Floodplain Management Plan 2018 Annual Progress Report
Pinal County (Unincorporated)
NFIP Community Number 040077
September 2018
Floodplain Management Plan Annual Progress Report Pinal County (Unincorporated)
NFIP Community Number 040077 September 2018
Page 2 of 6 Background Pinal County participates in the Federal Emergency Management Agency’s Community Rating System (CRS) program. CRS is a voluntary incentive program that recognizes and encourages community floodplain management activities that exceed the minimum National Flood Insurance Program requirements. Pinal County’s participation in the CRS program requires an annual recertification of the activities that presently result in a 15% reduction in flood insurance policy premiums for properties within Special Flood Hazard Area (SFHA) of the unincorporated portion of the County. This report was prepared in accordance with the annual recertification requirements of the Community Rating System. Floodplain Management Plan The Pinal County Multi‐Jurisdictional Hazard Mitigation Plan (MJHMP) serves as the basis for the Pinal County Floodplain Management Plan. The primary objectives of the MJHMP are:
To identify natural hazards and certain human‐caused hazards that impact the various jurisdictions located within Pinal County
To assess the vulnerability and risk posed by those hazards to community‐wide human and structural assets
To develop strategies for mitigation of those identified hazards To present future maintenance procedures for the plan and document the planning process.
The MJHMP was jointly developed by the County, municipalities and community stakeholders to reduce and/or eliminate risks associated with natural and man‐made hazards. The current MJHMP was adopted by Pinal County on July 12, 2017 and approved by the Federal Emergency Management Agency (FEMA) on August 18, 2017. A copy of the approval letter from FEMA is attached to this report. Section 5.4 of the MJHMP contains a project list that includes current and completed projects intended to mitigate local flood hazards within the unincorporated areas. An updated projects table is included as an attachment to this progress report. Community Outreach Pinal County routinely engages in outreach as part of the ongoing effort to educate and inform citizens about flooding and flood protection. First and foremost, Pinal County prepares and mails out an annual newsletter to residents within the Special Flood Hazard Area in advance of Arizona’s monsoon season. The newsletter provides useful information to residents regarding flood preparedness, County and Federal regulations, and permitting procedures. For 2018, the newsletter contained 8 pages of useful information and facts. It was mailed to residents of the unincorporated areas of Pinal County as well as those residents living within the Cities. In total, more than 3,000 newsletters were mailed out. Pinal County also prepared mailers/letters to residences in certain parts of Pinal County whose property contained an earth fissure on it as identified by the Arizona Geological Survey. Although this outreach did not necessarily qualify for credit under the Community Rating System, it was conducted nonetheless to help improve knowledge and awareness about this geologic hazard.
Floodplain Management Plan Annual Progress Report Pinal County (Unincorporated)
NFIP Community Number 040077 September 2018
Page 3 of 6 In addition to these things, Pinal County also performed outreach for two revisions to the Flood Insurance Rate Maps. In particular, outreach was conducted for the Eloy Industrial Park Physical Map Revision as well as the Mountain View Estates Letter of Map Revision. Between the two projects, 854 letters to property owners were sent out. In November, 2017 a public meeting was conducted in Arizona City to discuss a number of issues and topics important to the community. Included on the agenda was the topic of floodplains and floodplain map changes. Maps were brought to the meeting and brochures and information about flood insurances were also made available for attendees. Certified Floodplain Manager (CFM ®) Program The Association of State Floodplain Managers (ASFPM) has established a national program for professional certification of floodplain managers. The program recognizes continuing education and professional development that enhances the knowledge and performance of local, state, federal, and private‐sector floodplain managers. Pinal County currently has five employees who are Certified Floodplain Managers (CFMs ®) that have a combined total of more than 40 years in the floodplain management fields. These employees regularly speak with residents about flooding problems, flood insurance, and floodplain permitting. Staff also makes field visits to provide specific advice to homeowners pertaining to their particular flooding hazard. These CFMs maintain their certification by regularly participating in training as well as by attending at least one floodplain management conference per year. There are also several more CFMs within the Public Works department however they do not have active floodplain management roles. Pinal County Flood Mitigation Projects Update Four flood mitigation projects listed in the MJHMP have been completed over the past few years with several more currently in the study or design phase. A summary of some of the mitigation projects listed in the MJHMP, as well as some additional ones Pinal County is working on, is listed below:
Develop InterGovernmental Agreements (IGAs) with County Dependent Communities: Pinal County is in the unique position that it also has floodplain management responsibility for seven cities residing within the County. This project was identified in the MJHMP as an activity that would codify a set of standard operating procedures between the jurisdictions in order to better serve the residents. This is an ongoing project; one IGA has been completed and several others are in progress. Quarterly Flood Control Meetings with Local Jurisdictions: Another project identified in the MJHMP as having high importance is to have regular meetings with the local jurisdictions to discuss the status of floodplain issues affecting the community. Pinal County holds quarterly Flood Advisory Council meetings to serve this purpose. The meetings typically cover policy issues affecting the community as well as the status of mitigation projects and studies. The meetings have greatly improved the relationship Pinal County has with the local cities. Queen Valley Flood Mitigation Project, Phase II: Phase II of this flood mitigation project has been completed. Principal construction features included: 1) The construction of a 5 cell
Floodplain Management Plan Annual Progress Report Pinal County (Unincorporated)
NFIP Community Number 040077 September 2018
Page 4 of 6
8 foot by 10 foot box culvert at Sharon Dr and 2) 1,525 feet of channel improvements to include excavation and re‐contouring the Queen Creek wash as well as the placement of rip‐rap erosion protection and minor landscaping. The project mitigated flooding issues on 22 properties. The total tax payer investment for this project was $1,107,502.56. Lower Santa Cruz River Flood Mitigation: In conjunction with the US Army Corps of Engineers a feasibility study for a regional project on the Santa Cruz River is being conducted. An extensive hydrologic and hydraulic analysis of the river has been completed for the entire reach within Pinal County. The feasibility study is still underway was supposed to be completed in early 2018. However, the project alternative that was identified by the US Army Corps of Engineers was not supported by the community. Instead, a locally preferred plan was developed and that is currently being pursued instead. It is anticipated that it will take an additional 2 years of study in order to finish the feasibility study of the locally preferred plan. Hunt Highway & Magma Road Flood Mitigation: Pinal County is making major investments in regional drainage infrastructure in the unincorporated community of San Tan Valley. The project include the construction of more than 2 miles of channels as well as a regional detention basin attenuate peak flood flows. When the project is complete there should be reduction in flooding problems for 3 residential subdivisions and hundreds of single and multi‐family homes. Expenditures for land acquisition, design & construction of this project exceed $5 million. The project is about 75% completed as of this writing. ALERT Gauges: Pinal County owns and operates a network of 41 rainfall and stream gauges placed strategically around the County. This system provides important data to the National Weather Service which uses it to prepare more accurate weather forecasts and flood warnings. This project was identified in the MJHMP and is an ongoing effort. The system is maintained annually with new components being added in accordance with the ALERT program’s five year plan. In 2018, additional gauging stations were added to the system and several older stations were upgraded to work with the latest ALERT protocols.
The table of projects from the MJHMP is attached to this report. Flood Control 5Year Capital Improvement and Study Plan In 2018, Pinal County Flood Control also completed its first written 5‐Year Capital Improvement and Study Plan. This document plans out all of the projects and studies that are anticipated to occur over the next 5 years. The plan is currently in draft form however it is anticipated to be adopted/accepted by the Board of Directors within the next 2 months. A copy of this draft plan is attached to this update. Pinal County Floodplain Mapping and Studies Pinal County is currently working several floodplain delineation studies in an effort to improve the accuracy and reliability of the FEMA Flood Insurance Rate Maps (FIRMs). Accurate maps help to build public confidence while also supporting smart growth and development within the County. Since these maps also form the basis for where flood insurance would be required, accuracy is
Floodplain Management Plan Annual Progress Report Pinal County (Unincorporated)
NFIP Community Number 040077 September 2018
Page 5 of 6 important in helping to ensure that federally mandated flood insurance is required for structures that actually have a 1% annual chance of flooding. Pinal County currently has one floodplain mapping study that is in for review with FEMA called the Eloy Industrial Park study. In the past year, one Letter of Map Revision (LOMR) has been approved by FEMA for incorporation into the Flood Insurance Rate Maps. The table below shows the LOMRs that have modified the limits of the Special Flood Hazard Area within Pinal County.
Name Panel# Case Number Effective Date
Mountain View Estates
04021C1555E04021C1560E 04021C1565E 04021C1570E 17090587P040077 7/13/2018
Summary Pinal County has achieved a “Class 7” rating under the CRS program’s criteria primarily due to its comprehensive approach to floodplain management and its experienced staff. Pinal County’s participation in the CRS program has resulted in a 15% reduction in flood insurance policy premiums for properties within Special Flood Hazard Area (SFHA) of the unincorporated portion of the County. Progress on the 2016 Multi‐Jurisdictional Hazard Mitigation Plan (MJHMP) has been made over the past year with many flood mitigation projects having been completed or started. In addition to this, Pinal County completed and started various mitigation projects that weren’t included in the MJHMP and is currently working on the early stages of several others. An updated project list is attached. Attachments Multi‐Jurisdictional Hazard Mitigation Plan FEMA Approval Notice
Floodplain Management Plan Annual Progress Report Pinal County (Unincorporated)
NFIP Community Number 040077 September 2018
Page 6 of 6 Multi‐Jurisdictional Hazard Mitigation Plan Project Table Flood Control 5‐Year Capital Improvement and Study Plan (Draft)
PINAL COUNTY MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 2016
148
Table 5-11: Mitigation Strategy for Pinal County
Project NameDescription
Hazard(s) Mitigated
Estimated Cost
Project Primary or Lead
Potential Funding Source(s)
StatusNo ProgressIn ProgressComplete
Explanation or brief description of work so far or reason for ‘no progress’
Develop IGAs with County dependent communities to define and clarify roles in implementing the NFIP program and managing the floodplains
Flood$15,000+ Staff TimeJan 2018
Pinal Co Flood Control District / Section Chief
Flood Control District Levy
In Progress
IGA with Eloy complete. Still working with other communities.
Develop Wildfire Mitigation and Prevention program to include community awareness.
Wildfires$30,000+ Staff TimeJune 2017
Pinal Co Office of Emergency Mgt
Grant Funding In progress
Oracle Fire is only FireWise community so revise project to get other jurisdictions on board.
Conduct quarterly flood control Meetings with all districts, Indian Tribes, and Cities
FloodStaff TimeOngoing
Pinal Co Flood Control District
Flood Control District
In ProgressQuarterly meetings are held with stakeholders.
Fissure monitoring for state-wide mapping by AZGS and promote fissure awareness with the public
Subsidence,Fissure
$10,000/ yr + Staff TimeOngoing
Pinal Co Office of Emergency Mgt
OEM Grant Funding In Progress
IGA with ADWR and the Pinal County FCD pays for InSAR coverage
All Weather Access analysis.Review County transportation network and determine areas in need of stream crossing upgrades to improve public access.
Flood$20,0000+Staff TimeJune 2020
Pinal Co Transportation Planner
Flood Control District Levy/ HURF
In Progress
No separate analysis – there is some data in the ADMP’s about access issues
Superior Flood Prone Property Plan. Develop a plan to address homes currently located in FEMA floodway. Plan to address feasibility of mitigation projects and potential property buy-outs.
Flood$2M+ Staff TimeJune 2020
Pinal Co Flood Control District
FloodControl District Levy
No Progress
PCFCD is working on a survey and possible flood mitigation project at this time. It may include land acquisition, but we want the Town to buy into the concept.
Queen Valley Flood Mitigation Plan.Multi-phase project to address flooding in the community. Planned elements include construction of new culverts, improved channel segments, and removal of floodplain encroachments.
Flood$1.5M + Staff TimeDec 2017
Pinal Co Flood Control District
Flood Control District Levy
Complete
Plan is complete.Construction on some of the plan is underway. There is more in the plan we could implement.
