ff cabling solutions
TRANSCRIPT
-
8/10/2019 FF Cabling Solutions
1/23
Cabling Solutions forFoundation Fieldbus Systems
By Raman KalraBelden India
Technology Event
Fieldbus Foundation Changing the Playing Field "
Date : 21 st June, 2008 (Saturday)Venue : TROPICANA Conference Room.Hotel : Taj Residency,
Akota Gardens,Vadodara - 390 020 INDIA
-
8/10/2019 FF Cabling Solutions
2/23
AgendaFoundation Fieldbus Cable Standard
Beyond the Standard- Multi Pair Solutions- Field Barrier and Long Distance Applications
Cost Comparison
Jacket & Armouring Options
-
8/10/2019 FF Cabling Solutions
3/23
FF standard
Colour code orange / blueJacket colour Orange or Blue (for IS applications)Optional armouring to meet e.g. Atex requirements
IEC 61158/ISA-SP 50 Standards Type AFF Specif icationH1 Cable Test specifications FF844
Conductor Size 18AWG(0.8 sq.mm)Impedance 100ohms +/-20Capacitance Unbalance 4nF/KmConductor DC resistance 24ohms/Km
Attenuation@39kHz 3dB/KmMax. Propagation Delay 1.7 S/KmMinimum Shield Coverage 90%Max Network Length 1900m
-
8/10/2019 FF Cabling Solutions
4/23
Key Cable ParametersImpedance 100 @ 31.25 kHzCapacitance Unbalance < 4 F/km (capacitance between one wire andscreen to other wire and shield)
Conductor DC Resistance < 24 /kmCable Shielding > 90% coverage
CcS
Ccc
Insulation
Drain wire
Shield Inductance & resistance
Centricity
CcS
Conductor
-
8/10/2019 FF Cabling Solutions
5/23
When twisted pair is exposed to a noise source such as runningmachinery or fluorescent lights , each conductor of the pair isexposed equally .
Capacitance Unbalance A Twisted Pair Exposed to a Noise Source
Key Cable Parameters
-
8/10/2019 FF Cabling Solutions
6/23
Noise and Signal at the Receiving End of a Typical Pair
Ideal Capacitance Unbalance
When the capacitance of conductors within a pair are not equal, eachconductor will react differently to noise.Total subtraction of noise is vir tually impossible.
Key Cable Parameters
-
8/10/2019 FF Cabling Solutions
7/23
When the capacitance of conductors within a pair are different, signals may travel atdifferent rates (velocity).Signal interpretation issues may occur as signals arrive at different times.Lower levels of capacitance unbalance equates to higher noise cancellation.
Key Cable Parameters
-
8/10/2019 FF Cabling Solutions
8/23
FF vs Standard Instrument Cable
FF cable has lower Capacitance
FF cable is designed to a specific impedance toreduce signal reflections and maximize network lengthFF cables are tested during production to meetspecific requirements:
Capacitance Unbalance Impedance Conductor D.C. resistance
-
8/10/2019 FF Cabling Solutions
9/23
FF Wiring
Control Strategy
-
8/10/2019 FF Cabling Solutions
10/23
Agenda
Foundation Fieldbus Cable StandardBeyond the Standard- Multi Pair Solutions- Field Barrier and Long Distance ApplicationsCost Comparison
Jacket & Armouring Options
-
8/10/2019 FF Cabling Solutions
11/23
Multi Pair Solutions
Multi Pair Fieldbus cables:
2 to 24 pair configurationsEach individual pair meets the FF Type ArequirementsOrange or Blue (IS) outer jacket
Armouring optionallyOther jacket materials optionally
-
8/10/2019 FF Cabling Solutions
12/23
Agenda
Foundation Fieldbus Cable Standard
Beyond the Standard- Multi Pair Solutions- Field Barrier and Long Distance Applications
Cost Comparison
Jacket & Armouring Options
-
8/10/2019 FF Cabling Solutions
13/23
Fieldbarrier ConceptFieldbarriers inZone 1Instrument Spursin Zone 0Bus trunklinealso used to
power theFieldbarriers
Maximize nr. of
instruments onthe bus in thezone.
