AP/asb 07.07.2005 FIDIC Green Book Std. (3) 1 TURKS & CAICOS ISLANDS NATIONAL INSURANCE BOARD SHORT FORM OF CONTRACT FOR CONSTRUCTION DATE: 2013 CONTRACTOR: WORKS: RENOVATION AND REFURBISHMENT OF THE HON. L. HEADLEY DURHAM BUILDING, GRAND TURK. CONTRACT No. TENDER REFERENCE No.: NATIONAL INSURANCE BOARD WATERLOO PLAZA, WATERLOO ROAD GRAND TURK TURKS AND CAICOS ISLANDS BRITISH WEST INDIES

Upload: mahandhika-putra

Post on 15-Sep-2015

2.414 views

Category:

Documents


282 download

DESCRIPTION

Green Book Template Explained

TRANSCRIPT

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 1

    TURKS & CAICOS ISLANDS NATIONAL INSURANCE BOARD

    SHORT FORM OF CONTRACT FOR CONSTRUCTION

    DATE: 2013

    CONTRACTOR:

    WORKS: RENOVATION AND REFURBISHMENT OF THE HON. L.

    HEADLEY DURHAM BUILDING, GRAND TURK.

    CONTRACT No.

    TENDER REFERENCE No.:

    NATIONAL INSURANCE BOARD

    WATERLOO PLAZA, WATERLOO ROAD

    GRAND TURK

    TURKS AND CAICOS ISLANDS

    BRITISH WEST INDIES

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 2

    CONTENTS

    Page

    Agreement 3

    Offer 3

    Acceptance 4

    Appendix 5

    Particular Conditions 9

    Performance Security 14

    Advance Payment Guarantee 20

    Attestation Clauses of Short Form of Contract for Construction 22

    Certificate of Non-Collusion 23

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 3

    TURKS AND CAICOS ISLANDS NATIONAL INSURANCE BOARD

    SHORT FORM OF CONTRACT FOR CONSTRUCTION

    AGREEMENT

    The Employer is THE TURKS AND CAICOS ISLANDS NATIONAL

    INSURANCE BOARD of Waterloo Plaza, Waterloo Road, Grand Turk, Turks and

    Caicos Islands, British West Indies.

    The Contractor is of , Turks and

    Caicos Islands, British West Indies.

    The Employer desires the execution of certain Works known as RENOVATION AND

    REFURBISHMENT OF THE HON L. HEADLEY DURHAM BUILDING,

    GRAND TURK

    OFFER

    The Contractor has examined the documents listed in the Appendix which forms part of

    this Agreement, and offers to execute the Works in conformity with the Contract for the

    sum of (US$ ), or such

    other sum as may be ascertained under the Contract.

    This offer, of which the Contractor has submitted 3 (three) signed originals, may be

    accepted by the Employer by signing and returning one original of this document to the

    Contractor before 2013.

    The Contractor understands that the Employer is not bound to accept the lowest or any

    offer received for the Works.

    That the Contractor understands and agrees that their name, the Island on which the work

    is to be carried out, the project details, the start and completion date of the project and the

    contract amount will appear in the Gazette in accordance with the Tendering process for

    this project.

    The Contractor warrants that it has paid up to date all National Insurance Board

    Contributions. The Contractor understands and agrees that failure to pay the

    aforementioned will result in the payments for works done being withheld until

    proof of payment is supplied to the Director of National Insurance Board or the

    outstanding amount being deducted by the Board from any sum due to the

    Contractor or can alternatively result in the termination of the Agreement.

    Signature: Name: Date: ____________

    Authorised to sign on behalf of: Capacity:

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 4

    ACCEPTANCE

    The Employer has, by signing below, accepted the Contractors offer and agrees that in consideration of the execution of the Works by the Contractor, the Employer shall pay

    the Contractor in accordance with the Contract. This Agreement comes into effect on the

    date when the Contractor receives one original of this document signed by the Employer.

    Signature: Date: 2013

    Name: Lillian Misick Authorised to sign on behalf of:

    Capacity: NIB Chairman THE TURKS AND CAICOS ISLANDS

    NATIONAL INSURANCE BOARD

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 5

    APPENDIX

    This Appendix forms part of the Agreement.

