Version 2 – 28.10.2013
1/53
FICHE NO 17 D
DELEGATED ACT ON THE DATA TO BE RECORDED AND STORED IN
COMPUTERISED FORM
VERSION 2 - 28.10.2013
Regulation Article
The Common Provisions Regulation (CPR) Article 114 (8) Functions of the managing
authority
This document is provisional, without prejudice to the on-going negotiations in the Trilogues
between the European Parliament and the Council (in line with the principle that "nothing is
agreed until everything is agreed"). This document is a draft that shall be adjusted following
the expert meeting.
It does not prejudge the final nature of the basic act, nor the content of any delegated or
implementing act that may be prepared by the Commission.
Version 2 – 28.10.2013
2/53
1. EMPOWERMENT
Article 114 (8) of the CPR sets out that:
“The Commission shall be empowered to adopt delegated acts, in accordance with
Article 142 laying down rules specifying the information in relation to the data to be
recorded and stored in computerised form within monitoring system established under
point (d) of paragraph 2.”
Point (d) of paragraph 2 of this Article states that the managing authority shall:
“(d) establish a system to record and store in computerised form data on each
operation necessary for monitoring, evaluation, financial management, verification and
audit, including data on individual participants in operations, where applicable”.
This empowerment for a delegated act is complemented by a parallel empowerment to adopt
an implementing act to lay down the technical specifications of the system referred to above.
2. MAIN OBJECTIVES AND SCOPE
The main objective of the act is to set out minimum data necessary to be maintained in a
computerised form for the purposes of monitoring, evaluation, financial management,
verification and audit including reporting to the Commission.
In the definition of these data requirements an alignment has been sought with reporting
requirements (including the draft reporting models for annual implementation reports,
payment applications and accounts already discussed in the expert group) in order to ensure
that Member States maintain, in a computerised form, data on operations including data on
individual participants that in aggregated form is used for the purposes of reporting to the
Commision.
Some of data is necessary in computerised form also to fulfil other functions of the managing
authority and the certifying authority (e.g. ensuring compliance with ceilings established at
EU level).
The data requirements set out in in the delegated acts will constitute minimum requirements
established at EU level. The managing authority or the Member State may record and store
additional data in their monitoring systems in particular to facilitate the electronic data
exchange with beneficiaries as set out in Article 112 (3) of the CPR1. In addition, the
remaining information necessary to fulfil the responsibilities of the managing authority,
certifying authority and audit authority may also be kept in an electronic unstructured format
or paper format.
The delegated act will set out a list of data to be recorded and stored and accompanying legal
provisions. This list does not prejudge the technical characteristics or the structure of the
computerised systems established by managing authorities. Without prejudice to the
requirements set out in Article 114(2)(d) CPR it does not pre-determine the format of the data
1 Article 112 of the CPR sets out a derogation for the EMFF from the obligation and the deadline for the set-up
of electronic information exchange systems with beneficiaries (“e-cohesion”).
Version 2 – 28.10.2013
3/53
recorded and stored, unless specifically indicated (e.g. it will be indicated if amounts will be
needed in EUR or that the format/measurement unit will need to be standard within the
system to allow for aggregation). In some cases the data may require the entry of multiple
values for a single operation.
The delegated act also does not prejudge the means by which data is entered or generated
within the system. The data can therefore be entered manually, by way of electronic
information exchange with beneficiaries (e-cohesion), other information systems etc.
It should be possible to record this data, where it is appropriate, at the latest before
submission of the first payment application to the Commission.
3. MAIN ELEMENTS
(1) A definition of data to be recorded and stored in computerised form
(2) Minimum rules on the nature of data recoded and stored
(3) Rules on the protection of individuals with regard to the processing of personal data
linked to individual participants
(4) Annex 1 (as annexed to the fiche)
4. CONTENT
(1) A definition of data to be recorded and stored in computerised form
The data requirements proposed are threefold:
The list of data set out in Annex 1. Some of this data is relevant only for particular
types of operations, or individual Funds (and will not be required for all operations or
Funds). Therefore Annex 1 specifies the applicability of data requirements.
[In order to ensure the recording and storage of information necessary for reporting on
financial instruments in accordance with Article 40 of the CPR, additional data
requirements are necessary for operations implemented through financial instruments.
Therefore, the computerised system should also include the data listed under Article
40 of the CPR, which is set out in more detail in the model for the reporting of
financial instruments (Fiche 4b, already presented to the expert group).]
Specific requirements for the recording and storage of data on individual participants
as set out in article 114(2)(d) and Annex XX CPR (3)(A)(iv)
The rules set out in the CPR and Fund-specific regulations, as well as in other delegated
and implementing acts, particularly those pertaining to reporting need to be taken into
account.
Therefore, where an operation is supported from more than one operational programme,
priority, Fund or under more than one category of regions, the information referred to in
fields 46-139 of Annex 1 should be broken down by operational programme, priority,
Version 2 – 28.10.2013
4/53
Fund or category of region. The indicator data referred to in fields 46 -55 of Annex 1
shall in addition be broken down by investment priority and by gender, where applicable.
