Chapter 1 Page#
1.0 Introduction 6
1.1 Scope 6
1.2 Objective 7
1.3 Preliminary investigation 7
1.4 Fact finding techniques 7
1.4.1 Interviews 7
1.4.2 Summary of Interviews 7
1.4.3 Surveys 8
1.4.4 Summary of Surveys 8
1.5 Problems of the current system 8
1.6 Proposed solutions to the problems 8
1.6 Benefits of the proposed system 9
1.7 Conclusion 10
1
System Analysis and Design Group Project
Chapter 2 Page#
2.0 Feasibility 10
2.1 Technical Feasibility 11
2.1.1 Hardware 11
2.1.2 Software 11
2.1.3 Machines 11
2.2 Operational Feasibility 11
2.2.1 PIECES 11
2.3 Schedule feasibility 12
2.3.1 Task Description 13
2.4 Economic Feasibility 14
2.4.1 Cost-Benefits Analysis 15
2.4.2 Pay Back Analysis 15
2.4.3 Pay Back Analysis Graph 16
2.4.4 Explanation of Pay Back Analysis 16
2.4.5 Return on Investment Analysis 17
2.4.6 Explanation of Return on Investment Analysis 17
2.5 Conclusion 17
2
System Analysis and Design Group Project
Chapter 3 Page#
3.0 Data Flow Diagrams 18
3.1 Context Diagram 18
3.1.1 Explanation of Context Diagram 19
3.2 Level 0 Diagram 21
3.2.1 Explanation of Level 0 20
3.3 Level 1 Diagram 22
3.3.1 Explanation of Level 1 22
3.4 Data Dictionary 23
3.4.1 Data Flows 24
3.4.3 Data Store 33
3.4.4 Processes 35
3.4.5 Entities 39
Chapter 4 Page#
4.0 Sun Video Corporations Logo 41
4.1 Main Menu 42
4.2 Customer 43
4.3 Video Return 44
4.4 New Customer Registration 45
4.5 Customer Payment Details 45
4.6 Database Tables 46
4.6.1 Rent a Video Table 47
4.6.2 Payment Details Table 49
4.6.3 Customer Table 51
4.6.4 Video Returned Table 53
3
System Analysis and Design Group Project
Chapter 5 Page#
5.0 Gantt Chart 57
5.1 Conclusion 58
5.2 Reference 59
5.3 Appendix 60
ACKNOWLEDGEMENT
4
System Analysis and Design Group Project
In the beginning we would like to thank our GOD, the most merciful and beneficent, for
giving us the strength to complete this project with full determination.
My special thanks to my course instructor, Mrs. Ambreen Ahmed, without her help and
guidance we would not have been able to complete the report up to the mark and as well
if it was not for her support in the field of Microsoft acsses i don’t think we would be
able to present the screen shots in a appropriate way.
INTRODUCTION
5
System Analysis and Design Group Project
This case study is about a video shop whose name us Sun Video Corporation. It has
expertise in video rental business. Their plan is to have a series of stores scattered
strategically around a metropolitan area. As being expertise in the video rental business
they offer great deal for their customer and provide a competitive edge for their
competitors. In this case we are required to do the work of the system analyst and go
through each process which the system analyst performs.
SCOPE
As all of you know that as the world is advancing the need for new system have increased
in every organization old systems are being replaced by new system, the reason behind
this is that the organization demands excellent quality work more profit to be earned in
short term and to gain more market share as quick as they can and to kick their
competitors out of the market. New system is:
User Friendly
More Efficient
They provide you with the latest security (I.E Fire Wall)
U can use internet proving you with the better speed and quality so you could
send and receive important e-mails
As mentioned above that what the new system does, our prime target is to create a
new and reliable system for Sun Video Corporation as it is offering many facilities to
its customers and it is proving a competitive edge.