    [NOTE: with the exception of the items for which the Employers requirements have been inserted, the Contractor shall complete the following information before submitting

    his offer.]

    Item Sub-Clause Data

    Documents forming

    the Contract listed in

    the order of priority

    (all of which are either

    annexed or have been

    signed in triplicate for

    identification purposes

    on behalf of the parties): 1.1.1

    Document (delete if not applicable) Document Identification

    (a) The Agreement Annexed.

    (b) Particular Conditions Annexed.

    (c) General Conditions The General Conditions of

    the Fdration

    Internationale des

    Ingnieurs- Conseils

    (FIDIC) Short Form of Contract, First Edition 1999

    ISBN 2-88432-024-5.

    (d) Specifications Schedule 1

    (e) The Bill of Quantities Schedule 2

    (f) Drawings Schedule 3

    Time for Completion 1.1.9 To be agreed

    Law of the Contract 1.4 Law of the Country.

    Language 1.5 English.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 6

    Provision of Site 2.1 On the Commencement

    Date.

    Authorised person 3.1 Colin Heartwell

    Name and address of 3.2 BCQS Limited

    Employers representative

    Performance security (if any):

    Amount 4.4 10% (Ten per cent.) of

    the Accepted Contract

    Amount, in the currencies

    and proportions in which

    the Contract Price is

    payable.

    Form 4.4 Annexed.*

    Contractors ultimate parent 4.4 N/A company (if any)

    Requirements for Contractors 5.1 Specification Clause design (if any) Nos:

    Programme:

    Time for submission 7.2 Within 2 (two) days* of

    the Commencement Date.

    Form of programme 7.2 MS Project

    Amount payable due to failure to 7.4 US $500.00 (five hundred

    complete the works within the United States dollars) per

    specified contract period. day up to a maximum of

    10% (ten per cent.)* of

    the sum stated in the

    Agreement.

    Period for notifying defects 9.1 & 11.5 365 (Three Hundred and

    Sixty Five) days *

    calculated from the date

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 7

    stated in the notice under

    Sub-Clause 8.2.

    Variation procedure:

    Daywork rates 10.2

    Valuation of the Works:

    Lump sum Price 11.1

    Lump sum price with 11.1

    schedules of rates

    Lump sum price with bill of

    quantitities 11.1

    Re-measurement with tender bill

    of quantities 11.1 Applicable

    Cost reimbursable 11.1

    Total advance payment 11.1A 20% (Twenty per cent.)

    of the Accepted Contract

    Amount.

    Advance Payment guarantee 11.1A Required

    Number and timing of installments 11.1A 1 (One)

    Repayment amortization of 11.1A On a pro-rata basis as the

    Advance payment works proceed, with full

    repayment being no later

    than the date of Notice of

    Taking Over

    Percentage of value 11.2 Materials: 80%

    of Materials and Plant Plant: NA

    Percentage of retention 11.3 5% (five Per cent)

    Currency of payment 11.7 United States dollars.

    Rate of interest 11.8 3% (Three per cent.) per

    annum

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 8

    Insurances: 14.1 To be supplied by

    Contractor

    (a) evidence of insurance

    14.1

    7 (Seven) days after

    receiving the signed

    contract.

    (b) relevant policies 14.1 7 (Seven) days after

    receiving the signed

    contract.

    Type of cover* Amount of cover* Exclusions*

    The Works, Materials, Plant The sum stated in the

    and fees Agreement plus 15%

    (fifteen per cent.).

    Contractors Equipment N/A.

    Third Party injury to persons US $1,000,000.00

    and damage to property (One Million United States dollars).

    Workers US $1,000,000.00

    (One Million United States dollars).

    Other cover*

    Arbitration:

    Rules 15.3 UNCITRAL

    Arbitration Rules as in

    force on the

    Commencement Date.

    Appointing authority 15.3 President of FIDIC or his

    nominee.

    Place of Arbitration 15.3 Grand Turk.

