DESIGN STATEMENT: THESE CONSTRUCTION DOCUMENTS HAVE BEEN PREPARED TO OBTAIN A BUILDING PERMIT. THE SCOPE OF THESE CONSTRUCTION DOCUMENTS IS TO DEPICT A 'DESIGN INTENT'. DETAIL AND SIZING OF ANY ADDITIONAL OR NEW STRUCTURAL MEMBERS WILL BE DETERMINED IN THE FIELD PRIOR TO REMOVAL OF ANY EXISTING, UNFORESEEN, STRUCTURAL COMPONENT. ALL CONTRACTORS ENGAGED ON THIS PROJECT SHALL FOLLOW ALL FEDERAL, STATE, AND LOCAL CODES AND SHALL BE RESPONSIBLE FOR ANY DEVIATIONS FROM THESE CODES. THE WORK IS TO BE CONDUCTED IN STRICT COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS INCLUDING THE 'OCCUPATIONAL SAFETY AND HEATH ADMINISTRATION' (OSHA) AND THE 'ENVIRONMENTAL PROTECTION AGENCY' (EPA) REGULATIONS. 4730 Casa Cola Way, Suite 200 St. Augustine, FL 32095 (904) 757 - 6106 ARCHITECTURAL: CITY OF FERNANDINA BEACH 204 ASH STREET FERNANDINA BEACH, FL 32034 Former FBO Office Demolition and Hangar Rehabilitation PASSERO ASSOCIATES PROJECT NUMBER: 99000047.0082 Fernandina Beach Municipal Airport - FHB 650 Airport Rd. Fernandina Beach, FL 32034 CONTRACT DOCUMENTS FOR: MARCH 11, 2019 Bid Set DRAWING INDEX A-000 COVER PAGE A-001 SYMBOLS & DETAILS A-002 FLOOR DEMOLITION PLAN A-100 FLOOR PLAN A-101 DETAILS

Upload: others

Post on 22-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FERNANDINA BEACH, FL 32034 Former FBO Office Demolition ... · and hangar rehabilitation passero associates project number: 99000047.0082 fernandina beach ... mas masonry mo masonry

DESIGN STATEMENT:THESE CONSTRUCTION DOCUMENTS HAVE BEEN PREPARED TO OBTAIN A BUILDING PERMIT.

THE SCOPE OF THESE CONSTRUCTION DOCUMENTS IS TO DEPICT A 'DESIGN INTENT'.

DETAIL AND SIZING OF ANY ADDITIONAL OR NEW STRUCTURAL MEMBERS WILL BE DETERMINED IN THE FIELD PRIOR TO REMOVAL OF ANY EXISTING, UNFORESEEN, STRUCTURAL COMPONENT.

ALL CONTRACTORS ENGAGED ON THIS PROJECT SHALL FOLLOW ALL FEDERAL, STATE, AND LOCAL CODES AND SHALL BE RESPONSIBLE FOR ANY DEVIATIONS FROM THESE CODES.

THE WORK IS TO BE CONDUCTED IN STRICT COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS INCLUDING THE 'OCCUPATIONAL SAFETY AND HEATH ADMINISTRATION' (OSHA) AND THE 'ENVIRONMENTAL PROTECTION AGENCY' (EPA) REGULATIONS.

4730 Casa Cola Way, Suite 200St. Augustine, FL 32095

(904) 757-6106

ARCHITECTURAL:

CITY OF FERNANDINA BEACH204 ASH STREET

FERNANDINA BEACH, FL 32034

Former FBO Office Demolition and Hangar Rehabilitation

PASSERO ASSOCIATES PROJECT NUMBER: 99000047.0082

Fernandina BeachMunicipal Airport -FHB650 Airport Rd.Fernandina Beach, FL 32034

CONTRACT DOCUMENTS FOR:

MARCH 11, 2019

Bid Set

DRAWING INDEX

A-000 COVER PAGEA-001 SYMBOLS & DETAILSA-002 FLOOR DEMOLITION PLANA-100 FLOOR PLANA-101 DETAILS

Page 2: FERNANDINA BEACH, FL 32034 Former FBO Office Demolition ... · and hangar rehabilitation passero associates project number: 99000047.0082 fernandina beach ... mas masonry mo masonry

EARTH/COMPACT FILL

ROCK

BRICK (PLAN/SECTION)

METALS (SECTION)

PLYWOOD

BATT/LOOSE INSUL.

