Floodplain Program Update Virginia Department of Conservation & Recreation Division of Dam Safety & Floodplain Management Charley Banks, CFM | Gina DiCicco, AICP, CFM | Kristin Owen, AICP, CFM VFMA Fall Workshops 2017

Upload: others

Post on 10-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Floodplain Program UpdateVirginia Department of Conservation & RecreationDivision of Dam Safety & Floodplain Management

Charley Banks, CFM | Gina DiCicco, AICP, CFM | Kristin Owen, AICP, CFM

VFMA Fall Workshops 2017

Page 2: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Topics

• Program Overview, Accomplishments, and Goals• Upcoming Training Opportunities• Virginia Flood Risk Information System (VFRIS)• Floodplain Regulation Updates

• Accessory Structures• Permitting Requirements• Model Ordinance Updates

• Dam Safety Inventory System (DSIS)

2

Page 3: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Floodplain Management Program Overview• DCR is charged by the General Assembly in the VA Flood Damage

Reduction Act, Section 10.1-600 to 10.1-603 of the Code of Virginia, to serve as the coordinator of all flood protection programs and activities in the Commonwealth.

• DCR acts as a liaison between FEMA and communities for the National Flood Insurance Program (NFIP).

• DCR assists communities with their floodplain ordinances and maps, provides floodplain workshops and trainings, and provides technical assistance and guidance.

• DCR works closely with FEMA Region III, VA state agencies, other state NFIP offices in the Region, and the VA Silver Jackets team.

3

Page 4: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Silver Jackets Program Goals• Facilitate strategic life-cycle flood risk reduction.• Create or supplement a continuous mechanism to

collaboratively solve state-prioritized issues and implement or recommend those solutions.

• Improve processes, identifying and resolving gaps and counteractive programs.

• Leverage and optimize resources.• Improve and increase flood risk communication and present a

unified interagency message.• Establish close relationships to facilitate integrated post-

disaster recovery solutions.4

Presenter
Presentation Notes
Projects: Flood Risk Guide Multi-Hazard Tournament City of Franklin mapping project Project Proposals (NOT APPROVED YET) Flood mapping project for Roanoke area
Page 5: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

The Floodplain Management Plan for the Commonwealth of Virginia• The plan will be a web-based resource that serves as a one-

stop-shop for flood information in Virginia.• This is a departure from the 2005 plan, which was a 226 page

document.

• The new Virginia Flood Risk Information System (VFRIS) is one major element of the website. Phase 1 of VFRIS was rolled out in February 2017.

• The draft website layout is complete and two pages are in the initial draft phase.

• Legal information and analysis has been provided by the Virginia Coastal Policy Center.

5

Page 6: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

2017 Accomplishments• Working with FEMA, DCR ensured that the 8 NFIP

participating communities that received new FIRMs in February 2017 updated and adopted their floodplain ordinances accordingly

• Conducted 13 Community Assistance Visits/Contacts• DCR is assisting FEMA Region III in hosting a CAP Summit in

fall 2017 for all state and FEMA partners in the region.• Virginia will participate in the next NFIP/SHMO meeting in DC

this winter, and will host the following meeting in spring/summer (at VDEM).

6

Page 7: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Goals for the Upcoming Year

• Update the DCR-FM website to serve as the state floodplain management plan.

• Consider the Certified Floodplain Surveyor Program.• Incorporate floodplain management into state

university programs.• Complete VFRIS Phase III.

7

Page 8: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

2017 Trainings

• Offered two L-273 courses• Provided workshops and training on:

• Post-Matthew Recovery• Community Rating System• Virginia Flood Risk Information System• Permitting

8

Page 9: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Upcoming Trainings

• VA APA Webinars• October 23 – FEMA

• Natural Disaster Preparedness• January 22 – DCR

• Floodplain Management for Planners

• Silver Jackets Webinar• October 31 – National Weather Service

• Hydro Gone Bad

• Substantial Damage Estimator Tool Workshop(s)• Tentatively: March-April 2018

9

Page 10: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

PDC Floodplain Workshops• DCR is partnering with all 21 PDCs to offer one-day

floodplain management workshops across the state.