(1) The nature of data recoded and stored
The nature and the format of the data recorded and stored for each operation (including where
appropriate, data on individual participants) shall allow for its aggregation where this is
necessary for the purposes of the financial data referred to in Article 102 of the CPR,
payment applications referred to in Article 121 of the CPR, accounts referred to in Article
128 of the CPR, the annual implementation and final reports referred to in Article 44, Article
101 of the CPR and Article 15(iv)(3) and (4) ESF Regulation. It shall also allow the
aggregation of such data cumulatively for the entire programming period. For the ESF, the
data shall be recorded and stored in a way that permits the managing authorities to perform
the tasks related to monitoring and evaluation in conformity with the requirements set out in
Art. 49 CPR and Articles 5 and 15(iv)(4) and (6) and Annex 1 and 2 of the ESF Regulation.
Respective provisions will be included in the delegated act.
(2) The protection of individuals with regard to the processing of personal data linked
to individual participants
Managing authorities will be deemed as data controllers and therefore should ensure adequate
safeguards for the protection of individuals with regard to the personal data recorded and
stored. Managing authorities should, in particular:
Ensure that national data protection laws regarding the processing of of special categories
of data considered sensitive data, as defined by Article 8 of Directive 95/46/EC and the
national legislation implementing it, are respected;
Ensure that data subjects’ rights are duly respected and in particular with reference to the
right to information referred to in Articles 10 and 11 of Directive 95/46/EC, the right to
access referred to in Article 12 of Directive 95/46/EC, the right to object referred to
Articles 14 and 15 of Directive 95/46/EC, and national legislation implementing these
provisions;
Ensure the respect of the principle of data quality, as required under Article 6 of Directive
94/35/EC and national legislation implementing it. In particular the managing authorities
should not process the data on individual participants for purposes other than complying
with the requirements set out in Article 114 (2)(d) of the Common Provisions Regulation.
Managing authorities shall take measures to ensure that the data are accurate and, where
relevant, kept up to date and that maximum periods for the retention of personal data are
set.
Notify the national supervisory authority of the processing of sensitive data as required in
Articles 18 and 19 of Directive 95/46/EC and national legislation implementing it.
Implement appropriate technical and organizational measures to ensure confidentiality
and protect personal data against accidental or unlawful destruction or accidental loss,
Version 2 – 28.10.2013
5/53
alteration, unauthorized disclosure or access, in particular where the processing involves
the transmission of data over a network, and against all other unlawful forms of
processing as required under the provisions of Articles 16 and 17 of Directive 95/46/EC
and national legislation implementing them.
Apply other measures where required in national data protection legislation, seeking,
where appropriate, advice from the national data protection authorities on how to ensure
adequate respect of national data protection legislation implementing Directive 95/46/EC
when processing personal data.
Respective requirements will be included in the delegated act.
5. MAIN CHANGES COMPARED TO THE PERIOD 2007-2013
There is no directly comparable secondary legislation in place for the period 2007-2013.
Annex III of Commission Regulation 1828/2006 sets out a list of information that Member
States must be ready to submit for all operations within 15 working days of the request of the
Commission. Many of the elements proposed for the delegated act in 2014-2020 are derived
from this list.
However, this list is primarily used for audit purposes and does not, for instance, include
elements necessary for monitoring and evaluation, which are required under the new
empowerment provided under Article 114 (8) of the CPR. Therefore, the elements pertaining
to elements categorisation and indicators have been added to the list.
In addition, the basic data on operations, as well data used for the purposes of control and
audit as well as financial management have been reviewed and revised, and adjusted to the
new legislative framework, and therefore new elements have been inserted in this type of
data.
ANNEXES
Annex 1: The list of data to be recorded and stored in computerised form within the
monitoring system referred to under Article 114 (2) (d) of the CPR
.
Version 2 – 28.10.2013
6/53
ANNEX 1: THE LIST OF DATA TO BE RECORDED AND STORED IN COMPUTERISED FORM WITHIN THE MONITORING
SYSTEM REFERRED TO UNDER ARTICLE 114 (2) (D) OF THE CPR
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
Beneficiary
1. Name of the beneficiary
or, in the case of ETC,
lead and other
beneficiaries
X X X X Required for all
operations
supported by the
Fund
Necessary to
identify the
beneficiary, who is
responsible for
initiating or
initiating and
implementing the
operations as set
out in Article 2 of
the CPR. With the
exception of
operations under
the ETC
programmes,
2. Beneficiary ID (unique
identifier of the
beneficiary)4 or, in the
case of ETC, ID of the
lead and other
beneficiaries
X X X X Required for all
operations
supported by the
Fund
YES
2 "X" designates the Fund or Funds for which the data set out in the first column is required.
3 This indicated that the same or similar (not necessarily identical) information is included in Annex II of the Commission Regulation 1828/2006 for the period 2006-2013.
4 ID is a code that enables the identification of the body e.g. a business registry code.
Version 2 – 28.10.2013
7/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
operations have a
single beneficiary
– the entity the
operation to whom
the document
referred to under
Article 114 (3) (c)
of the CPR is
provided and who
remains
responsible for the
operation vis à vis
the
national/regional
authorities.
3. Names of other bodies
incurring expenditure
within the operation5
X X X X Required for
operations
supported by the
Fund, where
applicable
Necessary to
identify other
bodies (project
partners) who
implement parts of
the operation and
whose expenditure
4. IDs of other bodies
incurring expenditure
X X X X Required for all
operations
5 Including entities who incur expenditure and are reimbursed on the same basis as the beneficiary, excluding contractors and service providers.