R
Power Power SupplySupply
FieldbusFieldbus CardCard
FieldField ControlControl StationStation
HumanHuman Interface StationInterface Station
VV--networknetwork
Zone 1Zone 1
Zone 0Zone 0EexEex ia IICia IIC
EExEEx (e)(e) EExEEx (e)(e)
-
8/10/2019 FF Cabling Solutions
14/23
Agenda
Foundation Fieldbus Cable Standard
Beyond the Standard- Multi Pair Solutions- Field Barrier and Long Distance Applications
Cost Comparison
Jacket & Armouring Options
-
8/10/2019 FF Cabling Solutions
15/23
Reduction in hardware costs
4-20 mA
ISISIS IS IS Fieldbus
Less cable
Less installation timeLess I/OLess Interfacing
Reduced footprint in CR
Cost Comparison Vs Instr. Cable
-
8/10/2019 FF Cabling Solutions
16/23
Cost ComparisonWhy is Fieldbus cabling more expensive than standard
instrumentation cable?PP instead of PVC or XLPE on the cores
More insulation material requiredMore complicated process = slower process = higher costs
0
20
40
60
80
100
120
140
160
PLTC ISOS FF Multi Pair BS5308 RE 2X(St)Y
P r i c e
I n d e x
-
200
400
600
800
1,000
1,200
1,400
V o
l u m e
i n k m
-
8/10/2019 FF Cabling Solutions
17/23
AgendaFoundation Fieldbus Cable Standard
Beyond the Standard- Multi Pair Solutions- Field Barrier and Long Distance Applications
Cost Comparison
Jacket & Armouring Options
-
8/10/2019 FF Cabling Solutions
18/23
Jacket options
$$Limited Smoke, Low AcidGas GenerationHalogen Free
$$$$High & Low Temp,Chemical ExposureTPE
$$$Chemical Wash Downs,
Exposure to ChlorinesCPE
$General ApplicationsPVCCost ApplicationsJacket Material
-
8/10/2019 FF Cabling Solutions
19/23
Jacket options
PVC meeting UL 13 (for physical requirements) (UL 1685 for flamerequirements)
LSNH meeting IEC 60332-3-24 (c) CPE (for improved chemical resistance) meeting UL 13 (forphysical requirements) (UL 1685 for flame requirements)
Oil Resistant PVC meeting UL 13(for physical requirements) (UL1685 for flame requirements)
TPE jacket for improved flexibility meeting UL 13(for physicalrequirements) (UL 1685 for flame requirements)
-
8/10/2019 FF Cabling Solutions
20/23
Armouring options
Interlock Aluminum
SteelProtective Metal Tapes Smooth or Corrugated (longitudinal or spiral
wrapped) Copper Aluminum Steel
SWA (Steel Wire Armour) Steel
-
8/10/2019 FF Cabling Solutions
21/23
Why use armour Physical protectionMaintain signal integrity
Provides additional shieldingReduces cost of conduitDirect BurialEasy to install and re-routeRodent ProtectionHazardous Locations Class 1, DIV. 1 in Canada
Class 1, Div. 2 or Class 2, Div. 2 in USA Zone 0, 1 or 2 IEC 60079 and Cenelec
-
8/10/2019 FF Cabling Solutions
22/23
FOUNDATION Fieldbus Features
PlantDiagnostics
process or equipment
Level 4
actuators, elementsvalves, connections
FieldPerformanceDiagnostics
Level 3
Fisher
DeviceDiagnostics
Level 2
electronics
CommunicationsDiagnostics
Level 1
communicationsFisher
More information from field devices.
Reduced maintenance
Diagnostics/Adv diagnostics/ Asset Management Pro-active maintenance
Fact based maintenance, avoid no action work
In order to achieve this all passive andactive components have to be optimized
for a flawless data-transmission
-
8/10/2019 FF Cabling Solutions
23/23
Questions?