    * Employer to amend as appropriate.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 9

    PARTICULAR CONDITIONS

    Sub Clause 1.1 Definitions

    Sub Clause 1.1.4 shall be deleted, and the following substituted:

    1.1.4 Employer means the person named in the Agreement and the legal

    successors in title to this person, and his permitted assignees.

    Sub Clause 1.7 Confidentiality

    Add the following Sub Clause 1.7 after Sub Clause 1.6:

    The Contractor shall treat the details of the Contract as private and confidential, except

    to the extent necessary to carry out obligations under it or to comply with applicable

    laws. The Contractor shall not publish, permit to be published, or disclose any particulars

    of the Works in any trade or technical paper or elsewhere without the previous agreement

    of the Employer.

    Sub Clause 2.5 Assignment

    Add the following Sub Clause 2.5 after Sub Clause 2.4:

    The Employer may, without the consent of the Contractor, assign the benefit of the

    Contract after either the expiry of the period stated in the Appendix, or the remedying of

    notified defects, or the completion of outstanding work, all as referred to in Sub Clause

    9.1, whichever is the later, or the termination of the Contract.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 10

    Sub Clause 4.4 Performance Security

    Sub Clause 4.4 shall be deleted, and the following substituted:

    If stated in the Appendix, the Contractor shall deliver to the Employer within 14

    (fourteen) days of the Commencement Date a performance security in a form and from a

    third party approved by the Employer, and a parent company guarantee from the

    Contractors ultimate parent company (if any) identified in the Appendix. In return for a

    suitable abatement in price, the Employer may in his sole discretion accept a parent

    company guarantee alone. The forms of performance security and parent company

    guarantee annexed shall be used, with such modifications as may be necessary properly

    to bind the guarantors and benefit the Employer.

    Sub Clause 7.4 Late Completion

    Sub Clause 7.4 shall be deleted, and the following substituted:

    If the Contractor fails to complete the Works within the Time for Completion, the

    Contractors only liability to the Employer for such failure shall be to pay the amount

    stated in the Appendix for each day for which he fails to complete the Works, but if the

    maximum of such amount (if any) stated in the Appendix is reached, the Employer may

    by notice terminate the Contract immediately. The Contractor shall then demobilize from

    the Site, leaving behind Materials and Plant and any Contractors Equipment which the

    Employer instructs in the notice is to be used until the completion of the Works.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 11

    Sub Clause 11.1A Advance Payment

    Add the following Sub Clause 11.1A after Sub Clause 11.1:

    The Employer shall make an advance payment, as an interest-free loan for mobilization.

    If the Appendix states that an advance payment guarantee is required, the Employer shall

    not be required to make any advance payment until the Contractor submits such a

    guarantee in accordance with this Sub-Clause. The total advance payment, the number

    and timing of instalments (if more than one), and the applicable currencies and

    proportions, shall be as stated in the Appendix.

    Unless and until the Employer receives the advance payment guarantee (if required), or if

    the total advance payment is not stated in the Appendix, this Sub-Clause shall not apply.

    The Employer shall pay the Contractor the first instalment of the advance payment within

    21 (twenty-one) days after receiving a statement in respect thereof (which the Contractor

    shall be entitled to submit under Sub-Clause 11.2) and after the Employer receives (i) the

    performance security and parent company guarantee in accordance with Sub-Clause 4.4

    and (ii) a guarantee (if required) in amounts and currencies equal to the advance payment.

    This guarantee shall be issued by an entity and from within a country (or other

    jurisdiction) approved by the Employer, and shall be in the form annexed, with such

    modifications as may be necessary properly to bind the guarantor and benefit the

    Employer, or in another form approved by the Employer.

    The Contractor shall ensure that the guarantee is valid and enforceable until the advance

    payment has been repaid, but its amount may be progressively reduced by the amount

    repaid by the Contractor. If the terms of the guarantee specify its expiry date, and the

    advance payment has not been repaid by the date 28 (twenty-eight) days prior to the

    expiry date, the Contractor shall extend the validity of the guarantee until the advance

    payment has been repaid.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 12

    The advance payment shall be repaid through percentage deductions from all gross

    payments due to the Contractor, at the percentage stated in the Appendix. If the advance

    payment has not been repaid prior to the issue by the Employer of a notice under Sub-

    Clause 8.2 or prior to termination under Sub-Clause 12.1 and 12.2 or 12.3 or 13.2 (as the

    case may be), the whole of the balance then outstanding shall immediately become due

    and payable by the Contractor to the Employer.