PINAL COUNTY MULTI-JURISDICTIONAL HAZARD MITIGATION PLAN 2016
149
Table 5-11: Mitigation Strategy for Pinal County
Project NameDescription
Hazard(s) Mitigated
Estimated Cost
Project Primary or Lead
Potential Funding Source(s)
StatusNo ProgressIn ProgressComplete
Explanation or brief description of work so far or reason for ‘no progress’
Santa Cruz River Watercourse Master Plan. Develop a reconnaissance study to determine possible flood mitigation alternatives.
Flood$1.5M+Staff TimeJune 2018
USACE/Pinal Co Flood Control District
Federal Funding In Progress
Cost share for PCFCD is $1.5 million for 3 years
Emergency Shelters/Redundant Power.Develop Shelter Operations Plan along with appropriate contracts & agreements. Plan for ensuring shelter sites have permanent or access to back-up power.
Severe Wind$30,000June 2016
Pinal Co OEMGeneral Fund In Progress
Finalize shelter plan; get schools to sign AZMAC; retrofit schools for generator power
ALERT Gauges.Includes the maintenance of the existing ALERT system as well as yearly software and hardware upgrades.
Flood$200,000+Staff TimeOngoing
Pinal Co Flood Control District
Flood Control District Levy
In Progress
Yearly we spend between $150,000 and $200,000 on ALERT
Pinal County Flood Control
District 5‐Year Capital
Improvement and Study Plan
Fiscal Years FY19‐20 through FY23‐24
Draft Report
August, 2018
Page 2
1. Annual Budget & Overhead, Fund #68 The Pinal County Flood Control District receives funds though a secondary property tax paid by Pinal
County property owners. Additionally, the District seeks financial project partnerships from Federal,
state and local agencies to supplement tax revenue. Other revenue sources include sales of excess
land and other assets, permitting fees, and fund balance interest.
The District’s annual revenue is approximately $3.3 Million. By the beginning of FY23‐24, annual
revenues are expected to be approximately $4 Million. The District’s overhead costs (Salaries,
Equipment, Emergency Management Support, etc) are about $840,000 and are expected to exceed
$1.2 Million by FY23‐24. In addition to overhead, the District has several annual obligations and
programs (described in detail in section 2) with expenses nearing $300,000. By FY23‐24, these
annual expenses are expected to be about $585,000.
At the beginning of FY18‐19, the District had a fund balance of approximately $7.4 Million.
Page 3
2. Annual Programs & Projects, Fund #68
2.1. ALERT Flood Warning System The Pinal County Flood Control District currently has an ALERT system with a base station located in Florence, Arizona that receives data from remote sensor stations owned and operated by the Pinal County Flood Control District, the Pima County Regional Flood Control District, the Flood Control District of Maricopa County (FCDMC), and the Arizona Department of Water Resources (ADWR). Additionally, real‐time data generated by the county’s ALERT system are received at the offices of the National Weather Service (NWS) located in Phoenix and Tucson. The NWS uses the ALERT system data in support of their forecast and weather/flood advisory programs and decision support systems. The main components of the ALERT program include in gauging station installations, maintenance, data storage and processing, and website/public/user interfacing. Annual funding for this program is set at $200,000.
2.2. NPDES Phase II Compliance The District is currently responsible for ensuring that Pinal County remains compliant with
the MS4 program as administered by the Arizona Department of Environmental Quality
(ADEQ). This annual program includes funds for inspections, water sample testing, plan
development, plan review, training, public outreach, and annual reporting. The annual
budget for this effort has been set at $30,000.
2.3. Community Rating System On May 1st, 2015, Pinal County became a participant in the National Flood Insurance
Program’s (NFIP) Community Rating System (CRS) with a class rating of 7. The CRS program
was implemented nationally in 1990 and recognizes the efforts of communities who exceed
the NFIP’s minimum standards.
The result of Pinal County joining the CRS means that residents living in the unincorporated
areas of Pinal County can receive discounts on their flood insurance policy. For residents with
homes in the Special Flood Hazard Area a 15% discount on insurance premiums is available.
For residents with homes in a lower risk area a 5% discount on flood insurance is available.
In order to maintain Pinal County’s classification, the District must perform several actions.
Some of the primary actions include preparing an annual report, update GIS databases with
mapping and permitting information, and performing public outreach functions, among other
things. The annual budget for this program is currently $15,000. It will increase to $40,000 in
FY19‐20 due to the requirement to recertify every 5 years. Subsequent to this, it is expected
that the new budget will be set at $20,000 per year thereafter.
2.4. Levee Analysis, Countywide The District is responsible for reviewing, analyzing, and maintaining an inventory of levees and levee‐like structures throughout the county. This data will be compiled and evaluated
Page 4
against applicable engineering standards, the draft requirements of the Arizona Counties Insurance Pool (ACIP) Levee and Dike Policies, and Part 65.10 of 44 CFR, National Flood Insurance Program (NFIP) regulations. The annual budget for this effort has been set at $50,000.
2.5. San Pedro River Crossing Permit The District pays $20,000 biennially to renew a permit for a crossing on the San Pedro River.
2.6. Litigation Schnepf Bridge In 2006, the Schnepf Road Bridge in Queen Creek was permanently closed because the
structure’s stability was compromised during a flood. Subsequently, a lawsuit was filed
against area sand and gravel mining businesses to recover funds to replace the bridge.
Construction of the bridge has since been completed, however, the all of the terms of the
settlement agreement have not been fully executed at this time. An annual appropriation of
$5,000 is set to pay for legal fees, etc until all remaining tasks have been completed.
2.7. Litigation Sorrento An annual appropriation of $50,000 is set to deal with a lawsuit regarding the Sorrento
development until the case is close.
2.8. Misc Land Acquisition An annual appropriation of $5,000 is made for various easements or rights of way that the
district may need throughout any given year.
2.9. Topographic Mapping The District is set an annual budget of $100,000 to acquire 1ft topographic mapping of
various sections of Pinal County. This program helps to support future projects, floodplain
mapping studies, and in‐house design work. Depending on the number and location of the
areas to be acquired, $100,000 will cover around 4 square miles of land.
2.10. Flood Control Structure Maintenance The District currently owns several channels and basins throughout Pinal County. The annual
budget for maintenance of these structure is currently $200,000. However, this will be
reduced to $100,000 starting in FY19‐20.
Page 5
3. Capital Improvement Project Descriptions, Fund #68
3.1. Santa Cruz River Reconnaissance, Feasibility Study 3.1.1. Project Description
A joint feasibility study between Pinal County Flood Control and the US Army Corp of
Engineers to study 80 stream miles of the Lower Santa Cruz River (LSCR). The goal of the
feasibility study is to find a regional or localized solution to the flooding problems. The
feasibility study is expected to complete in FY21‐20.
3.1.2. Project Information
District: 1, 3, & 4
Funding Allocation FY18‐19: $1,000,000 (Study)
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.2. Community CIP 3.2.1. Project Description
An annual placeholder of $250,000 for projects with incorporated Cities. Projects for
FY18/19 and FY19‐20 have already been selected (Superior & Eloy respectively). Future
projects remain undetermined at this time.
3.2.2. Project Information
District: Various
Funding Allocation FY18‐19: $0 (Allocated to the Superior Project)
Funding Allocation FY19‐20: $0 (Allocated to the Eloy Project)
Funding Allocation FY20‐21: $250,000 (Design & Construction)
Funding Allocation FY21‐22: $250,000 (Design & Construction)
Funding Allocation FY22‐23: $250,000 (Design & Construction)
Funding Allocation FY23‐24: $250,000 (Design & Construction)
3.3. Dams, Permits, & Maintenance 3.3.1. Project Description
This project is a complete assessment of the 4 detention basins that Pinal County Flood
Control owns in the Hidden Valley. In addition, funds have been allocated for
construction activities to bring the basins out of ADWR’s jurisdictional dam
classification.
3.3.2. Project Information
District: 4
Page 6
Funding Allocation FY18‐19: $800,000 (Construction)
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.4. Queen Valley Flood Mitigation, Phase II 3.4.1. Project Description
This project is a complete assessment of the 4 detention basins that Pinal County Flood
Control owns in the Hidden Valley. In addition, funds have been allocated for
construction activities to bring the basins out of ADWR’s jurisdictional dam
classification.
3.4.2. Project Information
District: 5
Funding Allocation FY18‐19: $800,000 (Construction)
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.5. Ordinance Revision 3.5.1. Project Description
Pinal County Flood Control is currently working on revisions to the Drainage and
Floodplain Ordinances. Allocated funds will help with public outreach, writing of the
documents, and preparation of information materials for the public and permit
applicants.
3.5.2. Project Information
District: Countywide
Funding Allocation FY18‐19: $15,000 (Study)
Funding Allocation FY19‐20: $15,000 (Study)
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.6. McClellan Wash WCMP 3.6.1. Project Description
Pinal County Flood Control is currently working on a Watercourse Masterplan for the
McClellan Wash Watershed. This plan includes a comprehensive Hydrologic and
Page 7
Hydraulic analysis of the watershed as well as a determination of regional and local
projects designed to mitigate flooding in the area. The plan will ultimately be adopted
by the Pinal County Flood Control Board of Directors and the City of Eloy with the intent
that projects will be jointly funded in the future. In addition, the plan will form a
consistent standard for which future development will need to adhere to.
3.6.2. Project Information
District: 1
Funding Allocation FY18‐19: $170,000 (Study)
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.7. Dudleyville Community Center 3.7.1. Project Description
This project seeks to mitigate flooding on the Dudleyville Community Center property as
well as the local fire departments property. The drainage analysis has been completed
and the design is underway.
3.7.2. Project Information
District: 1
Funding Allocation FY18‐19: $500,000 (Design & Construction), $50,000 (ROW)
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.8. Airpark Drainage and Flood Mitigation 3.8.1. Project Description
A regional/local drainage assessment of the Pinal Airpark as well as the three tributary
watersheds impacting the Airpark’s property and assets.
3.8.2. Project Information
District: 4
Funding Allocation FY18‐19: $105,000 (Study)
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
Page 8
3.9. Sunland Gin Road and Flood Mitigation 3.9.1. Project Description
A study to find a regional solution to the flooding of Sunland Road and the vicinity south
of Arizona City. The study may result in a design for roadway improvements that may be
funded by Pinal County Public Works. In addition, Pinal County Flood Control is seeking
FEMA funding to help pay for the project. This project also includes floodplain mapping
of the Greene Wash from split with the Santa Cruz River upstream.
3.9.2. Project Information
District: 4
Funding Allocation FY18‐19: $260,500 (Study)
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.10. Superior Church Avenue and Copper Mountain Motel 3.10.1. Project Description
This project includes the design and construction of the Church Ave and Copper
Mountain Flood Mitigation Project within the Town of Superior. It will mitigate the risk
of flooding on 10 to 15 residences and businesses as well as improve access for up to 75
residences and businesses.
3.10.2. Project Information
District: 1
Funding Allocation FY18‐19: $16,000 (Design), $300,000 (Construction)
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.11. Russell Road Industrial Area 3.11.1. Project Description
This project seeks to evaluation the drainage problems in the area of Russell Road,
Peters & Nall Road, and Maricopa‐Casa Grande Highway. There are existing drainage
problems within the Saddleback Farms Subdivision, the Industrial area, and the Ak‐Chin
Airport. This project’s goal is to find a comprehensive regional solution to these
problems that also will work with the proposed future East‐West Corridor. In addition,
there is an opportunity to jointly fund the project with the Ak‐Chin Indian Tribe.
Page 9
3.11.2. Project Information
District: 3
Funding Allocation FY18‐19: $241,000 (Study)
Funding Allocation FY19‐20: $125,000 (Design)
Funding Allocation FY20‐21: $650,000 (Construction)
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.12. Roberts/Thompson Channel 3.12.1. Project Description
This project is will look at the feasibility of construction a channel along Thompson Road
south of Roberts Road in San Tan Valley. The goal is to mitigate flooding on several
residential properties as well as Eduprize School. Should a feasible project result from
the study, design and land acquisition would begin in FY19‐20.
