first visual inspection in b 867

11
First results of the HRMT-09 tests on a LHC TCT collimator in HiRadMat Collimation WG Meeting 21.01.2013 Oliver Aberle on behalf of the Collimation team, special thanks to M. Cauchi, K. Weiss, R. Bebb and J. Lendaro 1 Collimation WG Meeting 28.01.2013

Upload: denton

Post on 08-Feb-2016

42 views

Category:

Documents


1 download

DESCRIPTION

First results of the HRMT-09 tests on a LHC TCT collimator in HiRadMat Collimation WG Meeting 21.01.2013 Oliver Aberle on behalf of the Collimation team, special thanks to M . Cauchi , K . Weiss, R. Bebb and J. Lendaro. First visual inspection in B 867. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: First visual inspection in B 867

First results of the HRMT-09 tests on a LHC TCT collimator in HiRadMat

Collimation WG Meeting21.01.2013

Oliver Aberleon behalf of the Collimation team,

special thanks to M. Cauchi, K. Weiss, R. Bebb andJ. Lendaro

1Collimation WG Meeting28.01.2013

Page 2: First visual inspection in B 867

First visual inspection in B 867

2Collimation WG Meeting28.01.2013

• History can be found in Marija‘s presentation (CWG, 15.10.2012):Preliminary Results of TCT HiRadMat Tests

RP check before inspection (Kurt Weiss):Dose rate is the highest under thecollimator box, not in excess of 40 microSv/h @ contact.Contamination found, results available soon

Page 3: First visual inspection in B 867

First visual inspection in B 867

3Collimation WG Meeting28.01.2013

• History can be found in Marija‘s presentation (CWG, 15.10.2012):Preliminary Results of TCT HiRadMat TestsTest Intensity

[p]Number of bunches*

Beam Energy [GeV]

Energy on Jaw

[kJ]

TNT equivalent

[g]BBA before Test 1

5.674 x1011 79 pilot 440

Test 1 3.2 x 1012 24 high-intensity

440 81.5 19.4

BBA after Test 1 1.5065 x 1011

18 pilot 440

BBA before Test 2

4.049 x 1011

35 pilot 440

Test 2 9 x 1011 6 high-intensity

440 22.9 5.46

BBA after Test2/before Test 3

2.32 x 1011 22 pilot 440

Test 3 9.34 x 1012 72 high-intensity

440 251.8 60.0

TOTAL 1.479 x 1013

356.2 84.9* Pilot bunch: ~ 5 – 10 x 109 ppb; High-intensity bunch: ~ 1.3 - 1.5 x 1011 ppb

Page 4: First visual inspection in B 867

4

Some pictures

– Downstream side clean (on first glance)

Collimation WG Meeting28.01.2013

– Particles and dust between jaws and behind RF fingers

Page 5: First visual inspection in B 867

Collimation WG Meeting 5

Some pictures

28.01.2013

• Loose particles, fragments and droplets of different sizes.

• Distribution could have been modified by transportation and manipulation.(Note: Jaws have been moved prior to inspection)

Page 6: First visual inspection in B 867

Collimation WG Meeting 6

Impact side - Upstream

28.01.2013

• Upstream side

Spread droplets

Large lips of excessmetal

Page 7: First visual inspection in B 867

Collimation WG Meeting 7

Impact side - Upstream• Debris of large

dimensions.• Concentrated

around the impact region.

• Some distantprojections?

28.01.2013

Page 8: First visual inspection in B 867

Collimation WG Meeting 8

Jaws opened

28.01.2013

• Jaw opened to full retracted position (switches).

• Projections from impact towards top and bottom plate (from test 3 towards opposite jaw).

• Vaporisation deposit around molten region.

Test 1

Test 2

Test 3

Page 9: First visual inspection in B 867

Collimation WG Meeting 9

Left jaw

28.01.2013

34 mm

~ 3 mm

• Deposition from test 3

Page 10: First visual inspection in B 867

Collimation WG Meeting 10

Right jaw

28.01.2013

~ 4 mm

~ 2 blocks (400mm)

Page 11: First visual inspection in B 867

Collimation WG Meeting 11

Next steps• Results from smear test to quantify and qualify contamination.• Cross check the beam and impact parameters and compare

with simulations.• Better estimate of dimensional extent of visible damage.• Possibility of inserting tools?• Access to the tungsten blocks, open the box?• Collaboration with external partners (e.g. PSI)?

28.01.2013