OBJECTIVE
6
System Analysis and Design Group Project
My objective is to make useful and user friendly system, so that non technical person can
also under stand it. It is easy for the company to use the system, providing the system that
would be designed for the company will consists of high security software (zone alarm
version 9) so that no hacker can break inside the system and stole data and installing
latest version of antivirus (I.E McAfee version 8.0) so the system is virus free and the
data is secured
PRELIMINARY INVESTIGATION
After receiving the request from Sun Video Corporation regarding their system our team
started its work with the very basic step that was searching for the problem by the method
of fact and finding techniques and gather the information regarding the problem that
was faced by the Sun Video Corporation.
FACT FINDING TECHNIQUES
This stage involves Interviews, conclusion, Survey, conclusion problem of the current
system, proposed solution to the problem of the current solution conclusion
Interviews
This was the basic step taken by our team this main reason for conducting interview was
that we would know that what are the problem that the company is currently facing and
how is it affecting their business? Although taking interview is not an easy task but we
manage to do it some how.
Conclusion
As a part of our first step we conducted this session and went to various people like the
managing director the company, the sales manager, the cashier and asked them about the
problem that they were facing, so that the information that they provide us would be later
used on.
Surveys
7
System Analysis and Design Group Project
The second step that our group took was going on to surveys of different famous and
large video stores in order to see what is the main reason behind their success in the
market and what type of system are they currently using ad what are the benefits that they
are getting out of it?
Conclusion of Survey
Conducting survey was successes as it gave answer to most of are questions. Are prime
target was achieve we gathered all the relevant information and the irrelevant information
was discarded.
Problems with the current system
1. The problem that was detected and was commonly seen in the answer of
interviews was that all the work was done manually,
2. There were a lot of records being generated on papers, which was very
insecure if any thing happened to the store all the records would be destroyed
and that would provide the company in a great loss,
3. No proper security arrangements every one was accessible to the personal
records of every individual customer.
4. No privacy.
SOLUTION to the problems
After conducting the interviews and surveys it was observed that the company needed a
latest system, in order to improve its quality so there fore we came up with the new
system know as Video Rental System which was to use further to solve all the problems
of the users and the corporation.
Advantages of the system to be introduced
8
System Analysis and Design Group Project
By introducing this system the company would be in safe hands due to the latest software
installed in the system which would prevent it from data hacking.
1. All the personal records would have right of privacy, as passwords can be easily
generated with the help of password manager guide which is an 8 user guide, user
friendly software which tells the user how to create a password and to use it.
2. It more reliable, Fast and user friendly.
3. It can generate automatic backup of each customer records. Incase the original
one is deleted the system can provide the user with the back up.
4. It would be sending automatic notifications to the user who have rented videos for
$50.
5. It will contain software which will the user on which shelf on what location is the
particular video which the customer s looking for this will provide them with time
flexibility and the customer would also be satisfied with this service.
6. Introducing this software would facilitate new customer enrolling and renting
movies from Sunny Videos that will make them enjoy high profit.
CONCULSION
9
System Analysis and Design Group Project
After performing the necessary steps it was founded that sunny videos manual way of
working was more time consuming and it was not efficient to work with this system
as no privacy right were available. Being the system analyst it was decided that it is
necessary to introduce a new system for Sunny Video which is know as Sunny rental
Video
FEASIBILITY
Feasibility report means to identify the problem and summarizing the complete
objectives. It also creates broad data for the management team that would decide by
looking at the objects whether to move on the new phase or not. There are 4 types of
feasibility report which are mentioned below:
1. Technical
2. Operational
3. Economical
4. Schedule
Technological or Technical feasibility
10
System Analysis and Design Group Project
Under this process the (IT) company determines weather the company has technological
resources to compose or purchase the system. Thus we figured the technical feasibility
report; we came to know the system which is proposed to the Sun Cooperation can be
operated easily. The system replace the manually work and transform all the manually
data in to computerize form .which would augment productivity. Training sessions are
required for the employees to educate them to excel to the newly proposed system and to
further understand and use the built in software that are inside the system to prevent their
company from suffering great losses.
