steam and Condensate Piping ‐ Distribution  

 

  

Steam and Condensate Piping ‐ Distribution 

 

  

Steam and Condensate Piping ‐ Distribution  

 

  

Steam and Condensate Piping ‐ Distribution:‐ Condensate Return Pumping System in Kitchen 

MER 

 

Page 187: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 184 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Steam and Condensate Piping ‐ Distribution  

 

  

Dual Temperature Piping, HW/CHW:‐ Dual Temperature Pumps in Boiler Room  

 

  

Dual Temperature Piping, HW/CHW :‐ Damaged insulating because pipe moisture condensation, 

basement room (1) 

 

  

Dual Temperature Piping, HW/CHW:‐ Damaged insulating because pipe moisture condensation, 

basement room (2), damaged ceiling 

 

Page 188: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 185 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Dual Temperature Piping, HW/CHW :‐ Dual temperature piping and moisture condensation 

piping feeding fan coil above 

 

  

Air Conditioner, Window 

 

  

Electric Unit Heater  

 

  

Meter, Natural Gas ‐ Unknown Capacity 

 

Page 189: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 186 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Building Controls (SF), Pneumatic, Basic :‐ Typical pneumatic control elements at H&V unit 

 

  

Building Controls, Variable Frequency Drive (VFD):‐ VFD at Dual Temperature Pump (1) 

 

  

Building Controls, Variable Frequency Drive (VFD) :‐ VFD at Dual Temperature Pump (2) 

 

  

Building Controls, Variable Frequency Drive (VFD):‐ VFD at Cooling Tower 

 

Page 190: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 187 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Fire Extinguisher  

 

  

Kitchen Fire Suppression System:‐ Fire suppression nozzles capped, no open flame appliances below 

hood 

 

  

Kitchen Fire Suppression System  

 

  

 Main Service Switch:‐ Main Service Switch 

 

Page 191: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 188 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Disconnect Switch for Cooling Tower :‐ Disconnect Switch for Cooling Tower 

 

  

Motor Starter, 2.000 HP, 208 V:‐ Motor Starter 

 

  

Motor Starter, Older :‐ Motor Starter Older 

 

  

Motor Starter, Older:‐ Motor Starter Older 

 

Page 192: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 189 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Panel Board :‐ Panel Board 

 

  

Panel Board ‐ Newer (Corridor and Multipurpose Rooms):‐ Newer Panelboard 

 

  

Panel Board ‐ Newer (Corridor) :‐ Newer Panelboard 

 

  

Panel Board ‐ Older:‐ Older Panelboard 

 

Page 193: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 190 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Switchboard, 1200 Amps, 1 section :‐ Main Switchboard 

 

  

Occupancy Sensors, Indoor Lighting:‐ Occupancy Sensors 

 

  

Occupancy Sensors, Indoor Lighting :‐ Occupancy Sensors 

 

  

Flood Light, Exterior ‐ Newer:‐ Exterior Security Lights 

 

Page 194: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 191 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Flood Light, Exterior ‐ Older :‐ Exterior Security Lighting 

 

  

Incandescent Lighting Fixture:‐ Incandescent Lighting 

 

  

Lighting Equipment ‐ Fluorescent :‐ Fluorescent Lighting 

 

  

Lighting Equipment ‐ Fluorescent:‐ Fluorescent Lighting 

 

Page 195: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 192 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Public Address System :‐ Public Address System 

 

  

Public Address System:‐ Public Address System 

 

  

Sound System, 7 Channel :‐ Local Sound System 

 

  

Fire Alarm Systems:‐ Fire Alarm System 

 

Page 196: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 193 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

 Security and Detection Systems ‐ CCTV :‐ CCTV System 

 

  

 Security and Detection Systems ‐ CCTV:‐ CCTV System 

 

  

Card Reader :‐ Card Reader 

 

  

Intrusion Detection:‐ Intrusion Alarm System 

 

Page 197: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 194 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Intrusion Detection :‐ Intrusion Alarm System 

 

  

Intrusion Detection:‐ Intrusion Alarm System 

 

  

Lightning Protection System :‐ Lightning Protection System 

 

  

Lightning Protection System:‐ Lightning Protection Detached Ground Conductors 

 

Page 198: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 195 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

