Fifth Annual Conference on

Power Transmission in India

Smart Grid in Transmission – Road Ahead

April 30- May 1, 2012

By

N.S. SodhaExecutive Director

Load Despatch & Communication

Power Grid Corporation of India Limited

Page 2: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

INDIAN POWER SECTOR

Transmission Grid Comprises

• 765kV/400kV Lines - 1,22,730 ckt. Kms

• 220 kV Lines – 1,39,402 ckt. Kms

• ± 500 kV HVDC Lines – 9,432 ckt. Kms

*Data as on 29-02-12

Source : CEA Reports

Total installed

Generation

190593 MW

Thermal

124731 MWHydro

38848 MW

Renewable

22233 MW

Nuclear

4780 MW

Generation Mix

Growth of Installed Capacity from 1947 to 2020

Year 1947, 1.3

Year 2012, 190

Year 2020, 488

0

100

200

300

400

500

600

Year

Ca

pa

cit

y in

GW

Series1 1.3 190 488

Year 1947 Year 2012 Year 2020

Page 3: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

GROWTH OF INDIAN POWER SYSTEM

36874

26783

15043

28600

14400

57000

0

10000

20000

30000

40000

50000

60000

Central Sector State Sector Private Sector

XI Plan

XII Plan

Central Sector State Sector Private Sector Total

36874 MW (47%) 26783 MW (34%) 15043 MW (19%) 78700 MW (Rev. 62374)

54630 MW (Achieved)

28600 MW (28%) 14400 MW(15%) 57000 MW (57%) 100000 MW

XI

XII

*Data as on Feb‟ 2012

Page 4: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

DEVELOPMENT OF NATIONAL GRID

4

NEW Grid

South

Grid

South

West

North

East

Northeast

Five Regional Grids

Five Frequencies

October 1991

East and Northeast

synchronized

March 2003

West synchronized

With East & Northeast

August 2006

North synchronized

With Central Grid

Central Grid

Five Regional Grids

Two Frequencies

4

2240028000

70000

0

20000

40000

60000

80000

Present By 2011-12 By 2016-17

Growth of inter regional capacity

ONE

Grid

2013 Southern Grid shall

synchronize

With NEW Grid

Page 5: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

NR

WR

SR

ER

NER

Ennore

Kudankulam

Kayamkulam

Partabpur

Talcher/Ib Valley

Vindhyachal

Korba

MAJOR ENERGY RESOURCES IN INDIA

LEGEND

Coal

Hydro

Lignite

Coastal

Nuclear

Vizag

Simhadri

Kaiga

Tarapur

Mangalore

Krishnapatnam

RAPP

53,000MW

23,000MW

1,700MWSIKKIM

MY

AN

MM

AR

CHICKEN NECK

Cuddalore

SRI LANKACOLOMBO

NEPALBHUTAN

DESHBANGLA

South Madras

Pipavav

Generation Load-Centre

Kolkata

Bhubaneswar

Patna

Lucknow

Delhi

Mumbai

Chennai

Bangalore

Bhopal

Guwahati

Jammu

Ludhiana

Jaipur

Gandhinagar

Indore

Raipur

Thiruvananthapuram

Kozhikode

Hyderabad

* Hydro Potential : 1,10,000

> 25,000MW already installed

> 19,000MW under implementation

> 66,000MW still to be exploited

* 90% coal reserves in ER & WR

Traditional Energy Resource metrics

Page 6: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

ROURKELA