GLASS (ELEVATION)

POROUS FILL/GRAVEL

(PLANS/SECTIONS)CONCRETE

BRICK (ELEVATION)

WOOD, FINISHED

GLASS BLOCK

CERAMIC TILE (ELEV)

(AROUND MEMBER)SPRAY FIREPROOF

PLASTER(SECT.)SAND/MORTAR

CONCRETE BLK.

(SECTION)WOOD BLOCKING

RIGID INSUL.

EIFS (ELEV.)PLASTER/PLAS BD.

ARCHITECTURAL ROOFSHINGLES

A300

GRAPHIC SYMBOLS

ABBREVIATIONS

MATERIALS SYMBOLS

2

XXXXXXXXX

1

A

102A

X

1

19'

2A600

#

5

6

7

8 A600

COLUMN NO.

FIRST FLR.

0.00'WORK POINTELEV/FIN. FLOOR, ROOF)

CENTER LINE

WINDOW/FRAME TYPE

DOOR NUMBER

REVISION

WALL TYPE

ROOM NAME/NUMBERINDICATOR

NORTH ARROW

NO. OF SECTIONPLAN DETAILS

SHEET LOCATED ON

NEW DOOR

EXISTING DOOR

DOOR REMOVED

REVISIONPLACE W/ DATE IN REVISEDPORTION OF SHT.

NO. OF SECTION

SHEET LOCATED ON

INTERIOR ELEVATION INDICATOR

WALL SECTION INDICATOR

PLAN DETAIL INDICATOR

ELEV. NUMBER

SHEET LOCATED

INDICATED # OF VIEW

4730 Casa Cola Way, Suite 200 (904) 757-6106

Passero AssociatesSt. Augustine, FL

Drawing No.:

Date:

Project No.:

Project ArchitectDesigner

Town/City:County: State:

UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS IN VIOLATION OF STATE EDUCATION LAW ARTICLE 145 SECTION 7209 AND ARTICLE 147 SECTION 7307, THESE PLANS ARE COPYRIGHT PROTECTED. ©

Client:

Stamp:

Project Manager

Former FBO Office Demolition and

Hangar Rehabilitation

A-001

SYMBOLS & DETAILS

99000047.0082

MARCH 11, 2019

City of Fernandina Beach

Chris Nardone, AIAJustin Vollenweider, AIA

-

204 Ash StreetFernandina Beach, Florida32034

650 Airport Rd.

Fernandina BeachNassau Florida

Bid Set

ARCHITECT'S CERTIFICATIONTHE ARCHITECT CERTIFIES TO THE BEST OF THEIR KNOWLEDGE AND BELIEF, THE PLANS AND SPECIFICATIONS ARE IN ACCORDANCE WITH THE APPLICABLE REQUIREMENTS OF THE "FLORIDA BUILDING CODE".

BUILDING NOTES DURING CONSTRUCTION:

CONTRACTOR SHALL FOLLOW THE FLORIDA BUILDING CODE. THEY SHALL COMPLY WITH CHAPTER 33 "SAFEGUARDS DURING CONSTRUCTION" OF FLORIDA BUILDING CODE. THIS SECTION COVERS SAFETY DURING CONSTRUCTION AND THE PROTECTION OF ADJACENT PUBLIC AND PRIVATE PROPERTIES. THE ARCHITECT IS NOT RESPONSIBLE FOR ENFORCING THIS ON THE CONTRACTOR.

