Page 1: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank
Page 2: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank (M. McAulay) Agriculture in the Murray-Darling Basin (J. Baker)

Australian Government investment in irrigation modernisation on- and off-farm

Richard McLoughlin

Page 3: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

1. Sustainable Rural Water Use and Infrastructure Program2. Restoring the Balance in the Basin3. National Urban Water and Desalination Plan4. Water Smart Australia5. Driving Reform in the Basin (DEWHA and ACCC)6. Improving Water Information (BOM)7. National Water Security Plan for Cities and Towns8. National Rainwater and Greywater Initiatives9. Raising National Water Standards (NWC)10. Living Murray Initiative11. Great Artesian Basin12. Northern Australia Futures

Water for the Future

Page 4: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

• Established in 2008• Total funding of $5.8 billion. • A national program which invests in rural water use,

management and efficiency, including improved water knowledge and market reform

• Over $5bn is committed in the Murray-Darling Basin• A share of water savings from SRWUIP projects go towards

‘bridging the gap’ to the sustainable diversion limits under the Murray-Darling Basin Plan

Sustainable Rural Water Use and Infrastructure Program (SRWUIP)

Page 5: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

SRWUIP - Program StructureSRWUIP

State priority projects (up to $3.2b)

Other commitmentsInclude:

State led projectsCommonwealth led

projects

Victoria $1,103m including NVIRP

South Australia $420m

Queensland $160m

New South Wales $708m

Australian Capital Territory $85m

NSW Private Irrigation Infrastructure Operators Program $650m

South Australia Private Irrigation Infrastructure Program $110m

On-Farm Irrigation Efficiency $450m

Strengthening Basin Communities $200m

National Water Market System $56m

Compliance and Enforcement $60m

Irrigation in Tasmania $140m

Strategic Sub-System Reconfiguration $200m

Page 6: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank (M. McAulay) Agriculture in the Murray-Darling Basin (J. Baker)

Page 7: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

State Priority Projects$3.2 billion for State Priority Projects

• agreed in the July 2008 Intergovernmental Agreement (IGA) on Murray Darling Basin Reform

Objectives for State Priority Projectso Invest in infrastructure to improve the efficiency &

productivity of rural water use and management;o Help secure a long-term sustainable future for irrigated

agriculture and communities;o Deliver substantial and lasting returns of water to the

environment; ando Deliver value for money projects.

Page 8: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

What types of infrastructure projects are being funded?

• Planning, investigations and project design

• Works on irrigation systems off farm - modernisation and rationalisation

• Works on farm to improve water use efficiency

• Works to improve ecological health and restore natural flows

• Water saving municipal projects – e.g. storm water harvesting

Page 9: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

Planning and Investigations• Local government – preparing for a future with less or more

variable water supply

• Modernisation plans - prepared by irrigation districts/corporations

₋ Hot spots assessments (identifying areas of water loss and leakage)

• Water resource assessment (e.g. CSIRO sustainable yield studies) to underpin better water management

Page 10: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

Upgrading irrigation systems off farm• fixing/replacing inefficient supply systems

• lining channels, replacing channels with pipes

• improving water delivery standards for timing and volume

• metering to meet modern standards

• reconfiguring and rationalising channel systems and farm off-takes

• decommissioning channels and providing alternate stock and domestic supply

Page 11: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

Off-Farm Project ExamplesNSW and SA Private Infrastructure Operator Programs

• $650m in NSW and $110m for South Australia for integrated on- and off-farm upgrades.

Northern Victoria Irrigation Renewal Project • $1 billion for delivery system modernisation and user connections

in the Goulburn-Murray Irrigation District.

Page 12: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

Private Irrigation Infrastructure Operators Program for NSW

Page 13: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

On Farm InvestmentWorks on farm to deliver and use water more efficiently and increasing productivity, e.g.

• Improving on farm storage and tail water recirculation system• Installing pipes and risers• Installing drip irrigation systems and centre pivot irrigation as an alternative to the traditional flood irrigation

Examples:• On-Farm Irrigation Efficiency Program in the Southern Basin• NVIRP “3” on-farm component • QLD Water Use Efficiency Program• NSW Irrigated Farm Modernisation program

Page 14: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

Project assessment – due diligence Technical• Engineering assessment• Validation of water savings projections • Fit-for-purpose, properly costed designSocioeconomic• Net community benefit• Sustainable system renewal and upgrade• System upgrades affordable to run in futureEnvironmental• Water balance – recharge• Meets all environmental standardsGovernance• Water savings transfer, project control, OH&S, etc