    Payments to the Contractor under Sub-Clauses 11.3, 11.4, 11.5, 11.6 and 11.7 shall be

    subject to this Sub Clause.

    Sub Clause 11.3 Interim Payments

    The second paragraph of Sub-Clause 11.3 shall be deleted, and the following substituted:

    The Employer may withhold interim payments until he receives the performance

    security and parent company guarantee under Sub-Clause 4.4 (if any).

    Sub - Clause 11.9 Taxes and Duties

    Add the following Sub Clause 11.9 after Sub Clause 11.8:

    No Turks and Caicos Islands Government taxes or duties (except Turks and Caicos

    Islands Government National Insurance contributions properly payable) are payable on

    works undertaken on behalf of the Turks and Caicos Islands Government.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 13

    Sub Clause 12.1 Default by Contractor

    Add the following new first paragraph to Sub-Clause 12.1:

    If the Contractor has given (before or after the award of the Contract), or gives, or offers

    to give (directly or indirectly) to any person any bribe, gift, gratuity, commission or other

    thing of value, as an inducement or reward:

    (i) for doing or forbearing to do any action in relation to the Contract and/or its award, or

    (ii) for showing or forbearing to show favour or disfavour to any person in relation to the Contract and/or its award,

    or if any of the Contractors employees, agents or subcontractors has given (before or

    after the award of the Contract), or gives, or offers to give (directly or indirectly) to any

    person any such inducement or reward (however, lawful inducements and rewards to

    Contractors employees shall not entitle termination); or has misrepresented facts, or has

    used collusive practices, in order to influence the award of the Contract; then the

    Employer may by notice terminate the Contract immediately: and shall be entitled (in

    addition to any other rights of the Employer under the Contract or otherwise) to recover

    from the Contractor the amount or value of any such inducement or reward (if any).

    Upon the service of such notice, the Contractor shall demobilise from the Site, leaving

    behind Materials and Plant and any Contractors Equipment which the Employer

    instructs in the notice is to be used until the completion of the Works.

    At the beginning of the second (formerly first) paragraph of Sub-Clause 12.1, the word

    If shall be deleted, and the words Further, if substituted:

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 14

    Sub Clause 12.4 Payment upon Termination

    Sub Clause 12.4 (c) shall be deleted, and the following substituted:

    (c) if the Employer has terminated under Sub Clause 7.4 or 12.1 or 12.3, the

    Employer shall be entitled to a sum equivalent to 20% (twenty per cent.) of the

    value of those parts of the Works not executed at the date of the termination,

    Sub Clause 15.1 Adjudication

    Add at the end of Sub Clause 15.1:

    Any Adjudicators Agreement shall provide:

    (a) that the Agreement shall be governed by the law of the Turks and Caicos Islands,

    and that all disputes which may arise under, out of, or in connection with, or in

    relation to, the Agreement shall be submitted to the jurisdiction of the courts of

    the Turks and Caicos Islands; and

    (b) that the language of the Agreement shall be English.

    Sub Clause 15.3 Arbitration

    Add at the end of Sub Clause 15.3:

    Subject to this Clause 15, all disputes shall be submitted to the jurisdiction of the courts

    of the Turks and Caicos Islands.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 15

    PERFORMANCE SECURITY

    THIS GUARANTEE is made on the day of

    Two thousand and

    BETWEEN:

    (1)

    whose registered office is at

    (the Guarantor); and

    (2) THE TURKS & CAICOS NATIONAL INSURANCE BOARD of Waterloo Road,

    Grand Turk, Turks and Caicos Islands, British West Indies

    (the Employer, which term shall include its successors and assignees).