Operational feasibility
Operational feasibility helps to crack business problems and provide opportunities to
business .Our system would help users to use the system effortlessly, thus eliminating the
paper work. Through data entry the system would cradle all the records of the customers
and hence the transactions made by sun video can be seen through any interface of sun
video. Through this all the customers record would be maintain properly without fuss. It
would show all the records of payment received, due dates, and pending payments. This
system would be user- friendly which would enable employees to learn and operate the
system fester achieving productive results.
Pieces framework
Pieces stands for Performance, Information, Economy, Control, Efficiency, Services
Pieces has merely 6 points.
Performance
The currant system is not that fast and efficient which waste sundry time in paper work
even after that the transactions of the customers are not recorded properly thus arising
conflicts between management and employees and customers .Thus performance is
effected, through new system the whole thing would be computerized and the task would
be done rapidly hence augmenting performance levels.
Information
11
System Analysis and Design Group Project
The system will have its own data base through it the company can look and see all the
transactions of the customers thus having information about all it customers .
Economy
The system would be computerized, user friendly thus it would enhance productivity,
thus making the project economically strong. Perishing manually work thus codifying
and organizing the data of the customers properly. It would reduce the more workers,
thus cutting down the expanses and saving more money.
Control
Top management would have charge to control the system, thus it would decrease
pilfering , providing security . Thus every employee would have limited excess.
Efficiency
The system would be computerizes all over thus it would coup with all sinecures like data
entry, customer information, billing information resulting efficiency among employees
eventually satisfying customers .
Services
Our company would provide augment product or system thus in future if the sun
cooperation needs to have new tools we would provide them. Thus upgrading the system.
Schedule Feasibility.
Is that feasibility under which our company will meet its deadlines, and task to gratify
them? Under it we have set targets to finish what activity on which time.
Task completing dates
12
System Analysis and Design Group Project
Feasibility report would be done in 3 days including technical, economical,
operational, schedule.
Pieces framework would be done in 4 days which would include performance,
information, economy, control, efficiency and services.
Investigation of (PI) will be done in 2days
Requirements of users will be done in 2.5 days
Analysis of system needs would be done in 4days
Development and documenting the software would take 8days
Cost benefit analysis would be done in 2days
Payback analysis would be done in 1 day
All the diagrams e.g. pert chart, data flow, level zero diagrams would be done in
5days
Level 1 diagram would be done in 3days
Data store would be made in 1 day
All Entities software would be done in 4 days
Making of screenshots in 2 days
Economical Feasibility
13
System Analysis and Design Group Project
Under this feasibility we analysis weather benefits in making the new system are
more then the development cost. Is it profitable to take the task and make it? Will it
going to provide any benefits to the organization.
COST-BENEFIT ANALYSIS
Economic feasibility is performed by doing the cost-benefit analysis, which is the
process of identifying the financial benefits and costs associated with the
development of the project.
The evaluation of our project is being done on the following strategies
PAYBACK ANALYSIS
14
System Analysis and Design Group Project
It is the process in which the organization identifies the time period in which the
system would pay back for itself.
The costs in the development of this project and the profits attained are shown below:
PAYBACK ANALYSIS GRAPH
15
Year Cost
Cumulative
cost Benefits
Cumulative
benefits
0 50,000 50,000 2,500 2,500
1 20,000 70,000 10,000 12,500
2 18,000 98,000 20,000 32,500
3 14,000 112,000 25,000 57,500
4 17,000 129,000 35,000 92,500
5 19,000 148,000 50,000 142,500
6 21,000 169,000 52,000 194,500
7 23,500 192,500 55,000 249,500
8 25,000 217,500 60,000 309,500
9 25,000 242,500 62,000 371,500
10 27,000 269,500 65,000 436,500
0
50000
100000
150000
200000
250000
300000
350000
400000
450000
1 2 3 4 5 6 7 8 9 10 11
Year
Cost
Cumulative cost
Benefits
Cumulative benefits
System Analysis and Design Group Project
EXPLAINATION OF PAYBACK ANALYSIS
This graph was made on Microsoft Excel which helped in analyzing By the looking at the
above payback analysis graph it could be easily concluded that the system would payback
for itself in the 6th year after its development.
