FEMS ENGINE COMPANY 22 COMMUNITY MEETING 2 - SEPT 9, 2015

Upload: others

Post on 04-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

FEMS ENGINE COMPANY 22COMMUNITY MEETING 2 - SEPT 9, 2015

Page 2: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

AGENDA

• INTRODUCTIONS

• RULES OF THE ROAD

• DESIGN PRESENTATION

• PROJECT TIMELINE

• QUESTIONS

FEMS ENGINE COMPANY 22 - COMMUNITY MEETING 22

Page 3: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

02 EXISTING CONDITIONS- PHOTOS

D E F

A

View from Butternut St. NW View from Georgia Ave. NW

View from intersection(Existing building to be demolished)

Main entrance of existing building Alley entrance View down alley to parking garage

A

B C

B

DCE

F

BUTTERNUT ST

GE

OR

GIA

AV

E

ALLEY

9T

H S

T N

W

3FEMS ENGINE COMPANY 22 - COMMUNITY MEETING

Page 4: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

03 SITE RIGHT-OF-WAY SCOPE

4FEMS ENGINE COMPANY 22 - COMMUNITY MEETING

1

1

2

KEY NOTES

EXISTING BUS STOP TO BE RELOCATED

STREET PARKING

FEMS TRAFFIC SIGNAL CONTROL

EXISTING ALLEY CURB CUT

PROPOSED APPARATUS BAY CURB CUT

PROPOSED ACCESSIBLE STREETPARKING (1 STALL)

2

3

3

4

4

5

5

6

6

NEW ENGINE CO. 227

7

Page 5: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

CONSTRUCTION UPDATE

• WHITING-TURNER CONTRACTING CO.

• SCHEDULE AND WORK HOURS MONDAY-SATURDAY, 7AM-7PM

• PARKING

• SITE ACCESS

• PUBLIC SPACE AND ALLEY

03 CONSTRUCTION ACTIVITIES

5FEMS ENGINE COMPANY 22 - COMMUNITY MEETING

Page 6: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

03 BUS STOP

6FEMS ENGINE COMPANY 22 - COMMUNITY MEETING

Page 7: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

NEW FACILITY FEATURES

• 19,329 SF FACILITY

• EQUIPPED WITH MOST CURRENT ALERT AND RESPONSE SYSTEMS.

• APPARATUS BAY FOR LADDER TRUCK, ENGINE, AMBULANCE AND FUTURE

• COMMUNITY ROOM FOR UP TO 30 PEOPLE

• STAFF LIVING QUARTERS AND OFFICE FUNCTIONS

• ENERGY-EFFICIENT DESIGN / LEED GOLD CERTIFICATION MIN.

03 PROGRAM

7FEMS ENGINE COMPANY 22 - COMMUNITY MEETING

Page 8: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

03 GROUND FLOOR PLAN

REF

.R

EF.

REF

.R

EF.UP

UP

UP

RAMP DOWN

APPARATUS BAY

WATCH

VESTIBULE / LOBBY

DECON

EMS

CLEANING WORKROOM / HOSESTORAGE

COMPANY OFFICE

CLEANING

LOUNGE / DINING KITCHEN

OFFICER BEDROOM

OFFICER BEDROOM

COMMUNITY

WC

WC

STAFF PATIO

LANDSCAPE

GENERATOR

ENTRYCOURT

STG

TRASH /RECYCLING

CORRIDOR

BATH

BATH

STORAGE

LANDSCAPE

8FEMS ENGINE COMPANY 22 - COMMUNITY MEETING

SCALE: 3/32” = 1’-0”

Page 9: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

03 SECOND FLOOR PLAN

SCALE: 3/32” = 1’-0”

DW

FEMALE LKR

MALE LKR

LAUNDRY

OPERATIONS

BUNKROOM

STG

LOWER ROOF(VEGETATED)

MECH. YARD

PLANTER(VEGETATED)

POLE ROOM

POLE ROOM

9FEMS ENGINE COMPANY 22 - COMMUNITY MEETING

Page 10: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

03 STREET CONTEXT

SCALE: 1” = 100’SCALE: 1” = 100’

10FEMS ENGINE COMPANY 22 - COMMUNITY MEETING

GEORGIA AVENUE

Page 11: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

03 WEST ELEVATION

SCALE: 3/32” = 1’-0”

11FEMS ENGINE COMPANY 22 - COMMUNITY MEETING

Page 12: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

03 NORTH ELEVATION

SCALE: 3/32” = 1’-0”

12FEMS ENGINE COMPANY 22 - COMMUNITY MEETING

Page 13: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

PROJECT TIMELINE

COMMUNITY ENGAGEMENT-

APRIL 2014 - • ANC 4B02 SMD• ANC 4B

JUNE 2014- • ANC 4A

JULY 2014-• WALTER REED CAC

JUNE 2015 + SEPT 2015-• COMMUNITY UPDATE MEETINGS

UPCOMING ACTIVITIES-

PUBLIC MEETINGS

• ANC

PROJECT DESIGN- SUMMER 2015

GROUNDBREAKING/ CONSTRUCTION START- FALL 2015

DGS CONSTRUCTION UPDATE- MONTHLY

CONSTRUCTION DURATION- 14 MONTHS

FEMS ENGINE COMPANY 22 - COMMUNITY MEETING 1515

Page 14: FEMS ENGINE COMPANY 22 - | dgs...03 site right-of-way scope fems engine company 22 - community meeting 4 1 1 2 key notes existing bus stop to be relocated street parking fems traffic

QUESTIONS??

DGS COMMUNITY CONTACT-

JACKIE STANLEY

COMMUNITY OUTREACH COORDINATOR

DEPARTMENT OF GENERAL SERVICES 202-431-1195 [email protected]

FEMS ENGINE COMPANY 22 - COMMUNITY MEETING 1616