    WHEREAS by an Agreement (the Contract) dated 20

    and made between the Employer of the one part and

    (the Contractor) of the other part, the Contractor undertook the execution of certain works

    (the Works) in accordance with the terms and conditions of the Contract.

    IT IS AGREED as follows:-

    1 The Guarantor hereby absolutely irrevocably and unconditionally guarantees to the

    Employer the due and punctual performance by the Contractor of all the obligations

    on the part of the Contractor under or pursuant to the Contract (the Terms) and (as

    a separate stipulation and as primary obligor) agrees that if the Contractor shall in any

    respect commit any breach of or fail to fulfil any of the Terms, then the Guarantor

    will forthwith perform and fulfil in place of the Contractor each and every Term in

    respect of which the Contractor has defaulted or which is unfulfilled by the

    Contractor. The Guarantor shall be liable to the Employer for all losses, damages,

    expenses, liabilities, claims, costs or proceedings which the Employer may suffer or

    incur by reason of the said failure or breach. Provided:

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 16

    1.1 that the total liability of the Guarantor shall not exceed US$

    ( United States dollars);

    1.2 that upon the taking - over of the Works by the Employer in accordance with

    Sub Clause 8.2 of the Contract, the total liability of the Guarantor stated

    above shall reduce by 50% (fifty per cent.)*; and

    1.3 that any claim hereunder must be received by the Guarantor on or before the

    payment by the Employer to the Contractor of the second half of the retention

    in accordance with Sub Clause 11.5 of the Contract, when this Agreement

    shall expire.*

    2 The Guarantor shall be, and continue to be, liable under this Agreement even if the

    Contract is or becomes not binding on, or unenforceable against, the Contractor, for

    any reason whatever. No alterations in the Contract, or in the Works, and no

    extension of time, forbearance or forgiveness, nor any act, matter or thing whatsoever

    except an express release by the Employer, shall in any way release or reduce any

    liability of the Guarantor hereunder. References to the Contract in this Agreement

    shall include all amendments, variations and additions to it, whether made before or

    after the date hereof.

    3 This guarantee shall remain in full force and effect until performance in full of the

    Terms, notwithstanding:

    3.1 the insolvency or liquidation of the Contractor, the Guarantor or any other

    person;

    3.2 any disclaimer of the Contract by a liquidator of the Contractor; and/or any

    feature of the Contract, the negotiations prior to the Contractor and the

    Employer entering into the Contract, or the performance of the Contract,

    making it ineffective or unenforceable.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 17

    4 Until the Terms have been unconditionally and irrevocably performed in full the

    Guarantor shall not by virtue of any performance or payment made by it or otherwise:

    4.1 be subrogated to any rights, security or moneys held or received or receivable

    by the Employer; or

    4.2 be entitled to exercise any right of contribution from any co-surety in respect

    of such performance and liabilities under any other guarantee, security or

    agreement; or

    4.3 exercise any right of set-off or counterclaim against the Contractor or any

    such co-surety; or

    4.4 receive, claim or have the benefit of any payment, distribution, security or

    indemnity from the Contractor or any such co-surety; or

    4.5 unless so directed by the Employer (when the Guarantor will prove, and turn

    over any realisations to the Employer, in accordance with such directions)

    claim as a creditor of the Contractor or any such co-surety in competition

    with the Employer.

    5 No delay or omission of the Employer in exercising any right, power or privilege

    hereunder shall impair such right, power or privilege or be construed as a waiver of

    such right, power or privilege nor shall any single or partial exercise of any such

    right, power or privilege preclude any further exercise thereof or the exercise of any

    other right, power or privilege. The rights and remedies of the Employer herein

    provided are cumulative and not exclusive of any rights or remedies provided by law.

    6 A waiver given or consent granted by the Employer under this guarantee will be

    effective only if given in writing and then only in the instance and for the purpose for

    which it is given.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 18

    7.1 If at any time any one or more of the provisions of this guarantee is or becomes

    invalid, illegal or unenforceable in any respect under any law, the validity, legality

    and enforceability of the remaining provisions hereof shall not be in any way affected

    or impaired thereby.