 Emergency Lights :‐ Emergency Lighting 

 

  

Exit Lighting Fixture:‐ Exit Lighting 

 

  

Kitchen Food Service Equipment, various types  

 

  

Kitchen Food Service Equipment, various types 

 

Page 199: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 196 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Kitchen Food Service Equipment, various types  

 

  

Kitchen Food Service Equipment, various types 

 

  

Concrete walkways :‐ Concrete walkway  

 

  

Concrete walkways:‐ Concrete walkway  

 

Page 200: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 197 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Concrete walkways :‐ Concrete walkway  

 

  

Parking Lot, Asphalt Paved, Basic:‐ Parking lots  

 

  

Parking Lot, Asphalt Paved, Basic :‐ Parking lots  

 

  

Parking Lot, Asphalt Paved, Basic:‐ Parking lots  

 

Page 201: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 198 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Parking Lot, Paving, Concrete, Driveways :‐ Concrete driveway  

 

  

Parking Lot, Paving, Concrete, Driveways:‐ Concrete driveway  

 

  

Parking Lot, Paving, Concrete, Driveways :‐ Concrete driveway  

 

  

Pedestrian Paving, Pavers, Brick:‐ Paving brick 

 

Page 202: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 199 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Pedestrian Paving, Pavers, Brick :‐ Paving bricks  

 

  

Pedestrian Paving, Pavers, Brick:‐ Paving bricks 

 

  

Pedestrian Paving, Exterior Ramp, Concrete :‐ ADA ramp 

 

  

Pedestrian Paving, Exterior Ramp, Concrete:‐ ADA ramp  

 

Page 203: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 200 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Fence, 8' Chain Link :‐ Fence 8 ' 

 

  

Fence, 8' Chain Link:‐ Fence 8 ' 

 

  

Fence, 8' Chain Link :‐ Fence 8' 

 

  

Retaining Wall, Stone:‐ Retaining wall 

 

Page 204: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 201 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Retaining Wall, Stone :‐ Retaining wall  

 

  

Retaining Wall, Stone:‐ Retaining wall 

 

  

Play Structure ‐ Large :‐ Playground  

 

  

Play Structure ‐ Medium:‐ Playground  

 

Page 205: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 202 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Play Structure ‐ Medium :‐ Playground  

 

  

Play Structure ‐ Medium:‐ Playground  

 

  

Play Structure ‐ Medium :‐ Playground  

 

  

Safety Surface:‐ Playground  

 

Page 206: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 203 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Safety Surface :‐ Playground  

 

  

Safety Surface:‐ Playground  

 

  

Safety Surface :‐ Playground  

 

  

Schoolyard :‐ Playground  

 

Page 207: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 204 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Schoolyard  :‐ Asphalt playground  

 

  

Schoolyard :‐ Asphalt playground  

 

  

Landscaping :‐ Landscaping  

 

  

Landscaping:‐ Landscaping  

 

Page 208: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 205 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Landscaping :‐ Landscaping  

 

  

Garden:‐ Garden  

 

  

Garden :‐ Garden  

 

  

Garden:‐ Garden  

 

Page 209: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 206 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

  

Gas Distribution Piping, Boilers and Gas Fired Domestic Water Heater Service  

 

  

Gas Distribution Piping, Kitchen Service 

 

Page 210: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 207 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

 

Appendix C: Survey Information Resulting In Plant 

Adaptation Recommendations 

Page 211: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 208 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

Access Control    

Does the facility have a key card proximity entry system  Yes 

Are all windows at grade level locked or fixed at all times  Yes 

There is one clearly marked and designated entrance for visitors 

Yes 

Signs are posted for visitors to report to main office or through a designated entrance 

Yes 

Access to bus loading area is restricted to other vehicles during loading/unloading 

No 

Lighting is provided at entrances and points of possible intrusion 

Yes 

Outside hardware has been removed from all doors except at points of entry 

Yes 

Basement windows are protected with grill or well cover  Yes 

Restricted areas are properly identified  No 

Access to electrical panels is restricted  Yes 

Are there control gates to separate gym, cafeteria, stage, lobby and restrooms from rest of school and classrooms during after hours without changing means of egress 

No 

Are all perimeter doors equipped with recessed magnetic contact – door position door sensors 

No 

Are interior doors with specific vulnerability equipped with door position monitoring sensors 

No 

Page 212: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 209 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

ADA    

Adequate number of designated parking stalls and signage for cars are not provided 

Adequate number of designated parking stalls and signage for vans are not provided 

Signage indicating accessible parking spaces for cars and vans are not provided 

Signage directing to accessible parking or accessible building entrances to the facility are not provided 

Obstacle or protrusion from wall impeding access.  4 

Stair handrails do not extend beyond the top and bottom risers. 