RETURN ON INVESTMENT(ROI) ANALYSIS
16
System Analysis and Design Group Project
ROI= (Total benefits – Total costs) / Total costs
ROI= (436,500 - 269,500) / 269,500
ROI= 167,000 / 269,500
ROI= 0.61
EXPLAINATION OF ROI
According to the workings of the ROI the organization is getting 61% return on its
investment.
CONCLUSION
After performing different steps of feasibility it was concluded that our software is
feasible and easy to use for the company. Now we decided to move on to the design
phase.
17
System Analysis and Design Group Project
DATA FLOW DIAGRAMS
Data flow is known as a geographical figure of the data. DFD denotes the process which
takes place in a system .it even shows how data evolve around through an information
system.
CONTEXT DIAGRAM
EXPLANATION OF CONTEXT DIAGRAM
18
System Analysis and Design Group Project
The diagram says that the customers would interact with the system and it would show
his/her id, it would include whose payments are outstanding, whose payment are done,
whose videos are due. The new customer has to fill the form to avail membership for the
sun video. System would generate reports and management would be accountable to see
the report of the whole report... The accounts department would send cash which would
received by customers.
EXPLANATION OF LEVEL 0 DATA FLOW DIAGRAM
19
System Analysis and Design Group Project
This diagram was made by using viso .In this case the when the customer will give there
id, the system would show customer payments, dues, etc. Accounts deportment sends
cash. Customer record shows rental information to compose a report. Which would give
to the management of the sun video. This system have information when the video is
rented then its receipt is made and passed to the customers. Payment which are which are
received from the accounts department is updated in customers records. If the customers
comes to the bonus level those customers’ details are forwarded to the accounts
department which generates motley or yearly schemes or bonus letters for those desire
customers.
LEVEL 0 DATA FLOW DIAGRAM
20
System Analysis and Design Group Project
LEVEL 1 DATA FLOW DIAGRAM
21
System Analysis and Design Group Project
EXPLANATION OF LEVEL 1 DATA FLOW DIAGRAM
In level 1 Data Flow Diagram, Customer Rental Record which is a data store sends
customer’s yearly details to the Create Yearly Bonus Letter. It advances to Free Coupons
Process which generates free coupons for the customer and both the items bonus letter
and free coupon goes to Create Customer Certificate. These three items that are coupons,
letter and certificate are sent directly to the customer.
DATA DICTONARY
22
System Analysis and Design Group Project
Date dictionary is just like a dictionary which contains meanings of words,
Data dictionary is made by the analysis to keep track and record of the
information and thus it could be use further in future if required changes
in the system. Data dictionary contains the meanings of words which are used
in the system and data flow diagrams. It helps to
• Deplete redundancy
• Compose data flow in a constructive manner
• Provide aid on data stored files and save it
• Create deductive data flow processes
the data dictionary for this project is given below
Data FlowsData Flows
23
System Analysis and Design Group Project
Name : customer details Name : customer details
Description : details of new customers Description : details of new customers
Source : customer Source : customer
Destination : add customer Destination : add customer
Data Structure: customer name + address + telephone. Data Structure: customer name + address + telephone.
Name : customer details Name : customer details
Description : details of new customers Description : details of new customers
Source : add customer Source : add customer
Destination : customer rental records Destination : customer rental records
Data Structure: customer name + customer id + address + Data Structure: customer name + customer id + address +
telephone number. telephone number.