    7.2 As a separate and alternative stipulation the Guarantor unconditionally and

    irrevocably agrees that any sum expressed to be payable by it or obligation to be

    performed by it under this guarantee but which is for any reason (whether or not now

    existing and whether or not now known or becoming known to the Guarantor) not

    recoverable from or enforceable against the Guarantor on the basis of a guarantee

    shall nevertheless be recoverable from or enforceable against the Guarantor as if the

    Guarantor were the sole principal debtor or obligor (where relevant).

    8.1 Any notice, demand or other communication to be served under this guarantee may

    be served upon the Guarantor only by posting or delivering the same or sending the

    same by telex or facsimile transmission to the Guarantor at its address, or telex or

    facsimile number shown below:

    Address:

    Telex:

    Fax:

    or at such other address or number as the Guarantor may from time to time notify in

    writing to the Employer.

    8.2 Any notice, demand or other communication to be served under this guarantee may

    be served upon the Employer only by posting or delivering the same or sending the

    same by telex or facsimile transmission to the Employer at its address, or telex or

    facsimile number shown below:

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 19

    Address:

    Telex:

    Fax:

    or at such other address or number as the Employer may from time to time notify in

    writing to the Guarantor.

    9 A notice or demand served by post shall be deemed duly served on the tenth business

    day after the date of posting and a notice or demand sent by telex or facsimile

    transmission shall be deemed to have been served at the time of transmission unless

    served after 5.00 p.m. in the place of intended receipt in which case it will be deemed

    served at 9.00 a.m. on the following business day. For the purposes of this clause

    business day means a day on which commercial banks are open for business in

    London, England.

    10 In proving service of any notice it will be sufficient to prove, in the case of a letter,

    that such letter was properly stamped or franked, addressed and placed in the post

    and, in the case of telex or facsimile transmission, that such telex or facsimile was

    duly transmitted on a business day to a current telex or facsimile number of the

    addressee at the address referred to above.

    11 The Employer shall be entitled to assign or transfer all or any of the Employers

    rights under this guarantee without the consent of the Guarantor.

    12 The proper law of this guarantee shall be the law of the Turks and Caicos Islands, and

    all disputes which may arise under, out of, or in connection with, or in relation to,

    this guarantee shall be submitted to the jurisdiction of the courts of the Turks and

    Caicos Islands.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 20

    IN WITNESS whereof the Guarantor has caused this guarantee to be executed as a Deed the

    day and year first before written in accordance with the law governing the constitution of the

    Guarantor.

    EXECUTED under Seal for

    and on behalf of

    in the presence of:

    ______________________________

    DIRECTOR

    ___________________________ ______________________________

    WITNESS DIRECTOR/SECRETARY

    * Employer to amend or delete as appropriate.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 21

    PARENT COMPANY GUARANTEE

    THIS GUARANTEE is made on the day of

    Two thousand and

    BETWEEN:

    (1)

    whose registered office is at

    (the Guarantor); and

    (2) THE TURKS & CAICOS NATIONAL INSURANCE BOARD of Waterloo Road,

    Grand Turk, Turks and Caicos Islands, British West Indies

    (the Employer, which term shall include its successors and assignees).

    WHEREAS by an Agreement (the Contract) dated 20

    and made between the Employer of the one part and

    (the Contractor) of the other part, the Contractor undertook the execution of certain works

    (the Works) in accordance with the terms and conditions of the Contract.

    IT IS AGREED as follows:-

    1 The Guarantor hereby absolutely irrevocably and unconditionally guarantees to the

    Employer the due and punctual performance by the Contractor of all the obligations

    on the part of the Contractor under or pursuant to the Contract (the Terms) and (as

    a separate stipulation and as primary obligor) agrees that if the Contractor shall in any

    respect commit any breach of or fail to fulfil any of the Terms, then the Guarantor

    will forthwith perform and fulfil in place of the Contractor each and every Term in

    respect of which the Contractor has defaulted or which is unfulfilled by the

    Contractor. The Guarantor shall be liable to the Employer for all losses, damages,

    expenses, liabilities, claims, costs or proceedings which the Employer may suffer or

    incur by reason of the said failure or breach.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 22

    2 The Guarantor shall be, and continue to be, liable under this Agreement even if the

    Contract is or becomes not binding on, or unenforceable against, the Contractor, for

    any reason whatever. No alterations in the Contract, or in the Works, and no

    extension of time, forbearance or forgiveness, nor any act, matter or thing whatsoever

    except an express release by the Employer, shall in any way release or reduce any

    liability of the Guarantor hereunder. References to the Contract in this Agreement

    shall include all amendments, variations and additions to it, whether made before or

    after the date hereof.