3.12.2. Project Information
District: 2
Funding Allocation FY18‐19: $90,000(Study)
Funding Allocation FY19‐20: $100,000 (Design), $350,000 (ROW)
Funding Allocation FY20‐21: $600,000 (Construction)
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.13. Valley of the Sun Phase IIB (Skyline Channel) 3.13.1. Project Description
This project will finish the design of the proposed Skyline Road channel which will give
an outfall for drainage to the Valley of the Sun community. This will eliminate a ponding
issue that currently impacts more than 50 residential lots in addition to several
roadways. Design was originally underway in 2011, however, the project was put on
hold.
3.13.2. Project Information
District: 5
Funding Allocation FY18‐19: $125,000 (Design)
Funding Allocation FY19‐20: $300,000 (Construction)
Funding Allocation FY20‐21: $200,000 (Construction)
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.14. Overfield/Randolph Drainage
Page 10
3.14.1. Project Description In recent years, 8 properties have sustained significant flooding damage. This project
will identify potential flood mitigation and flood risk reduction alternatives in and
around the area of Overfield and Randolph Roads. It will also provide comprehensive
documentation of the flooding risk in the area.
3.14.2. Project Information
District: 3
Funding Allocation FY18‐19: $92,000 (Study)
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.15. Coolidge Drainage Project 3.15.1. Project Description
Located approximately five miles southeast of the City of Coolidge downtown area, the
Coolidge Municipal Airport (Airport) has experienced flooding issues over recent years.
Several businesses operate from the airport property. In addition, the Pinal County
Sheriff’s office has a substation at the airport. This project will study the drainage issues
in the area and determine feasible improvements that could be implemented in order to
reduce flooding impacts to businesses and airport property.
3.15.2. Project Information
District: 1
Funding Allocation FY18‐19: $150,000 (Study)
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.16. Welton Wash 3.16.1. Project Description
This study will evaluate the flooding problems associated with Welton Wash which is
located near Dudleyville. While a regional solution may be implemented at some time in
the future, the intent is to consider smaller scale alternatives that could mitigate
flooding during more frequent storm events.
3.16.2. Project Information
District: 1
Funding Allocation FY18‐19: $50,000 (Study)
Page 11
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.17. Country Mini Farms A Zone Remapping 3.17.1. Project Description
Located in northern San Tan Valley, County Mini Farms currently has floodplain mapping
through the community. The Floodplain is not contiguous to regional drainage and has
no identified source. The intent is to remove this floodplain from the FEMA maps.
3.17.2. Project Information
District: 2
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $50,000 (Study)
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.18. Dirtwater Springs/Main Street Drainage 3.18.1. Project Description
Within Apache Junction there is a flooding problem on Apache Trail west of Highway 88
which impacts the Dirtwater Springs Restaurant, a nearby RV/Mobile Home Park, and
the roadway. The goal would be to find a local solution to reduce or eliminate this
flooding problem. It is anticipated that this project would be performed jointly with the
City of Apache Junction.
3.18.2. Project Information
District: 5
Funding Allocation FY18‐19: $5,000 (Study
Funding Allocation FY19‐20: $250,000 (Design & Construction)
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.19. Val Vista Channel Rehab 3.19.1. Project Description
Pinal County Flood Control owns a channel which runs parallel to Val Vista road from
Trekkel Road to Pinal Avenue. The channel is currently overgrown with vegetation and
has experienced both significant erosion and sedimentation. Because of the condition
Page 12
the channel, the need to obtain new permits with the Corps of Engineers, a plan of
rehabilitation is needed. Following this, construction operations could begin to
rehabilitate the channel.
3.19.2. Project Information
District: 5
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $50,000 (Design)
Funding Allocation FY20‐21: $350,000 (Construction)
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.20. San Tan Valley ADMP 3.20.1. Project Description
San Tan Valley is a fast‐growing community of more than 80,000 residents. This region
is in need of a comprehensive area drainage master plan to help guide future
development while also identifying solutions for current flooding problems. The ADMP
will include acquisition of community wide topography, a comprehensive review of all
past drainage studies, and new hydrologic/hydraulic modelling. In addition, area
specific drainage standards for development may also be identified. Coordination with
the Town of Queen Creek and the Town of Florence will be required.
3.20.2. Project Information
District: 1,2,5
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $500,000 (Study)
Funding Allocation FY20‐21: $350,000 (Study)
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.21. Greene Wash Watershed Plan 3.21.1. Project Description
The Greene Wash Watershed Plan will develop a comprehensive analysis of the Greene
Wash Watershed while also looking for solutions to problems of erosion, sedimentation
and Flooding. The plan will be performed to NRCS specifications in order to maintain
eligibility for federal funds to support future mitigation efforts resulting from the
completion of the watershed plan. A grant application has been submitted to the NRCS
to help fund the development of this plan.
3.21.2. Project Information
District: 1 & 4
Page 13
Funding Allocation FY18‐19: $20,000 (Study)
Funding Allocation FY19‐20: $20,000 (Study)
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.22. SCR‐North Branch Santa Cruz Wash Watershed Plan 3.22.1. Project Description
The SCR‐North Branch Santa Cruz Wash Watershed Plan will develop a comprehensive
analysis of the SCR‐North Branch Santa Cruz Wash Watershed while also looking for
solutions to problems of erosion, sedimentation and Flooding. The plan will be
performed to NRCS specifications in order to maintain eligibility for federal funds to
support future mitigation efforts resulting from the completion of the watershed plan. A
grant application has been submitted to the NRCS to help fund the development of this
plan.
3.22.2. Project Information
District: 1 & 4
Funding Allocation FY18‐19: $20,000 (Study)
Funding Allocation FY19‐20: $20,000 (Study)
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.23. Middle Magma Channel Watershed Plan 3.23.1. Project Description
The Middle Magma Channel Watershed Plan will develop a comprehensive analysis of
the Middle Magma Channel Watershed while also looking move into the design phase of
a proposed channel which runs through some existing subdivisions in the area. The plan
will be performed to NRCS specifications in order to maintain eligibility for federal funds
to support future mitigation efforts resulting from the completion of the watershed
plan. Magma Flood Control District is managing the project and the funds allocated in
our budget represent Pinal County Flood Control District’s potential contribution to
support the project.
3.23.2. Project Information
District: 1 & 4
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $105,000 (Study)
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Page 14
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.24. Mammoth Kino Street Drainage, Phase I & II 3.24.1. Project Description
Properties in the area of Kino street (as well as the street itself) within the Town of
Mammoth have experienced significant flooding problems in the past. The flooding will
be mitigated with a two phase project. The first phase is expected to comprise of an
upstream off‐line detention basin. The second phase will include two additional,
smaller detention basins as well as street improvements. Flows in this project
ultimately discharge to the San Pedro River. The Town of Mammoth is a funding partner
and it is anticipated that the Town ultimately own and maintain the new infrastructure.
3.24.2. Project Information
District: 1
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $50,000 (Study), $50,000 (Design), $25,000 ROW)
Funding Allocation FY20‐21: $300,000 (Construction)
Funding Allocation FY21‐22: $50,000 (Design, Phase II), ($25,000 ROW, Phase II)
Funding Allocation FY22‐23: $300,000 (Construction, Phase II)
Funding Allocation FY23‐24: $0
3.25. Houston Avenue Channel 3.25.1. Project Description
Located south of the Apache Junction, the Houston Industrial area has experiences
multiple flooding problems in the past. In addition, several earth fissures have also
caused problems for business owners and the road users. The proposed solution
includes a channel that will parallel Houston Avenue, taking runoff to the existing
channel on Meridian Road. An detention basin may also be needed as part of this
project as well as ancillary channel structures to help keep flows away from the existing
earth fissures. Coordination between FCDMC, Pinal County, Queen Creek, Mesa, and
Apache Junction will be needed to complete this project.
3.25.2. Project Information
District: 5
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $100,000 (Design), $350,000 (ROW)
Funding Allocation FY20‐21: $700,000 (Construction)
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.26. Empire @ Pegasus Channel
Page 15
3.26.1. Project Description The District currently owns a channel in western San Tan Valley called the Sonoqui
Channel. A new channel is needed to connect the discharge from the future San Tan
Groves Channel to the Sonoqui Channel. Accommodation of these flows was
anticipated in the design of the Sonoqui Channel, however, developers for the adjacent
subdivisions did not account for. These adjacent subdivisions have experienced flooding
problems in the past. The proposed channel connection would benefit both Pinal
County residents and residents in Queen Creek/Maricopa County.
3.26.2. Project Information
District: 5
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $100,000 (Study)
Funding Allocation FY20‐21: $500,000 (ROW)
Funding Allocation FY21‐22: $650,000 (Construction)
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.27. Combs Road Channel 3.27.1. Project Description
This project will be designed to take flows from the existing channel on Combs Rd East
of ironwood westward to the future Meridian Road Channel. This channel will need to
accommodate an existing school facility and a church. Furthermore, the channel needs
to provide a connection to the channels constructed by The Parks development which
currently terminate at combs road. It is anticipated that the District, in coordination
and/or partnership with Queen Creek would find the design of the channel. Funds for
construction have not been allocated yet.
3.27.2. Project Information
District: 2 & 5
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $75,000 (Study)
Funding Allocation FY20‐21: $100,000 (Design)
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.28. AZ City Flood Mitigation 3.28.1. Project Description
Arizona City has been subject to numerous flood events over the years. The District has
completed several studies in the area and has constructed a large, regional detention
basins. This project will seek to find localized solutions for flooding and will utilize the
existing detention basin as an outfall point.
Page 16
3.28.2. Project Information
District: 4
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $150,000 (Study & Design)
Funding Allocation FY20‐21: $200,000 (ROW)
Funding Allocation FY21‐22: $350,000 (Construction)
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.29. Eloy Industrial Park Drainage Mitigation (City of Eloy) 3.29.1. Project Description
This project is a joint project in partnership with The City of Eloy. The City has already
prepared construction documents for the project to mitigate flooding in the industrial
area. The District has allocated $250,00 to help fund the construction of the proposed
improvements.
3.29.2. Project Information
District: 1
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $250,000 (Construction)
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.30. Saguaro & McKellips Flood Mitigation 3.30.1. Project Description
Located near the intersection of Saguaro Road and McKellips Road north of Apache
Junction is a localized flooding problem that impacts 6 or 7 homes. In addition, several
encroachments to the wash exist which as exacerbated the problem. This project will
seek to mitigate or eliminate this drainage issue.
3.30.2. Project Information
District: 5
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $50,000 (Study)
Funding Allocation FY20‐21: $75,000 (ROW)
Funding Allocation FY21‐22: $250,000 (Construction)
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.31. San Tan West Flood Mitigation
Page 17
3.31.1. Project Description The westernmost section of San Tan Valley is rural and is mostly comprised of large lot
residential development. No existing drainage infrastructure exists in the area other
than a large detention basin that is owned and operated by FCDMC. This project seeks
to mitigate flooding issues in the vicinity of Pioneer Path Road and Sundance Road while
utilizing the FCDMC basin as an outfall point. Coordination with FCDMC will be
required.
3.31.2. Project Information
District: 2
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $50,000 (Study)
Funding Allocation FY21‐22: $125,000 (ROW)
Funding Allocation FY22‐23: $400,000 (Construction)
Funding Allocation FY23‐24: $0
3.32. Camino Alto Detention Basin 3.32.1. Project Description
There is an existing drainage problem in the Peralta Estates subdivision in the area
northeast of Apache Junction that is effecting the roadway as well as several homes. The
local drainage issue can most likely be mitigated by the creation of a detention basin on
one of the vacant lots within in the subdivision in addition to some ancillary drainage
improvements within and/or adjacent to the wash
3.32.2. Project Information
District: 5
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $50,000 (Study)
Funding Allocation FY21‐22: $75,000 (ROW)
Funding Allocation FY22‐23: $250,000 (Construction)
Funding Allocation FY23‐24: $0
3.33. Hidden Valley Drainage and Channel Assessment 3.33.1. Project Description
This project will study the Hidden Valley area and identify existing drainage problem
areas as well as potential solutions to correct those issues. In addition, this study will
support the future design/construction of several planned channel improvements that
are needed to convey area flows to the District’s 4 existing detention basins in the area.