Page 15: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

Other SRWUIP project examplesFeasibility Studies for Environmental Works and Measures• $10 million to Basin States for environmental works and measures feasibility

studieso Assessing projects which could improve the efficiency of environmental

watering - e.g. to ‘offset’ SDL reductions under the Basin Plan

Municipal Water in the Murray Darling Basin• ‘Strengthening Basin Communities’ Program

o Planning projectso Water Saving Infrastructure Projects

• $80 million in grants to 99 projects to date• Involves 70% of the local government authorities in the Murray Darling Basin

Page 16: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

SRWUIP - Who is delivering the projects? State government departments o e.g. water, primary industry, environment

Irrigation infrastructure operators Irrigation industry associations Industry commodity bodieso e.g. rice-growers, tomato growers

Individual irrigators Catchment management (resource management) authorities

Local government Water utilities CSIRO (four sustainable yields studies)

Page 17: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

MDB Water Recovery from SRWUIP projects

• Water savings are mostly shared betweeno the Commonwealth (for environmental use) and o Irrigators/irrigation water providerso some are retained (municipal projects) for community

benefit• Water savings provided to the Commonwealth will help

‘bridge the gap’ between the historical water use and the new sustainable diversion limits

• Total expected Commonwealth water yield from SRWUIP is 600GL in average annual yield terms

• Once water savings agreed in a works contract, they are recorded in the water recovery tables on SEWPaC website

Page 18: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

Historical water

use

2008 2012 2019

Final Basin PlanSDLs enter into force in 2019

Water purchase

Infrastructure savings

the ‘gap’

Bridging the Gap

Page 19: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

Progress to dateDuring 2011-12 the Government has announced infrastructure investments totalling around $2 billion. This comprises commitments to both on and off farm irrigation infrastructure:

• $1 billion for the Northern Victoria Irrigation Renewal Project Stage 2. • $469 million for contracts enabling the commencement of four NSW State Priority Projects.• $383 million for projects in four irrigation districts in New South Wales under Round 2 of the Private Irrigation

Infrastructure Operators Program. • In-principle funding of $150 million under Round 2 of the On Farm Irrigation Efficiency Program ‑ for nine delivery

partners• $11 million for Round 2 of the Private Irrigation Infrastructure Program for South Australia.• $9 million for Queensland ‘Healthy Headwaters’ on-farm projects.

Page 20: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

Progress to dateSeveral projects and programs funding through SRWUIP are complete or nearing completion, including:

• Lower Lakes Integrated Pipeline Project and Early works for the Lower Lakes and Coorong Recovery Project (feasibility study and Goolwa Channel, South Australia);

• Harvey Pipeline Project and Gascoyne Irrigation Pipeline (Western Australia);• Mathaguy Irrigation Scheme upgrade in the Macquarie Valley (NSW);• Tasmania – completed: Headquarters Road Dam, Sassafras Wesley Vale Irrigation Scheme, Whitemore

Irrigation Scheme, Winnaleah Irrigation Scheme; underway: Lower South Esk, and Midlands• Vic Wimmera-Mallee Pipeline (which included $99 million of SRWUIP funding); and• On-Farm Irrigation Efficiency pilot projects in the MDB.

Page 21: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

Benefits of Investment• Community support for programs is strong• Completed projects have demonstrated improved productivity

benefits:o increased crop rotation ability o increased crop water use efficiencies o improved soil mangement o reduced maintenance and o reduced weed control requirements.

• Some projects have achieved greater than anticipated water savings, the benefit of which is retained by irrigators.

• Infrastructure investment creates jobs and underpins long-term economic sustainability of regional communities.

Page 22: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

SRWUIP –current issues• Expectations on SRWUIP to deliver water savings to ‘bridge the gap’ • Timelines for infrastructure roll-out

o managing expectations, while securing fit-for-purpose, properly costed, viable projects

• Integration of infrastructure investment (SRWUIP) with water purchaseo Water sales associated with delivery system/footprint

reconfiguration for irrigation districtso Avoiding investment in assets which become stranded

• Using and building local knowledge and capacity in rolling out infrastructure projects

Page 23: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

SRWUIP - next steps• Achieving expected water savings – bridging the gap in the

Murray Darling Basin• Delivering hundreds of infrastructure projects on time and on

budget through a wide array of delivery partners• Building scope for project adaptation to reflect developments

in technology and water availability• How to use remaining SRWUIP funds, e.g.

o Focus in catchments with a ‘gap to bridge’ in the Basin Plano Expectations of investment in environmental works and

measures

Page 24: Farm Irrigation (DSEWPaC) Murray-Goulburn (J. Baker) Murrumbidgee River Corridor (J. Houldsworth) River Murray at Bunyip Reach (J. Baker) Rainwater tank

www.environment.gov.au

Questions?