Version 2 – 28.10.2013
8/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
within the operation
(unique identifier of
each body)
supported by the
Fund, where
applicable.
is considered
eligible for
reimbursement
under the
operation.
5. Beneficiary/other body
or, in the case of ETC,
lead and other
beneficiaries incurring
expenditure is/are
- public
- private
(required for each body)
X X X X Required for all
operations
supported by the
Fund
Necessary for the
purposes of
evaluation.
6. VAT no of the
beneficiary/other body
or, in the case of ETC,
lead and other
beneficiaries incurring
expenditure, where
applicable
(required for each body)
X X X X Required for
operations
supported by the
Fund, where
applicable.
Necessary to
assess the VAT
status of the
bodies concerned.
7. An indication of whether
VAT on the expenditure
incurred by the
X X X X Required for
operations
supported by the
Necessary to
clarify whether
VAT is eligible or
Version 2 – 28.10.2013
9/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
beneficiaries/other body
or, in the case of ETC,
lead and other
beneficiaries incurring
expenditure, is eligible
expenditure in the
operation
(required for each body)
Fund, where
applicable.
not. This may
vary from one
body and
operation to
another.
8. Deleted
9. Telephone number of the
beneficiary or, in the
case of ETC, lead and
other beneficiaries
X X X X Required for all
operations
supported by the
Fund
Necessary for
project
management, to
contact
beneficiaries.
10. Email address of the
beneficiary or, in the
case of ETC, lead and
other beneficiaries
X X X X Required for all
operations
supported by the
Fund
11. Contact person of the
beneficiary or, in the
case of ETC, lead and
other beneficiaries
X X X X Required for all
operations
supported by the
Fund
12. Address of the
beneficiary or, in the
case of ETC, lead and
X X X X Required for all
operations
supported by the
Version 2 – 28.10.2013
10/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
other beneficiaries Fund
Operation – basic information
13. Unique identifier of the
operation (ID)
X X X X Required for all
operations
supported by the
Fund
Necessary to
identify the
operation.
YES
14. CCI no of the operation,
where applicable
X X X Required only for
major projects as
defined in Article
90 of the CPR and
Joint Action Plans
as defined in
Article 93 of the
CPR.
Necessary to
identify the
operation vis a vis
the Commission
and SFC 2014.
15. Name of the operation X X X X Required for all
operations
supported by the
Fund
Necessary to
identify the
operation and for
communication
(included in the
list of information
published for each
operation). See
Version 2 – 28.10.2013
11/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
Annex VI of the
CPR.
16. Short summary of the
operation
X X X X Required for all
operations
supported by the
Fund
Included in the list
of information
published for each
operation. See
Annex VI of the
CPR.
YES
17. Post code (s) or other
location indicator6
X X X X Required for all
operations
supported by the
Fund
Included in the list
of information
published for each
operation. See
Annex VI of the
CPR.
18. Date of submission of
the application/proposal
of the operation
X X X X Required for all
operations
supported by the
Fund
Necessary to track
possible appraisal
deadlines,
eligibility
conditions etc.
19. Start date7 X X X X Required for all
operations
Included in the list
of information
YES
6 Based on national rules e.g. municipality, county, region etc.
7 As indicated in the application or grant decision/agreement
Version 2 – 28.10.2013
12/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
supported by the
Fund
published for each
operation. See
Annex VI of the
CPR.
20. Expected date for
physical completion or
full implementation of
the operation 8
X X X X Required for all
operations
supported by the
Fund
Included in the list
of information
published for each
operation. See
Annex VI of the
CPR.
21. Real completion date X X X X Required for all
operations
supported by the
Fund
Necessary e.g. for
the establishment
of the retention
period for
supporting
documents for
operations above
the threshold set
out in Article 131
of the CPR.
YES
22. Start date of the X X X X Required for all Necessary to
8 As indicated in the application or grants decision/agreement
Version 2 – 28.10.2013
13/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
eligibility period of the
operation
operations
supported by the
Fund
assess whether
expenditure has
incurred within the
eligibility period.
23. End date of the
eligibility period of the
operation
X X X X Required for all
operations
supported by the
Fund
24. Body issuing the
approval decision
X X X X Required for all
operations
supported by the
Fund
Audit trail.
YES
25. Approval date X X X X Required for all
operations
supported by the
Fund
Audit trail, but
also necessary e.g.
to assess
consistency with
state aid rules etc.
YES
26. An indication that the
operation is a major
project
X X Required for
major projects as
defined in Article
90 of the CPR
Necessary to
identify as special
rules apply.
27. An indication that the
operation is joint action
plan
X X X Required for Joint
Action Plans as
defined in Article
Necessary to
identify as special
rules apply.
Version 2 – 28.10.2013
14/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
93 of the CPR
28. An indication that the
operation includes
funding under the Youth
Employment Initiative
X Required for
operations
supported under
the Youth
Employment
Initiative
Necessary to
identify as special
rules apply.
29. An indication that the
operation includes state
aid
X X X X Required for
operations
supported by the
Fund, where
applicable
Necessary to
identify as special
rules apply.
30. An indication that the
operation is
implemented in the form
of a public private
partnership
X X X Required for
operations which
constitute public
private
partnerships
Necessary to
identify as special
rules apply.