• Eligible for continuing education credits for the following certifications: CFM, AICP, VAZO, & CEM (not pre-approved)

• Topics include:• Overview of the National Flood Insurance Program• Floodplain Ordinances and Permitting requirements• Flood Hazard Maps and Data• Pre- and Post-Disaster Considerations• Community Rating System• DCR Division of Dam Safety & Floodplain Management update

10

Page 11: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

PDC Floodplain Workshops ScheduleMiddle Peninsula Planning District Commission October 18 SaludaCommonwealth Regional Council October 26 FarmvilleNorthern Virginia Regional Commission November 1 FairfaxNorthern Neck Planning District Commission November 6 WarsawWest Piedmont Planning District Commission November 16 MartinsvilleGeorge Washington Regional Commission November 28 FredericksburgThomas Jefferson Planning District Commission December 12 CharlottesvilleRegion 2000 Local Government Council January 18 LynchburgSouthside Planning District Commission January 29 South HillHampton Roads Planning District Commission January 31 ChesapeakeLenowisco Planning District Commission February 13 DuffieldCumberland Plateau Planning District Commission February 14 LebanonMount Rogers Planning District Commission February 15 MarionNorthern Shenandoah Valley Regional Commission February 22 Front RoyalRoanoke Valley-Alleghany Regional Commission March 23 RoanokeCentral Shenandoah Planning District Commission March 27 Fishersville

11

Presenter
Presentation Notes
Already conducted workshops with the New River Valley PDC, Richmond PDC, Crater PDC, Accomack-Northampton PDC, Rappahannock-Rapidan PDC.
Page 12: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Virginia Flood Risk Information System (VFRIS)

Update

12

Page 13: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

VFRIS Background• VFRIS is an interactive map tool that brings together

information from FEMA, FWS, ESRI, VGIN, and others to provide an understanding of flood risk.

• It is being developed by the Virginia Institute of Marine Science (VIMS) and DCR.

• Goals:• Provide local officials, home owners, realtors, and

developers with an understanding of a property’s flood risk.

• Develop a mapping tool that is specific to Virginia and can be customized to the needs of the commonwealth.

13

Page 14: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Accessing VFRIS

14

Page 15: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

VFRIS Phase 1

• Phase 1 of was launched in February 2017.• Based largely on National Flood Hazard Layer data• Included depth grids for coastal communities

15

Page 16: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

VFRIS Phase 2• Phase 2 is wrapping up now. It includes:

• LiMWA• Parcel boundaries• Changes since last FIRM• FIS and Flood Risk Reports• HEC-RAS model for Loudoun County• Increased functionality – upload shapefiles, draw on the

map, share a link to the current map view, make more mobile-friendly.

16

Presenter
Presentation Notes
I would say that Phase 2 is over, but it may be a while before we get Loudoun’s HEC-RAS models on VFRIS.
Page 17: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

VFRIS Phase 2

17

Presenter
Presentation Notes
FIS and Flood Risk Report downloads Ability to upload shape files
Page 18: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

VFRIS Phase 2

18

Presenter
Presentation Notes
Changes Since Last FIRM
Page 19: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

VFRIS Phase 2

19

Presenter
Presentation Notes
New drawing tools
Page 20: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

VFRIS Phase 3

• Phase 3 is planned for spring of 2018.• Possible features include:

• Coastal A Zone polygons

• Building footprints• Additional HEC-RAS models

• What features would you like to see?

20

Page 21: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Floodplain Regulations Update

21

Page 22: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

State Model Floodplain Ordinance• DCR updated the state model floodplain ordinance to

incorporate new FEMA guidance on accessory structures.• DCR has been working with communities to understand this

accessory structure guidance and incorporate it into their ordinances.• No statewide deadline for community adoption. DCR works with

communities on a rolling basis.

• DCR is currently working to ensure the ordinance aligns with the current and future VA Uniform Statewide Building Code.

• DCR is updating a model MOU for towns and counties to adopt so that floodplain management program responsibilities can be clearly outlined.

22

Page 23: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Accessory StructuresTypes of Development

• Residential Development• Non-Residential Development• Other Development

Appurtenant structure: A structure which is on the same parcel of property as the principal structure to be insured and the use of which is incidental to the use of the principal structure. (44CFR 59.1)

23

Page 24: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Accessory or Appurtenant Structures

• Considered non-residential structures• 44 CFR 60.3(c)(3) & (e)(1) requires:

oMust be at or above the BFE, or

oDry flood-proofed

24

Page 25: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Wet-Floodproofing Exception

• FEMA guidance has been that small, low cost accessory structures can be wet-floodproofed

o TB 7-93o TB 5-08o FEMA 480

• Problem: What is small and low cost?

