factor for construction estimates
DESCRIPTION
Factor for Construction EstimatesTRANSCRIPT
-
Proposed Two-Storey Residential Building with Roofdeck
I. Concreting Works II. Rebar Works
PRICE LIST PRICE LISTMATERIAL PRICE MATERIAL
LAFARGE REPUBLIC PORTLAND PLUS 40KG 203.00 /bag 10 mmWASHED SAND 600.00 /m 12 mm
CRUSHED GRAVEL 1" 850.00 /m 16 mm
Concreting of Column Footing #16 G.I. WIRE
Total Volume of Column Footing (m) 5.4 REINFORCEMENT BARS FOR COLUMN FOOTING (F1)
DIMENSIO
NS
WIDTH 1.5Total Length for of RSB for Column Footing (m)
LENGTH 1.5
HEIGHT/THICKNESS 0.2
DIMENSIO
NS
NUMBER OF CF 12
CEMENT
48.6TOTAL COST
12825.54MATERIAL COST LABOR COST
9865.8 2959.74 2375.1 /m16 mm x 6m REINFORCEMENT STEEL BAR
105.6SAND
2.7 m of Washed SandTOTAL COST MATERIAL COST
2106 LABOR COSTMATERIAL COST LABOR COST COST
1620 486 390 /m #16 G.I. WIRENUMBER OF INTERSECTIONS
GRAVEL NUMBER OF FOOTING
5.4 m of Crushed Gravel 1"TOTAL COST LENGTH OF TIE WIRE
5967 302.4MATERIAL COST LABOR COST
4590 1377 1105 /m MATERIAL COSTLABOR COST
Concreting of Column TOTAL COST
Total Volume of Column (m) 11.56
REINFORCEMENT BARS FOR COLUMN FOOTING (F2)
DIMENSIO
NS
WIDTH 0.25
LENGTH 0.4Total Length for of RSB for Column Footing (m)
CONCRETE M
IXTURE CLASS A
40 kg./bag Portland Cement
CONCRETE M
IXTURE CLASS A
-
DIMENSIO
NS HEIGHT/THICKNESS 6.8Total Length for of RSB for Column Footing (m)
NUMBER OF COLUMN 17
DIMENSIO
NS
CEMENT
104.04TOTAL COST
27456.156MATERIAL COST LABOR COST
21120.12 6336.036 2375.1 /m16 mm x 6m REINFORCEMENT STEEL BAR
SAND9.9
5.78 m of Washed SandTOTAL COST
4508.4 MATERIAL COSTMATERIAL COST LABOR COST LABOR COST
3468 1040.4 390 /mCOST
#16 G.I. WIRE
GRAVEL NUMBER OF INTERSECTIONS
11.56 m of Crushed Gravel 1"TOTAL COST NUMBER OF FOOTING
12773.8 LENGTH OF TIE WIREMATERIAL COST LABOR COST
24.3
9826 2947.8 1105 /mMATERIAL COST
Concreting of Wall Footing LABOR COST
Total Volume of Wall Footing (m) 4.4925TOTAL COST
DIMENSIO
NS
WIDTH 0.5REINFORCEMENT BARS FOR COLUMN (C1)
THICKNESS 0.15
LENGTH OF WF1 59.9Total Length for of RSB for Column (m)
CEMENT
40.4325TOTAL COST DIM
ENSIONS
10670.13675MATERIAL COST LABOR COST
8207.7975 2462.33925 2375.1 /m16 mm x 6m REINFORCEMENT STEEL BAR
SAND 119.68
2.24625 m of Washed SandTOTAL COST
1752.075 MATERIAL COSTMATERIAL COST LABOR COST LABOR COST
1347.75 404.325 390 /mCOST
#16 G.I. WIRE
CONCRETE M
IXTURE CLASS A
40 kg./bag Portland Cement
CONCRETE M
IXTURE CLASS A
40 kg./bag Portland Cement
-
GRAVEL NUMBER OF LATERAL TIES
4.4925 m of Crushed Gravel 1"TOTAL COST NUMBER OF RSB
4964.2125 NUMBER OF COLUMNMATERIAL COST LABOR COST LENGTH OF TIE WIRE
3818.625 1145.5875 1105 /m 1180.8
Concreting of Beam MATERIAL COST
Total Volume of Beam (m) 16.9425LABOR COST
TOTAL COST
DIMENSIO
NS
WIDTH 0.5 THICKNESS 0.15
REINFORCEMENT BARS FOR COLUMN (C2)LENGTH OF BEAMS 225.9
LENGTH OF FTB-1 34.95Total Length for of RSB for Column (m)
LENGTH OF RCB-1 190.95
CEMENT
DIMENSIO
NS
152.4825TOTAL COST
40240.13175MATERIAL COST LABOR COST
30953.9475 9286.18425 80480.2635 /m16 mm x 6m REINFORCEMENT STEEL BAR
9.97SAND
8.47125 m of Washed SandTOTAL COST MATERIAL COST
6607.575 LABOR COSTMATERIAL COST LABOR COST COST
5082.75 1524.825 13215.15 /mLENGTH OF COLUMN LATERAL TIES (m)
GRAVEL PERIMETER OF COLUMN
16.9425 m of Crushed Gravel 1"TOTAL COST NUMBER OF COLUMN
18721.4625 NUMBER OF LATERAL TIESMATERIAL COST LABOR COST NUMBER
14401.125 4320.3375 37442.925 /m SPACINGREMAINING LENGTH
Concreting of Slab (GF) SPACING
Total Volume of Slab (m) 14.344510 mm x 6m REINFORCEMENT STEEL BAR
166.12DIMENSIO