48 

Install cup dispenser at an existing non‐conforming water fountain. 

10 

Install grab bars in accessible stalls at 36” above the floor.  1 

Wrap drain pipes below lavatory with insulation; protect against contact with hot, sharp, or abrasive surfaces 

Add pull station alarm in unisex bathroom  1 

Page 213: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 210 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

Fire Protection   

Does the facility have a fire sprinkler system  No 

Does the facility have wall mounted fire extinguishers  Yes 

Does the kitchen and cooking area have hood vent mounted fire suppression systems 

Yes 

Does combustion equipment have dedicated fire sprinkler system e.g. boilers, hot water heater 

No 

Are current fire protection system inspections up to date and onsite 

Yes 

A record of Fire Inspection by the local or state Fire Officer is maintained 

Yes 

Exit signs are clearly visible and pointing in the correct direction 

Yes 

Does the facility have monitored fire alarm system  Yes 

Is the fire alarm control panel solid‐state, modular design type, incorporating the following standard features:  lamp test, red alarm and amber LEDs per zone, positive and negative ground fault indicators , power ON indicator, two (2) auxiliary form C alarm contacts with disconnect switches and lights, one (1) auxiliary form C trouble contact, regulated 24Vdc four‐wire smoke detector power supply, and remote reset connection 

Yes 

Is the power supply to the fire alarm control panel from an individual circuit 

Yes 

Does the activation of any initiating device including but not limited to manual pull stations, smoke detectors, heat detectors and flow switches shall cause all signals to sound continuously until manually reset; flash all visual alarm indicator lights; illuminate respective zone  indicator lamps in the control panel; illuminate respective zone indicator lamps in the graphic display on the door of the control panel; and illuminate respective zone indicator lamps in the remote annunciator 

Yes 

Are the audible and visual devices such as combination horn/strobe indicating type wired to separate zones so that audible devices correctly provide code three temporal output and visual devices correctly provide ADA compliant strobe effect 

Yes 

Is the fire alarm wiring enclosed in ¾” metal conduit raceway to the manufacturer’s instructions 

Yes 

Page 214: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 211 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

Is there a smoke detector directly above the fire alarm control panel 

Yes 

Are there smoke detectors within 5’‐0” on each side of the fire doors? 

No 

Are there duct‐type smoke detectors on the supply side of HVAC units rated greater than 2000 cfm but less than 15,000 cfm 

No 

Are there duct‐type smoke detectors on both the supply side and return side of the HVAC units rated 15,000 cfm or more 

No 

Are there duct‐type smoke detectors at all smoke damper locations within the HVAC system ductwork? Is there additional wiring to close the damper and turn off the associated HVAC unit 

No 

Green Roof Feasibility   

Asset  Consider: Green Roof Investments 

Quantity  1 SF 

Unit Cost  $9,999.00 

Total Cost  $9,999.00 

Is the roof a sloped system  No 

Is the roof less than 5 years in age  Yes 

Does the roof have significant amounts of penetration and equipment  

Yes 

Will structural modification need to be made to support a green roof 

Yes 

Page 215: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 212 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

Hazardous Materials   

Does the facility have a current AHERA Asbestos Inspection on File 

Yes 

Does the facility currently have a Asbestos Containing material OM plan in place 

Yes 

Has all the material identified in the AHERA report been abated 

Yes 

Has the facility been tested for Lead Paint  Yes 

Does the facility have a Lead containing paint OM plan in place 

No 

.     Comments  Not Determined  

Has the facility been tested for Lead in Water  Yes 

Does the facility have a Lead in water OM plan in place  No 

.     Comments  Not Determined - there may be an abandoned underground tank 

.     Comments  N/A  

Does the facility have a AST  No 

.     Comments  N/A 

Are transformers PCB free  Yes 

Is there any known PCB containing equipment onsite  No 

Page 216: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 213 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