GENERAL NOTES:

SWBD SWITCHBOARDSYM SYMMETRICALTB TACKBOARDTEL TELEPHONETV TELEVISIONTEMP TEMPERATURE, TEMPORARYTEMPGL TEMPERED GLASSTEX TEXTURETHK THICKNESSTOIL TOILETT&G TONGUE AND GROOVETOS TOP OF STEELTYP TYPICALTOW TOP OF WALLUC UNDERCUTUG UNDERGROUNDUH UNIT HEATERUV UNIT VENTILATORUR URINALVTR VENT THROUGH ROOFVENT VENTILATORVERT VERTICALVEST VESTIBULEVCT VINYL COMPOSITION TILEVIF VERIFY IN FIELDVWC VINYL WALL COVERINGWSCT WAINSCOTWC WATER CLOSETWR WATER REPELLANTWS WEATHER STRIPWGT WEIGHTWWF WELDED WIRE FABRICWGL WIRE GLASSW/O WITHOUTWD WOODYD YARD

RO ROUGHT OPENINGPLGL PLATE GLASSPLYWD PLYWOODPLUB PLUMBINGPT/S PT/SPOL POLISHEDPPGL POLISHED PLATE GLASSPVP POLYVINYL CHLORIDEPCF POUNDS PER CUBIC FEETPSL POUNDS PER SQUARE INCHPLF POUNDS PER LINEAR FEETPSF POUNDS PER SQUARE FEETPCP PRECAST CONCRETE PANELPREFAB PREFABRICATEDPREF PREFINISHEDPROJ PROJECTIONPL PROPERTY LINEPR PRIMEDSST STAINLESS STEELSTORM STORM SEWERSECT SECTIONSS SERVICE SINKSHT SHEETSIM SIMILARSPKR SPEAKERSPEC SPECIFICATIONSSQ SQUARESP STAND PIPESTD STANDARDSTL STEELSD STORM DRAINSGT STRUCTURAL GLAZED TILESTRUCTL STRUCTURALSUSP SUSPENDEDSW SWITCH

NAT NATURALNRC NOISE REDUCTION

COEFICIENTNIC NOT IN CONTRACTNTS NOT TO SCALENOM NOMINALNO, # NUMBEROC ON CENTEROPNG OPENINGOPP OPPOSITEOPH OPPOSITE HANDOD OUTSIDE DIAMETEROA OVERALLOH OVERHEADPNT PAINTEDPN PANELPBD PARTICAL BOARDPLAS PLASTERPLAM PLASTIC LAMINATEQTY QUANTITYRAD RADIUSRWL RAIN WATER LEADERRECPT RECEPTACLE (ELECTRIC)REF REINFORCE (D) (ING)REQD REQUIREDRESIL RESILIENTRCP REINFORCE CONCRETE PIPERET RETURNRA RETURN AIRREV REVISION, REVISEDRH RIGHT HANDRW RIGHT OF WAYR RISERRD ROOF DRAINRM ROOM

HGT HEIGHTHM HOLLOW METALID INSIDE DIAMETERIBC INSTALLED BY CONTRACTORINSUL INSULATIONINS. GL Insulated GlassINT INTERIORINV INVERTJAN JANITORJT JOINTLAM LAMINATEDLAV LAVATORYLH LEFT HANDLCT LENGHTLGT LIGHTLF LINEAR FEETLTWT LIGHT WEIGHTLL LIVE LOADLOC LOCATIONLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLP LOW POINTMH MANHOLEMFR MANUFACTURERMAS MASONRYMO MASONRY OPENINGMATL MATERIALMAX MAXIMUMMECH MechanicalMTL/S METALSMTP METAL TOILET PARTITIONMIN MINIMUMMISC MISCELLANEOUSMOD MODULARMHP MOP HOPPER

EXPJ EXPANSION JOINTEXPD EXPOSEDEXTN EXTENSIONEXT EXTERIORFCU FAN COIL UNITFIN FINISHEDFA FIRE ALARMFACT FACTORYFE FIRE EXTINGUISHERFP FIRE PROOFINGFR FIRE RESISTANTFLR FLOORFD FLOOR DRAINFL FLUSHFT FOOTFTG FOOTINGFDTN FOUNDATIONFO FRAME OPENINGFBO FURNISHED BY OWNERFBC FURNISHED BY

CONTRACTORFUR FURRINGGALV GALVANIZEDGA GAGEGC GENERAL CONTRACTORGL GLASSGB GRAB BARGWB GYPSUM WALL BOARDHDCP HANDICAPHDW HARDWAREHDWD HARDWOODHTR HEATERHTG HEATINGHVAC HEATING, VENTILATION AIR