25

Page 26: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

What is Small & Low Cost?

• FEMA Region 3 has recently defined accessory structures as 600 ft2 or less.

• Wet-floodproofing exception:oCertain conditions must be met.oVariances may be required.oVariances may not be issued for an accessory structure

exceeding 600 ft2.

26

Presenter
Presentation Notes
The intent in establishing a definition for small and low cost accessory structures is to provide limited relief from the minimum requirement that all new or substantially improved accessory structures be elevated to or dry floodproofed above the base flood elevation within the Special Flood Hazard Area.
Page 27: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Accessory Structure Requirements1. Not for human habitation2. Be limited to no more than 600 ft2 in total floor

area3. Be useable only for parking of vehicles or limited

storage4. Be constructed with flood damage-resistant

materials below the base flood elevation5. Be constructed and placed to offer the minimum

resistance to the flow of floodwaters

27

Page 28: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Accessory Structure Requirements (cont.)

6. Be anchored to prevent flotation7. Have electrical service and mechanical equipment

elevated to or above the base flood elevation8. Shall be provided with flood openings (specific

standards defined)9. A signed Declaration of Land Restriction (Non-

Conversion Agreement) shall be recorded on the property deed*

28

Presenter
Presentation Notes
A signed declaration of land restriction is not a requirement if accessory structures are addressed in the ordinance. It would be considered a higher standard, but it is recommended to require this. If accessory structures are not addressed in the ordinance, the FEMA memo says the conversion agreement is required – FEMA is checking into this.
Page 29: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Accessory Structure Requirements (cont.)

• VariancesoNot allowed for accessory structures exceeding 600 ft2

• Higher StandardsoA community could choose a higher standard and limit

accessory structures to a size less than 600 ft2, such as 200 ft2

o In that case, a variance could be issued for larger accessory structures, not to exceed 600 ft (i.e. between 200 ft2 -600 ft2)

29

Page 30: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Ordinance Compliance

• Local ordinances must be in compliance with this accessory structure definition.

• Three options for compliance• Prohibit accessory structures in the SFHA• Allow accessory structures in the SFHA and identify minimum

requirements in your ordinance• Don’t address accessory structures and require a variance for all

accessory structures

NOTE: This is only for wet-floodproofing. You can still permit these structures in the SFHA if they meet the requirements of a non-residential structure (elevated or dry-floodproofed).

30

Page 31: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Model Ordinance Update

• New Definition• Appurtenant or accessory structure - A non-residential

structure which is on the same parcel of property as the principal structure and the use of which is incidental to the use of the principal structure. Accessory structures are not to exceed 600 ft2

• Incorporates two of FEMA’s accessory structure options:

• Prohibit accessory structures

• Address accessory structures and limit to 600 ft2

31

Page 32: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

32

Page 33: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Permitting Requirements

ALL development in the SFHA requires a permit• Definition of development (as per 44 CFR 59)

Any manmade change to improved or unimproved real estate, including, but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations, or storage of equipment or materials.

• Before any kind of development in the SFHA is allowed, the project must be permitted by the local floodplain administrator.

• Ensure you have a process for capturing all floodplain development

33

Page 34: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Permitting Requirements

• Federal, state, and local government agencies must also adhere to floodplain management requirements.

• Executive Memorandum 2-97 requires:• State projects in the SFHA must comply with the local

floodplain ordinance, if working in a participating community. This means obtaining permits from the community’s floodplain administrator.

• When doing a project in a community that does not participate in the NFIP, state agencies are still required to meet the minimum NFIP criteria as outlined in 44 CFR 60.3.

34

Page 35: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Building Codes and the NFIP

• VA Uniform Statewide Building Code establishes building standards for new and substantially-improved buildings

• VA USBC incorporates parts of the ICC Codes• Not all NFIP requirements appear in the VA USBC

• Does not establish site or location requirements• Other types of development (non-structures)

35

Page 36: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Building Codes and the NFIP• REMEMBER!