3.33.2. Project Information
District: 4
Page 18
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $200,000 (Study)
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.34. Amarillo Valley Road Channel 3.34.1. Project Description
This project will design and construct a channel along Amarillo Valley Road to convey
flows to the District’s existing Amarillo Valley Road detention basin. The design will be
supported by the Hidden Valley Drainage Assessment Study.
3.34.2. Project Information
District: 4
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $100,000 (Design), $100,000 (ROW)
Funding Allocation FY23‐24: $600,000 (Construction)
3.35. Green Road Channel 3.35.1. Project Description
This project will design and construct a channel along Green Road to convey flows to the
District’s existing Green Road detention basin. The design will be supported by the
Hidden Valley Drainage Assessment Study.
3.35.2. Project Information
District: 4
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $100,000 (Design), $100,000 (ROW)
3.36. Superior Floodplain Delineation 3.36.1. Project Description
The Town of Superior’s floodplain maps were originally created in 1978. Significant
changes within the watershed as well as the town have occurred since then. New
mapping is needed to accurately definite the limits of the floodplain within Superior.
Page 19
Currently, the District has asked FEMA to fund this study, however, there may be a cost
sharing requirement.
3.36.2. Project Information
District: 1
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $150,000 (Study)
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.37. Box Canyon Floodplain Delineation (San Tan Valley) 3.37.1. Project Description
Box Canyon is an area in western San Tan Valley that is currently mapped as an
approximate “A” Zone. The flows in this canyon are distributary and/or braided which
makes the flood hazard more unpredictable. A new study is needed to properly
delineate floodplains and replace the existing “A” Zone.
3.37.2. Project Information
District: 2
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $150,000 (Study)
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
3.38. Vekol Wash (& Tributary) Floodplain Delineation (Hidden Valley) 3.38.1. Project Description
The Vekol Wash in western Pinal County is currently mapped as an approximate “A”
Zone. In addition, there is a general lack of hydrologic and hydraulic information
regarding this flooding source. The FCDMC is currently working on their own Floodplain
delineation of the Vekol Wash which terminates at the Maricopa/Pinal County Line.
Once their study is complete and approved by FEMA, the District will continue that
study downstream where it enters the City of Maricopa.
3.38.2. Project Information
District: 4
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Page 20
Funding Allocation FY22‐23: $225,000 (Study)
Funding Allocation FY23‐24: $0
3.39. Big Wash Floodplain Delineation (Saddlebrooke) 3.39.1. Project Description
Big Wash is an area west of Saddlebrooke that is currently mapped as an approximate
“A” Zone. The flows in wash are potentially large and development is getting close to
the floodplain each year. A new study is needed to properly delineate floodplains and
replace the existing “A” Zone.
3.39.2. Project Information
District: 4
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $150,000 (Study)
3.40. UPRR/Kinder Morgan @ Eloy School Flood Mitigation 3.40.1. Project Description
There is an existing flooding problem at a historic school in the City of Eloy. It is alleged
that the problem is partially the result of changes made by Union Pacific Railroad as well
as Kinder Morgan. This study would seek to identify the flood source and proposed
solutions to mitigate it.
3.40.2. Project Information
District: 3
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $75,000 (Study)
3.41. Bogart Wash Channel 3.41.1. Project Description
Bogart wash currently exists as an unimproved channel in eastern Coolidge. Several
homes exist along the channel alignment and are in the floodplain. Some homes have
also experienced flooding problems. This project would seek to construct a true channel
that would remove homes from the floodplain and reduce flooding risk in the adjacent
community.
Page 21
3.41.2. Project Information
District: 1
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $50,000 (Study)
Funding Allocation FY22‐23: $100,000 (Design)
Funding Allocation FY23‐24: $100,000 (ROW), $500,000 (Construction)
3.42. Apache Junction Palm Wash Drainage Mitigation 3.42.1. Project Description
Palm Wash, within Apache Junction, exists as both an improved and unimproved
channel. There are several spots of localized flooding that need to be mitigated. Palm
wash will be evaluated and improvements will be determined to address the flooding.
The City of Apache Junction will be a funding partner in this project.
3.42.2. Project Information
District: 5
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $125,000 (Study)
Funding Allocation FY23‐24: $0
3.43. Magma Railroad Abandonment (STV) Drainage Study 3.43.1. Project Description
Portions of the railroad within San Tan Valley have been abandoned or are planned to
be abandoned in the future. This study will look at the potential impacts of the removal
of these structures and what infrastructure may be needed as a results of the railroad
abandonements.
3.43.2. Project Information
District: 1, 2, & 5
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $100,000 (Study)
3.44. CAP Overchute Evaluation Study 3.44.1. Project Description
Page 22
This study will determine the limits of ponding, downstream impacts, overchute sizes,
floodplains, and potential breaches of the CAP Canal within Pinal County.
Understanding the impact that this structure has on Pinal County will help to guide
future development and infrastructure.
3.44.2. Project Information
District: Countywide
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $225,000 (Study)
3.45. Stanfield Area Drainage Assessment 3.45.1. Project Description
Stanfield is an old farming community with little existing drainage infrastructure. This
study will seek to evaluate existing drainage problems and recommend solutions to
address the problems.
3.45.2. Project Information
District: 3
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $150,000 (Study)
3.46. Copper Hill Wash Mitigation (Near CDO Wash) 3.46.1. Project Description
This study will evaluate existing encroachments and non‐levee embankments that were
constructed in Copper Hill Wash. The study will evaluate flood risks and seek to find a
solution to the problems. This wash is located between Saddlebrooke and Oracle.
3.46.2. Project Information
District: 4
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $100,000 (Study)
Page 23
4. Future Flood Control Projects, Fund #68 (Beyond 5‐Years)
4.1. Queen Creek Channelization (Gantzel Road to Meridian Road)
4.2. Sonoqui Wash Floodplain Delineation (San Tan Valley)
4.3. Stanfield Channel Improvement Project
4.4. Smith Channel Improvement Project
4.5. Teel Channel Improvement Project
4.6. Milligan Channel Improvement Project
4.7. Papago Channel Improvement Project
4.8. Pecan Road Channel Improvement Project
4.9. Ralston Road Channel Improvement Project
4.10. Double Tank Watershed Plan and Flood Hazard Mapping
4.11. Silverbell Drainage Assessment
4.12. San Pedro River Floodplain Delineation (Pima County to Mammoth)
4.13. San Pedro River Floodplain Delineation (Mammoth to Winkleman)
4.14. San Pedro River Floodplain Delineation (Winkleman to Riverside)
4.15. Judy’s Road Area Drainage Assessment
4.16. McClellan Wash WCMP Regional Detention Basins/Channels (Various Areas)
4.17. Area Drainage Master Plan Updates (Various Areas)
4.18. Santa Cruz River Regional Projects, USACE (Various Areas)
4.19. Watershed Plans NRCS (Various Areas)
Page 24
5. Bridge Maintenance and Repair Program, Fund #64
5.1. Gantzel Road @ Queen Creek Wash Scour Remediation #10588 5.1.1. Project Description
The area downstream of this bridge has experienced several scour. A concrete apron
was constructed to temporarily fix the problem while a more comprehensive solution is
being designed. The proposal to remediate the scour problem is to channelize a portion
of the Queen Creek wash downstream of the bridge. This is currently in design.
5.1.2. Project Information
District: 2
Funding Allocation FY18‐19: $25,000 (Design)
Funding Allocation FY19‐20: $200,000 (Construction)
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
5.2. Boyd Road & Broadway Road Culvert Headwall #7826 5.2.1. Project Description
This bridge is currently experiencing scour and erosion. The proposed solution includes
the construction of a new headwall as well as some ancillary grading work.
5.2.2. Project Information
District: 4
Funding Allocation FY18‐19: $25,000 (Design)
Funding Allocation FY19‐20: $25,000 (Construction)
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
5.3. Queen Valley Dr @ Queen Creek Wash Bridge Replacement #8618 5.3.1. Project Description
The Bridge across the Queen Creek wash at Queen Valley drive is in need of
replacement. Flood Control will coordinate with Public Works on starting the bridge
selection or bridge repair scope process. A scour analysis was previously completed in
2016 with a recommendation to replace the bridge. Additional study will be needed to
select a cost effective bridge solution as well as to address environmental issues and
floodplain impacts.
5.3.2. Project Information
District: 5
Page 25
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $25,000 (Study)
Funding Allocation FY20‐21: $200,000 (Design)
Funding Allocation FY21‐22: $750,000 (Construction)
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
5.4. Superstition Mtn & Don Donelly Culvert Repairs #11398 5.4.1. Project Description
The culvert needs extensive repair to remove sediment built up within it. In addition,
there is limited access to perform the maintenance and coordination with the local HOA
will be necessary. The intent is to use a Maintenance Contractor and work with HOA for
access, to clear out boulders from RCB system (3 structures) throughout Superstition
Foothills Community. HOA to use contractor to remove accumulated debris upstream of
RCB in channel. Culvert work cannot be completed until HOA contractor remove debris
from the upstream wash.
5.4.2. Project Information
District: 5
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $100,000 (Construction)
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
5.5. Peppersauce Bridge Abutment Repairs #7709 5.5.1. Project Description
The bridge over Peppersauce Wash south of San Manuel needs repairs to the
abutments. The abutments were damaged from runoff coming through the bridge deck.
5.5.2. Project Information
District: 1
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $50,000 (Construction)
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
5.6. San Manuel Hwy South of Fire Department Gabion Repairs #7711 5.6.1. Project Description
Page 26
The bridge on San Manual Highway south of the Fire Department has some damage on
the gabion baskets. These are in need of repair.
5.6.2. Project Information
District: 1
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $50,000 (Construction)
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $0
Funding Allocation FY23‐24: $0
5.7. Aravaipa Rd Bridge Analysis #10124 5.7.1. Project Description
There is a need to evaluate and analyze the structural components of this bridge. The
ADOT inspection report indicates a 6” sag in the bridge with no traffic.
5.7.2. Project Information
District: 1
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $50,000 (Study)
Funding Allocation FY23‐24: $0
5.8. Riverside Bridge # 11368 5.8.1. Project Description
Riverside Bridge on Ray Junction Rd. Rehabilitation repairs to concrete surface of bridge
to repair cracks and spalling. New Guardrail to be placed at standard height. Erosion
protection to be analyzed at the time of repair. Wash channel to be analyzed prior to
repairs. Sediment builds up under bridge to block opening.
5.8.2. Project Information
District: 1
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $50,000 (Study)
Funding Allocation FY23‐24: $0
5.9. Riverside Bridge # 11369
Page 27
5.9.1. Project Description
Riverside Bridge on Ray Junction Rd. Rehabilitation repairs to concrete surface of bridge
to repair cracks and spalling. New Guardrail to be placed at standard height. Utility
crossing to be analyzed at the time of repairs. Wash channel to be analyzed prior to
repairs. Sediment builds up under bridge to block opening.
5.9.2. Project Information
District: 1
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $50,000 (Study)
Funding Allocation FY23‐24: $0
5.10. Riverside Bridge # 11370 5.10.1. Project Description
Riverside Bridge on Ray Junction Rd. Rehabilitation repairs to concrete surface of bridge
to repair cracks and spalling. New Guardrail to be placed at standard height.