RAIPURHIRMA

TALCHER

JAIPUR

NER

ER

WR

NR

SR

B'SHARIF

ALLAHABAD

SIPAT

GAZUWAKA

JEYPORECHANDRAPUR

SINGRAULI

VINDHYA-

2000MW

2000MW

2500MW

1000MW

500MW

LUCKNOW

DIHANG

CHICKEN NECK

TEESTA

TIPAIMUKH

BADARPUR

MISA

DAMWE

KATHAL-GURI

LEGEND

765 KV LINES

400 KV LINES

HVDC B/B

HVDC BIPOLE

EXISTING/ X PLAN NATIONAL

ZERDA

HISSAR

BONGAIGAON

DEVELOPMENT OF NATIONAL GRID

KOLHAPUR

NARENDRA

KAIGA

PONDA

IX PLAN

MARIANI

NORTH

KAHALGAON

RANGANADI

SEONI

CHEGAON

BHANDARA

DEHGAM

KARAD

LONIKAND

VAPI

GANDHAR/

TALA

BANGLA

BALLABGARH A'PUR(DELHI RING)

BANGALORE

KOZHIKODE

COCHIN

KAYAMKULAM

TRIVANDRUM

PUGALUR

KAYATHAR

KARAIKUDI

CUDDALORE

SOUTH CHENNAI

KRISHNAPATNAM

CHITTOOR

VIJAYAWADA

SINGARPET

PIPAVAV

LIMBDI

KISHENPUR

DULHASTI

WAGOORA

MOGA

URI

BHUTAN

RAMAGUNDAM

SATLUJRAVI

JULLANDHAR

DESH

VARANASI/UNNAO

M'BAD

PURNEA

KORBA

NAGDA

SILIGURI/BIRPARA

LAK

SH

AD

WE

EP

TEHRI

MEERUT

BHIWADI

BINA

SATNA

MALANPURSHIROHI

KAWAS

AMRAVATI

AKOLA

AGRA

SIRSI

CHAL

JETPURAMRELI

BOISARTARAPUR

PADGHE

DHABOL

KOYNA

BARH

G'PUR

HOSURMYSORE

KUDANKULAM

M'PUR

KARANPURA

MAITHON

JAMSHEDPUR

PARLI

WARDA

BEARILLY

SALEM GRID

XI PLAN

765 KV LINES IN X PLAN. TO BE CHARGED AT 400KV INITIALLY

TO BE CHARGED AT 765 KV UNDER NATIONAL GRID

765 KV RING MAIN SYSTEM

THE POWER

„HIGHWAY‟

HYDRO POWER FROM THE

NORTH-EAST AND PIT HEAD

THERMAL POWER FROM THE

EAST ENTERS THE RING AND

EXITS TO LOAD CENTER

Page 7: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

POWER SECTOR ENVIRONMENT CHANGE

ENABLERS

•Legislation

•Indian Electricity Act 2003

•National Electricity Policy

•Regulation

•IEGC Feb 2000

•ABT Jan 2000

•Open Access May 2004

•Power Exchange Aug 2007

•Execution

•CTU/STU, RLDC/SLDC

•Grid & Market Operation

•Control Centres & SEMs

•ABT settlement: in stages 2002-03

STRUCTURE

•Balancing Mechanism

•Frequency linked Unscheduled

Interchange

•Intra-day STOA

•Day-ahead PX

•Short-term Bilateral

•Day-ahead

•First-come-first served

•Three-month ahead

•Long-term Bilateral

• Shared resources (ISGS)

• Own resources

Page 8: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

RENEWABLE POWER- TARGET

Source Target

for

2010-11

Total

achievement

during

2010-11

Cumulative

achievement

up to

31.03.2011

Target

2012

Target

2017

A. GRID-INTERACTIVE POWER (CAPACITIES IN MW)

Wind power 2,000 2,350 14,157 16100 27300

Small Hydro

(upto 25

MW)

300 307 3,043 3,400 5000

Bio Power * 472 473 2,737 3000 5100

Solar energy 200 27 38 200 4,000

Total 2,972 3,157 19,975 22,700 41,400

B. OFF-GRID/ CAPTIVE POWER (CAPACITIES IN MWEQ)

# 142 120 518 - -

Source : Ministry of New and Renewable Energy Data upto 31.03.2011

* Includes bio mass power, bagasse cogeneration, urban & Industrial waste to energy