    3 This guarantee shall remain in full force and effect until performance in full of the

    Terms, notwithstanding:

    3.1 the insolvency or liquidation of the Contractor, the Guarantor or any other

    person;

    3.2 any disclaimer of the Contract by a liquidator of the Contractor; and/or any

    feature of the Contract, the negotiations prior to the Contractor and the

    Employer entering into the Contract, or the performance of the Contract,

    making it ineffective or unenforceable.

    4 Until the Terms have been unconditionally and irrevocably performed in full the

    Guarantor shall not by virtue of any performance or payment made by it or otherwise:

    4.1 be subrogated to any rights, security or moneys held or received or receivable

    by the Employer; or

    4.2 be entitled to exercise any right of contribution from any co-surety in respect

    of such performance and liabilities under any other guarantee, security or

    agreement; or

    4.3 exercise any right of set-off or counterclaim against the Contractor or any

    such co-surety; or

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 23

    4.4 receive, claim or have the benefit of any payment, distribution, security or

    indemnity from the Contractor or any such co-surety; or

    4.5 unless so directed by the Employer (when the Guarantor will prove, and turn

    over any realisations to the Employer, in accordance with such directions)

    claim as a creditor of the Contractor or any such co-surety in competition

    with the Employer.

    5 No delay or omission of the Employer in exercising any right, power or privilege

    hereunder shall impair such right, power or privilege or be construed as a waiver of

    such right, power or privilege nor shall any single or partial exercise of any such

    right, power or privilege preclude any further exercise thereof or the exercise of any

    other right, power or privilege. The rights and remedies of the Employer herein

    provided are cumulative and not exclusive of any rights or remedies provided by law.

    6 A waiver given or consent granted by the Employer under this guarantee will be

    effective only if given in writing and then only in the instance and for the purpose for

    which it is given.

    7.1 If at any time any one or more of the provisions of this guarantee is or becomes

    invalid, illegal or unenforceable in any respect under any law, the validity, legality

    and enforceability of the remaining provisions hereof shall not be in any way affected

    or impaired thereby.

    7.2 As a separate and alternative stipulation the Guarantor unconditionally and

    irrevocably agrees that any sum expressed to be payable by it or obligation to be

    performed by it under this guarantee but which is for any reason (whether or not now

    existing and whether or not now known or becoming known to the Guarantor) not

    recoverable from or enforceable against the Guarantor on the basis of a guarantee

    shall nevertheless be recoverable from or enforceable against the Guarantor as if the

    Guarantor were the sole principal debtor or obligor (where relevant).

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 24

    8.1 Any notice, demand or other communication to be served under this guarantee may

    be served upon the Guarantor only by posting or delivering the same or sending the

    same by telex or facsimile transmission to the Guarantor at its address, or telex or

    facsimile number shown below:

    Address:

    Telex:

    Fax:

    or at such other address or number as the Guarantor may from time to time notify in

    writing to the Employer.

    8.2 Any notice, demand or other communication to be served under this guarantee may

    be served upon the Employer only by posting or delivering the same or sending the

    same by telex or facsimile transmission to the Employer at its address, or telex or

    facsimile number shown below:

    Address:

    Telex:

    Fax:

    or at such other address or number as the Employer may from time to time notify in

    writing to the Guarantor.

    9 A notice or demand served by post shall be deemed duly served on the tenth business

    day after the date of posting and a notice or demand sent by telex or facsimile

    transmission shall be deemed to have been served at the time of transmission unless

    served after 5.00 p.m. in the place of intended receipt in which case it will be deemed

    served at 9.00 a.m. on the following business day. For the purposes of this clause

    business day means a day on which commercial banks are open for business in

    London, England.

