fairbanks areawide industrial reclamation project area history janice wiegers adec
DESCRIPTION
Fairbanks Areawide Industrial Reclamation Project AREA HISTORY Janice Wiegers ADEC. Area History. 1989-1990 DOT plans Minnie Street Connector S&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs) - PowerPoint PPT PresentationTRANSCRIPT
Fairbanks Areawide Industrial Fairbanks Areawide Industrial Reclamation ProjectReclamation Project
AREA HISTORYAREA HISTORY
Janice WiegersJanice WiegersADECADEC
Area HistoryArea History 1989-1990 1989-1990
DOT plans Minnie Street ConnectorDOT plans Minnie Street Connector S&W investigate surface soil, subsurface soil, and S&W investigate surface soil, subsurface soil, and
groundwater groundwater Widespread contamination stops project (petroleum, Widespread contamination stops project (petroleum,
solvents, metals, PCBs)solvents, metals, PCBs)
1993-1996 1993-1996 MSLUG Project - Railroad and ~15 RPs MSLUG Project - Railroad and ~15 RPs USGS investigates groundwater characteristics and quality USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Primary focus is public drinking water wells on other site of the
Chena RiverChena River
2002 – 20042002 – 2004 ADEC begins FAIR project (larger than MSLUG)ADEC begins FAIR project (larger than MSLUG) 2002 Well point investigation conducted and coordinated 2002 Well point investigation conducted and coordinated
sampling beginssampling begins 2003 Risk Management Workplan completed by EPA2003 Risk Management Workplan completed by EPA
Area HistoryArea History 1989-1990 1989-1990
DOT plans Minnie Street ConnectorDOT plans Minnie Street Connector S&W investigate surface soil, subsurface soil, and groundwater S&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, Widespread contamination stops project (petroleum, solvents,
metals, PCBs)metals, PCBs)
1993-1996 1993-1996 MSLUG Project - Railroad and ~15 RPs MSLUG Project - Railroad and ~15 RPs USGS investigates groundwater characteristics and USGS investigates groundwater characteristics and
quality quality Primary focus is public drinking water wells on other Primary focus is public drinking water wells on other
site of the Chena Riversite of the Chena River
2002 – 20042002 – 2004 ADEC begins FAIR project (larger than MSLUG)ADEC begins FAIR project (larger than MSLUG) 2002 Well point investigation conducted and coordinated 2002 Well point investigation conducted and coordinated
sampling beginssampling begins 2003 Risk Management Workplan completed by EPA2003 Risk Management Workplan completed by EPA
MSLUG MSLUG
October 1993October 1993
April 1994April 1994March 1994March 1994
September 1993September 1993
Area HistoryArea History 1989-1990 1989-1990
DOT plans Minnie Street ConnectorDOT plans Minnie Street Connector S&W investigate surface soil, subsurface soil, and groundwater S&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, Widespread contamination stops project (petroleum, solvents,
metals, PCBs)metals, PCBs)
1993-1996 1993-1996 MSLUG Project - Railroad and ~15 RPs MSLUG Project - Railroad and ~15 RPs USGS investigates groundwater characteristics and quality USGS investigates groundwater characteristics and quality
Primary focus is public drinking water wells on other site of the Primary focus is public drinking water wells on other site of the Chena RiverChena River
2002 – 20042002 – 2004 ADEC begins FAIR project (larger than MSLUG)ADEC begins FAIR project (larger than MSLUG) 2002 Well point investigation conducted and 2002 Well point investigation conducted and
coordinated sampling beginscoordinated sampling begins 2003 Risk Management Workplan completed by EPA2003 Risk Management Workplan completed by EPA
FAIR AREAFAIR AREA
Four Tank FarmsFour Tank Farms – fuel delivered by rail – fuel delivered by rail
UNOCAL Tanks
Saupes TanksWillners
Tanks
Van Gas Tanks
FAIR AREA – Baseline SamplingFAIR AREA – Baseline Sampling
BenzeneND<5 ug/L5-99 ug/L100-999 ug/L>1,000 ug/LProduct
Groundwater Results - 2002
Groundwater Results – Fall 2003
BenzeneND<5 ug/L5-99 ug/L100-999 ug/L>1,000 ug/LProduct
Groundwater Results – Spring 2004
BenzeneND<5 ug/L5-99 ug/L100-999 ug/L>1,000 ug/LProduct
GROND<1.3 mg/L1.3-9 mg/L10-99 mg/L>100 mg/LProduct
Groundwater Results - 2002
Groundwater Results – Spring 2004
GROND<1.3 mg/L1.3-9 mg/L10-99 mg/L>100 mg/LProduct
DROND<1.5 mg/L1.5-9 mg/L10-99 mg/L>100 mg/LProduct
Groundwater Results - 2002
Groundwater Results – Fall 2003
DROND<1.5 mg/L1.5-9 mg/L10-99 mg/L>100 mg/LProduct
Groundwater Results – Spring 2004
DROND<1.5 mg/L1.5-9 mg/L10-99 mg/L>100 mg/LProduct
RROND<1.1 mg/L1.1-9 mg/L10-99 mg/L>100 mg/LProduct
Groundwater Results – Spring 2004