31. Date of signature of first
works contract9
X X Required for
major projects as
defined in Article
90 of the CPR
Necessary to
assess consistency
with Article 92 (3)
of the CPR by
which the
eligibility of
9 Registered upon signature of the contract.
Version 2 – 28.10.2013
15/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
expenditure is
conditional on the
signature of the
first works
contract within a
certain time
period.
32. Location of supporting
documents (address (es))
X X X X Required for all
operations
supported by the
Fund.
Necessary for the
planning of on the
spot verification
and on the spot
audit work.
YES
33. Currency of the
operation
X X X X Required for all
operations
supported by the
Fund
YES
34. CCI code of the
operational programme
from which the
operation is supported
X X X X Required for all
operations
supported by the
Fund
Necessary for the
audit trail, in order
to determine to
which budget
commitment
expenditure is
attributed, under
which priority
YES
35. Priority of the
programme from which
X X X X Required for all
operations
YES
Version 2 – 28.10.2013
16/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
the operation is
supported
supported by the
Fund
expenditure is
declared and to
which programme
priorities and
Funds the
indicator data
should be linked
to.
36. Fund from which the
operation is supported
X X X X Required for all
operations
supported by the
Fund
YES
37. Category of region
- Less developed
region
- Transition region
- More developed
region
X X Required for all
operations
supported by the
Fund
YES (code of
region)
Information on categories of intervention
38. Code(s) for intervention
field
X X X Required for all
operations
supported by the
Fund
This information
is necessary for
the purposes of
monitoring and
evaluation. The
fields and the
codes are derived
from the
nomenclature
39. Code(s) s for form of
finance
X X X Required for all
operations
supported by the
Fund
40. Code(s) for territory type X X X Required for all
Version 2 – 28.10.2013
17/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
operations
supported by the
Fund
established by the
Commission on
the basis of the
empowerment
provided for in
Article 8 of the
CPR. When each
operation is
associated with a
series of codes, it
becomes possible
to aggregate
financial data for
operations by each
set of codes for the
purposes of
reporting under
Article 102 of the
CPR.
41. Code(s) for territorial
delivery mechanisms
X X X Required for all
operations
supported by the
Fund
42. Code(s) for thematic
objective
X X Required for all
operations
supported by the
Fund
43. Code(s) for ESF
secondary theme
X Required for all
operations
supported by the
Fund
44. Code(s) for economic
activity
X X X Required for all
operations
supported by the
Fund
45. Code(s) for location X X X Required for all
operations
supported by the
Fund
Data on indicators
Version 2 – 28.10.2013
18/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
46. Title of common and
programme specific
output indicators
relevant for the
operation or, where
required, title of each
common output
indicator, broken down
by gender where
appropriate / required
X X X X Required for all
operations
supported by the
Fund
This information
is necessary for
the purposes of
monitoring and
evaluation.
47. Identifier for the
common and programme
specific output indicators
relevant for the
operation or, where
required, for each
common output indicator 10
X X X X Required for all
operations
supported by the
Fund
48. Measurement unit for
each output indicator
X X X X Required for all
operations
supported by the
10
Includes relevant indicators included in the operational programme and, where required, indicators set out in the Fund-specific rules.
Version 2 – 28.10.2013
19/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
Fund
49. Where appropriate /
required a target for the
output indicator, broken
down by gender where
appropriate / required
X X X X Required for all
operations
supported by the
Fund
50. Achievement level of
each output indicator for
each year of
implementation or at the
end of the operation,
broken down by gender
where
appropriate/required
X X X X Required for all
operations
supported by the
Fund
51. Title of common and
programme specific
result indicators relevant
for the operation or,
where required, title of
each result indicator,
broken down by gender
X X Required for all
operations
supported by the
Fund
Version 2 – 28.10.2013
20/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
where appropriate /
required
52. Identifier for common
and programme-specific
result indicators
applicable to the
operation or, where
required, for each
common result
indicator.11
X X Required for all
operations
supported by the
Fund
53. Measurement unit for
each result indicator
X X Required for all
operations
supported by the
Fund
54. Where applicable,
baseline for the result
indicators
X X Required for all
operations
supported by the
Fund
55. Where applicable, a
target level for the result
indicator, broken down
by gender, where
X X Required for all
operations
supported by the
Fund
11
Includes relevant programme-specific indicators included in the operational programme and the common and YEI indicators required in the Fund-specific Regulations
Version 2 – 28.10.2013
21/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
required
56. Measurement unit for
each result target and
baseline
X X Required for all
operations
supported by the
Fund
57. Achievement level of
each result indicator for
each year of
implementation, broken
down by gender, where
required
X X Required for all
operations
supported by the
Fund
Operation – budget (amounts in the currency used in the operation)
58. Approved total eligible
cost of the operation in
the grant
decision/agreement
X X X X Required for all
operations
supported by the
Fund
Audit trail and
financial reporting
Already included
in Art 102 of the
CPR.
Information on
revenues is
necessary to
YES (total
eligible
expenditure to be
paid)
59. Public support
corresponding to total
eligible costs of the
operation as set out in
the grant
decision/agreement12
X X X X Required for all
operations
supported by the
Fund
YES
(corresponding
public
contribution)
12
Total public support, including any public funding from the beneficiary or other bodies incurring expenditure within the operation.