# Includes waste to energy, Biomass (non-bagasse) Cogeneration, Biomass

Gasifiers, Aero-Genrators/Hybrid systems, SPV Systems (>1kW) and Water

mills/micro hydel

Page 9: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Issues in Grid Integration of Renewable

• At system Level: Variability of Renewable Power

High Cost of Integration : Commercial Complexity

• At Generator’s interface to Grid: Overloading due to Reverse Energy Flow

Power Quality (Harmonics, Flicker, DC Injection)

Scheduling and Predictability

Unintentional Islanding

Rules and Standards are the need of hour for

successful Integration of Renewable

Page 10: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Map showing the

solar radiation across India

India: 5th Largest Wind Power

Producer

Total Renewable Energy Sources ~ 20 GW

Wind Installed Capacity ~ 13 GW

Estimated Wind Potential ~ 49 GW

Page 11: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

NLDC:

Ensure integrated operation of

National Grid

RLDC:

Ensure integrated operation of

Regional Grid

SLDC:

Ensure integrated operation of State

Grid31

5

Power System Hierarchy

Page 12: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Plant/Sub

Station Level

Group of

Distt. Level

State HQ

Level

Region

Level

National

Level

RTU RTU RTU

SUB LDC SUB LDC SUB LDC

SLDC SLDC SLDC

ERLDC WRLDC NRLDC SRLDC NERLDC

20

15

1

25

NLDCNLDC

12

-15

se

c

s

RTU RTU

SKEWIn sec

30

Data Flow Latency in the present system

Page 13: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

More dynamic Controls are required in view of more Energy exchanges across the regions

Cluster of

Generation

pockets will

be spread

across

regions in

the Country

As the Energy Source metrics change from the traditional to a mix of Renewable and Conventional, the Power flow is no more unidirectional & predictable across UHV.

Page 14: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

SMART GRID

Need For SMARTER GRID To Meet

Exponential growth of Power System

Haulage of power over long distances

Open Access : Freedom and Choice

Reliability : Adequacy and Security

Lack of tools for monitoring Dynamic behavior

Integration of Large Power Systems : Southern Grid

Integration of Renewable Energy Sources (RES)

Page 15: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

ISSUES & CHALLENGES IN SYSTEM

OPERATION

Static view of system

Latency and Time skew in Data

Integration of upcoming Wind and

Solar Generations.

Integration of upcoming IPPs and

MPPs

Integration of Dispersed

Generation

Necessitates installation of Intelligent Electronic Devices, Phasor

measurement units (PMU) and Wide area Monitoring systems

(WAMS) to enhance system operation capabilities and

visualization of Unified National Grid.

Page 16: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Source: Report on Smart Grid Interoperability Standards

Roadmap (NIST)

Smart Transmission Grid

Page 17: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Smart Grid in Transmission

Use of Flexible AC Transmission system like Series

Compensation, TCSC, SVC etc. for increase in power

transfer capacity & maintaining critical grid parameters

Phasor Measurement Units (PMUs) for Protection & Control

Adaptive Islanding, Self Healing

HVDC Transmission

Substation Automation

Use of High temperature endurance conductor such as

INVAR

More MW per meter of RoW

Gas Insulated S/s (GIS) for optimization of S/s space in

urban areas

17

Page 18: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

OPERATIONAL EXCELLENCE -

UPCOMING INTIATIVES

National Transmission Asset Management Centre(NTAMC)

Remote Operation and control of Transmission Elements / unmanned substations

To enhance Grid reliability while improving Asset Productivity

Reduction in down time

Availability of Experts round the clock

Consolidation of Real-time as well as maintenance data

Page 19: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Centralised Operation of all POWERGRID Substations including auxiliaries leading to unmanned substation

Centralised acquisition of Disturbance recorders and Event logs from Substations at Control center