CONDITIONING

CW Cold WaterCMT CERAMIC MOSAIC TILECONC CONCRETECONSTR CONSTRUCTIONCONT CONTINUOSCLL CONTACT LIMIT LINECNTOR CONTRACTORCJ CONTROL JOINTCG CORNER GUARDCS COUNTER SINKCNTR COUNTERCRS COURSEDEMO DEMOLISHDET DETAILDIAG DIAGONALDIA DIAMETERDIM DIMENSIONDO DITTODR DOORDBL DOUBLEDN DOWNDWG DRAWINGEA EACHELEC ELECTRICALEL ELEVATIONEWC ELECTRIC WATER COOLERELEV ELEVATOREMERG EMERGENCYENCL ENCLOSUREEQ EQUALEQUIP EQUIPMENTEO EQUIPMENT BY OWNEREXF EXHAUST FANEXIST EXISTINGEXP EXPANSION

AD ACCESS DOORAFF ABOVE FINISH FLOORACT ACOUSTICAL TILEADD ADDENDUMADJ ADJACENTA/C AIR CONDITIONINGALT ALTERNATEALUM ALUMINUMAB Anchor BoltAPPROX APPROXIMATEARCH ARCHITECTURALATTN ATTENUATIONAUTO AUTOMATICBM BEAMBRG BEARINGBIT BITUMINOUSBLK BLOCKBLKG BLOCKINGBD BOARDBOT BOTTOMBRK BRICKBC BRICK COURSEBLDG BUILDINGBUR BUILT-UP ROOFINGBEJ BRICK EXPANS, JOINTCAB CABINETCH CABINET HEATERCSW CASEWORKCLG CEILINGCTR CENTERC/L CENTER LINECT CERAMIC TILECMU CONCRETE MASONRY UNITCLR CLEARCOL COLUMN

1. Bidders shall review drawing index and verify that they have received copies of all drawings. Do not bid this project or commence construction without having a complete set of drawings.

2. This is a demolition project generally consisting of the removal of the existing FBO office attached to an existing hangar. Existing hangar to remain intact with modifications to enclose existing hangar after removal of existing FBO. Bidders shall promptly notify the Architect in writing of any ambiguity, inconsistency, or error which they may discover upon examination of the bidding documents or the site and local conditions. Do not bid or proceed with installations in areas of discrepancy until all such discrepancies are fully resolved.

3. The plans are based upon information furnished to the Architect by the Fernandina Beach Municipal Airport, consisting of drawings prepared by others, these plans have been modified to reflect actual conditions based on limited field observations. To the best of the architect's knowledge and belief, the information on these drawings is believed to be accurate. The architect does not guarantee its accuracy.

4. Prior to submitting bids, the contractor shall visit the job site to familiarize themselves with existing conditions. They shall immediately notify the Architect , in writing, if any discrepancies or inconsistencies exist. Failure to verify the existing conditions shall not relieve the contractor of any expenses or responsibilities resulting from that failure.

5. Where concrete slabs, wall partitions and other surfaces are to be removed, surfaces that are to remain shall be repaired and patched. The contractor shall prepare existing conditions to receive new work and match existing adjacent surfaces.

6. Any disruption in the continuity of existing utility lines within the facilities site shall be coordinated with Fernandina Beach Municipal Airport representative, giving 72 hours notice prior to any disruption and shall be restored immediately.

7. General contractor and subcontractors shall complete all work in accordance with the requirements of applicable laws, codes, regulations, safety, FAA and FDOT standards.

8. Contractor shall coordinate staging areas with Architect and Fernandina Beach Municipal Airport representative.

9. The contractor shall maintain a safe environment during all phases of construction.

10. Contractor to comply with AC 150/5370-2G "Operational Safety on Airports During Construction."

11. The contractor shall clear the project site of all trash, rubbish and debris daily. Dispose of all waste material in a legal manner. Contractor shall supply his own dumpster at location as directed by Architect and Fernandina Beach Municipal Airport representative.

12. The contractor is responsible for maintaining security per FAA and Airport regulations for an operational airport facility including parking, delivery requirements, etc.

