Department of TransportationPublic Workshop #3 - 9/15/16
Matt Darrow, PE – Sacramento CountyAdrian Engel, PE – Fehr & Peers
Fair Oaks Boulevard Complete Streets Project
Project Funding
• Project funding is provided by a grant from Sacramento Area Council of Governments (SACOG) 2014 Bicycle and Pedestrian Funding Program
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 2September 15, 2016
Project Area
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 3September 15, 2016
Project Objectives
• Improve mobility of pedestrian, bicyclists, motorists and transit
• Create a sense of place and center of activity• Strengthen neighborhood cohesiveness• Stimulate economic development
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 4September 15, 2016
Components
• Develop multimodal streetscape master plan for Fair Oaks Boulevard from Howe Avenue to Munroe Street
• Construct two signalized pedestrian crossings on Fair Oaks Boulevard as Phase 1
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 5September 15, 2016
Boulevard Users
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 6September 15, 2016
About 60% of trips using Fair Oaks Boulevard are local and begin and end within ½ mile of the corridor.
11 Lanes
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 7September 15, 2016
Hard to Cross
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 8September 15, 2016
Stressful to Ride
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 9September 15, 2016
Hard to Access
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 10September 15, 2016
Has Potential
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 11September 15, 2016
Concept 1
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 12September 15, 2016
• 6 Travel Lanes, Two-way Frontage• 3 New Pedestrian Crossings• Sidewalk Enhancements
• Bike Route with Frontage Roads• Bike Lanes on ends of Fair Oaks Blvd• Minimal Changes to Traffic Patterns
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 13September 15, 2016
Near Talbots and McDonalds
Near Roxy and Zinfandel Grill
Near Loehmann’s Plaza and Sierra Fair Apts
Pedestrian Hybrid
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 14September 15, 2016
Sharrows
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 15September 15, 2016
Concept 2
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 16September 15, 2016
• 6 Travel Lanes, One-way Frontage• 3 New Pedestrian Crossings• Sidewalk Enhancements
• Bike Lanes with Frontage Roads• Bike Lanes on ends of Fair Oaks Blvd• Moderate Changes to Traffic Patterns
Traffic Signals
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 17September 15, 2016
Near Pavilions and Boston Market Near CC Pet Hospital and Ettore’s
One-way frontage
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 18September 15, 2016
Bike Lanes
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 19September 15, 2016
Concept 3
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 20September 15, 2016
• 4 Travel Lanes, Two-way Frontage• 4 New Pedestrian Crossings• Sidewalk Enhancements
• Protected Bikeways on Fair Oaks Blvd• Major Changes to Traffic Patterns• Sierra Intersection Modifications
Traffic Signals
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 21September 15, 2016
Fair Oaks Blvd / University Ave Fair Oaks Blvd / Fulton Ave / Fairgate Rd
Munroe and Sierra
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 22September 15, 2016
Signalize U-turn Improved 5-legged Intersection
Munroe and Sierra
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 23September 15, 2016
New Signal – 300’ spacing New Signal – 600’ spacing
Protected Bikeway
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 24September 15, 2016
Photo: Nick Falbo
ComparisonConcepts
Cost
One Two Three
Remove Driver Conflict
Accommodate Bike Rider
Pedestrian Improvements
Changes in Traffic Patterns
Impact to Business Access
Frontage Parking
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 25September 15, 2016
Low Medium High
Next Step
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 26September 15, 2016
• Create a preferred alternative– Take input from concept review meetings– Explore preferred alternatives– Traffic analysis and cost estimates
Next Step
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 27September 15, 2016
• Public Workshop #4– Review Preferred Alternative and Draft Plan– Review Phase 1 Construction Project
• Planning Commission & Board of Supervisors
Survey
• Do you support each concept?• In the future would you change your travel
mode with each concept?• What parts of the concept do you really like?• What parts of the concept do you dislike?• Are there outstanding issues we have not
addressed?
Sacramento County Department of TransportationFair Oaks Boulevard Complete Streets Project 28September 15, 2016