Remote management of relays

Visual monitoring of all the assets through CCTV system

Centralised Access Control to Substations

Automated Fault Analysis (Relay operation evaluation, Fault summary, CT/CVT monitoring)

OPERATIONAL EXCELLENCE - UPCOMINGINTIATIVES

Page 20: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

20

• National Control CenterNTAMC• Asset Monitoring and

Control

• Regional Control Centers

RTAMCs• One for each Region (9)

• Managing Maintenance and emergency operations

• Disaster Recovery CentreBack-up NTAMC

SOUTHERN WESTERN NORTHERN EASTERN NORTH EASTERN

NATIONAL TRANSMISSION ASSET MANAGEMENT CENTRE

SR -I SR-II WR-I WR-II NR-I NR-II ER-I ER-II NER

WRI

Sub Station Maintenance

Service Hub

NRII

O AM O AM O AM O AMO AM

REGIONAL TRANSMISSION ASSET MANAGEMENT CENTRES

OPERATIONAL EXCELLENCE -UPCOMING

INTATIVES

Page 21: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

21

OPERATIONAL EXCELLENCE- UPCOMING INITIATIVE

NTAMCMajor Systems

SCADA/EMS system

Remote Accessibility System

• Automated disturbance record retrieval

• Centralized management of Relays

Automated Fault Analysis System

Visual Monitoring System

• CCTV system and Access control

VoIP connectivity to all Substations

MPLS communication network

Page 22: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Smart Grid In System Operation

Fault Current Limiting

Wide Area Monitoring (WAM), Visualization &

Control

Dynamic Capability Rating

Flow Control

Adaptive Protection

Automated Feeder Switching

Automated Islanding and Reconnection

Automated Voltage and VAR Control

Diagnosis and Notification of Equipment Condition

Enhanced Fault Protection

Page 23: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Elements of WAMS (Wide Area

Measurement System)

• Phasor Measurement Unit (PMU)

• Phasor Data Concentrator (PDC)

• Communication Network

• Analytical Software

Page 24: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Phasor Measurement Unit (PMU)

• PMU is a device capable of measuring time synchronized voltage and current phasor in a power system with sampling rate of 10,25,50 samples per second at 50 Hz

• Synchronized through Global Positioning System (GPS) technology

Page 25: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

WAM Architecture

Page 26: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

PMU Pilot Project in Northern

Region

Page 27: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Experience & Benefits : Northern Region PMU

Pilot Project

• Installed 8 PMUs at various

important stations and PDC at

NRLDC

• Availability of data of every 40ms

• Frequency oscillations for 1sec are

observed after loss of one

generation side

• Increased visibility of Power

System

• Data archiving for post mortem

analysis

• Oscillation Monitoring & Bad Data

Detection

Snapshots of PMU Data

Page 28: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

PHASOR vs SCADA Data

• Phasor data

• Refresh rate 25 samples per

second

• All data points time tagged and

easy to “line up” for input to

state estimator, operator display

or planning study

• Compatible with modern

communication technology

• Enables action in response to

system dynamics

• Prelude to automatic switching

schemes

• SCADA data

• Refresh rate 2-5 seconds

• Some data points are newer than

others – no way to tell the difference.

This leads to state estimator

inaccuracy and uncertainty about what

is “real”.

• Relies on legacy communication

technology, i.e. does not take

advantage of newer comm. networks

• Enables action in response to system

statics

Page 29: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

SCADA Vs PMU / X-Ray Vs MRI

SCADA ASIA SUMMIT 2010 -

Paradigm Shift in Power System

SCADA 29

Page 30: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Smart Grid : Milestones

POWERGRID has appointed a Panel of Experts to

advise upon WAMS Implementation in Indian Power

System.