Version 2 – 28.10.2013
22/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
60. The amount of public
support13
granted to the
beneficiary, as set out in
the grant/decision
agreement
X X X X Required for all
operations
supported by the
Fund
ensure the
application of
Article 55(6) of
the CPR.
61. Revenue generated by
the operation during the
implementation of the
operation as set out in
the application and /or
grant decision/agreement
X X X X Required where
operations
generate revenue
during their
implementation
and do not fall
under the
provisions of
Article 54 (1)-(6)
of the CPR, but
under Article 55
(6) of the CPR.
Operation – payments to the beneficiary (amounts in the currency used in the operation)
62. Date of receipt of each
payment claim from the
beneficiary
X X X X Required for all
operations
supported by the
Audit trail, Article
121 and 122 of the
CPR.
YES
13
The grant amount awarded to the beneficiary, without the possible public funding from the beneficiary or other bodies incurring expenditure within the operation.
Version 2 – 28.10.2013
23/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
Fund, where
applicable
63. Date of each payment to
the beneficiary
X X X X Required for all
operations
supported by the
Fund, where
applicable
64. Amount of each
payment to the
beneficiary14
X X X X Required for all
operations
supported by the
Fund, where
applicable
64 A Eligible expenditure
forming the basis for each
payment to the beneficiary
X X X X YES
64 B Public support
corresponding to the eligible
expenditure forming the
basis for each payment
X X X X
65. Date of each advance
payment to the
beneficiary
X X X X Required for all
operations
supported by the
14
Amount of programme contributions effectively paid as eligible expenditure in the meaning of Article 36 (1) (a), (b) and (d) (4) In the case of financial instruments.
Version 2 – 28.10.2013
24/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
Fund, where
applicable
66. Amount of each advance
payment paid to the
beneficiary
X X X X Required for all
operations
supported by the
Fund, where
applicable
67. Revenue generated by
the operation during its
implementation which
has not been taken into
account in the initial
grant decision/agreement
and which leads to a
reduction of eligible
expenditure in
accordance with Article.
55(6) of the CPR15
X X X X Required for
operations which
generate revenue
during their
implementation
and do not fall
under Article 54
p. (1)-(6) of the
CPR, but under
Article 55 (6)..
YES
Operation - recoveries and recoverable and irrecoverable amounts (amounts in the currency used in the operation)
68. Basis for each recovery
- Article 135 of the
X X X X Required for all
operations
Audit trail,
aggregate figures
15
To be recorded at the latest with the final payment to the beneficiary.
Version 2 – 28.10.2013
25/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
CPR
- Article 135 and
Article 61 of the
CPR (durability)
supported by the
Fund
based on these
fields are
necessary to
complete the
annual accounts
and reconcile
these with
payment
applications.
69. Date of each recovery
decision
X X X X Required for all
operations
supported by the
Fund
70. Total expenditure
affected by each
recovery decision
X X X X Required for all
operations
supported by the
Fund
YES
71. Total public support
affected by each
recovery decision
X X X X Required for all
operations
supported by the
Fund
YES
72. Date of each recovery16
X X X X Required for all
operations
supported by the
Fund
73. Total public support
recovered for each
X X X X Required for all
operations
16
Date of receipt of amounts recovered from the beneficiary. Where amounts are paid back in instalments, the date of receipt for each instalment.
Version 2 – 28.10.2013
26/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
recovery17
supported by the
Fund.
74. Total expenditure
corresponding to the
public support
recovered, for each
recovery18
X X X X Required for all
operations
supported by the
Fund
75. Irrecoverable
expenditure
X X X X Required for all
operations
supported by the
Fund
76. Public support
corresponding to the
irrecoverable
expenditure
X X X X Required for all
operations
supported by the
Fund
The use of different forms of grants (amounts in the currency used in the operation)
Costs actually incurred and paid
[147]: Contract type
(works/provision of
X X X X Required for
operations
This information
is necessary for
17
For amounts actually paid back by the beneficiary, for each instalment, where applicable. Without interest or penalties. 18
For amounts actually paid back by the beneficiary, for each instalment, where applicable.
Version 2 – 28.10.2013
27/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
services/provision of goods)
if subject to public
procurement where contract
is above EU thresholds19
[148]: Contract amount (in
currency of the operation
[149]: The procurement
procedure used
[150]: name of the
contractor
[151]: unique identifier of
the contractor
[152]: eligible expenditure
incurred based on the
contract
supported by the
Fund, where
applicable
the purposes of
sampling by
Commission audit
services and to
facilitate audit and
verifications.
Linked to
expenditure item
but only for
contracts subject
to public
procurement
where the contract
is above EU
thresholds (for
each contract
above EU
thresholds).
77. Eligible expenditure
declared to the
Commission established
on the basis of costs
actually incurred and
X X X X Required for all
operations
supported by the
Fund, where
applicable
For a full
overview of the
use of
reimbursement
methods for
19
There fields are only for contracts subject to public procurement where the contract is above EU thresholds (for each contract above EU threshold).
Version 2 – 28.10.2013
28/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
paid, together with in-
kind contributions and
depreciations, where
appropriate (Article 57
(1) (a) of the CPR)
verifications, audit
and evaluation
purposes.