NS
THICKNESS 0.15
TOTAL AREA 95.63MATERIAL COST
LABOR COST
CONCRETE M
IXTURE CLASS A
40 kg./bag Portland Cement
CONCRETE M
IXTURE CLASS A
-
CEMENT COST
86.067TOTAL COST #16 G.I. WIRE
22713.0813NUMBER OF LATERAL TIES
MATERIAL COST LABOR COST NUMBER OF RSB
17471.601 5241.4803 1583.4 /m NUMBER OF COLUMNLENGTH OF TIE WIRE
SAND98.4
7.17225 m of Washed SandTOTAL COST
5594.355MATERIAL COST
MATERIAL COST LABOR COST LABOR COST
4303.35 1291.005 390 /mTOTAL COST
GRAVEL
REINFORCEMENT BARS FOR WALL FOOTING14.3445 m of Crushed Gravel 1"
TOTAL COST
15850.6725 Total Length of RSB for Wall Footing (m)MATERIAL COST LABOR COST
12192.825 3657.8475 1105 /m
DIMENSIO
NS
Concreting of Slab (2F and RD)
Total Volume of Slab (m) 35.23545
DIMENSIO
NS
THICKNESS 0.15
TOTAL AREA 234.90312 mm x 6m REINFORCEMENT STEEL BAR
32.95CEMENT
317.11905TOTAL COST MATERIAL COST
83687.717295 LABOR COSTMATERIAL COST LABOR COST COST
64375.16715 19312.550145 2375.1 /m10 mm x 6m REINFORCEMENT STEEL BAR
18.49SAND
17.617725 m of Washed SandTOTAL COST MATERIAL COST
13741.8255 LABOR COSTMATERIAL COST LABOR COST COST
10570.635 3171.1905 390 /m#16 G.I. WIRE
NUMBER OF HOOP BARS
GRAVEL NUMBER OF RSB
35.23545 m of Crushed Gravel 1"TOTAL COST LENGTH OF TIE WIRE
40 kg./bag Portland Cement
CONCRETE
MIXTURE CLASS A
40 kg./bag Portland Cement
-
35.23545 m of Crushed Gravel 1"
38935.17225 180.6MATERIAL COST LABOR COST
29950.1325 8985.03975 1105 /mMATERIAL COST
LABOR COST
Concreting of Stairs TOTAL COST
Total Volume of Column (m) 0.9
REINFORCEMENT BARS FOR CONCRETE BEAM (FTB-1)
DIMENSIO
NS
WIDTH 1.5
LENGTH 0.2 Total Length of RSB for FTB-1
HEIGHT/THICKNESS 0.2 DIMENSIO
NS
NUMBER OF STEPS 15
CEMENT
8.1TOTAL COST
2137.5912 mm x 6m REINFORCEMENT STEEL BAR
MATERIAL COST LABOR COST41.94
1644.3 493.29 2375.1 /mMATERIAL COST
SAND LABOR COST
0.45 m of Washed SandTOTAL COST COST
351 Total Length of Stirrups for FTB-1MATERIAL COST LABOR COST
270 81 390 /m PERIMETER OF FTB-110 mm x 6m REINFORCEMENT STEEL BAR
GRAVEL61.16
0.9 m of Crushed Gravel 1"TOTAL COST
994.5 MATERIAL COSTMATERIAL COST LABOR COST LABOR COST
765 229.5 1105 /mCOST
#16 G.I. WIRE
NUMBER OF STIRRUPSNUMBER OF RSB
LENGTH OF TIE WIRE
550.4625
MATERIAL COST
LABOR COST
TOTAL COST
REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)
CONCRETE M
IXTURE CLASS A
40 kg./bag Portland Cement
-
REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)
Total Length of RSB for RCB-1
DIMENSIO
NS
16 mm x 6m REINFORCEMENT STEEL BAR
305.52
MATERIAL COST
LABOR COSTCOST
Total Length of Stirrups for RCB-1
PERIMETER OF RCB-110 mm x 6m REINFORCEMENT STEEL BAR
334.16
MATERIAL COST
LABOR COSTCOST
#16 G.I. WIRENUMBER OF STIRRUPS
NUMBER OF RSB
LENGTH OF TIE WIRE
4009.95
MATERIAL COST
LABOR COST
TOTAL COST
REINFORCEMENT FOR GROUND FLOOR SLAB
Total Length of RSB for GF Slab
A
B
LENGTH OF RSBALONG A
ALONG B
-
12 mm x 6m REINFORCEMENT STEEL BAR
257.91
MATERIAL COST
LABOR COSTCOST
#16 G.I. WIRENUMBER OR INTERSECTIONS
LENGTH OF TIE WIRE
1310.4
MATERIAL COST
LABOR COST
TOTAL COST
REINFORCEMENT FOR 2F AND RD SLAB
NUMBER OF STEEL BARS
AREA12 mm x 6m REINFORCEMENT STEEL BAR
144.74
MATERIAL COST
LABOR COSTCOST
NUMBER OF STEEL BARS
AREA10 mm x 6m REINFORCEMENT STEEL BAR
144.74
MATERIAL COST
LABOR COSTCOST
#16 G.I. WIRENUMBER OR INTERSECTIONS
LENGTH OF TIE WIRE
Total Length of 12mm RSB
Total Length of 10mm RSB
-
80.886
MATERIAL COST
LABOR COST
TOTAL COST
-
II. Rebar Works III. Masonry Works
PRICE LIST PRICE LISTMATERIAL PRICE MATERIAL