5.10.2. Project Information
District: 1
Funding Allocation FY18‐19: $0
Funding Allocation FY19‐20: $0
Funding Allocation FY20‐21: $0
Funding Allocation FY21‐22: $0
Funding Allocation FY22‐23: $50,000 (Study
Funding Allocation FY23‐24: $0
Page 28
Appendix A
Summary 5‐Year Plan Table and Projected Budget Allocations
Pinal County Flood Control District 5-Year Capital Improvement and Study Plan
Cost Type NOTES Total FY17/18 Total FY18/19 Total FY19/20 Total FY20/21 Total FY21/22 Total FY22/23 Total FY23/24
Total Revenue Taxes, Fees (3,301,233.90) (3,485,338.00) (3,590,398.14) (3,693,460.08) (3,799,613.89) (3,905,966.89) (4,012,319.89) Total Annual Expenses Salaries, Overhead 838,163.99 1,117,980.00 1,181,672.58 1,190,756.90 1,201,256.90 1,211,756.90 1,225,993.16
60684171 - ALERT Flood Warning System Maintenance and New Installations $184,000.67 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.0060684113 - NPDES Phase II Compliance Permit, Testing, Inspections, Reporting $790.54 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00 $30,000.00
60684178 - Community Rating System Annual Outreach, GIS Work , Reporting $5,700.15 $15,000.00 $40,000.00 $20,000.00 $20,000.00 $20,000.00 $20,000.0060684179 - Levee Analysis, Countywide Analyze Levee Inventory, Permits, Research $49,932.96 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00
60684242 - San Pedro River Crossing Permit Renewal --- $9,393.92 $0.00 $20,000.00 $0.00 $20,000.00 $0.00 $20,000.0060684142 - Litigation Schnepf Bridge Attorney Expenses $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00
60684213 - Litigation Sorrento Attorney Expenses $1,170.50 $75,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.00 $50,000.0060684231 - Strategic Planning Planning $0.00 $0.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00
60684194 - LAWI - Misc Miscellaneous Land, Appraisal, Title Fees $0.00 $0.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $5,000.0060684243 - Topographic Mapping Annual Mapping $10,852.96 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00
60684235 - Flood Control Maintenance Maintenance/Repairs of Existing Strutures $17,908.30 $200,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00 $100,000.00TOTAL ANNUAL PROGRAMS AND PROJECTS $284,750.00 $675,000.00 $605,000.00 $565,000.00 $585,000.00 $565,000.00 $585,000.00
60684153 - SANTA CRUZ PROJ-RECON FEAS STD $200,000.00 $1,000,000.00 $0.00 $0.00 $0.00 $0.00 $0.0060684207 - COMMUNITY CIP $0.00 $0.00 $0.00 $250,000.00 $250,000.00 $250,000.00 $250,000.00
60684218 - DAMS - PERMITS & MAINTENANCE $103,113.13 $800,000.00 $0.00 $0.00 $0.00 $0.00 $0.0060684220 - TOWN OF SUPERIOR DCR $13,038.09 $16,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
60684225 - Queen Vly Flood Mit & Const Phase II $838,334.69 $30,000.00 $0.00 $0.00 $0.00 $0.00 $0.0060684229 - ORDINANCE REVISION $0.00 $15,000.00 $15,000.00 $0.00 $0.00 $0.00 $0.00
60684232 - McClellan Wash Study $312,796.92 $170,000.00 $0.00 $0.00 $0.00 $0.00 $0.0060684238 - DUDLEYVILLE COMMUNITY CENTER $16,863.84 $500,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
60684239 - AIRPARK DRAINAGE AND FLOOD MIT $219,433.72 $105,000.00 $0.00 $0.00 $0.00 $0.00 $0.0060684241 - SUNLAND GIN RD FLOOD MITIGATION $36,441.92 $260,500.00 $0.00 $0.00 $0.00 $0.00 $0.00
60684244 - Dudleyville LAWI (Dudleyville Community Center) $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.0060684245 - SUPERIOR-CHURCH AVE-COPPER MTN FLOOD MIT $0.00 $300,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
60684246 - RUSSELL RD INDUSTRIAL AREA FLOOD MIT DCR $0.00 $241,000.00 $0.00 $0.00 $0.00 $0.00 $0.0060684247 - ROBERTS/THOMPSON CHANNEL DCR $0.00 $90,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
60684248 - VALLEY OF THE SUN PHASE IIB (SKYLINE CHANNEL) $0.00 $125,000.00 $300,000.00 $200,000.00 $0.00 $0.00 $0.0060684249 - OVERFIELD/RANDOLPH DCR $0.00 $92,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
60684250 - COOLIDGE DRAINAGE PROJECT - DCR $0.00 $150,000.00 $0.00 $0.00 $0.00 $0.00 $0.0060684251 - WELTON WASH DCR $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
XXXXXXX - COUNTRY MINI FARMS A ZONE REMAPPING $0.00 $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00XXXXXXX - DIRTWATER SPRINGS/MAIN STREET DRAINAGE DCR $0.00 $5,000.00 $0.00 $0.00 $0.00 $0.00 $0.00
XXXXXXX - DIRTWATER SPRINGS/MAIN STREET DRAINAGE DESIGN/CONSTRUCTION $0.00 $0.00 $250,000.00 $0.00 $0.00 $0.00 $0.00XXXXXXX - VAL VISTA CHANNEL REHAB DESIGN $0.00 $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00
XXXXXXX - VAL VISTA CHANNEL REHAB CONSTRUCTION $0.00 $0.00 $0.00 $350,000.00 $0.00 $0.00 $0.00XXXXXXXX - SAN TAN VALLEY ADMP $0.00 $0.00 $500,000.00 $350,000.00 $0.00 $0.00 $0.00
XXXXXXXX - GREENE WASH WATERSHED PLAN $0.00 $20,000.00 $20,000.00 $0.00 $0.00 $0.00 $0.00XXXXXXXX - SCR-NORTH BRANCH SANTA CRUZ WASH WATERSHED PLAN $0.00 $20,000.00 $20,000.00 $0.00 $0.00 $0.00 $0.00
XXXXXXXX- MIDDLE MAGMA CHANNEL WATERSHED PLAN $0.00 $0.00 $105,000.00 $0.00 $0.00 $0.00 $0.00XXXXXXX - MAMMOTH KINO STREET DRAINAGE DCR $0.00 $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00
XXXXXXX - MAMMOTH KINO STREET DRAINAGE PHASE 1, DESIGN $0.00 $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00XXXXXXX - MAMMOTH KINO STREET DRAINAGE PHASE 1, LAND ACQUISITION $0.00 $0.00 $25,000.00 $0.00 $0.00 $0.00 $0.00
XXXXXXX - MAMMOTH KINO STREET DRAINAGE PHASE 1, CONSTRUCTION $0.00 $0.00 $0.00 $300,000.00 $0.00 $0.00 $0.00XXXXXXX - MAMMOTH KINO STREET DRAINAGE PHASE 2, DESIGN $0.00 $0.00 $0.00 $50,000.00 $0.00 $0.00 $0.00
XXXXXXX - MAMMOTH KINO STREET DRAINAGE PHASE 2, LAND ACQUISITION $0.00 $0.00 $0.00 $25,000.00 $0.00 $0.00 $0.00XXXXXXX - MAMMOTH KINO STREET DRAINAGE PHASE 2, CONSTRUCTION $0.00 $0.00 $0.00 $0.00 $300,000.00 $0.00 $0.00
XXXXXXX - RUSSELL RD INDUSTRIAL AREA FLOOD MIT DESIGN Potential Joint Project with AK-Chin, Casa Grande $0.00 $0.00 $125,000.00 $0.00 $0.00 $0.00 $0.00XXXXXXX - RUSSELL RD INDUSTRIAL AREA FLOOD MIT CONSTRUCTION $0.00 $0.00 $0.00 $650,000.00 $0.00 $0.00 $0.00
XXXXXXXX- HOUSTON AVENUE CHANNEL DCR & DESIGN $0.00 $0.00 $100,000.00 $0.00 $0.00 $0.00 $0.00XXXXXXXX- HOUSTON AVENUE CHANNEL LAND ACQUISITION $0.00 $0.00 $350,000.00 $0.00 $0.00 $0.00 $0.00
XXXXXXXX- HOUSTON AVENUE CHANNEL CONSTRUCTION $0.00 $0.00 $0.00 $700,000.00 $0.00 $0.00 $0.00XXXXXXXX - EMPIRE @ PEGASUS CHANNEL DCR Potential Joint Project with Queen Creek, FCDMC $0.00 $0.00 $100,000.00 $0.00 $0.00 $0.00 $0.00
XXXXXXXX - EMPIRE @ PEGASUS CHANNEL LAND ACQUISITION Potential Joint Project with Queen Creek, FCDMC $0.00 $0.00 $0.00 $500,000.00 $0.00 $0.00 $0.00XXXXXXXX - EMPIRE @ PEGASUS CHANNEL CONSTRUCTION Potential Joint Project with Queen Creek, FCDMC $0.00 $0.00 $0.00 $0.00 $650,000.00 $0.00 $0.00
XXXXXXX - COMBS ROAD CHANNEL DCR Potential Joint Project with Queen Creek, FCDMC $0.00 $0.00 $75,000.00 $0.00 $0.00 $0.00 $0.00XXXXXXX - COMBS ROAD CHANNEL DESIGN Potential Joint Project with Queen Creek, FCDMC $0.00 $0.00 $0.00 $100,000.00 $0.00 $0.00 $0.00
XXXXXXXX - ROBERTS/THOMPSON CHANNEL DESIGN $0.00 $0.00 $100,000.00 $0.00 $0.00 $0.00 $0.00XXXXXXXX - ROBERTS/THOMPSON CHANNEL LAND ACQUISITION $0.00 $0.00 $350,000.00 $0.00 $0.00 $0.00 $0.00
XXXXXXXX - ROBERTS/THOMPSON CHANNEL CONSTRUCTION $0.00 $0.00 $0.00 $600,000.00 $0.00 $0.00 $0.0060684236 - AZ City Flood (Mt View Estates Study Info) Design & Const $0.00 $0.00 $150,000.00 $0.00 $350,000.00 $0.00 $0.00
60684237 - LAWI - AZ City Flood (Mt View Estates Study Info) $0.00 $0.00 $0.00 $200,000.00 $0.00 $0.00 $0.00XXXXXXXX - ELOY INDUSTRIAL PARK DRAINAGE MIT (CITY OF ELOY) $0.00 $0.00 $250,000.00 $0.00 $0.00 $0.00 $0.00
XXXXXXXX - SAGUARO & MCKELLIPS FLOOD MIT DCR & DESIGN $0.00 $0.00 $50,000.00 $0.00 $0.00 $0.00 $0.00XXXXXXXX - SAGUARO & MCKELLIPS FLOOD MIT LAND ACQUISITION $0.00 $0.00 $0.00 $75,000.00 $0.00 $0.00 $0.00
XXXXXXXX - SAGUARO & MCKELLIPS FLOOD CONSTRUCTION $0.00 $0.00 $0.00 $0.00 $250,000.00 $0.00 $0.00XXXXXXXX - SAN TAN WEST FLOOD MIT DCR & DESIGN $0.00 $0.00 $0.00 $50,000.00 $0.00 $0.00 $0.00