13. The contractor shall maintain the integrity of other systems inside the scope of work during construction.

14. The contractor shall field verify all dimensions and existing conditions. The contractor shall verify that the proposed details can be fabricated and installed in accordance with all pertinent codes, regulations and safety standards.

15. Due to the nature of work involved in remodeling, unforeseeable conditions may arise during construction. Any unforeseen condition that affects the progress of the work shall be reported immediately to the architect for review.

16. Any existing equipment or building components not to be reused must be completely removed and disposed of properly.

17. Perform all construction and arrange for materials and equipment delivery in accordance with the requirements of Fernandina Beach Municipal Airport.

18. It is the contractor's responsibility to secure the premises throughout the duration of the project.

19. The contractor shall include in his bid all costs associated with material handling, storage and delivery.

20. No animals allowed on the job site.

1. Fernandina Beach Municipal Airport authority has the right of first refusal.

2. Prior to any demolition work, locate all underground utilities.

3. Any plumbing and/or electrical lines not being reused are to be capped and placed below or behind the finished surface as necessary and according to local building codes.

4. All capped plumbing including water and sewer shall be pressure tested and inspected prior to covering them.

5. Contractor shall provide his own dumpster for trash removal from all trades and all work relating to this project. The contractor shall not be allowed to use existing dumpster on site. Demolition debris shall be disposed strictly in accordance with all local, state and federal authorities requirements.

6. Do not saw cut into or remove structural walls, columns and beams. Exposed all structural load bearing conditions for architect's observation.

7. If during demolition of the existing structure is found to contain asbestos or lead, it is the responsibility of the contractor to comply with the provisions of S.469.003 Florida statutes and to notify the department of environmental protection of their intentions to remove asbestos and/or lead, when applicable, and in accordance with state and federal law.

8. Contractor shall obtain all necessary approvals and/or permits before commencing work from proper authorities having jurisdiction.

9. The demolition plans are general in nature and do not attempt to indicate smaller individual items which may also need to be removed. Therefore, the contractor shall visit the site to determine whether such non-specified items exist and are to be removed to achieve the overall intent. Contractor shall verify existing conditions including structural, mechanical, electrical, and plumbing, and report any discrepancies to the architect.

10. During demolition the contractor shall be responsible for the safe stability of the structure until the operation is complete. Any observation by the architect does not relieve the contractor from his responsibility to provide for safety and protection of persons and property.

11. Protect all existing areas and/or items not included for demolition from dust and damage, by use of water misting, temporary enclosures or other suitable methods. Any damage occurring during demolition shall be fixed or replaced by the contractor to the satisfaction of the architect, to match existing at no additional cost to Fernandina Beach Municipal Airport.

12. Contractor is advised that there may be concealed pipelines, electrical, telephone, cable wires, columns, beams or other structural, mechanical, electrical, plumbing items, etc.. Although the documents produced by the architect and engineers are believed to be substantially correct. The architect, engineers and Fernandina Beach Municipal Airport authority do not guarantee the location or existence or condition of any concealed items. Contractor must proceed with caution during demolition and must make their own determination, measurements and evaluation of the working condition of existing concealed items. Any environmentally sensitive material, encountered during demolition shall be reported in writing to Fernandina Beach Municipal Airport authority and disposed of in accordance with state and federal regulations.

13. Prior to demolition the contractor shall walk the site and provide a written list, photographs and/or videotapes of any damage to existing finishes, missing equipment, non-operable equipment, any water damage, etc.

14. Contractor to shut off all building systems prior to any demolition work.

15. Contractor is responsibile for all as-built documents required for project closeout and rehabilitated hangar building certificate of occupancy.

GENERAL DEMOLITION NOTES:

No. Date By Description

FIRE PROTECTION DURING CONSTRUCTION:• Fire Protection During Construction - Florida Fire Prevention Code

Latest Edition:A. Structures undergoing construction, alteration, or demolition

operations, including those in underground locations, shall comply with NFPA 241, Standard for Safeguarding Construction, Alteration, and Demolition Operations, and this Chapter.