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 25

    10 In proving service of any notice it will be sufficient to prove, in the case of a letter,

    that such letter was properly stamped or franked, addressed and placed in the post

    and, in the case of telex or facsimile transmission, that such telex or facsimile was

    duly transmitted on a business day to a current telex or facsimile number of the

    addressee at the address referred to above.

    11 The Employer shall be entitled to assign or transfer all or any of the Employers

    rights under this guarantee without the consent of the Guarantor.

    12 The proper law of this guarantee shall be the law of the Turks and Caicos Islands, and

    all disputes which may arise under, out of, or in connection with, or in relation to,

    this guarantee shall be submitted to the jurisdiction of the courts of the Turks and

    Caicos Islands.

    IN WITNESS whereof the Guarantor has caused this guarantee to be executed as a Deed the

    day and year first before written in accordance with the law governing the constitution of the

    Guarantor.

    EXECUTED under Seal for

    and on behalf of

    in the presence of:

    _____________________________________

    DIRECTOR

    __________________________________ _____________________________________

    WITNESS DIRECTOR/SECRETARY

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 26

    ADVANCE PAYMENT GUARANTEE

    To: THE TURKS & CAICOS NATIONAL INSURANCE BOARD of Waterloo

    Road, Grand Turk, Turks and Caicos Islands, British West Indies (hereinafter called

    the Employer).

    Re: Contract No:

    (the Contract).

    In accordance with the Conditions of Contract (Sub-Clause 11.1A (Advance Payment))

    of the Contract, of

    (the Contractor) is required to provide the Employer with a guarantee in amounts and

    currencies equal to the advance payment, namely:

    US$

    We, of ,

    unconditionally and irrevocably guarantee to pay (as primary obligor and not as surety

    merely) to the Employer on his first demand without any right of objection whatsoever on

    our part and without any Employers first claim to the Contractor, amounts from time to

    time so demanded not exceeding the amount[s] stated above.

    We shall be, and continue to be, liable under this guarantee even if the Contract is or

    becomes not binding on, or unenforceable against, the Contractor, for any reason

    whatever. No alterations in the Contract, or in the Works described therein, and no

    extension of time, forbearance or forgiveness, nor any act, matter or thing whatsoever

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 27

    except expiry in accordance with its terms or an express release by the Employer, shall in

    any way release or reduce our liability under this guarantee. References to the Contract

    in this guarantee shall include all amendments, variations and additions to it, whether

    made before or after the date hereof. We hereby waive notice of any such amendment,

    variation or addition.

    The amount of this guarantee shall be progressively reduced by the amount of the

    advance payment repaid by the Contractor in accordance with the Contract.

    This guarantee (as so progressively reduced) shall remain valid and in full effect until the

    Employer receives full repayment of the amount[s] stated above from the Contractor.

    The proper law of this guarantee shall be the law of the Turks and Caicos Islands, and all

    matters relating hereto shall be determined by the courts of the Turks and Caicos Islands.

    IN WITNESS whereof we have caused this guarantee to be executed as a Deed this

    day of 20

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 28

    THE COMMON SEAL of

    was hereunto affixed in the presence of:

    Director

    Secretary

  • AP/asb 07.07.2005 FIDIC Green Book Std. (3) 29

    ATTESTATION CLAUSES OF SHORT FORM OF CONTRACT FOR

    CONSTRUCTION

    EXECUTED under Seal for and on

    behalf of THE TURKS & CAICOS

    NATIONAL INSURANCE BOARD

    by

    _______________________________

    LILLIAN MISICK

    CHAIRMAN TCI NATIONAL INSURANCE BOARD

    in the presence of:

    ___________________________________

    WITNESS

    Name_____________________

    EXECUTED under Seal for and

    on behalf of

    ___________________________________

    DIRECTOR

    Name: __________________________

    In the presence of:

    _____________________________ ____________________________________

    WITNESS DIRECTOR/SECRETARY