Name : customer info Name : customer info
24
System Analysis and Design Group Project
Description : update customer rental records Description : update customer rental records
Source : video return Source : video return
Destination : customer rental records Destination : customer rental records
Data Structure: customer name + customer id + address + Data Structure: customer name + customer id + address +
telephone number + returned videos telephone number + returned videos
Name : customer/Video ID Name : customer/Video ID
Description : identification of customer and video Description : identification of customer and video
25
System Analysis and Design Group Project
Source : customer Source : customer
Destination : video return Destination : video return
Data Structure: customer name + address + telephone + Data Structure: customer name + address + telephone +
identification code. identification code.
Name : video info Name : video info
Description : video rental information Description : video rental information
Source : video return Source : video return
Destination : video rental record Destination : video rental record
Data Structure: available videos list + video returned Data Structure: available videos list + video returned
Name : payment/dues Name : payment/dues
Description : details of payments Description : details of payments
26
System Analysis and Design Group Project
Source : customer Source : customer
Destination : payment received Destination : payment received
Data Structure: amount of payment + mode of payment Data Structure: amount of payment + mode of payment
+customer ID. +customer ID.
Name : receipt Name : receipt
Description : receipt of the payment made Description : receipt of the payment made
Source : receipt generation Source : receipt generation
Destination : customer Destination : customer
Data Structure: customer ID + amount paid Data Structure: customer ID + amount paid
Name : customer info Name : customer info
Description : updates the rental records Description : updates the rental records
27
System Analysis and Design Group Project
Source : customer rental record Source : customer rental record
Destination : receipt generation Destination : receipt generation
Data Structure: amount owed + customer ID Data Structure: amount owed + customer ID
Name : payment received update Name : payment received update
Description : receipt of the payment made Description : receipt of the payment made
Source : payment received Source : payment received
Destination : customer rental record Destination : customer rental record
Data Structure: amount paid + balances if any left + customer ID. Data Structure: amount paid + balances if any left + customer ID.
Name : cash Name : cash
Description : payment being paid Description : payment being paid
28
System Analysis and Design Group Project
Source : accounts Source : accounts
Destination : payment received Destination : payment received
Data Structure: amount paid + customer ID. Data Structure: amount paid + customer ID.
Name : customer rental info Name : customer rental info
Description : details about customers Description : details about customers
Source : customer rental record Source : customer rental record
Destination : create yearly free coupons. Destination : create yearly free coupons.
Data Structure: ID + code+ name + rent paid + type of video issued. Data Structure: ID + code+ name + rent paid + type of video issued.
Name : customer rental info Name : customer rental info
Description : details about customers Description : details about customers
29
System Analysis and Design Group Project
Source : customer rental record Source : customer rental record
Destination : create monthly letter discount coupon Destination : create monthly letter discount coupon
Data Structure: ID + code+ name + rent paid + type of video rented. Data Structure: ID + code+ name + rent paid + type of video rented.
Name : rental info Name : rental info
Description : details about the movies rented Description : details about the movies rented
Source : rental record Source : rental record
Destination : produce customer rental report Destination : produce customer rental report
Data Structure: customer name + ID + rent paid. Data Structure: customer name + ID + rent paid.