B. The suitability, distruption, and maintenance of extinguishers shall be in accordance with Section 13.6. [241:7.7.1]

C. At least one approved fire extinguisher also shall be provided in plain sight on each floor at each usable stairway as soon as combustible material accumulates. [241:7.7.4]

D. Suitable fire extinguishers shall be provided on self-propelled equipment. [241:7.7.5]

E. A water supply for fire protection, either temporary or permanent, shall be made available as soon as combustible material accumulates. [241:8.7.2.1]

• Flammable and Combustible Liquids and Flammable Gases - Florida Fire Prevention Code Latest Edition:A. Storage of flammable and combustible liquids shall be in

accordance with Chapter 66, unless otherwise modified by 16.2.3. [241:5.5.1.1]

B. Storage of Class I and Class II liquids shall not exceed 60 gal. (227 L) within 50 ft (15 m) of the structure. [241:5.5.1.2]

C. Storage areas shall be kept free of weeds, debris, and combustible material not necessary to the storage. [241:5.5.1.3]

D. Open flames and smoking shall not be permitted in flammable and combustible liquids storage areas. [241:5.5.1.4]

E. Such storage areas shall be appropriately posted as "No Smoking" areas. [241:5.5.1.5]

F. Class I and Class II liquids shall be kept in approved safety containers. [241:5.5.2.2]

G. Class I liquids shall be dispensed only where there are no open flames or other sources of ignition within the possible path of vapor travel. [241:5.5.2.4]

Page 3: FERNANDINA BEACH, FL 32034 Former FBO Office Demolition ... · and hangar rehabilitation passero associates project number: 99000047.0082 fernandina beach ... mas masonry mo masonry

GENERAL DEMOLITION NOTES:

The existing condition / demolition drawings are intended as a general guide to the demolition required for this project. Demolition is not shown incomplete detail and it shall be the responsibility of the contractor to remove existing construction as required to accomplish the design intent for the work shown and reasonably implied for the project. Refer to the work shown on all other drawings in the set for the extent of the demolition required to perform the work intent.

GENERAL CONDITIONS:

1. Visit the job site to verify existing conditions and dimensions prior to beginning any work. Notify the architect of any discrepancies prior to beginning the work.

2. Protect all finishes and construction scheduled to remain.3. Typical:

Demolish wall

Existing wall to remain

Demolish door, frame, and hardware

• Items found within walls and ceilings that run through the space feeding and/or connecting an adjacent area are required to remain unless otherwise noted.

• For questionable items including, but not limited to found/unknown conditions and items not shown/listed in the contract documents shall be coordinated with the architect before removing.

• Relocate any existing j-boxes, switches, etc. as required to accomodate new construction.

• Remove all abandoned conduit, ductwork, hangars, ceiling tiles, grid, framing, piping, etc. throughout work area.

• Remove all partitions, glazing, frames, roof, plumbing fixtures, etc. as shown dotted on plans.

• Remove all floor finishes and base to expose concrete slab.

• Remove all electrical, lighting, exit lighting, associated components, wiring and conduit above floor slab.

• Removal of all mechanical, electrical and plumbing fixtures and equipment as indicated.

Existing/Demolition Legend:

Existing door/fram to remain

BASIC PROJECT SCOPE:

Project generally consists of removal of existing FBO/office attached to hangar. Existing hangar is to remain and structural modifications to existing hangar are not anticipated.

EXISTING 60' X 80'HANGAR TO REMAIN Area of demolition

Demolition to generally consist of removal of entire office area to existing slab on grade. Existing slab on grade to remain.

100' - 10"

79' -

8 1

/2"

19' -

7"

60' -

1 1

/2"

81' - 3 1/2" 19' - 6 1/2"

Existing ramp and landing to remain

Demolish existing plumbing fixtures, cap and terminate below slab and patch existing slab, typical

Approximate location of existing electric service. Service to remain, provide new metal rack for mounting, as required to secure existing equipment per NEC code requirements

Existing electric room to remain

Existing railing to remain, clean and repair as required

Demolish existing doors/walls, typ.

Remove existing floor finish, bead blast existing concrete slab and patch as required for new finish, typ.