PMU installation as Pilot project for each region in

the country underway

Northern Region (9 PMUs) - Already installed

Northern Region phase 2 – (14 PMUs)

Southern Region (6 PMUs)

North Eastern Region (6 PMU)

Western Region (6 PMUs)

Eastern Region (8 PMUs)

Page 31: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Requirements for Smart Grid

• Availability of excellent Communication System

• Substation Automation system

• Asset Management System for Transmission

and Substation equipments

• Synergisation of activities among various

Stakeholders

Page 32: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Unified Real Time Dynamic

State Measurement

Project (URTDSM)

Page 33: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Need for Unified Real Time Dynamic

State Measurement (URTDSM) Project

• The phase angle measurement is a valuable information & not possible with Existing system

• Based upon the phase angle measurements from both the ends of the line enhanced utilization of Transmission lines closer to thermal loading of line can be achieved.

• Sustained or growing oscillations require prompt operators‟ attention, PMU measurement can detect them in real time and alert the operators for prompt action.

• The Synchrophasor measurements can be used to determine the change required in generation or load to synchronize the two isolated system, this being more accurate data facilitates faster restoration.

• Facilitate Renewable integration : Connection/disconnection of Intermittent Energy Sources

• Feedback of Pilot Projects for Post mortem Analysis

Page 34: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Unified Real Time Dynamic State Measurement

Project (URTDSM)

• URTDSM envisages a WAMS (Wide Area Measurement

Systems) using Phasor measurement units (PMUs) at National

level

• PMU Placement

• Installation of PMUs on substations of 400kV and above in the State &

Central Grids

• Installation of PMUs on Generating Stations of 220kV level and above

• HVDC terminals

• Important Regional & National connection points

Page 35: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Phasor Data Concentrator (PDC)

• All the electrical parameters measured by the number of

PMUs are collected in a Phasor Data Concentrator (PDC)

either locally or remotely

• In a hierarchal set up, the PDCs used to collect the data

from number of down stream PDCs. They can be

differentiated as:

•Nodal Phasor Data Concentrator (NPDC)

•Master Phasor Data Concentrator (MPDC)

• Super Phasor Data Concentrator (SPDC)

Page 36: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Nodal Phasor Data Concentrator (NPDC)

• Nodal PDC shall be located at strategic location in Central & State Sector to pool data of PMU installed in various sub-station of that area.

• Approx. for 50-60 PMUs, One Nodal PDC is Planned.

• Nodal PDC is equipped with Historian for data storage.

State Stations

Nodal PDC at Sub-StationNodal PDC at Sub-Station

Router & Switch

Sub Stn A

PMU

1PMU

n

Router & Switch

Sub Stn B

PMU

1PMU

n

State Stations

Router & Switch

Sub Stn C

Central Stations

PMU

1PMU

n

Page 37: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Nodal Phasor Data Concentrator (NPDC)

The use of NPDC results in:

• Unified interface between PDC at RLDC (named as

Master PDC) and Substation.

• Bandwidth requirement reduction

• Local Data Storage

• Ability to retrieve missed data due to Network disruption

or congestion

• PMU Configuration Management

• Increase in latency

Page 38: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Master Phasor Data Concentrator (MPDC)

• Master PDC will collect & correlate the required data from

PMUs and Nodal PDCs under its area of operation.

• The Master PDC shall be located at the SLDC Control

Centre.

• All Master PDC shall be equipped with Historian for data

storage, have analytical tool & visualization software

package.

• Master PDCs will also be connected to central database for

long term archiving of collected data for any analysis.

Page 39: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Architecture of Master PDC

CommunicationMedia

FieldDevices

MPDC / SPDC Printer

GPS

Frequency Display

Day-Time Display

Historian

PMUs / Nodal PDC

Router

MPDC / SPDC LAN

SLDC ControlCenter

Router cum

FirewallWorkstation

Page 40: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Super Phasor Data Concentrator (SPDC)

• Super PDCs will collect data from PMUs at ISTS stations

& ISGS as well as from Master PDCs.

• Super PDC shall be placed at each RLDC.