XXXXXXXX - SAN TAN WEST FLOOD MIT LAND ACQUISITION $0.00 $0.00 $0.00 $0.00 $125,000.00 $0.00 $0.00XXXXXXXX - SAN TAN WEST FLOOD MIT CONSTRUCTION $0.00 $0.00 $0.00 $0.00 $0.00 $400,000.00 $0.00
XXXXXXXX - CAMINO ALTO DETENTION BASIN DCR & DESIGN $0.00 $0.00 $0.00 $50,000.00 $0.00 $0.00 $0.00XXXXXXXX - CAMINO ALTO DETENTION BASIN LAND ACQUISITION $0.00 $0.00 $0.00 $0.00 $75,000.00 $0.00 $0.00
XXXXXXXX - CAMINO ALTO DETENTION BASIN CONSTRUCTION $0.00 $0.00 $0.00 $0.00 $0.00 $250,000.00 $0.00XXXXXXX - HIDDEN VALLEY DRAINAGE AND CHANNEL ASSESSMENT $0.00 $0.00 $0.00 $0.00 $200,000.00 $0.00 $0.00
XXXXXXX - AMARILLO VALLEY ROAD CHANNEL DESIGN $0.00 $0.00 $0.00 $0.00 $0.00 $100,000.00 $0.00XXXXXXX - AMARILLO VALLEY ROAD CHANNEL LAND ACQUISITION $0.00 $0.00 $0.00 $0.00 $0.00 $100,000.00 $0.00
XXXXXXX - AMARILLO VALLEY ROAD CHANNEL CONSTRUCTION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $600,000.00XXXXXXX - GREEN ROAD CHANNEL DESIGN $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $100,000.00
XXXXXXX - GREEN ROAD CHANNEL LAND ACQUISITION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $100,000.00XXXXXXXXXX - SUPERIOR FLOODPLAIN DELINEATION $0.00 $0.00 $0.00 $150,000.00 $0.00 $0.00 $0.00
XXXXXXX - BOX CANYON FLOODPLAIN DELINEATION (SAN TAN VALLEY) $0.00 $0.00 $0.00 $0.00 $150,000.00 $0.00 $0.00XXXXXXX - VEKOL WASH (& TRIB) FLOODPLAIN DELINEATION (HIDDEN VALLEY) $0.00 $0.00 $0.00 $0.00 $0.00 $225,000.00 $0.00
XXXXXXX - BIG WASH FLOODPLAIN DELINEATION (SADDLEBROOKE) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $150,000.00XXXXXXX - UPRR/KINDER MORGAN @ ELOY SCHOOL FLOOD MITIGATION DCR $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $75,000.00
XXXXXXX - BOGART WASH CHANNEL DCR $0.00 $0.00 $0.00 $0.00 $50,000.00 $0.00 $0.00XXXXXXXX - BOGART WASH CHANNEL DESIGN $0.00 $0.00 $0.00 $0.00 $0.00 $100,000.00 $0.00
XXXXXXXX - BOGART WASH CHANNEL LAND ACQUISITION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $100,000.00XXXXXXX - BOGART WASH CHANNEL CONSTRUCTION $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $500,000.00
XXXXXXXX - APACHE JUNCTION PALM WASH DRAINAGE MITIGATION $0.00 $0.00 $0.00 $0.00 $0.00 $125,000.00 $0.00XXXXXXX - MAGMA RAILROAD ABANDONMENT (STV) DRAINAGE STUDY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $100,000.00
XXXXXXX - CAP OVERCHUTE EVALUATION STUDY $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $225,000.00XXXXXXX - STANFIELD AREA DRAINAGE ASSESSMENT DCR $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $150,000.00
XXXXXXX - COPPER HILL WASH MITIGATION (NEAR CDO WASH) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $100,000.00
QUEEN CREEK CHANNELIZATION (GANTZEL ROAD TO MERIDIAN) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00SONOQUI WASH FLOODPLAIN DELINEATION (SAN TAN VALLEY) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
STANFIELD CHANNEL IMPROVEMENT PROJECT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00SMITH CHANNEL IMPROVEMENTS (HIDDEN VALLEY) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TEEL CHANNEL IMPROVEMENT PROJECT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00MILLIGAN CHANNEL IMPROVMENTS (AZ CITY) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00PAPAGO CHANNEL IMPROVEMENT PROJECT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
PECAN ROAD CHANNEL IMPROVEMENT PROJECT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00RALSTON ROAD CHANNEL IMPROVEMENT PROJECT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
DOUBLE TANK WATERSHED PLAN AND FLOOD HAZARD MAPPING $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00SILVERBELL DRAINAGE ASSESSMENT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SAN PEDRO RIVER FLOODPLAIN DELINEATION (PIMA COUNTY TO MAMMOTH) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00SAN PEDRO RIVER FLOODPLAIN DELINEATION (MAMMOTH TO WINKLEMAN) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
GILA RIVER FLOODPLAIN DELINEATION (WINKLEMAN TO RIVERSIDE) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00JUDY'S ROAD AREA DRAINAGE ASSESSMENT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
MCCLELLAN WASH WCMP REGIONAL DETENTION BASINS/CHANNELS (VARIOUS) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00AREA DRAINAGE MASTER PLAN UPDATES (VARIOUS) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
SANTA CRUZ RIVER REGIONAL PROJECTS, USACE (VARIOUS) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00WATERSHED PLANS NRCS (VARIOUS) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
TOTAL CAPITAL IMPROVEMENT PROJECTS AND STUDIES $1,740,022.31 $4,239,500.00 $3,285,000.00 $4,800,000.00 $2,600,000.00 $1,750,000.00 $2,650,000.00
Total Sources (Revenues) -$3,301,233.90 -$3,485,338.00 -$3,590,398.14 -$3,693,460.08 -$3,799,613.89 -$3,905,966.89 -$4,012,319.89Total Uses (Expenditures) $6,032,480.00 $5,071,672.58 $6,555,756.90 $4,386,256.90 $3,526,756.90 $4,460,993.16
Sources Less Uses $2,547,142.00 $1,481,274.44 $2,862,296.81 $586,643.01 -$379,209.99 $448,673.27
Beginning FY Fund Balance -$7,421,003.34 -$4,873,861.34 -$3,392,586.90 -$530,290.09 $56,352.92 -$322,857.07Increase/(Decrease) $2,547,142.00 $1,481,274.44 $2,862,296.81 $586,643.01 -$379,209.99 $448,673.27
Ending Fund Balance -$4,873,861.34 -$3,392,586.90 -$530,290.09 $56,352.92 -$322,857.07 $125,816.20
Bridges: Gantzel Road @ Queen Creek Wash Scour Remediation #10588 Design $25,000.00Bridges: Gantzel Road @ Queen Creek Wash Scour Remediation #10588 Construction $200,000.00Bridges: Boyd Road & Broadway Road Culvert Headwall #7826 Design $25,000.00Bridges: Boyd Road & Broadway Road Culvert Headwall #7826 Construction $25,000.00Bridges: Queen Valley Dr @ Queen Creek Wash Bridge Replacement Selection #8618 Analysis $25,000.00Bridges: Queen Valley Dr @ Queen Creek Wash Bridge Replacement #8618 Design $200,000.00Bridges: Superstition Mtn & Don Donelly Culver Repairs #11398 Construction $100,000.00Bridges: Peppersauce Bridge Abutment Repairs #7709 Maintenance/Construction $50,000.00Bridges: San Manuel Hwy South of Fire Department Gabion Repairs #7711 Maintenance/Construction $50,000.00Bridges: Queen Valley Dr @ Queen Creek Wash Bridge Replacement #8618 Construction $750,000.00Bridges: Aravaipa Rd 10 miles east of hwy 177. Structural analysis Analysis $50,000.00Bridges: Riverside Bridge # 11368 Maintenance / Analysis $50,000.00Bridges: Riverside Bridge # 11369 Maintenance / Analysis $50,000.00Bridges: Riverside Bridge # 11370 Maintenance / Analysis $50,000.00
TOTAL CAPITAL IMPROVEMENT PROJECTS AND STUDIES $0.00 $50,000.00 $250,000.00 $350,000.00 $800,000.00 $200,000.00 $0.00
ANNUAL PROGRAMS AND PROJECTS - FUND #68
CAPITAL IMPROVEMENT PROJECTS AND STUDIES - FUND #68
FUTURE PROJECTS
CAPITAL IMPROVEMENT PROJECTS AND STUDIES - FUND #64 (Bridges)
Page 29
Appendix B
Map of Planned Projects
1
1
7
12 1 5 233 455 4 2 1346
1
6
1
8 9 7 87 8 99
1
1 6
1
6
17
6
7
6
7
6
7
7
7
12 5
6
4 35 4
1
3
7
6
6 26
98 8
6
7
2
9
6
7
7
1 5 4
1
4 6 323 2
7
5
7
2
9
34
8
5
2
23
12
1
4
1
5 3
6
7
4
1
1
6
65
5 3
1
2
26
5
7
7
9
3
12
8
6 4
1
6
2
1
2
4
3
8
13
4
4
7
6
6
6
24
9
5
4 3
57
5
9
25
5
7
6
36
6
8
6
9
4
6
3
8
4
5
5
3
7
6
8
2
8
5
2
1
5
7
5
9
7
6
25
7
6
7
3
1
1
3
13
4
8
51
24
7
3
5 2
5
3
7
3
36
1
12
9
5
1
4
4
5
2
3
4
2
8
4
13
5
24
5
6
3 2
25
2
4
1
4
2
3
2
7
12
8
36
4
3
9
2
7
6
1
2
8
1
8
2
4
2
3
8
8
6
4
3
9
7
4
5
8
4
4
2
6
2
6
7
9
5
2
1
1
44
6
5
4
8
3
3
3
9
3
1
1
3
2
4
2
8
6
1
8
1
8
3
8
1
1
6
2
6
4
8
1
6
3
1
4
4
7
9
5
1
1
1
1
8
1
9
7
9
6
9
2
2
7
3
2
3
1
9
3
9
7
1
7
7
2
9
4
9
6
3
8
25
4 1
2
3
8
6
5
2
9
3
3
98
9
9
36
9
4
2
1
5
5
9
5
4
9
7
2
5
6
6
5
5
4
9
2
4
8
5
58
3
8
8
1
8
4
7
5
1
3
8
9
2
1
1
6
2
2
8
3
3
3
5 4
5
9
9
2
3
1
2
9
9
5
8
45
9
8
4
8
5
9
2
4
5
4
7
7
4
4
5
3
2
9
9
2
9
14
4
4
6
8
8
9
6
8
8
2
7
1
3
8
3
9
1
4
8
1
86
5
5
7
9
5
2
3
99
4
1
3
9
4
8
8
8
8
9
9
4
1
8
4
3
6
24
5
8
1
5
9
5
1
8
1
8
45
9
9
9
9
9
9
78
5
2
8
8
5
9
1
8
5
3
14
8
3
5
53
8
2
2
9
9
18
1
4
4
8
2
2
8
9
8
9
8
5
13
9
6
2
9
9
3
9
8
8
7
2
5
8
7
8
8
9
5
8
2
8
2
8 9
2
8
5
14
1
9
1
5
9
3
9
1
9
9
4
9
7
5
2
5
9
9
1
4
8
8
9
9
934 5 5
3
8
7
3
5
5
4
88
3
5
2
2
7
2
1
35
9
6
3
2
4
4
9
9
9
8
3
5
4
12
2
2
9
8
2
1
1
9
2
8