Approximate location of existing apron light pole to remain. Rerout power in conduits, as required

Demolish all furred/walls and existing metal panels, cmu at hangar to remain

Remove existing cabinetry and sink, cap existing piping below slab and patch

Existing door to remain, remove door knob with latch. Clean and prep. door for new work.

Existing door to remain, remove door knob with latch. Clean and prep. for new work.

Approximate location of existing flag pole to remain Approximate location of existing

ADA sign to remain

Approximate location of existing antenna to remain (at roof, above)

Sawcut existing slab, approximate location shown, verify exact location in field. Do not sawcut through slab edge. Verify underground utilities prior to cutting.

4730 Casa Cola Way, Suite 200 (904) 757-6106

Passero AssociatesSt. Augustine, FL

Drawing No.:

Date:

Project No.:

Project ArchitectDesigner

Town/City:County: State:

UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS IN VIOLATION OF STATE EDUCATION LAW ARTICLE 145 SECTION 7209 AND ARTICLE 147 SECTION 7307, THESE PLANS ARE COPYRIGHT PROTECTED. ©

Client:

Stamp:

Project Manager

Former FBO Office Demolition and

Hangar Rehabilitation

A-002

FLOOR DEMOLITIONPLAN

99000047.0082

MARCH 11, 2019

City of Fernandina Beach

Chris Nardone, AIAJustin Vollenweider, AIA

-

204 Ash StreetFernandina Beach, Florida32034

650 Airport Rd.

Fernandina BeachNassau Florida

Bid Set

0" 2' 4' 8' 16'3/16" = 1'-0"

1 DEMOLITION FLOOR PLAN

No. Date By Description

Page 4: FERNANDINA BEACH, FL 32034 Former FBO Office Demolition ... · and hangar rehabilitation passero associates project number: 99000047.0082 fernandina beach ... mas masonry mo masonry

FLOOR PLAN GENERAL NOTES:1. Verify dimensions in field.2. New work is limited, refer to demolition plan and buidling section for

more information on scope of work.

EXISTING 60' X 80'HANGAR TO REMAIN

2A-101

Typ.

19' -

6"

60' -

1 1

/2"

79' -

7 1

/2"

81' - 1 1/2" 19' - 5 1/2"

100' - 7"

Patch and repair slab as required prior to sealing. Prep floor according to mfr. instructions.Provide sealer over slab on grade, landing and ramp (basis of design: SEAL-KRETE Epoxy-Seal Concrete Floor Paint)Color selection by owner.

Prep. and patch existing cmu as required and seal, prime and paint cmu to match existing

(basis of design: LOXON by Sherwin Williams, Primer/Sealer and top coat as recommended by mfr. Minimum of one primer coat and two top coats) Color selection by owner.

Provide new 26 ga. min. wall panels to match existing color and style. Final approval by owner.

Existing sidewalk to remain, approximate location shown

Seed hatched area as required to establish turf, existing living trees to remain, remove dead trees and vegetation, owner has final say before removal

Existing electric service and approximate location of new service rack

Service rack to generally consist of the following:• 3" schedule 40 weather proof steel bolted to existing concrete.

Bolts to be min. 6" from slab edge to prevent cracking.• Posts spaced to provide stable mounting for existing equipment.• Rack cross-members must be weatherproof steel of sufficient

number, size, strength and spacing to provide stable mounting of existing electrical enclosures.

Confirm clear access to electrical enclosures, remove all impediments, as required.

Sawcut and patch existing concrete slab as required. Roughen face of sawcut prior to pouring new slab. Align control joints with existing. (control joints to be a max. 15'-0" o.c.) Slab assumed to be at least 4" thick.

75 LF 6" dia. PVC sch. 40, ADS N-12, or approved equal @ min. 0.65% slope

Connect downspout to drain pipe with sealed boot connection

12" yard drain at bottom of swale. Top elevation = +/- 12.0, invert = 10.0, see yard drain detail on A-101

Existing door to remain, prime and paint as required. Provide new hardware to replace existing. Hardware to be ADA compliant, heavy duty, commercial grade, lever style with entrance function.

Basis of Design (door paint):Provide one coat zinc chormate primer and two coats "Sherwin Williams" or equal, Pro-Industrial water based alkyd urethane enamel, color as selected by owner.