LEED     

SS  Sustainable Sites ‐ Possible Points: 68 

SS.C3  Does the facility have an Integrated Pest Management, Erosion Control, and Landscape Management Plan

No 

        If No, level of effort to achieve Hard 

SS.C4  Does the facility provide car pooling or Alternative Commuting Transportation options or incentives

No 

SS.C5  Does the way the site is developed Protect or Restore Open Habitat

Yes 

SS.C6  Does the facility have retention ponds rain gardens to control the quantity of Storm water

No 

        If No, level of effort to achieve Hard 

SS.C7.1  Does the facility have non asphalt / macadam based paving such as light colored pavers or concrete

No 

        If No, level of effort to achieve Easy 

SS.C7.2  Does the facility have a cool roof (white or light color roof surface) 

Yes 

SS.C8  Are measures installed preventing operable exterior lighting from encroaching on adjacent properties

No 

WE  Water Efficiency ‐ Possible Points: 0 

WE.P1  The facility has a Minimum Indoor Plumbing Fixture and Fitting Efficiency policy

No 

        If No, level of effort to achieve Easy 

WE.C1  Does the facility have a water meter for the whole building

Yes 

                   Does the facility have sub meters for boiler wtr, cooling tower wtr, irrigation wtr, fire sprinkler

No 

        If No, level of effort to achieve Not Feasible 

WE.C2  Are all of the plumbing fixtures at the facility non‐water saving devices

No 

Page 217: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 214 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

        If No, level of effort to achieve Easy 

                   Are some of the plumbing fixture at the facility are non‐water saving devices (10‐25%)

No 

        If No, level of effort to achieve Easy 

                   Are all of the plumbing fixture at the facility water saving devices (100%)

No 

        If No, level of effort to achieve Easy 

WE.C3  Does the school use native planting that does not require irrigation

No 

        If No, level of effort to achieve Not Feasible 

                   Does the school have an irrigation system with a rain gauge and time system

No 

        If No, level of effort to achieve Not Feasible 

WE.C4  Does the Cooling Tower utilize a Chemical Management System

Yes 

Page 218: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 215 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

Safety Security   

Do all areas of the school, including bathrooms, hallways, and offices, have the ability to receive an announcement via the P.A. System 

Yes 

Do all areas of the school have the ability to privately call the main office or for emergency 

Yes 

Does the general office, principal’s office, assistant principal’s office have CCTV receptacles 

No 

Is there an automated notification system to lockdown the building envelope 

Yes 

Does the facility have a monitored burglar alarm system  Yes 

Are all classrooms and all other rooms that are grade‐accessible will be equipped with motion detector 

No 

Are all general corridor or lobby areas plus rooms with specific vulnerability equipped with motion detectors? 

No 

Is the main office and one or more additional locations(s) accessed by designated staff equipped with IDS arm/disarm keypads 

Yes 

Are alarm monitoring and response performed by DCPS via their existing central alarm monitoring facility via either dial‐up telephone lines or LAN/WAN 

Yes 

Is there a video surveillance system that provides general surveillance of the site, common areas and building entry and exit points 

Yes 

Does the facility have monitored video surveillance system at the interior 

Yes 

Does the facility have monitored video surveillance system at the exterior 

Yes 

Does the facility have exterior door hardware that allows controlled access to the building? 

Yes 

Does the facility have exterior card access readers that allow controlled access to the building? 

Yes 

Does the facility have allow occupants a quick, unimpeded egress from the building? 

Yes 

Does the facility have interor door hardware that allows controlled access to classrooms? 

No 

Does the facility have interior card access readers that allow controlled access within the building? 

No 

Page 219: FACILITY CONDITION ASSESSMENT · 1/8/2018  · Facility Condition Assessment Report (FCA Report) ‐ The work product resulting from completing a FCA is a FCA Report. The FCA Report

  0726.0

Hayat Brown LLC Page 216 of 216  Powered by iPlan™ © 4tell™ Solutions, LP  

Does the facility have Magnetometers that monitor for the entry of "unwanted items" into the building? 

No 

Does the facility have equipment that allows announcements to be made during large gatherings? 

Yes 

Extra Survey Information