february (1) –groundworks & substructure 7
TRANSCRIPT
Site Fencing
Managed / Secured Vehicle Gate
Pedestrian Access
Construction Traffic Movement
Site Welfare and Accommodation
Materials Storage Area
Waste Separation & Recycling
Demolition
Construction of Building
Scaffold
Hoist
Site Traffic / Plant Hardstandings
Site Gate Manned by Banksmen
Key / Legend
Notes
• To be read in conjunction with Master Programme
FEBRUARY (1) – Groundworks & Substructure
PROJECT: Dover Court, Blocks D, E & G
Date:
Drawn By:
7
Site Fencing
Managed / Secured Vehicle Gate
Pedestrian Access
Construction Traffic Movement
Site Welfare and Accommodation
Materials Storage Area
Waste Separation & Recycling
Demolition
Construction of Building
Scaffold
Hoist
Site Traffic / Plant Hardstandings
Site Gate Manned by Banksmen
Temporary Safe Escape Route
November 2018
Robert Rundle
To be read in conjunction with Contract Programme (PH2 CP00001) dated 07 November 2018
Spaces Required by Residents
Spaces Suspended
Spaces Available
25 53 34
Site Fencing
Managed / Secured Vehicle Gate
Operative Access
Construction Traffic Movement
Site Welfare and Accommodation
Materials / Plant Storage Area
Waste Separation & Recycling
Demolition
Construction of Building
Scaffold
Hoist
Site Traffic / Plant Hardstandings
Site Gate Manned by Banksmen
Temporary Safe Escape Route
Temporary Bin Store