10 mm 125.00 /pc CONCRETE HOLLOW BLOCK 5" THK12 mm 192.00 /pc CONCRETE HOLLOW BLOCK 4" THK16 mm 315.00 /pc LAFARGE REPUBLIC PORTLAND PLUS 40KG
#16 G.I. WIRE 180.00 /kg WASHED SAND
REINFORCEMENT BARS FOR COLUMN FOOTING (F1)CRUSHED GRAVEL 1"
CONCRETE HOLLOW BLOCKS FOR WALL (EXTERIOR)Total Length for of RSB for Column Footing (m) 633.6
LENGTH 3.3 NUMBER OF RSBGROUND FLOOR
ALONG (B) 1.5 9 SECOND FLOOR
ALONG (L) 1.5 7CONCRETE HOLLOW BLOCK 5" THK
NUMBER OF FOOTING (F1) 12CEMENT MORTAR (CLASS C)
16 mm x 6m REINFORCEMENT STEEL BAR CEMENT
105.6 pcsTOTAL COST SAND
43243.2 PLASTERING @ 12mm THK (CLASS B)MATERIAL COST 33264 AREA OF WALLS (TWO SIDES)
LABOR COST 9979.2 CEMENTCOST 19219.2 /m SAND
#16 G.I. WIRE TOTAL COSTNUMBER OF INTERSECTIONS 63 MATERIAL COST
NUMBER OF FOOTING 16 CHB 5" THK
LENGTH OF TIE WIRE 0.3 m CEMENT
302.4 meters 5.71 kg.SAND
CHB 5" THKMATERIAL COST 1027.0188679245 CEMENT
LABOR COST 308.1056603774 SAND
TOTAL COST 1335.1245283019CONCRETE HOLLOW BLOCKS FOR WALL (INTERIOR)
593.3886792453
REINFORCEMENT BARS FOR COLUMN FOOTING (F2)
Total Length for of RSB for Column Footing (m) 59.4GROUND FLOOR
REINFORCEM
ENT BARS
16 mm x 6m
REINFORCEM
ENT STEEL BAR
Total Area of Exterior Walls (m)
/m
Total Area of Interior Walls (m)
16 mm x 6m
REINFORCEM
ENT STEEL BAR
-
Total Length for of RSB for Column Footing (m)Total Length for of RSB for Column Footing (m) 59.4SECOND FLOOR
LENGTH 3.3 NUMBER OF RSB CONCRETE HOLLOW BLOCK 4" THK
ALONG (B) 1.5 9 CEMENT MORTAR (CLASS C)ALONG (L) 1.5 9 CEMENT
NUMBER OF FOOTING (F1) 1SAND
PLASTERING @ 8mm THK (CLASS B)16 mm x 6m REINFORCEMENT STEEL BAR AREA OF WALLS (TWO SIDES)
9.9 pcsTOTAL COST CEMENT
4054.05 SANDMATERIAL COST 3118.5 TOTAL COST
LABOR COST 935.55 MATERIAL COSTCOST 68.25 /m CHB 5" THK
#16 G.I. WIRE CEMENTNUMBER OF INTERSECTIONS 81 SAND
NUMBER OF FOOTING 1 CHB 5" THK
LENGTH OF TIE WIRE 0.3 m CEMENT
24.3 meters 0.46 kg.SAND
Total Length of RSB for Vertical BarsMATERIAL COST 82.5283018868
LABOR COST 24.758490566 TOTAL WIDTH OF WALLS
TOTAL COST 107.2867924528 SPACING47.6830188679 LENGTH
REINFORCEMENT BARS FOR COLUMN (C1)12 mm x 6m REINFORCEMENT STEEL BAR
67.5229166667
Total Length for of RSB for Column (m) 718.08MATERIAL COST
LENGTH OF COLUMN6.8
12964.4COST
NUMBER OF RSB/COLUMN 6Total Length of RSB for Horizontal Bars
NUMBER OF COLUMN 1616 mm x 6m REINFORCEMENT STEEL BAR HEIGHT OF WALL
119.68 pcs TOTAL COST WIDTH 49008.96 10 mm x 6m REINFORCEMENT STEEL BAR
MATERIAL COST 37699.28.98
LABOR COST 11309.76COST 68.25 /m MATERIAL COST
#16 G.I. WIRE LABOR COST
16 mm x 6m
REINFORCEM
ENT STEEL BAR
/m
16 mm
x 6m
REINFO
RCEMENT STEEL
BAR
-
NUMBER OF LATERAL TIES 41 COST
NUMBER OF RSB 6
NUMBER OF COLUMN 16
LENGTH OF TIE WIRE 0.3 /m
1180.8 meters 22.28 kg.
MATERIAL COST 4010.2641509434
LABOR COST 1203.079245283TOTAL COST 5213.3433962264
766.6681465039 /m
REINFORCEMENT BARS FOR COLUMN (C2)
Total Length for of RSB for Column (m) 59.84
LENGTH OF COLUMN 6.8
NUMBER OF RSB/COLUMN 8
NUMBER OF COLUMN 1
16 mm x 6m REINFORCEMENT STEEL BAR
9.97 pcsTOTAL COST
4084.08MATERIAL COST 3141.6
LABOR COST 942.48COST 68.25 /m
LENGTH OF COLUMN LATERAL TIES (m)996.71
PERIMETER OF COLUMN 1.3 m
NUMBER OF COLUMN 17
NUMBER OF LATERAL TIES 40.5
NUMBER 11TOTAL NUMBER OF LATERAL TIES
SPACING 0.1
REMAINING LENGTH 5.741
SPACING 0.210 mm x 6m REINFORCEMENT STEEL BAR
166.12 pcsTOTAL COST
26994.2291666667MATERIAL COST 20764.7916666667
LABOR COST 6229.4375
16 mm
x 6m
REINFO
RCEMENT STEEL
BAR
-
COST 27.0833333333 /m#16 G.I. WIRE
NUMBER OF LATERAL TIES 41
NUMBER OF RSB 8
NUMBER OF COLUMN 1
LENGTH OF TIE WIRE 0.3 /m
98.4 meters 1.86 kg.
