al afpm conference big creek drainage studyadeca.alabama.gov/divisions/owr/floodplain/nfip/big creek...

30
BIG CREEK DRAINAGE STUDY AL AFPM CONFERENCE October 2014

Upload: buikiet

Post on 29-Mar-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

BIG CREEK DRAINAGE STUDY

AL AFPM CONFERENCE

October 2014

Page 2: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

2

Page 3: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

3

Page 4: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

Big Creek basin data collection

Hydrologic modeling

Hydraulic modeling

Flood mitigation projects

STUDY ELEMENTS

4

Page 5: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

Data collected consisted of the following:

GIS data for Shelby and Tipton counties

Lidar Data

Soils/Land Use Data

Nexrad Data

Field survey channel cross-sections and bridge data

75 additional cross-sections

Drainage studies

Previous Corps studies

DATA COLLECTION

5

Page 6: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

HEC-HMS & HEC-GeoHMS Model used

100-year and 500-year design flows

HYDROLOGIC MODEL

6

Page 7: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

7

Page 8: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

8

Page 9: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

9

Page 10: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

10

Page 11: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

11

Page 12: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby
Page 13: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

HEC-RAS & HEC-GeoRAS models for water surface elevations

Extended model upstream into Tipton County

100-year and 500-year water surface elevations

May, 2010 water surface elevations for model validation

HYDRAULIC MODEL

13

Page 14: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

14

Page 15: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

15

Page 16: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

MAY 2010 HIGHWAY 51 FLOOD INUNDATION

16

Page 17: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

MAY 2010 SINGLETON PARKWAY

17

Page 18: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

Identify flooding locations and conceptual projects to mitigate

flooding

Mitigation alternatives

Alternative 1 - Temporary detention upstream

Alternative 2 - Enhanced protection

Alternative 3 - Diversion of high flows

FLOODING MITIGATION

18

Page 19: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

19

Page 20: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

20

Page 21: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

Maximum water surface elevation reduction

at Navy base (BCRM 11.54) equals 1.52’

21

Page 22: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

Effective at reducing water surface elevations

Significant land acquisition

Moderate to high total project cost depending on site or

combination of sites selected

BIG CREEK ALTERNATIVE 1 – FINDINGS

22

Page 23: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

23

Page 24: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

Prevents flooding of Navy base due to levee overtopping

No significant effect on water surface elevations

No land acquisition

Lower project cost

BIG CREEK ALTERNATIVE 2 – RAISE EAST LEVEE FINDINGS

24

Page 25: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

25

Page 26: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

Maximum water surface elevation reduction of 1.04’

at RM 11.54 (Just upstream of Singleton Pkwy.)

26

Page 27: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

Effective in reducing water surface elevations

Minimal land acquisition

High construction cost (two new bridges)

BIG CREEK ALTERNATIVE 3 – HIGH FLOW DIVERSION FINDINGS

27

Page 28: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

28

ALTERNATIVES U.S. HWY 51 SINGLETON PKWY. U.S. HWY 51 SINGLETON PKWY.

ALTERNATE #1-TEMPORARY DETENTION UPSTREAM

Big Creek Dam #1 0.08 1.07 0.96 1.52

Crooked Creek Dam 0.12 1.36 0.00 0.89

Royster Creek Dam 0.32 0.03 0.00 0.00

Big Crk. #1 & Crooked Crk. Dams 0.27 2.15 1.26 2.69

Crooked Crk. & Royster Crk. Dams 0.54 1.39 0.98 1.19

ALTERNATE #2-ENHANCED LEVEE PROTECTION

Raise East Navy Base Levee 0.00 0.00 0.00 0.00

ALTERNATE #3-HIGH FLOW DIVERSION

Crooked Creek Diversion 0.12 1.36 1.25 1.04

DECREASE IN WATER SURFACE ELEV.

FOR 500-YR. STORM AT:

DECREASE IN WATER SURFACE ELEV.

FOR MAY, 2010 STORM AT:

SHELBY COUNTY TN GOVERNMENT

BIG CREEK DRAINAGE STUDY

COMPARISON OF VARIOUS STUDY ALTERNATIVES

Page 29: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

Develop and evaluate additional potential projects

Evaluate combinations of projects

WORK GOING FORWARD

29

Page 30: AL AFPM CONFERENCE BIG CREEK DRAINAGE STUDYadeca.alabama.gov/Divisions/owr/floodplain/NFIP/Big Creek Drainage... · Data collected consisted of the following: GIS data for Shelby

Questions!

[email protected] 615-252-4329