final project financial

30
Budget Proposal CISD Heather Williams Johnathan Keener Jeffery Shields Michael Williams

Upload: heather-williams

Post on 12-Apr-2017

150 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Final Project Financial

Budget Proposal CISD

Heather Williams Johnathan Keener

Jeffery ShieldsMichael Williams

Page 2: Final Project Financial

School Information

13,500 students Pre-K through 12th grade All the buildings are in relatively good condition,

and not in disrepair. Budget being used for maintenance is an issue

that is significant and a priority in budget planning.

Page 3: Final Project Financial

Staff Information

2011-2012 Number of Staff (per previous slide): 60

2012-2013 Number of Staff: Projected at 51 25 classroom teachers = 22:1 ratio for 547

students (lower than average) 26 additional staff members

Page 4: Final Project Financial

Demographics

68 % Anglo19% Hispanic11% African American2% other

Page 5: Final Project Financial

Campus Demographics

71% Anglo18% African American9% Hispanic2% Other

Page 6: Final Project Financial

Test Scores

Higher than average testing scores as shown by the state exams.

Focus on encouraging these numbers with economic viability in mind.

CISD has a history of high achievement and a strong potential for student population growth.

Page 7: Final Project Financial

Schools

10 elementary schools, 3 middle schools, 2 high schools, one early childhood center and one alternative campus.

The district has maintained a consisteng rate of 2.5%-4% growth for the past 15 years.

Predictive increase of 10% but this has not happened yet.

Page 8: Final Project Financial

Campus Goals

To support our students in a wide variety of ways.

To support trades training. Encourage high ability student excellence. Reasonably fund these goals with an eye to

economic viability.

Page 9: Final Project Financial

Budget Plan Overview

Approach Line-Item Advantages; easily applied historically,

though it has less flexibility. Need to review potential need for new

expenditures as necessary.

Page 10: Final Project Financial

Ideal Budget Estimations

Reduction in cost to 100.00 dollars per student. Expanded in the future if necessary, seeking out

other grants or financial sources. Local funding taxes are also an option that

should be considered. School has history of bonds being passed over

the past 20 years to increase funding for schools

Page 11: Final Project Financial

Budget Goals

Use maintence funds for repair of schools not for increases in staff or salaries.

Seek out and prioritize bonds/taxes in locality to increase student funding.

Encourage teacher communication and parent discussion of budget setting goals.

Page 12: Final Project Financial

Needs Accessment

Using student evaluation methods which include standardized testing, and portfolio review our school has will have a set point to approach budget needs.

Compare quality and price with accessment results in mind.

Create online accessment that parents take to determine their priorities and questions.

Page 13: Final Project Financial

Needs Accessment

Using student evaluation methods which include standardized testing, and portfolio review our school has will have a set point to approach budget needs.

Compare quality and price with accessment results in mind.

Create online accessment that parents take to determine their priorities and questions.

Page 14: Final Project Financial

Parent Accessment

Questions1) From a scale of 1-5 how do you rate your

students campus? 2) From a scale of 1-5 how do you rate the

communication from your students school? 3) From a scale of 1-5 how do you rate the

updates you have received concerning school budget setting?

Page 15: Final Project Financial

Parent Accessment

4) From a scale of 1-5 how would you rate the trades training choices for your student?

5) From a scale of 1-5 how would you rate the opportunities for advanced classes that your student has received?

6) From a scale of 1-5 how would you rate the school districts website communication?

7) What suggestions would you have for us?

Page 16: Final Project Financial

Governmental Funds

Various governmental funds which we would apply to support our academic aims.

Application estimations are based on average numbers gathered per year, and shown in the Excel sheet associated with this presentation.

Focus would be on supporting trades training, high achievement students, and increasing maintenance funds use for that aim.

Page 17: Final Project Financial

Title I, Part A: Improving the Academic Achievement of the

DisadvantagedGrant one which our school will apply for. Title I is the largest source of federal

education funding, providing over $14 billion to schools with high numbers or percentages of children living in poverty. Schools may operate a targeted program, in which services are provided to children who are failing or at risk of failing. Schools operating a schoolwide program may provide services to all students.

Page 18: Final Project Financial

Title II, Part A: Improving Teaching Quality

Title II funds are intended to increase the number of high-quality, effective teachers and principals. Funds can be used for a variety of purposes, from recruiting and retaining teachers to reducing class sizes, or providing professional development.

Page 19: Final Project Financial

Technical Credit Grant Program (ATC)

The purpose of the 2013-2014 Advanced Technical Credit (ATC) grant program, also known as statewide articulation, is to support students interested in preparing for college and a technical career that requires postsecondary education. The program provides students with opportunities to earn college credit while in high school by taking enhanced high school Career and Technical Education (CTE) courses that have been aligned with postsecondary technical courses.