Name : report Name : report
Description : details about the customers and the videos Description : details about the customers and the videos
30
System Analysis and Design Group Project
Source : produce customer rental report Source : produce customer rental report
Destination : management Destination : management
Data Structure: customer name + movies rented Data Structure: customer name + movies rented
Name : monthly coupon letter Name : monthly coupon letter
Description : certificates provided to customers Description : certificates provided to customers
Source : create monthly letter discount coupon Source : create monthly letter discount coupon
Destination : customer Destination : customer
Data Structure: customer name + Customer ID Data Structure: customer name + Customer ID
Name : yearly coupon letter Name : yearly coupon letter
31
System Analysis and Design Group Project
Description : certificate issued yearly Description : certificate issued yearly
Source : create yearly free coupon Source : create yearly free coupon
Destination : customer Destination : customer
Data Structure: customer name + ID Data Structure: customer name + ID
Data StoreData Store
32
System Analysis and Design Group Project
Name : customer rental record Name : customer rental record
Description : all the details of a customerDescription : all the details of a customer
Input Data Flow : customer details Input Data Flow : customer details
Payment received update Payment received update
Customer info Customer info
Output Data Flow : customer rental info Output Data Flow : customer rental info
Rental info Rental info
Data Structure : customers name + customer id’s + addresses + Data Structure : customers name + customer id’s + addresses +
telephone numbers + movies rented + amount telephone numbers + movies rented + amount
balances + amount paid balances + amount paid
33
System Analysis and Design Group Project
Name : video rental record Name : video rental record
Description : all the details of videosDescription : all the details of videos
Input Data Flow : customer details Input Data Flow : customer details
Payment received update Payment received update
Customer info Customer info
Output Data Flow : customer rental info Output Data Flow : customer rental info
Rental info Rental info
Data Structure : customers name + customer id’s + addresses + Data Structure : customers name + customer id’s + addresses +
telephone numbers + movies rented + amount telephone numbers + movies rented + amount
balances + amount paid balances + amount paid
ProcessesProcesses
34
System Analysis and Design Group Project
Name : add customer Name : add customer
Description : registering new customers Description : registering new customers
Input Data Flow : customer details Input Data Flow : customer details
Output Data Flow : customer details Output Data Flow : customer details
Process Specification: receives customer details Process Specification: receives customer details
verifies new customers verifies new customers
sends customer rental card to customer and new sends customer rental card to customer and new
customer info to customer record customer info to customer record
35
System Analysis and Design Group Project
Name : video rental Name : video rental
Description : manages the renting process Description : manages the renting process
Input Data Flow : customer/video ID Input Data Flow : customer/video ID
Output Data Flow : video info Output Data Flow : video info
customer info customer info
Process Specification: checks request and issue videos Process Specification: checks request and issue videos
sends out rental info sends out rental info
Name : payment received Name : payment received
Description : recording cash transactions Description : recording cash transactions
Input Data Flow : payment/dues Input Data Flow : payment/dues
cash cash
Output Data Flow : payment received update Output Data Flow : payment received update
Process Specification: takes in the payments. Process Specification: takes in the payments.
Name : receipt generation Name : receipt generation
36
System Analysis and Design Group Project
Description : makes receipts Description : makes receipts
Input Data Flow : customer info Input Data Flow : customer info
Output Data Flow : receipt Output Data Flow : receipt
Process Specification: takes in payment info and sends the receipt generated to Process Specification: takes in payment info and sends the receipt generated to
the customer the customer
Name : create monthly letter discount coupon Name : create monthly letter discount coupon
Description : produces monthly reports Description : produces monthly reports
Input Data Flow : customer rental info Input Data Flow : customer rental info
Output Data Flow : monthly coupon letter Output Data Flow : monthly coupon letter
Process Specification: checks in customer final details and sends monthly Process Specification: checks in customer final details and sends monthly
coupons to various customers coupons to various customers
Name : create yearly free movie coupon Name : create yearly free movie coupon
37
System Analysis and Design Group Project
Description : produces yearly reports Description : produces yearly reports
Input Data Flow : customer rental info Input Data Flow : customer rental info
Output Data Flow : yearly coupon letter Output Data Flow : yearly coupon letter
Process Specification: checks in customer final details and sends yearly Process Specification: checks in customer final details and sends yearly
coupons to various customers coupons to various customers
Name : produce report Name : produce report
Description : makes final reports Description : makes final reports
Input Data Flow : rental info Input Data Flow : rental info
Video rental info Video rental info
Output Data Flow : report Output Data Flow : report
Process Specification: takes in info about customer and videos and send the Process Specification: takes in info about customer and videos and send the
info to the management. info to the management.