1
3
3
3
1
8
99
8
1
9
8
8
2
2
4
4
3
8
1
3
8
3
2
8
7
3
9
1
2
1
4
4
9
7
8
3
8
9
9
1
12
8
2
7
9
3
9
1
9
8
5
4
4
8
8
3
9
3
5
4
9
2
5
3
1
5
3
5
8
1
8
8
5
9
3
9
8
4
4
59
5
3
9
8
9
9
9
8
9
3
4
1
1
9
2
8
8
9
3
9
8
8
4
8
1
7
8
2
7
18
7
8
2
9
8
8
4
3
9
3
4
9
9
4
9
8
2
9
6
8
8
3
9
5
9
8 89
8
1
8
4
9
2
5
2
5
3
9
8
58
9
2
8
9
87
8
4
8
7
9
8
68
8
2
1
21
2
5
7
9
5
8
9
9
6
5
4
7
5
5
8
1
6
4
7
8
8
4
9
5
3
8
9
1
4
5
8
5
2
3
7
4
37
9
4
1
2
6
9
9
1
3
8
9
5
3
3
8
2
9
9
4 1
8
3
6
3
9
6
5
4
2
9
5
7
24
5
6
9
1
5
3
7
3
1
6
24
6
4
1
4
7
4
7
6
9
2
7
5
2
7
7
5
9
3
6
1
7
6
46
1
7
53
2
9
2
3
8
6
26
7
4
36
6
1
4
2
25
7
8
1
7
6
7
6
8
3
7
6
4
4
2
3
7
13
7
4
7
5
7
2
3
2
13
8
7
6
52
7
7
9
12
4
9
6
8
1
7
1
2
3
2
4
3
3
1
7
5
6
5
5
5
7
8
2
66
7
4
7
5
6
6
7
6
2
4
4
3
8
6
2
3
6
6
7
7
6
4
2
7
3
5
1
7
6
22
7
5
98
3
8
2
2
7
6
7
6
9
6
6
6
8
7
6
5
4
7
6
5
7
3
6
3
7
3
7
8
4
1
6
77
7
1
7
6
6
75
1
7
3
7
9
6
7
1
6
5
1
4
2
7
7
2
4
5
1
4
6
6
2
2
5
7
3
7
7
6
5
5
7
7
6
6
66
3
5
5
7
7
6
7
7
1
4
1
6
6
6
1
6
4
6
3
9
5
3
33
6
6
7
9
4
7
6
6
3
7
7
1
3
6
9
2 1
6
2
4
3
4
6
7
2
6
7
3 1
4
3
4
7
2
5
5
6
2
1
5
5
6
4
4
3
4
7
2
2
2
1
3
7
3
6
7
1
7
4
6
5
9
6
2
1
26
1
24 3 15 5
7
5
4
45 3
5
1
5
2
34
4
4
6
7
3
2 1
2
2 1
3
1
36 4
4
1
5
5
6
6
12345
7
6
5 134 2 1 2
1
35 4 5
31
6
3 2 4
4
1
5 123
2
35 36
3
32
4
33 34
615 46 6
25
7
24
11 12
13
11
6
36
7
2
25
24
13
34
12
5
12
562
10
1
12 11
4
10
3
4
10
5 4
1
36
3 2
136
5
7
2
6
7
3
6
4
25
7
31
30
18
19
19
18
30
31
31
6
30
19
31
18
30
19
18
31
30
19
18
11
24
5
18
19
34
11
3
30
1
24
31
11
18
31
19
32
30
33
13
31
35
10
11
11
36
33
12
11
11
25
34
11
10
29
12
11
24
11
11
11
30
28
11
11
19
31
11
11
11
11
18
11
11
31
11
11
11
11
11
30
10
31
11
11
11
18
11
11
11
11
11
11
11
19
1111
11
11
11
11 11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
11
1111 11
11
11
11
11
11
11
11
11
11
1111
11
11
11
11
11
11
11
11
11
11
11
11
11 12
11
11
11
11
11
11
11
11
11 11
11
11
11 11
11
11
11
11
11
11
11
11
11
11
11
11
13
1111 11
11
11
11
11
11
11
11
11
11
11
18
34
11
11
11
11
27
20
22
19
11
18
31
11
18
24
19
30
36
13
12
31
13
12
17
17
30
18
18
10
32
26
19
18
11
35
25
21
12
32
21
12
12
16
19
20
10 11
31
30
30
10
30
19
31
34
17
20
13
12
13
10
36
26
33
22
33
18
33
18
35
29
32
19
19
34
30
16
22
15
30
24
15
12
32
34
16
28
16
24
18
17
19
19
17
35
19
30
10
10
13
13
18
14
25
21
34
21
35
32
12
18
20
29
22
26
15
24
19
27
34
15
12
19
28
15
3425
16
21
31
35
32
18
29
23
28
33
2826
14
26
13
36
20
15
34
10
24
29
24
24
36
35
36
14
27
27
23
14
17
25
22 21
33
35
21
32
22
27
31
2627
17
16
27
33
23
31
12
13
10
25
31
33
34
30
34
17
32
20
33
17
35
22
32
35
18
30
35
22
10
35
31
33
31
27
35
15
25
24
30
27
31
28
15
14
27
20
28
17
29
15
2629
30
21
13
17
20
23
32
25
15
18
30
29
13
35
2420
17
22
18
30
16
36
26
36
34
14
32
16
12
12
22
34
25
23
17
24
30
31
24
21
17
13
24
23
15
14
12
14
27
36
33
35
20
21
21
29
27
26
12
28
10
14
16
19
19
14
34
16
17
20
14
15
21
15
28
36
31
28
36
27
13
2320
26
25
29
32
20
19
29
14
18
15
24
24
18
20
25
22
24
18
16
13
12
24
10
25
18
12
2019
34
27
36
14
26
18
20
23
22
19
12
28
25
36
28
36
35
13
29
23
29
14
30
18
30
33
17
30
12
2827
25
33
18
14
13
21
16
21
34
29
23
13
23
14
28
26
36
19
25
24
18
22
10
27
14
20
19
28
23
27
23
19
16
16
15
13
34
23
35
18
16
33
17
28
13
17
21
21
16
26
13
20
18
17
19
23
28
15
33
18
26
20
13
33
17
10
34
18
31
1317
13
31
32
17
25
32
25
26
23
16
2629
33
30
14
30
19
16
29
25
36
21
26
22
29
19
28
32 32
30
10
32
12
25
30
25
21
13
12
25
36
33
21
35
31
10
18
18 23
29
29
24
35
24
27
15
35
22
33
12
17
28
34
20
36
22
12
15
23
29
17
32
26
12
23
22
25
12
21
34
13
20
15
32
36
28
10
23
31
12
16
3032
15
30
23
32
14
14
29
30
33
17
20
31
27
19
32 33
3023
20
35
28
26
12
18
22
14
21 24
29
12
19
33
19
25
24
31
36
16
16
10
32
36
12
25
35
14
29
26
21
12
36
23
13
17
20
24
25
33
13
24
30
22
24
13
34
36
34
34
22
26
16
2221
24
31
28
33
12
10
13
36
34
28
23
18
22
33
34
31
19
21
12
25
25
21
14
24
27
24
33
31
22
29
24
27
31
32
14
32
36
36
15
32
22
28
26
32
20
29
10
36
12
13
26
29
28
34
27
24
14
16
15
22
20
17
21
32
33
32
28
28
28
12
16
29
10
18
13
20
36
29
25
23
22
13
22
16
17
27
14
14
36
10
13
19
15
20
27
16
27
28
15
26
19
29
23
21
28
14
32
2115
26
21
16
19
20
15
34
16
13
28
21
15
27
22
17
10
36
16
35
18
14
12
12
35
35
30
2325
27
16
12
26
10
22
29
10
28
28
21
12
22
24
27
27
23
20
17
27
12
13
15
32
12
23
14
20
25
22
13
36
26
33
35
28
16
23
18
16
28
35
33
35
22
36
32
21
16
10
26
13
32
16
36
16
34
27
33
12
29
20
12
14
33
35
33
10
24
29
35
35
34
10
24
10
29
13
20
34
36
18
27
26
20
27
17
36
13
33
15
12
23
31
31
20
24
32
32
12
12
15 22
31
26
3433
21
36
24
14
24
14
36
32
18
26
22
32
30
14
13
12
16
13
15
24
14
17
25
12
29
17
17 23
26
25
12
34
14
14
26
34
32
21 29
15
14
26
33
21
25
26
33
23
28
10
21
27
20
20
25
15
25
27
32
24
17
15
28
17
29
12
10
17
24
14
14
36
34
29
35
26
20
14
16
14
33
14
22
34
14
25
32
26
24
23
21
22
33
21
22
16
29
23
22
16
24
24
14
29
12
23
24
13
20
15
27
23
26
33
12
25
16
17
14
32
26
10
26
25
13
17
23
26
34
25
21 25
35
35
13
2015
28
13
21
24
25
35
27
22
13
36
13
13
3433
35
26
28
28
32
15
17
21
12
23
12
23
34
35
16
28
28
33
12
34
18
23
32
16
30
17
15
13
28
12
35
27
15
23
20
27
10
19
23
33
23
26
29
16
23
27
29
30
29
23
13
20
15
25
31
27
15
29
36
17
26
20
35
14
10
10
13
17
15
15
30
23
21
24
29
23
21
12
12
23
29
30
27
26
26
34
17
32
17
3426
35
12
21
23
26
13
21
15
33
17
32
29
36
10
16
14
24
24
22
26
14
10
10
10
14
17
26
19
25
28
22
29
20
10
17
10
19
28
1310
23
33
10
32
13
20
28
35
10
28
34
22
35
23
30
29
12
32
23
10
21
2420
20
35
28
20
21
23
22
15
18
36
16
29
14
35
12
23
25
25
15
25
10
29
26
35
27
23
30
29
21
18
12
26
23
29
33
36
36
22
20
27
35
12
34
31
31
35
24
26
17
22
19
14
29
15
31
17
29
34
35
27
23
26
17
14
29
23
12
35
10
15
27
10
20
3235
25
17
16
10
21
17
26
15
27
16
26
22
26
21
26
15
34
30
24
24
13
29
14
34
17
10
35
35
13
25
33
19
18
25
22
32
36
32
22
29
30
13
24
14
20
28
36
12
16
28
33
12
16
16
23
14
35
17
19
24
22
22
28
21
29
15
16
33
34
33
31
36
16
19
28
22
32
21
28
17
15
32
29
29
14
29
35
28
20
36
29
27
13
21
16
20
25
10
36
22
20
25
16
35
19
27
28
15
20
24
20
14
35
21
15
34
29
10
33
34
20
33
34
12
29
29
26
27
35
24
22
27
32
2322
26
13
33
16
15
22
34
24
23
20
20
26
17
14
16
28
25
24
27
19
16
15
36
33
22
17
15
17
25
29
19
30
36
29
35
35
16
27
27
27
14
31
23
24
21
21
28
29
33
20
17
17
20
14
22
25
18
31
25
35
16
32
26
36
17
21
26
20
23
17
35
36
14
35
13
35
24
32
36
16
16
15
12
29
14
3336
32
33
20 25
17
27
16
34
25
22
21
25
15
23
16
23
27
17
28
27
16
12
36
17
36
32
32
24
29
16
32
14
25
33
24
14
33
27
28
17
26
12
19
20
17
12
27
17
29
23
25
23
15
20
20
35 36
26
29
35
17
25
21
24
22
13
35
20
34
13
13
21
10
26
32
13
1415
35
27
21
10
36
34
20
17
13
21
17
24
34
29
17
18
20
34
28
23
29
10
12
17
36
35
22
28
21
32
34
32
15
28
29
16
26
34
24
27
17
27
26
1415
24
33
17
32
34
17
15
34
13
30
23
17
31
36
35
16
15
27
14
26
29
29
15
21
32
17
17
23
35
12
15
12
17
20
23
26
32
16
30
10
28
27
33
26
21
35
33
17
10
27
18
23
21
34
35
16
16
32
33
14
27
25
33
35
35
17
33
13
32
26
13
17
35
29
20
27
21
34
22
33
34
33
20
34
36
35
32
28
18
24
10
13
32
17
32
12
22
25
10
25
21
23
29
29
23
10
16
27
14
14
36
26
15
33
36
22
19
27
16
12
21
23
36
24
21
25
28
35
12
32
28
26
25
21
24
15
29
28
20
15
20
28
31
21
27
21
26
21
27
23
22
21
20
26
17
17
34
13
36
26
28
28
14
29
31
27
10
29
15
36
16
10
15
36
29
29
24
23
10
35
20
36
25
10
32
23
20
26
14
32
24
34
21
16
35
35
36
30
35
12
32
22
13
32
32
22
32
12
25
34
35
20
35
22
35
31
34
14
33
24
32
14
32
28
34
13
33
25
16
34
26
14
33
27
29
36
28
17
34
25
13
33
25
20
20
23
12
25
22
25
27
33 34
35
16
24
33
15
14
32
26
13
28
23
28
17
23
29
32
16
17
36
15
28
35
20
25
20
28
20
14
36
28
27
31
20
32
26
36
28
14
25
34
20
35
1717
35
29
13
10
26
33
12
23
14
20
23
26
22
34
27
25
25
18
34
27
29
28
12
24
10
26
27
16
21
14
32
33
20
26
20
22
36
35
36
12
28
26
23
36
32
14
34
33
26
20
25
20
35
2632
21
28
10
26
25
28
29
33
26
28
17
17
21
25
26
36
32
28
16
29
35
21
23
32
26
24
35
21
17
27
18
29
28
21
26
12
16
14
35
28
24
23
21
32
34
26
20
13
14
33
10
21
31
22
14
10
29
36
33
10
36
10
14
36
27 26
21
22
10
14
13
27
30
35
27
24
21
35
34
36
25
12
23
17
34
2313
16
33
24
33
33
28
31
24
21
22
32
21
32
21
22
14
31
25
27
19
29
27
20
24
10
35
20
14
29
21
26
27
22
34
10
10
12