Page 20: Final Project Financial

Grants Opprotunities

Using Music To Teach MathFunding available: $3,000Application found at: www.nctm.org/Grants-and-

Awards/grants/Using-Music-to-Teach-Mathematics-Grants

Page 21: Final Project Financial

Grants Opprotunities

Pre-K-6 Classroom Research GrantsFunding available: $6,000Application found at: www.nctm.org/Grants-and-

Awards/grants/Pre-K-6-Classroom-Research-Grants

Page 22: Final Project Financial

Grants Opprotunities

NEA Student Achievement GrantFunding Available: $2,000 or $5,000Application found at:

www.neafoundation.org/pages/nea-student-achievement-grants

Page 23: Final Project Financial

Grants Opportunities

TEA Educator Excellence Innovation ProgramFunding Available: Minimum $50,000 per district;

Maximum $1,000,000 per districtESC Statewide School Support and Family

Community Engagement InitiativeFunding Available: $421,980/one school district in

the state

Page 24: Final Project Financial

Budget Setting

We are assumign receive a Improving the Academic Achievement of the Disadvantaged grant for 16,000,000 dollars, and have distributed funds based on projections from proposed past years.

This method needs consistent review if new needs arise, such as computers/technology, or student populations increase.

Page 25: Final Project Financial

Budget

Function 11 Instruction 1998-99 1999-2000 2000-2001 2001-20026269 Equipment Repairs $100.00 $- $- 6391 General Supplies $35,000.00 $26,000.00 $24,000.00 $20,000.00 6399 Paper, Masters, Fluid $12,000.00 $12,000.00 $13,000.00 $10,000.00 6411 Travel $1,500.00 $1,800.00 $2,000.00 $1,500.00 6419 Field Trips - School bus $500.00 $500.00 $500.00 $500.00 6631 Furniture $- $- $- 6639 Other Equipment $- $- $-

Total Function 11 $49,100.00 $40,300.00 $39,500.00 $32,000.00

Page 26: Final Project Financial

Budget

Function 11 Instruction 1998-99 1999-2000 2000-2001 2001-20026269 Equipment Repairs $100.00 $- $- 6391 General Supplies $35,000.00 $26,000.00 $24,000.00 $20,000.00 6399 Paper, Masters, Fluid $12,000.00 $12,000.00 $13,000.00 $10,000.00 6411 Travel $1,500.00 $1,800.00 $2,000.00 $1,500.00 6419 Field Trips - School bus $500.00 $500.00 $500.00 $500.00 6631 Furniture $- $- $- 6639 Other Equipment $- $- $-

Total Function 11 $49,100.00 $40,300.00 $39,500.00 $32,000.00

Page 27: Final Project Financial

Budget

Function 12 Instructional Computing6269 Equipment repairs $750.00 $500.00 $750.00 $500.00 6391 General Supplies $1,200.00 $1,500.00 $2,000.00 $1,500.00

Total Function 12 $1,950.00 $2,000.00 $2,750.00 $2,000.00

Function 22 Instructional Media Services6264 Audio-visual equipment $1,500.00 $1,500.00 $1,500.00 $2,000.00 6331 Books/Rebinding $750.00 $750.00 $750.00 $500.00 6333 Periodicals $2,000.00 $2,100.00 $2,250.00 $2,000.00 6391 General Supplies $2,000.00 $2,000.00 $2,000.00 $1,500.00 6635 Library books/films $12,000.00 $12,000.00 $12,000.00 $10,000.00

Total Function 22 $18,250.00 $18,350.00 $18,500.00 $16,000.00

Page 28: Final Project Financial

References

2014-2015 Advanced Technical Credit. (n.d). Retrieved May 5 2015 at http://burleson.tea.state.tx.us/GrantOpportunities/forms/GrantProgramSearch.aspx

Title II, Part A: Improving Teacher Quality. (n.d). Retrieved May 5 2015 at http://www.pearsonschool.com/index.cfm?locator=PS14Ga

Title I, Part A: Improving the Academic Achievement of the Disadvantaged. (n.d) Retrieved May 5 2015 at http://www.pearsonschool.com/index.cfm?locator=PSZuEd

Page 29: Final Project Financial

Checks and Balances

There will be an bi-annual review of financial reports to determine use standards of funds for maintance, versus salary/teacher.

There will be an annual audit by a CPA firm to confirm following of GAAP standards.

Page 30: Final Project Financial

Presentation

Presentation completed by: Heather Williams Johnathan KeenerJeffery ShieldsMichael Williams