MATERIAL COST 334.1886792453LABOR COST 100.2566037736TOTAL COST 434.4452830189
63.8890122087 /m
REINFORCEMENT BARS FOR WALL FOOTING
Total Length of RSB for Wall Footing (m) 197.67
NUMBER OF RSB 3
LENGTH OF WALL FOOTING 59.9
Total Length of Hoop Bars (m) 110.92
SPACING OF HOOP BARS 0.3
WIDTH OF HOOP BARS 0.512 mm x 6m REINFORCEMENT STEEL BAR
32.95 pcsTOTAL COST
8223.072MATERIAL COST 6325.44
LABOR COST 1897.632COST 41.6 /m
10 mm x 6m REINFORCEMENT STEEL BAR
18.49 pcsTOTAL COST
3003.9930555556MATERIAL COST 2310.7638888889
LABOR COST 693.2291666667COST 27.0833333333 /m
#16 G.I. WIRE
NUMBER OF HOOP BARS 200.67
NUMBER OF RSB 3
LENGTH OF TIE WIRE 0.3 m
12 mm
and 10 mm
REINFORCEM
ENT STEEL BARS
-
180.6 meters 3.41 kg.
MATERIAL COST 613.358490566LABOR COST 184.0075471698
TOTAL COST 797.3660377358
13.3116199956 /m
REINFORCEMENT BARS FOR CONCRETE BEAM (FTB-1)
Total Length of RSB for FTB-1 251.64 m
NUMBER OF RSB 6TOP BARS 3
BOTTOM BARS 3
TOTAL LENGTH OF FTB-1 34.95 m
12 mm x 6m REINFORCEMENT STEEL BAR
41.94 pcsTOTAL COST
10468.224MATERIAL COST 8052.48
LABOR COST 2415.744COST 41.6 /m
Total Length of Stirrups for FTB-1 366.975
PERIMETER OF FTB-1 1.2 m
10 mm x 6m REINFORCEMENT STEEL BAR
61.16 pcsTOTAL COST
9938.90625MATERIAL COST 7645.3125
LABOR COST 2293.59375COST 284.375 /m
#16 G.I. WIRE
NUMBER OF STIRRUPS 305.8125NUMBER OF RSB 6
LENGTH OF TIE WIRE 0.3
550.4625 meters 10.39 kg.
MATERIAL COST 1869.4952830189LABOR COST 560.8485849057TOTAL COST 2430.3438679245
810.1146226415 /m
REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)
-
REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)
Total Length of RSB for RCB-1 1833.12 m
WEB BARS 2TOP BARS 3
BOTTOM BARS 3
TOTAL LENGTH OF RCB-1 190.95 m
16 mm x 6m REINFORCEMENT STEEL BAR
305.52 pcsTOTAL COST
125110.44MATERIAL COST 96238.8
LABOR COST 28871.64COST 68.25 /m
Total Length of Stirrups for RCB-1 2005.0
PERIMETER OF RCB-1 1.2 m
10 mm x 6m REINFORCEMENT STEEL BAR
334.16 pcsTOTAL COST
54301.40625MATERIAL COST 41770.3125
LABOR COST 12531.09375COST 284.375 /m
#16 G.I. WIRENUMBER OF STIRRUPS 1670.8125
NUMBER OF RSB 8
LENGTH OF TIE WIRE 0.3
4009.95 meters 75.66 kg.
MATERIAL COST 13618.6981132075LABOR COST 4085.6094339623TOTAL COST 17704.3075471698
92.7169811321 /m
REINFORCEMENT FOR GROUND FLOOR SLAB
Total Length of RSB for GF Slab 1547.46
7.05 m SPACING ALONG A 48
13.5 m 0.15 m ALONG B 91
LENGTH OF RSB 1289.55 m
ALONG A 648 m
ALONG B 641.55 m
-
12 mm x 6m REINFORCEMENT STEEL BAR
257.91 pcsTOTAL COST
64374.336MATERIAL COST 49518.72
LABOR COST 14855.616COST 14.7377142857 /m
#16 G.I. WIRENUMBER OR INTERSECTIONS 4368
LENGTH OF TIE WIRE 0.3 m
1310.4 meters 24.72 kg.
MATERIAL COST 4450.4150943396LABOR COST 1335.1245283019TOTAL COST 5785.5396226415
1.3245283019 /m
REINFORCEMENT FOR 2F AND RD SLAB
868.45
NUMBER OF STEEL BARS 3.221 m
AREA 269.6212 mm x 6m REINFORCEMENT STEEL BAR
144.74 pcsTOTAL COST
36127.354432MATERIAL COST 27790.27264
LABOR COST 8337.081792COST 133.9936 /m
868.45
NUMBER OF STEEL BARS 3.221 m
AREA 269.6210 mm x 6m REINFORCEMENT STEEL BAR
144.74 pcsTOTAL COST
23520.4130416667MATERIAL COST 18092.6254166667
LABOR COST 5427.787625COST 87.2354166667 /m
#16 G.I. WIRENUMBER OR INTERSECTIONS 269.62
LENGTH OF TIE WIRE 0.3 m
Total Length of 12mm RSB
m
Total Length of 10mm RSB
m
-
80.886 meters 1.53 kg.
