fiber optics 1-2-3 · pdf filefiber optics 1-2-3 cation eta international fiber optic...

1
© 2014, The Light Brigade, all rights reserved. Specifications are subject to change without notice 206.575.0404 • 800.451.7128 • www .lightbrigade.com 2015 Training Classes This four-day class has been developed with 16 hours of classroom lecture and 16 hours of hands-on skills labs to provide practical understanding and skills required to properly design, This course is also available in a two-day version with 16 hours of classroom lecture. on-the-job safety as well as reduce cost and downtime. systems for voice, video, and data applications. April 21-24, 2015 Phoenix, Arizona Fiber Optics 1-2-3 cation ETA International Fiber Optic Installer Course Fees Four-day course . . . . . . . . . . . . $1700 Two-day course . . . . . . . . . . . . .$900 Optional ETA FOI exam . . . . . . . $150 Discounts 10% Multiple attendees 10% USTelecom members 15% IMSA, UTC, and FTTH Council members 25% Light Brigade alumni 25% GSA #GS02F0012R To Register Betty Kosiczky, Inside Sales Manager Industrial Fiber Optics 480-804-1227 Classroom (16 Hours) Introduction to Fiber Optics Standards • Terminology Fiber Theory and Optical Fibers Single-mode • Multimode • New Generation Fiber Optic Cables Indoor/Outdoor • Special Types Connectors Single-mode • Multimode • SFF Styles Attenuators and Terminators Connector Cleaning and Inspection Fiber Optic Splicing Fusion Splicing • Mechanical Splicing Cleaving Tools Cable Management Panels • Closures • Pedestals FTTx Products Installation Outside Plant • Underground • Aerial Premises / LAN Test Equipment and Testing Optical Loss Test Sets Visual Inspection Equipment Dispersion Testers Optical Testing Premises • Outside Plant • Systems Restoration/Maintenance Outside Plant • Premises Emergency Restoration Safety System Design Sources / Detectors Passive Devices WDM • DWDM • CWDM Loss Budgets • Integration Systems Overview Ethernet • HDTV • SONET • FTTx/PON Hands-On (16 Hours) Station #1 – Splicing Fusion / Mechanical / Pigtail Splicing Fiber Handling and Cleaving Station #2 – Connectorization Multiple Bonding Methods Visual Inspection and Cleaning Cable Assembly Testing Station #3 – Cable Preparation Loose Tube Cable Preparation Breakout and Distribution Cable Preparation Patch Panel and Splice Closure Preparation Mid-Entry Practices Station #4 – OTDR Operation Span Testing and Splice Loss Emergency Restoration • Troubleshooting Station #5 – Optical Loss Testing Link Loss Measurement Transmit and Receive Power Variable and Fixed Attenuators CANCELLED

Upload: phungdiep

Post on 01-Feb-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fiber Optics 1-2-3 · PDF fileFiber Optics 1-2-3 cation ETA International Fiber Optic Installer ... 25% Light Brigade alumni 25% GSA #GS02F0012R To Register Betty Kosiczky, Inside

© 2014, The Light Brigade, all rights reserved. Speci�cations are subject to change without notice

206.575.0404 • 800.451.7128 • www.lightbrigade.com

2015 Training Classes

This four-day class has been developed with 16 hours of classroom lecture and 16 hours of hands-on skills labs to provide practical understanding and skills required to properly design,

This course is also available in a two-day version with 16 hours of classroom lecture.

on-the-job safety as well as reduce cost and downtime.

systems for voice, video, and data applications.

April 21-24, 2015Phoenix, Arizona

Fiber Optics 1-2-3 cation

ETA InternationalFiber Optic Installer

Course Fees

Four-day course . . . . . . . . . . . .$1700Two-day course . . . . . . . . . . . . .$900Optional ETA FOI exam . . . . . . .$150Discounts10% Multiple attendees10% USTelecom members15% IMSA, UTC, and FTTH Council members25% Light Brigade alumni25% GSA #GS02F0012R

To RegisterBetty Kosiczky, Inside Sales ManagerIndustrial Fiber Optics480-804-1227

Classroom (16 Hours)Introduction to Fiber Optics

Standards • Terminology

Fiber Theory and Optical FibersSingle-mode • Multimode • New Generation

Fiber Optic CablesIndoor/Outdoor • Special Types

ConnectorsSingle-mode • Multimode • SFF StylesAttenuators and Terminators

Connector Cleaning and Inspection

Fiber Optic SplicingFusion Splicing • Mechanical SplicingCleaving Tools

Cable ManagementPanels • Closures • PedestalsFTTx Products

InstallationOutside Plant • Underground • AerialPremises / LAN

Test Equipment and TestingOptical Loss Test Sets

Visual Inspection EquipmentDispersion Testers

Optical TestingPremises • Outside Plant • Systems

Restoration/MaintenanceOutside Plant • PremisesEmergency Restoration

Safety

System DesignSources / Detectors

Passive DevicesWDM • DWDM • CWDMLoss Budgets • Integration

Systems OverviewEthernet • HDTV • SONET • FTTx/PON

Hands-On (16 Hours)Station #1 – Splicing

Fusion / Mechanical / Pigtail SplicingFiber Handling and Cleaving

Station #2 – ConnectorizationMultiple Bonding MethodsVisual Inspection and CleaningCable Assembly Testing

Station #3 – Cable PreparationLoose Tube Cable PreparationBreakout and Distribution Cable PreparationPatch Panel and Splice Closure PreparationMid-Entry Practices

Station #4 – OTDR Operation

Span Testing and Splice LossEmergency Restoration • Troubleshooting

Station #5 – Optical Loss TestingLink Loss MeasurementTransmit and Receive PowerVariable and Fixed Attenuators

CANCELLED