Page 1: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

FEMA’s Hazard Mitigation

Assistance Grant Programs

Jeff Ward, JSWA

Page 2: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

Hazard Mitigation Grant

Program (HMGP)

Overview

Page 3: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

HMGP Introduction and Summary

• Section 404 of the Stafford Act

• Administered by FEMA

• Funding: Total Federal assistance, subject to sliding scale formula:

–Up to 15% of the first $2 billion

–Up to 10% for amounts $2B and $10B

–Up to 7.5% for amounts between $10B and $35.33B

–These grants are 75% federally funded/25% local

Page 4: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

HAZARD MITIGATION GRANT PROGRAM

Projects must:

Solve a problem

Have a beneficial impact

Be cost effective

Substantially reduce future risk

Be environmentally sound

Page 5: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

Benefit Cost Analysis

(BCA)

Page 6: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

“Calculated using the Net Present Value”

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

now $50k $50k $50k $50k

$25.4

$18.1

$12.9

$92k

$35.6

Present value of 20 years of losses is $92k not $200k

BEHIND THE CURTAIN

Page 7: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

Benefit Cost Analysis

Benefit Cost Analysis:

• Avoided future losses > Cost

• FEMA software - BCA done on each individual home

• For buyouts - Substantial Damage Waiver or

$276,000 waiver

– MUST BE IN FEMAs SFHA

• For Elevations - $175,000 waiver – MUST BE IN FEMAs SFHA

Page 8: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

Benefit Cost Analysis

• No waiver for Mitigation/Reconstruction

• It the property does not meet above waivers (In

SFHA)

– Elevation Certificate and Flood Insurance Study

– At least three prior known flood losses to complete the

required BCA

• If outside SFHA – At least three prior known flood losses to complete the required BCA

Page 9: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

Mitigation of Flood

Damaged Homes

Page 10: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

Mitigation of Flood Damaged Homes

Primary Mitigation project types

•Home Acquisition and Demolition

•Home Elevation

Page 11: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

The acquisition of an existing at-risk structure and conversion of

the land to open space.

Property Acquisition and Structure Demolition

Page 12: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

Voluntary Participation

•FEMA Buyouts are strictly voluntary – No homeowners are ever forced to sell

– No owner relocation assistance

Page 13: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

The Typical Buyout Process

• Appraise

– Pre-Flood

– DOB

• Generate offer

• Appeal Process

– Owner paying for an independent appraisal

– State has final say in value

• Title search

Page 14: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

The Typical Buyout Process

• Closing

– Properties must be vacant at the time of closing

– Necessary paperwork to transfer clear title

– Owner receives net proceeds

• FEMA Deed Restrictions

• Demolish buildings and clear sites

Page 15: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

Timeframe

•From Appraisal to Closing

–Can be completed in 90 Days

•Assuming

–Seller is ready to sell

–No title issues

Page 16: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

Elevation

• One of the most common retrofitting methods is

elevating

• When a house is properly elevated, the living area

will be above all but the most severe floods (such as

the 500 year flood).

• Almost any home can be elevated

• Most elevations in TX are slab on grade

Page 17: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

• Raise existing structure two foot

above base flood elevation (BFE)

• Project must be cost-effective

• Elevation methods:

– Continuous foundation walls

– Piles, piers, posts, or columns

17

Elevation

Page 18: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

• Benefit

–Prior flood loss

–Depth in the floodplain

• Cost

–Method of elevation

–Lift height

–Vertical footprint 18

Elevation

Page 19: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

19

Architectural and engineering fees

Permitting

Clearing necessary vegetation

Excavation around the dwelling

Lifting or jacking building

Temporary support cribbing

Eligible Elevation Costs

Page 20: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

20

Disconnecting , extending, and reconnecting utilities

Constructing a compliant foundation

Cost associated with elevating the building to the

required height

Restoring the lawn, walks, driveways, and other

surfaces outside the perimeter exterior walls, if

damaged by the elevation process

Eligible Elevation Costs

Page 21: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

• Costs related to building additions or auxiliary structures

• Construction of new decks or porches

• Any improvements for purely aesthetic reasons, unless

required by the EHP compliance review

• Additional landscaping for ornamentation beyond what

existed on the site prior to construction of the project (e.g.,

trees, shrubs)

Ineligible Costs

Page 22: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

22

Understand who is interested

Acquisition or Elevation

Complete Benefit Cost Analysis

Aggregate BCR > 1.0

Obtain Council Approval based on interest/eligibility

Application for interested/cost effective homes

Submit application by Due date

Wait for results of review

What’s Next

Page 23: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

23

Elevations – Before and After

Page 24: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4
Page 25: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4
Page 26: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4
Page 27: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4
Page 28: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4
Page 29: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4
Page 30: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4
Page 31: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4
Page 32: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4
Page 33: FEMA’s Hazard Mitigation Assistance Grant Programs · “Calculated using the Net Present Value” 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 now $50k $50k $50k $50k $25.4

Questions?

Prepared by Jeffery S. Ward and Associates, Inc.