Transcript
Page 1: Fiber Optics 1-2-3 · PDF fileFiber Optics 1-2-3 cation ETA International Fiber Optic Installer ... 25% Light Brigade alumni 25% GSA #GS02F0012R To Register Betty Kosiczky, Inside

© 2014, The Light Brigade, all rights reserved. Speci�cations are subject to change without notice

206.575.0404 • 800.451.7128 • www.lightbrigade.com

2015 Training Classes

This four-day class has been developed with 16 hours of classroom lecture and 16 hours of hands-on skills labs to provide practical understanding and skills required to properly design,

This course is also available in a two-day version with 16 hours of classroom lecture.

on-the-job safety as well as reduce cost and downtime.

systems for voice, video, and data applications.

April 21-24, 2015Phoenix, Arizona

Fiber Optics 1-2-3 cation

ETA InternationalFiber Optic Installer

Course Fees

Four-day course . . . . . . . . . . . .$1700Two-day course . . . . . . . . . . . . .$900Optional ETA FOI exam . . . . . . .$150Discounts10% Multiple attendees10% USTelecom members15% IMSA, UTC, and FTTH Council members25% Light Brigade alumni25% GSA #GS02F0012R

To RegisterBetty Kosiczky, Inside Sales ManagerIndustrial Fiber Optics480-804-1227

Classroom (16 Hours)Introduction to Fiber Optics

Standards • Terminology

Fiber Theory and Optical FibersSingle-mode • Multimode • New Generation

Fiber Optic CablesIndoor/Outdoor • Special Types

ConnectorsSingle-mode • Multimode • SFF StylesAttenuators and Terminators

Connector Cleaning and Inspection

Fiber Optic SplicingFusion Splicing • Mechanical SplicingCleaving Tools

Cable ManagementPanels • Closures • PedestalsFTTx Products

InstallationOutside Plant • Underground • AerialPremises / LAN

Test Equipment and TestingOptical Loss Test Sets

Visual Inspection EquipmentDispersion Testers

Optical TestingPremises • Outside Plant • Systems

Restoration/MaintenanceOutside Plant • PremisesEmergency Restoration

Safety

System DesignSources / Detectors

Passive DevicesWDM • DWDM • CWDMLoss Budgets • Integration

Systems OverviewEthernet • HDTV • SONET • FTTx/PON

Hands-On (16 Hours)Station #1 – Splicing

Fusion / Mechanical / Pigtail SplicingFiber Handling and Cleaving

Station #2 – ConnectorizationMultiple Bonding MethodsVisual Inspection and CleaningCable Assembly Testing

Station #3 – Cable PreparationLoose Tube Cable PreparationBreakout and Distribution Cable PreparationPatch Panel and Splice Closure PreparationMid-Entry Practices

Station #4 – OTDR Operation

Span Testing and Splice LossEmergency Restoration • Troubleshooting

Station #5 – Optical Loss TestingLink Loss MeasurementTransmit and Receive PowerVariable and Fixed Attenuators

CANCELLED

Top Related