MATERIAL COST 274.7071698113LABOR COST 82.4121509434TOTAL COST 357.1193207547
1.3245283019 /m
-
III. Masonry Works III. Formworks
PRICE LIST PRICE LISTMATERIAL PRICE MATERIAL
CONCRETE HOLLOW BLOCK 5" THK 9.00 /pc Form Lumber 2" x 3" x 12' Coco LumberCONCRETE HOLLOW BLOCK 4" THK 8.00 /pc Form Lumber 2" x 2" x 12' Coco LumberLAFARGE REPUBLIC PORTLAND PLUS 40KG 203.00 /bag 1/2"x4'x8' Ordinary Plywood
WASHED SAND
600.00 /m FORMS FOR COLUMN
CRUSHED GRAVEL 1" 850.00 /m SIDES OF THE COLUMN
CONCRETE HOLLOW BLOCKS FOR WALL (EXTERIOR) SHORTER SIDELONGER SIDE
167.929LATERAL PERIMETER OF THE COLUMN
GROUND FLOOR 85.3155 COLUMN HEIGHT
SECOND FLOOR 82.6135 NUMBER OF COLUMNS
CONCRETE HOLLOW BLOCK 5" THK 2099.1125 pcs.TOTAL AREA
1/2"x4'x8' Ordinary PlywoodCEMENT MORTAR (CLASS C)
CEMENT 1601.62 bag TOTAL COSTSAND 177.17 MATERIAL COST
PLASTERING @ 12mm THK (CLASS B) LABOR COSTAREA OF WALLS (TWO SIDES) 335.86 m 42.651
CEMENT 48.36 bag WOOD FRAME OF COLUMNSSAND 4.03 m
Form Lumber 2" x 2" x 12' Coco LumberTOTAL COST 601323.43MATERIAL COST LABOR COST TOTAL COST
18892.0125 5667.60375 MATERIAL COST 334947.2370685 100484.17112055 LABOR COST 108717.23 32615.17038 29.000
CHB 5" THK 146.25 /m SCAFFOLDING FOR COLUMNSCEMENT 2592.94945 /m
HORIZONTAL BRACESSAND 841.62 /m
CONCRETE HOLLOW BLOCKS FOR WALL (INTERIOR)VERTICAL BRACES
DIAGONAL BRACES
150.005
Form Lumber 2" x 2" x 12' Coco LumberGROUND FLOOR 65.2
Total Area of Exterior Walls (m)
m
Total Area of Interior Walls (m)
-
SECOND FLOOR 84.805 TOTAL COST
CONCRETE HOLLOW BLOCK 4" THK 1875.0625 pcs.MATERIAL COST
LABOR COST
CEMENT MORTAR (CLASS C) 1675.960CEMENT 1430.67 bag
Form Lumber 2" x 3" x 12' Coco LumberSAND 158.26PLASTERING @ 8mm THK (CLASS B) TOTAL COST
AREA OF WALLS (TWO SIDES) 300.01 m MATERIAL COST
CEMENT 28.80 bag LABOR COST
SAND 2.40 m 66.733TOTAL COST 529966.92 FORMS FOR BEAM
MATERIAL COST LABOR COST PERIMETER OF TWO SIDES FORM
15000.5 4500.15 TWO SIDE FORMS 296273.1504425 88881.94513275 BOTTOM FORM 96393.21 28917.9639 LENGTH OF BEAM
CHB 5" THK 130 /m TOTAL AREACEMENT 2567.61505 /m 1/2"x4'x8' Ordinary Plywood
SAND 835.38 /m
Total Length of RSB for Vertical Bars 405.1375 mTOTAL COST
MATERIAL COST
TOTAL WIDTH OF WALLS 107.77 m LABOR COST
SPACING 0.8 m 42.651LENGTH 3.00 m WOOD FRAME OF COLUMNS
12 mm x 6m REINFORCEMENT STEEL BARForm Lumber 2" x 3" x 12' Coco Lumber
67.5229166667 pcs.TOTAL COST
16853.72 TOTAL COSTMATERIAL COST LABOR COST MATERIAL COST
12964.4 3889.32 LABOR COST 156.3860072376 /m 55.126
Total Length of RSB for Horizontal Bars 53.885 mSCAFFOLDING FOR COLUMNS
HORIZONTAL BRACESHEIGHT OF WALL 3
WIDTH 107.77VERTICAL BRACES
10 mm x 6m REINFORCEMENT STEEL BAR
Form Lumber 2" x 2" x 12' Coco Lumber8.98 pcs
TOTAL COST 1459.3854166667 TOTAL COST
MATERIAL COST 1122.6041666667 MATERIAL COSTLABOR COST 336.78125 LABOR COST
m
-
27.0833333333 /m 47.165
Form Lumber 2" x 3" x 12' Coco LumberTOTAL COST
MATERIAL COST
LABOR COST
90.316
-
PRICE LISTMATERIAL PRICE
Form Lumber 2" x 3" x 12' Coco Lumber 132.00 /pcForm Lumber 2" x 2" x 12' Coco Lumber 88.00 /pc
1/2"x4'x8' Ordinary Plywood 320.00 /pc
FORMS FOR COLUMN
SIDES OF THE COLUMN 0.65 m
SHORTER SIDE 0.25 m
LONGER SIDE 0.4 m
LATERAL PERIMETER OF THE COLUMN1.5 m
COLUMN HEIGHT 6.8m
NUMBER OF COLUMNS 17
TOTAL AREA 173.4 m
1/2"x4'x8' Ordinary Plywood 17.7780511811 pcs
TOTAL COST 7395.67MATERIAL COST 5688.98
LABOR COST 1706.6942.651 /m
WOOD FRAME OF COLUMNS
Form Lumber 2" x 2" x 12' Coco Lumber43.956
pcs
TOTAL COST 5028.59MATERIAL COST 3868.15
LABOR COST 1160.4429.000 /m
SCAFFOLDING FOR COLUMNS
HORIZONTAL BRACES 2427.6
bd. Ft.
VERTICAL BRACES 809.2
bd. Ft.
DIAGONAL BRACES 1352.52
bd. Ft.
Form Lumber 2" x 2" x 12' Coco Lumber2540.310
bd. Ft.