• Super PDC shall be equipped with Historian for data

storage, have analytical tool & visualization software

package.

Page 41: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Hierarchy of Unified Real Time Dynamic Measurement System (URTDSM)

Super PDC

at RLDCs

Back up NLDC NLDC

Master PDC at SLDCs

Remote console at

At UT(3) & NER

States (4), Sikkim,

NTAMC(2),CEA

Remote Console

at RPCs

State Stations

PMU

1

PMU

n

Router & Switch

Sub Stn B

PMU

1

PMU

n

Router & Switch

Sub StnC

Nodal PDC at Sub-Station

Sub Stn A

PMU

1

PMU

n

Router & Switch

Nodal PDC at Sub-Station

Central Stations

Router & SwitchRouter & Switch

PMU

1

Router & Switch

PMU

n

PMU

1

Router & Switch

PMU

n

PMU

1

Router & Switch

Sub Stn B

PMU

n

PMU

1

Router & Switch

Page 42: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Proposed URTDSM in Indian Power

System.

Region Sub-stations

No of Feeders

No. of PMUs No. of Nodal PDC

No. of MPDC

No. of SPDC

ISTS STU ISTS STU ISTS STU

NR 83 96 434 435 227 231 6 9 1

WR 60 76 520 415 267 216 11 4 1

ER 51 44 395 199 202 105 4 5 1

SR 60 71 348 289 183 152 6 4 1

NER 18 22 95 69 50 36 0 3 1

Sub Total 272 309 1792 1407 929 740 27 25 5

Total 581 3199 1669 57

Page 43: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Methodology of Implementation

• Proposed URSTDM Project may be implemented in two phases:

• Phase 1:

• Placement of 1186 nos. PMUs at all lines in HVDC terminal stations,

400kV & above voltage level S/s, generating station stepped up at

220kV level & above, where FO cable along with communication

equipment is either existing or being implemented by 2014-2015.

• Placement of Nodal PDC (27 Nos), Master PDC (25 Nos), Super PDC

(5) at RLDCs, 2 Nos PDC at main & backup NLDC

• Remote console at each RPC (5), UT (3), Sikkim, NTMC (2), CEA (1), &

NER States (4), Total (16).

• Phase 2:

• Placement of balance 483 nos PMUs along with provision of Fibre

Optic connectivity & communication equipments.

Page 44: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Analytical Functions development using PMU data in URTDSM

Phase-I

• Vulnerability test on relay characteristics

• Instrument transformer measurement validation

• Dynamic state Measurement

• Supervised Zone 3 Blocking

• Network model validation.

• Schemes for controlling angular instability

• Emergency Control Schemes for controlling frequency & voltage

instability

• Improved transmission corridor capability

Page 45: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Phase –II : Development of Analytical

Functions

• Adaptive islanding

• Network transient stability model validation

• Load shedding and other load control techniques

Capacity Building is also taken up to match NEW Technology

Page 46: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Communication System for Smart Grid

• Existing Telecom Network of

Fibre Optic – Approx. 28000 Kms

• Fibre Optics establishment - Approx. 38000 Kms

in process

• Total Fibre network - Approx 66000 Kms

Page 47: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

Challenges Ahead……

• We are moving from a regime of 10-12 seconds

latency to that of milliseconds with Smart Grid.

• In future more and more integration of

Renewable Energy with Conventional Energy

takes place across the Nation, which will

emphasize the need of dynamic control and

visibility of the Power System.

• All stakeholders to synergize for overall growth

& development in Indian Power Sector

• Capacity Building is a Major Challenge.

Page 48: Fifth Annual Conference on Power Transmission in India ... · PDF file220 kv lines –1,39,402 ckt. kms ... mariani north kahalgaon ranganadi seoni ... to be charged at 765 kv under

N S SodhaED LD&C

[email protected] - 09717890988

ONE NATION - ONE GRIDPOWERGRID