25
15
22
23
34
16
36
28
32
28
33
32
17
27
20
16
34
20
34
10
23
15
24
26
12
26
26
36
16
33
28
12
21
29
10
20
29
15
30
14
10
33
12
24
35
25
31
21
15
3533
31
27
34
32
29
20
22
13
36
31
15
20
35
33
31
12
28
16
22
28
27
27
16
28
21
36
28
27
21
23
30
16
10
32
28
19
35
28
20
16
27
21
22
30
16
23
13
32
24
21
34
16
15
35
29
10
15
21
23
15
29
17
20
22
29
17
31
33
12
31
21
12
16
15
17
35
18 24
2729
21
32
10
36
16
23
16
21
26
17
20
22
32
27
36
16
33
14
28
27
21
13
29
14
27
29
18
34
16
33
19
27
25
28
34
22
22
24
22
35
23
24
12
29
13
29
12
21
13
14
15
10
23
24
13
2822
26
34
10
20
10
17
16
12
22
17
34
20
28
28
14
12
26
32
22
36
28
25
15
21
26
36
30
32
34
21
27
28
12
34
13
21
3333
29
12
26
15
15
26
30
22
13
35
27
34
1213
15
25
20
14
34
20
16
21
26
36
12
21
15
22
24
25
34
20
22
27
13
25
10
32
26
14
15
28
25
21
14
27
23
22
17
36
24
13
34
13
12
15
28
33
30
17
15
29
12
15
28
33
35
25
16
14
24
24
26
2423
35
20
35
21
17
23
13
27
15
24
17
20
2820
13
22
36
12
20
17
10
31
20
2521
15
28
16
34
22
25
26
30
35
15
33
10
34
15
34
34
26
22
32
24
23
35
36
14
33
34
14
29
22
27
17
15
13
27 27
13
33
35
17
31
29
15
16
33
36
14
26
31
35
32
26
30
23
10
27
14
20
16
29
24
16
36
10
22
27
25
36
15
21
33
22
29
23
15
28
13
28
24
33
17
26
28
19
29
31
31
29
32
16
24
28
21
13
17
14
10
35
31
22
25
22
33
20
35
29
22
14
20
22
33
16
20
16
33
30
14
35
10
10
29
34
36
32
15
33
22
14
24
10
19
34
20
13
30
26
23
14
22 23
34
24
17
25
16
32
32
17
17
10
10
22
30
12
32
10
35
22
28
21
20
15
25
22
19
29
13
26
27
34
35
22
17
23
25
10
27
33
21
14
14
10
22
26
26
16
14
23 27
27
20
13
30
10
14
29
23
15
24
24
34
14
27
17
33
22
19
27
28
32
28
29
21
10
20
17
25
14
24
26
34
17
10
21
15
27
12
35
33
36
10
36
22
22
31
10
27
13
23
10
26
21
17
18
20
26
20
16
26
10
15
26
23
33
34
17
29
35
29
20
16
25
32
23
21
25
32
13
2121
20
15 16
34
29
14
18
17
32
31
19
26
36
16
13
33
17 13
21
32
10
15
23
12
10
36
12
15
2220
15
22
14
25
15
10
24
17
34 32
17
30
25
21
22
15
10
23
10
28
18
28
20
23
12
34
28
23
22
29
32
25
17
25
15
30
12
34
21
14
24
30
31
22
22
28
16
25
15
32
15
27
30
32
12
29
22
26
24
35
18
20
32
31
34
27
27
19
10
35
27
28
26
33
16
27
27
10
28
32
18
34
28
36
17
23
13
23
22
32
20
35
30
28
10
32
32
18
14
30
26
33
30
34
32
17
13
13
23
16
31
20
16
22
10
27
22
27
18
23
18
22
14 13
33
25
28
19
19
33
13
26
36
35
28
35
17
34
23
10
25
15
33
34
22
33
14
17
33
23
21
36
32
18
22
24
3635
15
13
16
30
15
16
31
32
36
29
35
32
32
17
36
28
23
34
19
30
29
3134
23
27
13
28
35
33
10
29
19
10
25
20
28
15
22
24
28
22
16
22
21
12
36
24
10
29
2316
28
27
25
15
18
16
30
29
19
28
27
20
36
19
14
28
21
26
35
26
1814
30 27
15
31
22
34
19
22
21
30
22
14
21
33
24
21
20
3333
29
26
10
13
10
14
15
23
17
26
35
17
15
33
32
20
21
30
18
12
36
19
22
24
16
33
10
33
29
27
24
36
35
19
33
30
24
32
26
13
16
2024
12
2327
10
21
33
19 23
10
35
20
34
19
34
24
15
25
14
14
28
15
32
27
34
28
21
10
29
16
1920 26
18
26
15
33
31
36
25
13
24
19
14
15
31
15
34
28
14
32
18
29
20
16
14
23
17
35
29
10
27
12
31
35
32
15
2018
20
12
21
32
23
33
13 17
14
32
2119
16
36
32
34
10
25
29
25
21
2930
19
19
15
28
26
23
36
29
21
12
35
32
18
15
18
29
16
28
21
32
23
31
27
16
27
33
14
33
14
28
36
20
16
22
16
33
12
27
17
25
17
30
22
13
27
15
10
29
31
30
34
23
3336
20
22
33
12
36
17
18
31
34
32
27
15
19
33
33
29
14
25
19
29
27
12
20
21
31
13
31
35
13
33
26
34
25
23
21
29
24
35
36
34
33
24
33
19
16
14
25
23
23
18
26
36
20
14
16
31
16
14
21
14
34
13
17
34
35
24
34
35
19
22
30
29
12
24
16
36
17
16
20
13
24
17
21
26
34
16
31
35
27
14
13
35
25
30
21
24
30
10
15
28
18
36
10
27
30
12
17
13
18
15
12
21
18
19
18
30
36
31 33
34
32
13
24
31
19
30
31
10
26
18
13
28
36
30
19
19
34
32
25
12
26
35
26
34
27
25
18
25
24
32
30
31
22
27
19
19
30
27
30
18
32
33
36
28
18
31
12
35
23
29
31
18
35
18
22
15
16
18
16
27
30
18
25
31
25
30
29
36
26
36
30
26
17
26
36
25
19
12
19
22
30
23
23
26
22
23
25
18
30
15
30
35
34
31
14
19
24
26
24
17
36
15
18
30
30
33
13
32
31
19
29
36
30
28
13
35
34
19
25
18
22
19
31
1923
30
19
31
10
25
19
19
16
32
31
31
30
29
3135
20
19
23
33
24
32
31
36
18
31
13
15
19
31 31 31
19
30
30
19
21
31
15
18
26
18
32
10
17
21
34
36
30
31
31
10
12
14
14
22
30
29
31
3630
34
19
33
18
18
30
14
30
1518
35
10
23
16
36
16
35
19
18
22
32
19
13
31
18
19
16
31
23
30
34
31
19
18
28
18
18
19
24
28
18
19
21
15
33
18
20
30
19
30
12
16
18
31
33
25
18
21
19
13
34
18
27
30
19
22
12
18
19
16
30
35
16
34
3131
30
33
2023
32
28
31
7
10
31
18
12
16
19
27
29
31
18
31
20
36
17
12
28
25
18
25
32
24
32
21
18
31
30
22
30
19
30
17
22
24
19
21
19
25
19
3631
30
31
31
31
29
28
18
19
19
30
18
34
13
18
29
25
31
35
18
31
30
14
19
28
30
31
22
10
30
26
23
13
14
13
30
19
19
18
31
18
12
30
25
33
27
19
19
18
30
16
36
19
19
18
30
27
24
24
28
28
36
25
15
31
19
18
34
15
33
30
14
18
27
30
30
23
13
22
17
15
34
19
18
31
24
24
31
10
14
31
20
10
35
18
34
27
10
26
24
21
31
34
33
22
18
32
34
13
31
10
25
36
19
26
24
30
16
13
7
31
15
24
2219
15
2723
18
31
30
31
30
31
19
25
30
34
13
34
18
19
31
24
18
30
30
18
19
18
19
18
33
19
30
31
12
12
18
16
13
14
27
22
18
31
30
19
19
30
18
29
24
31
36
13
19
30
18
18
12
31
25
30
26
32
25
14
17
31
19
30
18
19
18
24
7
15
18
13
12
12
20
5
19
35
21
22
29
24
19
23
18
33
19
31
30
6
31
19
30
18
25
18
19
30
30
31
19
31
18
26
12
36
28
13
24
25
31
17
18
15
6
7
10
11
7
6
6
33
28
16
20
36
29
31
26
23
13
9
30
10
32
10
31
7
33
7
6
6
7
7
7
6
20
6
7
19
31
18
30
7
6
31
30
6
19
18
15
2
1
3
24
15
11
31
30
19
18
18
19
31
30
18
30
31
19
18
30
19
19
31
31
18
30
31
30
19
18
10
29
14
18
27
6
16
28
32
23
15
17
23
25
30
14
3
88
12
36
27
28
17
30
16
District 1
District 4
District 3
District 5
District 2
98
76
5
4
32
1
595857
56
5554
53
52
51
50
49
48
47
46
45
44
43
42
41
4039
38
37
36
35
34
33
3231
3029
28
2726
25
24
23
22
21
20
19
1817
16
15
14
1312
11
10
Eloy
Maricopa
Mammoth
Superior
Florence
Coolidge
Casa Grande
Arizona City
Apache Junction
Kearny
Queen Creek
Marana
Winkelman
Pinal County Flood Control District5-Year Capital Improvement and Study Plan
Fiscal Years FY19-20 through FY23-24
¯
Number Project Name Number Project Name1 Corps of Engineers LSCR Feasibility Study 31 Arizona City Flood Mitigation2 Greene Wash Watershed Plan (NRCS) 32 Eloy Industrial Park Flood Mitigation3 Sunland Gin Road Mitigation 33 Saguaro and McKlleips Flood Mitigation4 Pinal Airpark Drainage 34 San Tan West Flood Mitigation5 Russel Road & Ak-Chin Airport Study 35 Camino Alto Detention Basin6 Amarillo Valley Dams 36 Superior Floodplain Delineation7 Amarillo Valley Dams 37 Hidden Valley Drainage and Channel Assessment8 Amarillo Valley Dams 38 Box Canyon Floodplain Delineation9 Amarillo Valley Dams 39 Bogart Wash Channel
10 North Santa Cruz Wash Watershed Plan (NRCS) 40 Vekol Wash (& Trib) Floodplain Delineation11 Tangerine Basin Repairs 41 Amarillo Valley Road Channel12 Town of Superior Flood Mitigation 42 Apache junction Palm Wash Drainage Mitigation13 Queen Valley Mitigation 43 Green Road Channel14 McClellan Wash WCMP 44 Big Wash Floodplain Delineation15 Dudleyville Community Center Mitigation 45 UPRR/Kinder Morgan @ Eloy School Flood Mitigation16 Roberts & Thompson Channel 46 Magma Railroad Abandonment (STV) Study17 Overfield & Randolph DCR 47 CAP Overchute Evaluation Study18 Coolidge Drainage Project 48 Stanfield Area Drainage Assessment19 Valley of the Sun Phase IIB, Skyline Channel 49 Copper Hill Wash Mitigation20 Welton Wash DCR 50 Boyd Road & Broadway Road Culvert Headwall #782621 Dirtwater Springs/Main Street Drainage 51 Gantzel Road @ Queen Creek Wash Scour Remediation #1058822 Country Mini Farms A Zone Remapping 52 Queen Valley Dr @ Queen Creek Wash Bridge Replacement #861823 Val Vista Channel Rehab 53 Superstition Mtn & Don Donelly Culvert Repairs #1139824 San Tan Valley ADMP 54 San Manuel Hwy South of Fire Department Gabion Repairs #771125 Middle Magma Channel Watershed Plan 55 Peppersauce Bridge Abutment Repairs #770926 Mammoth Kino Street Drainage, Phase 1 56 Aravaipa Road Bridge Structural Analysis27 Mammoth Kino Street Drainage, Phase 2 57 Riverside Bridge # 11368, Analysis28 Houston Avenue Channel 58 Riverside Bridge # 11369, Analysis29 Empire @ Pegasus Channel 59 Riverside Bridge # 11370, Analysis30 Combs Road Channel DCR