-
TOTAL COST 290611.46MATERIAL COST 223547.28
LABOR COST 67064.181675.960 /m
Form Lumber 2" x 3" x 12' Coco Lumber67.433
bd. Ft.
TOTAL COST 11571.56MATERIAL COST 8901.20
LABOR COST 2670.3666.733 /m
FORMS FOR BEAM
PERIMETER OF TWO SIDES FORM 0.95 m
TWO SIDE FORMS 0.25 m
BOTTOM FORM 0.35 m
LENGTH OF BEAM 225.9 m
TOTAL AREA 214.605 m
1/2"x4'x8' Ordinary Plywood 22.003 pcs
TOTAL COST 9153.10MATERIAL COST 7040.85
LABOR COST
2112.25
42.651 /m
WOOD FRAME OF COLUMNS
Form Lumber 2" x 3" x 12' Coco Lumber68.942
bd. Ft.
TOTAL COST 11830.38MATERIAL COST 9100.29
LABOR COST 2730.0955.126 /m
SCAFFOLDING FOR COLUMNS
HORIZONTAL BRACES 88.4775
bd. Ft.
VERTICAL BRACES 112.95
bd. Ft.
Form Lumber 2" x 2" x 12' Coco Lumber88.478
pcs
TOTAL COST 10121.83MATERIAL COST 7786.02
LABOR COST 2335.81
-
47.165 /m
Form Lumber 2" x 3" x 12' Coco Lumber112.950
bd. Ft.
TOTAL COST 19382.22MATERIAL COST 14909.40
LABOR COST 4472.82
90.316 /m
-
TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK
BILL OF MATERIALSI.D. NO DESCRIPTION UNIT
GENERAL REQUIREMENTSMobilization/Temporary Structures, Utilities
lotand Services/Demobilization/Permits
Sub-total1.00 Earthworks1.01 Clearing and Grubbing sq.m1.02 Structural Excavation cu.m1.03 Backfilling and Compaction cu.m1.04 Gravel Bedding G-1 cu.m1.05 Select Fill cu.m1.06 Soil Poisoning sq.m
Sub-Total
2.00 Concreting WorksColumn Footing
2.01 Portland Cement bag2.02 Crushed Gravel 1" cu.m2.03 Washed Sand cu.m
Wall Footing2.01 Portland Cement bag2.02 Crushed Gravel 1" cu.m2.03 Washed Sand cu.m
Column 2.01 Portland Cement bag2.02 Crushed Gravel 3/4"" cu.m2.03 Washed Sand cu.m
Beams2.01 Portland Cement bag2.02 Crushed Gravel 3/4"" cu.m2.03 Washed Sand cu.m
Slab on Grade2.01 Portland Cement bag2.02 Crushed Gravel 1" cu.m2.03 Washed Sand cu.m
Stairs
-
2.01 Portland Cement bag2.02 Crushed Gravel 1" cu.m2.03 Washed Sand cu.m
Sub-total
3.00 Rebar WorksFootings
Column Footings3.01 16 mm pc3.02 #16 G.I. Wire kg
Wall Footings3.01 12 mm pc3.02 10 mm pc3.03 #16 G.I. Wire kg
Column 3.01 16 mm pc3.02 10 mm pc3.03 #16 G.I. Wire kg
Roof beams & Tie beams3.01 16 mm pc3.02 12 mm pc3.03 10 mm pc3.04 #16 G.I. Wire kg
Slabs3.01 12 mm pc3.02 10 mm pc3.03 #16 G.I. Wire kg
Sub-total4.00 Forms and Scaffoldings
Column form4.01 Good lumber ( 2" x 2" x 12') pc4.02 Plywood Ordinary, 1/4" x 4" x 8' pc4.03 CWN, Assorted kg
Column & Roof beam Scaffolding4.01 Vertical Support ( 2" x 3" x 12' Good lumber) pc
Horizontal Support (2" x 2" x 12' Good lumber) pcDiagonal braces (2" x 2" x 12' Good lumber) pc
4.02 CWN, Assorted kgBeam form
4.01 Good lumber ( 2" x 2" x 12') pc4.02 Plywood Ordinary, 1/4" x 4" x 8' pc
-
4.03 CWN, Assorted kgSub-total
5.00 Masonry WorksMasonry wall
5.01 CHB 5" THK pcs.5.02 CHB 4" THK pcs.5.03 Portland Cement bag5.04 Washed Sand cu.m5.05 12mm x 6m RSB pc5.06 #61 G.I. Tie wire kg
Plastering5.01 Portland Cement bag5.02 Washed Sand cu.m
Sub-total6.00 Doors And Windows
6.01 set
6.02 set
6.03 set
6.04 set
6.05 set
6.07 set
6.08 set
6.09 set
6.1 set
6.12 set
6.13 set
Sub-total7.00 Electrical Works
Roughing-ins
7.01 Electrical Conduit uPVC, 15mm pc
D-1, Double swing panel door with 2" x 6" wooden frame & 2" x 6" wooden door jamb
D-2, Panel door with 2" x 6" wooden frame& 2" x 6" wooden door jamb
D-3, Panel door with 2" x 6" wooden frame& 2" x 6" wooden door jamb
W-1, 12mm thk. bronze glass on powder coatedaluminum frame
W-2, 6mm thk. bronze glass on powdercoated aluminum frame
W-3, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.
W-4, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.
W-5, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.
W-6, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.
W-7, 12mm thk. bronze glass on powder coatedaluminum frame
W-8, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.