78. Public support
corresponding to the
eligible expenditure
declared to the
Commission established
on the basis of costs
actually reimbursed and
paid, together with in-
kind contributions and
depreciations, where
appropriate (Article 57
(1) (a) of the CPR)
X X X X
79. Unique identifier for the
expenditure item
included in the eligible
expenditure for the
operation
X X X X Audit trail
Version 2 – 28.10.2013
29/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
80. Amount of the
expenditure item
included in the eligible
expenditure for the
operation20
X X X X Audit trail
81. Cost category of the
expenditure item
included in the eligible
expenditure for the
operation
X X X X Audit trail
According the cost
category system of
the Member State
82. Name of the counterpart
(supplier / contractor)
issuing the invoice (or
equivalent) for the
expenditure item, where
appropriate21
X X X X Audit trail
20
Low value items can be grouped together provided that they fall in the same cost category 21
Low value items can be grouped together provided that they fall in the same cost category. In the case of grouping, the name of the counterpart is required only when appropriate.
Version 2 – 28.10.2013
30/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
83. Date of the invoice (or
equivalent) for the
expenditure item22
X X X X Audit trail
Standardised scales of unit costs (amounts in the currency used in the operation)
84. Eligible expenditure
declared to the
Commission established
on the basis of
standardised scales of
unit costs ( Article 57 (1)
(b) of the CPR)
X X X X Required for all
operations
supported by the
Fund, where
applicable
For a full
overview of the
use of
reimbursement
methods for
verifications, audit
and evaluation
purposes.
YES
85. Public support
corresponding to the
eligible expenditure
declared to the
Commission established
on the basis of standard
scales of unit costs
X X X X
86. Definition of a unit to be X X X X Required for all
22
Low value items can be grouped together provided that they fall in the same cost category. In the case of grouping, the date of the invoice is required when appropriate.
Version 2 – 28.10.2013
31/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
used for the purposes of
unit costs
operations
supported by the
Fund, where
applicable 87. Deleted
88. Deleted
89. Number of units to be
delivered (forecast), per
indicator
X X X X
90. Number of units actually
delivered, per indicator
X X X X
91. Unit cost for a single
unit, per indicator
X X X X
92. Intermediary target for
number of units
(minimum to receive
payment), where
applicable
X X X X
Lump sum payments (amounts in the currency used in the operation)
93. Total eligible
expenditure declared to
the Commission
established on the basis
of lump sums (Article 57
(1) (c) of the CPR)
X X X X Required for all
operations
supported by the
Fund, where
applicable
For a full
overview of the
use of
reimbursement
methods for
verifications, audit
and evaluation
YES
94. Public support X X X X
Version 2 – 28.10.2013
32/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
corresponding to the
eligible expenditure
declared to the
Commission established
on the basis of lump
sums
purposes.
Necessary also to
verify the
application of the
ceiling of EUR
100 000 in Article
57 (1)(c).
95. Deliverables (outputs or
results) agreed as basis
for disbursement of
lump sum payment
(forecast) for each lump
sum payment
X X X X Required for
operations
supported by the
Fund, where
applicable
96. Deleted
97. Deleted
98. Deleted
99. Lump sum amount for
each lump sum payment
X X X X
100. Deleted
101. Deleted
Version 2 – 28.10.2013
33/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
Flat rates (amounts in the currency used in the operation)23
102. Eligible expenditure
declared to the
Commission established
on the basis of a flat rate
((Article 57 (1) (a) of the
CPR)
X X X X Required for all
operations
supported by the
Fund, where
applicable
For a full
overview of the
use of
reimbursement
methods for
verifications, audit
and evaluation
purposes. Flat
rates are in several
cases pre-set at EU
level or subject to
ceilings. This
information is
necessary to verify
the application of
the set rates or
ceilings.
YES
103. Public support
corresponding to the
eligible expenditure
declared to the
commission established
on the basis of a flat rate
X X X X
104. Deleted
23
In case where the calculation basis is the public eligible expenditure, the total eligible expenditure might be equal to the public eligible expenditure. To maintain consistency and to avoid potential future problems related to changes on the calculation basis of the EU co-financing rate these fields for these two amounts should be recorded by the systems.
Version 2 – 28.10.2013
34/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
Payment applications to the Commission (amounts in EUR)24
105. Date of submission
of each payment
application including
expenditure from the
operation
X X X X Required for all
operations
supported by the
Fund
Audit trail.