EntitiesEntities
38
System Analysis and Design Group Project
Name : Customer Name : Customer
Description : people wanting to rent video Description : people wanting to rent video
Input Data Flow: receipts Input Data Flow: receipts
monthly coupon letter monthly coupon letter
yearly coupon letter yearly coupon letter
Output Data Flow: customer detailsOutput Data Flow: customer details
customer/video ID customer/video ID
payment/dues payment/dues
Name : accounts dept Name : accounts dept
Description : manages all the finance of the organization and the system Description : manages all the finance of the organization and the system
Input Data Flow: Cash Input Data Flow: Cash
Output Data Flow: --- Output Data Flow: ---
39
System Analysis and Design Group Project
Name : management Name : management
Description : manages the organization and the system Description : manages the organization and the system
Input Data Flow: management report Input Data Flow: management report
Output Data Flow: ---Output Data Flow: ---
Screen Shots
40
System Analysis and Design Group Project
Our logo
This logo was designed with the help of adobe photo shop to provide a good
look for the system
41
System Analysis and Design Group Project
Main Screen:
42
System Analysis and Design Group Project
Video RENTAL FORM:
This form shows the video id and the customer id that what particular movie has been
issued by a particular customer
43
System Analysis and Design Group Project
Video RETURN FORM:
This form tells that whether the VCD that was issued by the customer has been returned
on the due date or not if not how much fine he has to pay for getting delayed.
44
System Analysis and Design Group Project
VCD/DVD DISCRIPTION FORM:
This tell the customer that the movie they are looking for in what category is it available
for (e.g in DVD or VCD)
45
System Analysis and Design Group Project
NEW CUSTOMER ID FORM:
46
System Analysis and Design Group Project
This is a plain form for a new customer to get enroll for the membership and start using
sun videos services.
Table:
47
System Analysis and Design Group Project
48
System Analysis and Design Group Project
This table shows the amount of customer that have been enrolled to use the services of
Sun Videos
49
System Analysis and Design Group Project
Bonus Table:
This table tells about how many customers have been enrolled in the bonus scheme
introduced by sun videos corporation.
50
System Analysis and Design Group Project
Rent a Video:
51
System Analysis and Design Group Project
This table shows that how man customer have taken the videos on rent.
Payment Mode
52
System Analysis and Design Group Project
This table shows that the fine that a particular customer has to pay when he extends his
return date and the video is over due
Reports
Customer:
53
System Analysis and Design Group Project
Video Rental:
Video Returned:
54
System Analysis and Design Group Project
This shows how many movies have been returned by the customer plus it is
also showing the fine that if a customer gets late how much does he has to pay
Gantt Chart
55
System Analysis and Design Group Project
This chart is made before starting the actual work. This helps us to plan each and every
thing and go about it according to time and days
Conclusion
56
System Analysis and Design Group Project
After putting hard effort on the designated proposal assigned by the Sun Videos
corporation it gives me and my group the honor that the making of the new system
was a complete success which in future will them to solve their problem, as new
hard ware and software are being installed in the system and it is user friendly nd is
easy for the management to understand .
REFERENCES
57
System Analysis and Design Group Project
Reference By Book:
Kendall.J,(1999), System Analysis and Design, 4th edition, Prentice Hall
International,
Cashman.T, (2001), System Analysis and Design, Course Technology.
APPENDIX
58
System Analysis and Design Group Project
TASK SHEET
Members Work Division
1. Bilal Mubashir Context diagram, level 0, level 1, Gantt
chart. economic feasibility, designing the
system
2. Mohsin Wahid Context diagram, level 0, level 1,
Feasibility
3. Usman Saleem Introduction, technical feasibility,
operational feasibility, schedule feasibility.
fact finding techniques, economic
feasibility, data dictionary.
4. Shoaib Mirza Technical feasibility, operational
feasibility, schedule feasibility.
59