-
7.02 RSC 60mm pc
7.03
Entrance Cap 60mm dia.
pc
7.04
Junction Box , 4" x 4" G.I
pc
7.05
Utility Box, 2" x 4" x G.I
pc
7.06
Grounding Rod, 2.4m x 16mm dia.
pcWires and Fixtures
7.01
3.5 mm2 THW wire , Stranded
box
7.02
Duplex C.O. with Plate
pc
7.03
3 Way Switch With Plate
pc
7.04
40 watts Flourescent Lamp
pc
7.05
Single Switch with Plate
pc
7.06
2-Gang Switch with Plate
pc
7.07 Incandescent Bulb 50W set
7.08 Panel Box, Flush Type, 4 Branches set7.09 Circuit Breaker, 20A 2P set7.10 Main Circuit Breaker, 175A 2P set7.11 Electrical Tape pc
Sub-total8.00 Plumbing Works8.01 Water Closet 1.6gpf with Accessories set8.02 Kitchen Sink set8.03 Faucet , Hose Bibb , Brass 3/4" pc8.04 G.I Coupling, 3/4" pc8.05 G.I Tee, 3/4" pc8.06 G.I. Pipe 3/4" Sch.40 pc8.07 G.I. Elbow 90 x 3/4" pc8.08 Gate Valve , 3/4"dia. pc8.09 Check Valve , 3/4"dia. pc8.10 S.S. Floor Drain 4' x 4" pc
Sub-total
-
9.00 Sanitary works9.01 uPVC Sanitary Pipe 4" x 10' pc9.02 uPVC Wye 4" x 4" pc
9.03 uPVC Wye 4" x 2" pc
9.04 uPVC Sanitary Pipe 2" pc9.05 uPVC P-TRAP 2" pc9.06 uPVC P-TRAP 4" pc9.07 uPVC Elbow 45 x 4 " pc9.08 uPVC Cleanout 4" diameter pc9.09 PVC Cement can
Sub-total10.00 Painting Works
Concrete surfaces sq.m10.01 Neutralizer qrt10.02 Latex, Flat gal
10.03 Latex, Semi Gloss gal
10.04 Acri Color qrtSub-total
11.00 TileWorksWall
11.01 Unglazed Wall Tiles 20cm x 30cm T&B pc11.02 Unglazed Wall Tiles 20cm x 20cm KITCHEN pc11.03 Tile Trim 6mm. pc11.04 Lining 2" X 20cm (T&B and KITCHEN) pc11.05 Tile Adhesive 25kg/bag bag11.06 Tile Grout 5 kg/bag bag
Flooring sq.m
11.01Glazed Floor Tiles 20cmx 20cm
pc(INTERIOR )
11.02 Tile Adhesive 25kg/bag bag
11.03 Tile Grout 5 kg/bag bagSub-total
TOTAL BUILDING COST (LABOR AND MATERIAL)
PRICE FOR BIDDING
LABOR AND MATERIALS
-
TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK
BILL OF MATERIALSQTY UNIT COST TOTAL COST
MATERIAL LABOR MATERIAL LABOR
1.00 30,000.00 9,000.00 30,000.00 9,000.00
140.00 0.00 50.00 0.00 7,000.0075.80 0.00 250.00 0.00 18,950.0050.00 150.00 50.00 7,500.00 2,500.005.00 850.00 255.00 4,250.00 1,275.00
13.00 150.00 45.00 1,950.00 585.00140.00 50.00 15.00 7,000.00 2,100.00
48.60 203.00 66.00 9,865.80 3,207.605.40 850.00 255.00 4,590.00 1,377.002.70 600.00 180.00 1,620.00 486.00
40 203.00 66.00 8,120.00 2,640.002.25 850.00 255.00 1,912.50 573.754.5 600.00 180.00 2,700.00 810.00
105.00 203.00 66.00 21,315.00 6,930.0011.56 850.00 255.00 9,826.00 2,947.805.78 600.00 180.00 3,468.00 1,040.40
153.00 203.00 66.00 31,059.00 10,098.0016.94 850.00 255.00 14,399.00 4,319.708.47 600.00 180.00 5,082.00 1,524.60
417.00 203.00 66.00 84,651.00 27,522.0050.85 850.00 255.00 43,225.90 12,967.7725.40 600.00 180.00 15,240.60 4,572.18
-
8.00 203.00 66.00 1,624.00 528.000.90 850.00 255.00 765.00 229.500.45 600.00 180.00 270.00 81.00
164.00 315.00 10.00 51,660.00 1,640.004.28 180.00 10.00 770.40 42.80
33.00 192.00 10.00 6,336.00 330.0018.50 125.00 10.00 2,312.50 185.003.41 180.00 10.00 613.80 34.10
130.00 315.00 10.50 40,950.00 1,365.00167.00 125.00 10.00 20,875.00 1,670.0024.14 180.00 10.00 4,345.20 241.40
306.00 315.00 10.50 96,390.00 3,213.0041.94 192.00 10.00 8,052.48 419.40
395.00 125.00 10.00 49,375.00 3,950.0086 180.00 10.00 15,480.00 860.00
403.00 192.00 10.00 77,376.00 4,030.00144.74 125.00 10.00 18,092.50 1,447.4026.25 180.00 10.00 4,725.00 262.50
44.00 88.00 26.40 3,872.00 1,161.6018.00 320.00 96.00 5,760.00 1,728.0030.00 80.00 24.00 2,400.00 720.00
180.38 132.00 39.60 23,810.16 7,143.05209.67 88.00 26.40 18,450.96 5,535.29112.71 88.00 26.40 9,918.48 2,975.5435.00 80.00 24.00 2,800.00 840.00
69.00 88.00 26.40 6,072.00 1,821.6022.00 320.00 96.00 7,040.00 2,112.00
-
30.00 80.00 24.00 2,400.00 720.00