• You must adhere the most restrictive code, provision, or requirement

• The absence of certain floodplain management requirements from existing building codes does not absolve the community from applying the requirements of its floodplain management ordinance and vice versa

36

Page 37: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Virginia Uniform Statewide Building Code• The 2012 USBC (adopted in 2015) is currently in place.

• The 2015 USBC will likely be adopted in the spring of 2018.• The new USBC is expected to include some additional higher standards

for building construction in floodplains, based on the 2015 I-Codes.

• While the USBC excludes certain types of smaller development from requiring a building permit (section 108.6), this does not exclude them from needing a floodplain permit of some kind.

• Currently, because these 15 activities are exempt from building permit requirements, a building permit may not be used for these types of development. Communities must use a different kind of permit to capture this development (such as a zoning or floodplain permit).

37

Page 38: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

38

FEMA Draft Permitting Policy• FEMA draft policy is

available online.• Public comment period

has ended. FEMA received comments from 37 entities.

• Comments are currently being reviewed and adjudicated.

https://www.fema.gov/media-library/assets/documents/131010

Page 39: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

FEMA Draft Permitting Policy

• FEMA draft policy requires that development be reviewed, assessed, and documented.

39

Page 40: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

FEMA Draft Permitting Policy• Classes of activities may be reviewed upfront and considered

to be permitted, without requiring an individual permit for each case.

40

Presenter
Presentation Notes
Ordinance amendment to refer to this administrative procedure for permit list.
Page 41: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

41

FEMA Map Updates - LiDAR

Within the next two years, Virginia will have full LiDAR coverage, assuming that funding remains.

Presenter
Presentation Notes
I forget the exact timeline on this. I think it is actually less than two years.
Page 42: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

42

FEMA Map Updates - Discovery

Page 43: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

43

FEMA Map Updates - FIRMs

Page 44: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Dam Safety Inventory System (DSIS)

44

Page 45: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Virginia Dam Locations and Regions

45

Page 46: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

DSIS Goals• Digital Files and Attachments• Centralized Database• Simplified Tracking• Quickly Find Data• Export Reports and Files for Sharing• Public Facing• Quickly Respond to Emergency Requests• Effective Response During Emergencies

46

Presenter
Presentation Notes
Database is not public facing yet. That is Phase 2, which DCR is working on now. Estimating 6-12 months before available to the public. Users will need a user id and password to log in. At the time, DCR is not really issuing user logins until the public version is complete. DSIS is available for DCR Engineers and some Emergency Operation Centers (i.e. VDEM) at this time.
Page 47: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

DSIS Information• Contact information• Technical Specifications• Inspections• Permits• Certificates• Emergency Action Plans• Map location and additional map layers (including dam break

inundation zones and SFHA)

47

Page 48: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

DSIS Features

48

Page 49: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

49

DSIS Features

Page 50: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

DSIS Features

50

Page 51: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

51

DSIS Features

Page 52: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

DSIS Features

52

Page 53: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

DSIS FeaturesLeatherwood Creek Dam #5 –Watershed

53

Page 54: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

DSIS FeaturesLeatherwood Creek Dam #5 – Watershed

54

Page 55: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

55

Dam Safety Inventory System ContactsDavid Wilmoth, PE, CFM, PH, Dam Safety Engineer

[email protected]

James Martin, Conservation Data [email protected]

804-887-8916

Page 56: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

56

Page 57: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Floodplain Management ContactsDCR Floodplain Management

• Charley Banks, CFM• Floodplain Program Manager• (804) 371-6135• [email protected]

• Gina DiCicco, AICP, CFM (VFRIS)• Floodplain Program Planner • (804) 786-6523 • [email protected]

• Kristin Owen, AICP, CFM (CRS)• Floodplain Program Planner • (804) 786-2886• [email protected]

57

Page 58: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600

Floodplain Management Contacts• FEMA Region III

• Zane Hadzick - Lead Mitigation Specialist for VA• [email protected]

• Charlie Baker - Backup Mitigation Specialist for VA• [email protected]

• Rich Sobota - Insurance and CRS Specialist• [email protected]

• ISO/CRS Specialist• Christina Groves

• (270) 754-3646• [email protected]

58

Page 59: Floodplain Program Update · 2017. 11. 3. · Floodplain Management Program Overview • DCR is charged by the General Assembly in the VA Flood Damage Reduction Act, Section 10.1-600