Provide GFI receptacle in waterproof box, final location to be confirmed in field

Provide GFI receptacle in waterproof box, final location to be confirmed in field

4730 Casa Cola Way, Suite 200 (904) 757-6106

Passero AssociatesSt. Augustine, FL

Drawing No.:

Date:

Project No.:

Project ArchitectDesigner

Town/City:County: State:

UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS IN VIOLATION OF STATE EDUCATION LAW ARTICLE 145 SECTION 7209 AND ARTICLE 147 SECTION 7307, THESE PLANS ARE COPYRIGHT PROTECTED. ©

Client:

Stamp:

Project Manager

Former FBO Office Demolition and

Hangar Rehabilitation

A-100

FLOOR PLAN

99000047.0082

MARCH 11, 2019

City of Fernandina Beach

Chris Nardone, AIAJustin Vollenweider, AIA

-

204 Ash StreetFernandina Beach, Florida32034

650 Airport Rd.

Fernandina BeachNassau Florida

Bid Set

0' 1' 2' 4' 8'3/16" = 1'-0"

1 Floor Plan

No. Date By Description

Page 5: FERNANDINA BEACH, FL 32034 Former FBO Office Demolition ... · and hangar rehabilitation passero associates project number: 99000047.0082 fernandina beach ... mas masonry mo masonry

Existing hangar roofing to remain, no work

Prep. and paint existing cmu

Demolish existing FBO office.Existing FBO slab to remain.

Existing railing, ramp and landing to remain

Approximate location of existing electric meter to remain, provide metal rack as required to mount existing meter, per NEC

Remove existing siding, to roof, and replace with new to match existing (new panel shown for clarity)

Provide aluminum rainhood, 6"x6"x48" at exterior doors, typ.

Existing hangar door enclosure to remain (no work)

Provide 5x5 min. alum. gutter and 4x4 min. alum. downspout system

New light, typical of 3, approximate locations shown, owner to confirm exact location in field. Provide power in conduit to new lights as required.

Basis of Lighting Design:Semi cut off exterior wall pack, Magnalux LED area light fixture with photocell sensor, P/N: HG-SL-E-200w-120/277, LED 4000k, 200 watt, color as selected by owner.

Provide new 26 ga. min. trim to match

FBO Finished Floor+0' - 0"

Hangar Finished Floor-0' - 2"

Prep. and paint existing CMU wall

Existing slab on grade, to remain

Existing hangar structure, to remain

Existing metal roofing to remain

Existing girts to remain, verify location in field

New metal wall panel to match existing (26 ga. min., galvanized)

Hangar door beyond

Existing slab on grade to remain• Remove existing floor finishes• Remove/cap floor penetrations below slab and patch slab as required• Bead blast slab and prep. as required for new finish• Paint slab edges yellow• Finish slab shall be a smooth surface with no changes in level per ADA requirements

Existing landing and ramp, prep and finish similar to existing FBO slab

7' -

2 1/

4" V

.I.F.

7' -

4" V

.I.F.

6" V

.I.F.

15' -

0 1

/4" V

.I.F.

Replace existing girt to match existing

4730 Casa Cola Way, Suite 200 (904) 757-6106

Passero AssociatesSt. Augustine, FL

Drawing No.:

Date:

Project No.:

Project ArchitectDesigner

Town/City:County: State:

UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS IN VIOLATION OF STATE EDUCATION LAW ARTICLE 145 SECTION 7209 AND ARTICLE 147 SECTION 7307, THESE PLANS ARE COPYRIGHT PROTECTED. ©

Client:

Stamp:

Project Manager

Former FBO Office Demolition and

Hangar Rehabilitation

A-101

DETAILS

99000047.0082

MARCH 11, 2019

City of Fernandina Beach

Chris Nardone, AIAJustin Vollenweider, AIA

-

204 Ash StreetFernandina Beach, Florida32034

650 Airport Rd.

Fernandina BeachNassau Florida

Bid Set

N.T.S.1 3D Diagram

0" 6" 1' 2' 4'1/2" = 1'-0"

2 Wall Section

No. Date By Description