falb series led area light installation sheet

1
CAUTION: PLEASE FOLLOW THIS INSTRUCTION MANUAL CAREFULLY TO PREVENT ANY INJURIES OR COMPLICATIONS THAT MAY ARISE. WARNING: Before installing or maintaining the luminary, make sure all powers are TURNED OFF. Verify that supply voltage is correct by comparing it with the label information on all fixtures. Make all connections in accordance with the NEC requirements, and make sure all luminaries are properly secured to prevent any wire complications. This luminary is to always be installed with the lens facing down and its not to exceed the maximum ambient temperature rating noted on the specification sheet. FALB Series LED Area Light Installation Sheet Need help? Tech help line: (800) 988-6386 Email: [email protected] Website: www.paclights.com Copyright © 2017 PacLights All Rights Reserved Note: Instructions are subject to change at any time without notice 02-00002-103117-2 AC-ALB-AM Arm Mount (Round or Square Pole) Includes: FALB080, FALB100, FALB120, FALB150, FALB185, FALB240, FALB300 AC-ALB-AM can be used on a Round Pole or a Square Pole DRILLING TEMPLATE O 0.688” Run Power Supply Cable through this hole opening into the Arm Mount WIRING DIAGRAM The LED Driver input cable consists of 3 conductors: ACL (black), ACN (white), and ground (green). These conductors are to be connected to a Power Supply Cable. (For Dimmable Fixtures) The Dimming cable consists of 2 conductors: DIM+ (Blue/ Brown+Gray) DIM- (White/ Blue+ Black) FALB DIM+ (BLUE) DIM- (WHITE) AC-ALB-AM bracket Socket Head Machine Screw Lock-washer Washer Square Pole Gasket Round Pole adapter plate Round Pole Gasket Locking Plate 5.531” 6.313” O 0.375” Clearance holes on pole to align with Locking plate hole locations 2.00” 1. Drill holes on the square pole by following the Drilling Template to mount the FALB to the desired heigh. 2. Remove the Locking Plate from the Arm Mount by removing the Socket head machine screws and 3. (Optional) If the FALB fixture is being installed to a round pole. Skip this step. Otherwise, Remove the Flat-head machine screws and remove the round pole adapter plate with it’s gasket. 4. Using a Phillips Screwdriver, remove the [4] Flat-head machine screws before installing into the FALB fixture. 5. Align the holes from the AC-ALB-AM arm mount with the FALB fixture and use the provided Socket head machine screws with washers to fasten them together. Run the FALB cables through the nylon gasket inside the arm mount. 6. Place the lock plate inside the mounting pole and fasten the FALB fixture onto the pole with the socket head machine screws removed in Step 2. 7. Run the Power Supply cable inside the mount pole through the 3/8” clearance hole and into the AC-ALB-AM. Follow the Wiring Diagram to properly connect the FALB fixture. 6b. (optional) If this is being installed to a Round Pole. All steps must be followed same as a square pole, except the round pole adapter will still be attached to the AC-ALB-AM bracket. 8. All wiring must be installed by a certified electrician and must be compliant to NEC standards. Once all wiring is properly installed Fasten the cap back to the AC-ALB-AM arm mount.

Upload: others

Post on 23-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

CAUTION: PLEASE FOLLOW THIS INSTRUCTION MANUAL CAREFULLY TOPREVENT ANY INJURIES OR COMPLICATIONS THAT MAY ARISE.WARNING: Before installing or maintaining the luminary, make sure all powers areTURNED OFF.Verify that supply voltage is correct by comparing it with the label information on allfixtures.Make all connections in accordance with the NEC requirements, and make sure allluminaries are properly secured to prevent any wire complications. This luminary isto always be installed with the lens facing down and its not to exceed the maximumambient temperature rating noted on the specification sheet.

FALB Series LED Area Light Installation Sheet

Need help? Tech help line: (800) 988-6386 Email: [email protected] Website: www.paclights.com

Copyright © 2017 PacLights All Rights Reserved

LED DRIVER

V(-)

[BLACK]

V(+)

[RED]

TO LOAD

[LED BOARD][WHITE]

[BLACK]ACN [BLUE/WHITE]

ACL [BROWN/BLACK]

GROUND [GREEN]

NEUTRAL [WHITE]

GROUND [GREEN]

HOT [BLACK]

INP

UT

OU

TP

UT

DIM

WH

ITE

(-)

BL

UE

(+)Inside F2SB

PRE-CONNECTED

(DO NOT DISCONNECT)

Using a J-Box (not included), Connect the ACL and the ACN from the driver to the conduit with the AC Power Supply cords.Follow the Wiring Diagram provided.