YES
106. The total amount of
eligible expenditure
incurred by beneficiaries
and paid in
implementing operations
from the operation
included in each
payment application to
the Commission
X X X X Required for all
operations
supported by the
Fund
YES
107. The total amount of
public expenditure
incurred in
implementing operations
corresponding to the
X X X X Required for all
operations
supported by the
Fund
YES
24
In case where the calculation basis is the public eligible expenditure, the total eligible expenditure might be equal to the public eligible expenditure. To maintain consistency and to avoid potential future problems related to changes on the calculation basis of the EU co-financing rate these fields for these two amounts should be recorded by the systems
Version 2 – 28.10.2013
35/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
total amount of eligible
expenditure incurred by
beneficiaries and paid in
implementing operations
from the operation
included in each
payment application to
the Commission
108. Total amount of
programme
contributions paid to
Financial Instruments
included in payment
applications from the
operation included in
each payment
application to the
Commission
X X X X Required for all
operations
supported by the
Fund
109. Amount of
corresponding public
expenditure to the total
amount of programme
contributions paid to
Financial Instruments
included in payment
X X X X Required for all
operations
supported by the
Fund
Version 2 – 28.10.2013
36/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
applications from the
operation included in
each payment
application to the
Commission
110. Total amount of
programme
contributions effectively
paid as eligible
expenditure in the
meaning of Article 36
(1) (a), (b) and (d) of the
CPR from the operation
included in each
payment application to
the Commission
X X X X Required for all
operations
supported by the
Fund
111. Amount of
corresponding public
expenditure to the total
amount of programme
contributions effectively
paid as eligible
expenditure in the
meaning of Article 36
(1) (a), (b) and (d) of the
X X X X Required for all
operations
supported by the
Fund
Version 2 – 28.10.2013
37/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
CPR from the operation
included in each
payment application to
the Commission
112. Total amount paid
from the operational
programme as advances
in the context of state aid
(Article 121 (2quater))
of the CPR from the
operation included in
each payment
application to the
Commission
X X X X Required for all
operations
supported by the
Fund
113. Amount which has
been covered by
expenditure paid by
beneficiaries within 3
years of the payment of
the advance in the
context of state aid
(Article 121 (2quater))
of the CPR from the
operation included in
each payment
X X X X Required for all
operations
supported by the
Fund
Version 2 – 28.10.2013
38/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
application to the
Commission
114. Amount which has
not been covered by
expenditure paid by
beneficiaries and for
which the 3 year period
has not elapsed in the
context of state aid
(Article 121 (2quater))
of the CPR from the
operation included in
each payment
application to the
Commission
X X X X Required for all
operations
supported by the
Fund
Accounts submitted to the Commission (amounts in EUR)25
115. The date of
submission of each set of
the accounts including
expenditure from the
X X X X Required for all
operations
supported by the
Fund
Audit trail
Article 128 of the
CPR.
25
In case where the calculation basis is the public eligible expenditure, the total eligible expenditure might be equal to the public eligible expenditure. To maintain consistency and to avoid potential future problems related to changes on the calculation basis of the EU co-financing rate these fields for these two amounts should be recorded by the systems.
Version 2 – 28.10.2013
39/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
operation
116. Date of submission
of the last accounts into
which expenditure from
the operation was
included following the
completion of the
operation
X X X X Required for all
operations
supported by the
Fund
Audit trail. This is
the date from
which the
retention period
for supporting
documents is
counted for
operations above
EUR 500 0000
(Article 132 (1) of
the CPR)26
.
117. Total amount of
eligible expenditure
entered into the
accounting systems of
the Certifying Authority
and which has been
included in the payment
applications submitted to
the Commission from
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
26
There is not political agreement between the co-legislators yet on Article 132 of the CPR. The explanation is based on the Presidency compromise text approved in
COREPER on 19.06.2013.
Version 2 – 28.10.2013
40/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
the operation included
in each set of accounts
118. Total amount of the
corresponding public
expenditure to the total
amount of eligible
expenditure entered into
the accounting systems
of the Certifying
Authority and which has
been included in the
payment applications
submitted to the
Commission from the
operation included in
each set of accounts
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
119. Total eligible amount
of expenditure included
in payment applications
withdrawn during the
accounting year from the
operation included in
each set of accounts
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
120. Corresponding
public expenditure to the
X X X X Required for all
operations
Audit trail.
Aggregate figures
Version 2 – 28.10.2013
41/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
total eligible amount of
expenditure included in
payment applications
withdrawn during the
accounting year from the
operation included in
each set op accounts
supported by the
Fund
are necessary to
reconcile the
accounts with the
payment
applications.
121. Total eligible amount
of expenditure included
in payment applications
recovered during the
accounting year from the
operation included in
each set of accounts
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
122. Corresponding
public expenditure to the
total eligible amount of
expenditure included in
payment applications
recovered during the
accounting year from the
operation included in
each set of accounts
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
123. Total eligible amount
of expenditure to be
X X X X Required for all
operations
Audit trail.
Aggregate figures
Version 2 – 28.10.2013
42/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
recovered as at the end
of the accounting year
from the operation
included in each set of
accounts
supported by the
Fund
are necessary to
reconcile the
accounts with the
payment
applications.
124. Corresponding
public expenditure to the
total eligible amount of
expenditure to be
recovered as at the end
of the accounting year
from the operation
included in each set of
accounts
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
125. Total eligible amount
of expenditure of
recoveries effected
pursuant to Article 61
during the accounting
year from the operation
included in each set of
accounts
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
126. Corresponding
public expenditure to the
total eligible amount of
X X X X Required for all
operations
supported by the
Audit trail.
Aggregate figures
are necessary to
Version 2 – 28.10.2013
43/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
expenditure of
recoveries effected
pursuant to Article 61 of
the CPR during the
accounting year from the
operation included in
each set of accounts
Fund reconcile the
accounts with the
payment
applications.