* LED DRIVER Input Ground (green) wire only available for selected fixtures.

If the Ground Wire is missing and the Power Supply includes a ground wire, connect the power supply ground wire to the fixture.

(FOR DIMMABLE VERSION)

7. Adjust the Tilt Angle on the F2SBluminaire, once the Tilt Angle is asdesired, finish tightening the SocketHead bolt to firmly tighten the F2SB withthe Arm Mount.

Note: Instructions are subject to change at any time without notice

STANDARD INSTALLATION STEPS

DRILLING TEMPLATE

5.5

0 in

4.2

5 in

3.6875 in

.625 in

2. Place mount against round tube.

3. Install the provided [2] Socket headM8-1.25 x 40 mm bolts with lock washerand washer to secure the arm mountfirmly in place, insert the flat-barwith threaded holes inside theround tube and use thethreaded holes to securethe mount. Make sure allbolts are tightened andholes are properly sealed.

1. Use provided Hole Pattern for drilling. Make sure to makean extra notch for the power cables to run through the RoundTube.

4. Once the Arm Mount is properlyfastened to the mounting round pole, runthe power cord cable from the inside ofthe pole and out the notch from the Arm Mount. This cablewill then be inserted intothe F2SB fixture.

5. Run the power cord from thearm mount to the F2SB luminaire,Once the cable has been insertedinside the F2SB, connect the powercable to the LED Driver inside theF2SB. In order to access the LEDDriver cables, the electrician mustfirst remove the [6] screws from the service door using a #2 Phillipsscrew driver and make allconnections inside the luminaire.

6. Once all wiring is complete,Close the service door and usethe M12 bolt to fasten theArm Mount to the F2SB.Do not fasten completely.

02-00002-103117-2

AC-ALB-AM Arm Mount (Round or Square Pole)Includes:FALB080, FALB100, FALB120, FALB150, FALB185, FALB240, FALB300

AC-ALB-AM can be used on a Round Pole or a Square Pole

DRILLINGTEMPLATE

O 0.688” RunPower SupplyCable throughthis holeopening intothe Arm Mount

1

4. Fasten the small bracket to the FALB fixture withthe provided socket head machine screws,lock-washers, and washers.

WIRING DIAGRAM

The LED Driver input cable consists of 3 conductors:ACL (black), ACN (white), and ground (green). These conductors are to be connected to a PowerSupply Cable.

(For Dimmable Fixtures) The Dimming cableconsists of 2 conductors:DIM+ (Blue/ Brown+Gray)DIM- (White/ Blue+ Black)

FALB

DIM+ (BLUE)

DIM- (WHITE)

AC-ALB-AMbracket

Socket HeadMachine Screw

Lock-washer

Washer

Square PoleGasket

Round Pole adapter plate

Round Pole Gasket

Locking Plate

5.531”

6.313”

O 0.375”Clearance holeson pole to alignwith Lockingplate holelocations

2.00”

FALB

DIM+ (BLUE)

DIM- (WHITE)

WIRING DIAGRAMThe LED Driver input cable consists of 3 conductors:ACL (black), ACN (white), and ground (green).These conductors are to be connected to a Power Supply Cable.

(For Dimmable Fixtures)The Dimming cable consists of 2 conductors:DIM+ (Blue/ Brown+Gray) & DIM- (White/ Blue+ Black)

1. Drill holes on the square pole by followingthe Drilling Templateto mount the FALB tothe desired heigh.

2. Remove the Locking Plate from the ArmMount by removing the Socket headmachine screws and

3. (Optional) If the FALB fixture is beinginstalled to a round pole. Skip this step.Otherwise, Remove the Flat-headmachine screws and remove the roundpole adapter plate with it’s gasket.

4. Using a Phillips Screwdriver,remove the [4] Flat-head machinescrews before installing into theFALB fixture.

5. Align the holes from the AC-ALB-AM armmount with the FALB fixture and use theprovided Socket head machine screws withwashers to fasten them together. Run theFALB cables through the nylon gasket insidethe arm mount.

6. Place the lock plate insidethe mounting pole and fastenthe FALB fixture onto the polewith the socket head machinescrews removed in Step 2.

7. Run the Power Supply cable inside the mount polethrough the 3/8” clearance hole and into theAC-ALB-AM. Follow the Wiring Diagram to properlyconnect the FALB fixture.

6b. (optional)If this is being installed to aRound Pole. All steps must befollowed same as a squarepole, except the round poleadapter will still be attached tothe AC-ALB-AM bracket.

8. All wiring mustbe installed by acertified electricianand must becompliant to NECstandards. Once allwiring is properlyinstalled Fasten thecap back to theAC-ALB-AM armmount.