127. Total eligible amount
of expenditure
irrecoverable as at the
end of the accounting
year from the operation
included in each set of
accounts
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
128. Corresponding
public expenditure to the
total eligible amount of
expenditure
irrecoverable as at the
end of the accounting
year from the operation
included in each set of
accounts
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
129. Total amount of X X X X Required for all Audit trail.
Version 2 – 28.10.2013
44/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
programme
contributions paid to
Financial Instruments
included in payment
applications from the
operation included in
each payment
application to the
Commission
operations
supported by the
Fund
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
130. Amount of
corresponding public
expenditure to the total
amount of programme
contributions paid to
Financial Instruments
included in payment
applications from the
operation included in
each payment
application to the
Commission
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
131. Total amount of
programme
contributions effectively
paid as eligible
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
Version 2 – 28.10.2013
45/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
expenditure in the
meaning of Article 36
(1) (a), (b) and (d) of the
CPR from the operation
included in each
payment application to
the Commission
accounts with the
payment
applications.
132. Amount of
corresponding public
expenditure to the total
amount of programme
contributions effectively
paid as eligible
expenditure in the
meaning of Article 36
(1) (a), (b) and (d) of the
CPR from the operation
included in each
payment application to
the Commission
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
133. Total amount paid
from the operational
programme as advances
in the context of state aid
(Article 121 (2quater))
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
Version 2 – 28.10.2013
46/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
of the CPR from the
operation included in
each payment
application to the
Commission
payment
applications.
134. Amount which has
been covered by
expenditure paid by
beneficiaries within 3
years of the payment of
the advance in the
context of state aid
(Article 121 (2quater))
of the CPR from the
operation included in
each payment
application to the
Commission
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
135. Amount which has
not been covered by
expenditure paid by
beneficiaries and for
which the 3 year period
has not elapsed in the
context of state aid
X X X X Required for all
operations
supported by the
Fund
Audit trail.
Aggregate figures
are necessary to
reconcile the
accounts with the
payment
applications.
Version 2 – 28.10.2013
47/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
(Article 121 (2quater))
of the CPR from the
operation included in
each payment
application to the
Commission
Cross-financing, operations outside the programme area and other elements subject to ceilings
136. An indication that
cross financing is used in
the operation
X X Required for
operations
supported by the
Fund, where
applicable
Cross-financing is
subject to ceilings
set out in Article
88 of the CPR.
The data is
necessary to
monitor that these
ceilings are not
exceeded and to
verify compliance
with these
requirements.
137. (maximum) ERDF
type expenditure co-
financed by the ESF as
set out in the grant
agreement/decision
X Required for
operations
supported by the
Fund, where
applicable.
138. Actual (incurred)
ERDF type expenditure
co-financed by the ESF
X Required for
operations
supported by the
Fund, where
applicable
YES
139. (maximum) ESF X Required for
Version 2 – 28.10.2013
48/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
type expenditure co-
financed by the ERDF as
set out in the grant
agreement/decision
operations
supported by the
Fund, where
applicable
140. Actual (incurred)
ESF type expenditure
co-financed by the
ERDF
X Required for
operations
supported by the
Fund, where
applicable
YES
141. An indication that
the operation takes place
(partially or fully)
outside the programme
area but within the
Union
X X X Required for
operations
supported by the
Fund, where
applicable
Article 60 of the
CPR sets out
ceilings for
support from the
ERDF, the
cohesion Fund and
the EMFF to
operations located
outside the
programme area.
This information
is necessary to
monitor
implementation in
order to ensure
that the ceilings
Version 2 – 28.10.2013
49/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
are not exceeded
and to verify
compliance with
these rules.
142. Expenditure incurred
outside the Union
X Required for
operations
supported by the
Fund, where
applicable
Article 13 of the
ESF sets out a
ceiling for support
to expenditure
incurred outside
the Union. This
information is
necessary to
monitor
implementation in
order to ensure
that the ceilings
are not exceeded
and to verify
compliance with
these rules.
143. An indication that
the operation is
implemented outside the
Union part of the
X Required only for
operations
supported by
programmes
under the
Necessary to
verify compliance
with Article 19 of
the ETC
Regulation.
YES
Version 2 – 28.10.2013
50/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
programme area European
Territorial
Cooperation goal,
where applicable
144. Expenditure incurred
for land purchase
X X X X Required for
operations
supported by the
Fund, where
applicable
Article 59 (3) of
the CPR
established a
ceiling for land
purchase. This
information is
necessary to
monitor
implementation in
order to ensure
that the ceilings
are not exceeded
and to verify
compliance with
these rules.
YES
145. The actual amount
of in-kind contributions
to the operation
X X X X Necessary for
compliance with
Article 59(2) of
the CPR.
146. Expenditure X Required only for Necessary to
Version 2 – 28.10.2013
51/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
incurred in Third
countries covered by
IPA or ENI.
operations under
ETC programmes
that are supported
from IPA or ENI.
verify the
requirement that
an amount equal
to IPA and ENI
allocations is spent
in Third countries.
147. Moved to 80 bis
.
148. Moved
149. Moved
150. Moved
151. Moved
152. Moved
153. Deleted
154. Deleted
Version 2 – 28.10.2013
52/53
Applicability of data requirements by Fund2 Specification of
applicability
Explanatory
remarks (not
part of the
delegated act)
Included in
Annex III of
Commission
Regulation
1828/20063
Data required ESF
operations
ERDF
operations
CF
operations
EMFF
operations
155. Deleted
156. Deleted
Version 2 – 28.10.2013