2,100.00 9.00 2.55 18,900.00 5,355.001,875.00 8.00 2.55 15,000.00 4,781.253,032.00 203.00 57.00 615,496.00 172,824.00
275.43 600.00 168.00 165,258.00 46,272.2476.50 192.00 9.60 14,688.00 734.4020.00 180.00 19.50 3,600.00 390.00
77.16 203.00 54.00 15,663.48 4,166.6456.32 600.00 168.00 33,792.00 9,461.76
1 10,800.00 3,240.00 10,800.00 3,240.00
5 4,500.00 1,350.00 22,500.00 6,750.00
3 2,495.00 748.50 7,485.00 2,245.50
1 8,700.00 2,610.00 8,700.00 2,610.00
9 7,500.00 2,250.00 67,500.00 20,250.00
6 7,000.00 2,100.00 42,000.00 12,600.00
7 5,625.00 1,687.50 39,375.00 11,812.50
2 5,500.00 1,650.00 11,000.00 3,300.00
5 4,200.00 1,260.00 21,000.00 6,300.00
1 3,145.00 943.50 3,145.00 943.50
1 3,000.00 900.00 3,000.00 900.00
50.00 58.00 14.50 2,900.00 725.00
-
11.00 1,000.00 250.00 11,000.00 2,750.00
11.00 80.00 20.00 880.00 220.00
34.00 20.00 5.00 680.00 170.00
12.00 20.00 5.00 240.00 60.00
14.00 200.00 50.00 2,800.00 700.00
12.00 3,750.00 937.50 45,000.00 11,250.00
14.00 108.00 27.00 1,512.00 378.00
4.00 250.00 62.50 1,000.00 250.00
10.00 150.00 37.50 1,500.00 375.00
10.00 68.00 17.00 680.00 170.00
13.00 108.00 27.00 1,404.00 351.00
14.00 40.00 10.00 560.00 140.00
3.00 320.00 80.00 960.00 240.004.00 350.00 87.50 1,400.00 350.001.00 3,000.00 750.00 3,000.00 750.00
35.00 25.00 6.25 875.00 218.75
4.00 4,500.00 1,125.00 18,000.00 4,500.002.00 600.00 150.00 1,200.00 300.007.00 250.00 62.50 1,750.00 437.50
11.00 17.00 4.25 187.00 46.7511.00 17.00 4.25 187.00 46.7513.00 370.00 92.50 4,810.00 1,202.508.00 17.00 4.25 136.00 34.005.00 360.00 90.00 1,800.00 450.00
12.00 300.00 75.00 3,600.00 900.004.00 200.00 50.00 800.00 200.00
-
11.00 525.00 131.25 5,775.00 1,443.7511.00 160.00 40.00 1,760.00 440.00
14.00 97.00 24.25 1,358.00 339.50
14.00 205.00 51.25 2,870.00 717.5011.00 50.00 12.50 550.00 137.5017.00 110.00 27.50 1,870.00 467.508.00 97.00 24.25 776.00 194.005.00 110.00 27.50 550.00 137.506.00 120.00 30.00 720.00 180.00
646.528.62 130.00 32.50 1,120.60 280.15
21.55 450.00 112.50 9,697.50 2,424.38
22.00 440.00 110.00 9,680.00 2,420.00
4.20 123.00 30.75 516.60 129.15
168.00 40.00 10.00 6,720.00 1,680.0045.00 32.00 8.00 1,440.00 360.0021.00 50.00 12.50 1,050.00 262.5054.00 25.00 6.25 1,350.00 337.508.00 270.00 67.50 2,160.00 540.008.00 165.00 41.25 1,320.00 330.00
431.39
15,530.00 13.00 3.25 201,890.00 50,472.50
134.00 270.00 67.50 36,180.00 9,045.00
134.00 185.00 46.25 24,790.00 6,197.50
TOTAL BUILDING COST (LABOR AND MATERIAL) 2,993,117.44
PRICE FOR BIDDING
LABOR AND MATERIALS 31506.50
-
TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK
BILL OF MATERIALS DETAILED ESTIMATESCOST (MATERIALS AND LABOR AND LABOR ONLY) GRAND TOTAL I.D. NO
39,000.00
39,000.001.00
7,000.00 1.0118,950.00 1.0210,000.00 1.035,525.00 1.042,535.00 1.059,100.00 1.0653,110.00
2.00
13,073.40 2.015,967.00 2.022,106.00 2.03
10,760.00 2.012,486.25 2.023,510.00 2.03
28,245.00 2.0112,773.80 2.024,508.40 2.03
41,157.00 2.0118,718.70 2.026,606.60 2.03
112,173.00 2.0156,193.67 2.0219,812.78 2.03
-
2,152.00 2.01994.50 2.02351.00 2.03
303,686.45
3.00
53,300.00 3.01813.20 3.02
6,666.00 3.012,497.50 3.02647.90
3.0142,315.00 3.0222,545.00 3.034,586.60
99,603.00 3.018,471.88 3.0253,325.00 3.0316,340.00
3.0181,406.00 3.0219,539.90 3.034,987.50
417,044.483.013.02
5,033.60 3.037,488.003,120.00 3.01
3.0230,953.21 3.0323,986.2512,894.023,640.00 3.01
3.027,893.609,152.00 3.01
-
3,120.00 3.02107,280.68 3.03
4.0024,255.0019,781.25 4.01788,320.00 4.02211,530.24 4.0315,422.403,990.00 4.01
19,830.1243,253.76 4.02
1,236,783.454.01
14,040.00 4.02
29,250.00 4.03
9,730.50
11,310.00 5.00
87,750.00
54,600.00 5.01
51,187.50 5.02
14,300.00 5.03
27,300.00 5.04
4,088.50 5.05
3,900.00 5.06
307,456.505.015.02
3,625.00
-
13,750.00 6.00
1,100.00 6.01
850.00 6.02
300.00 6.03
3,500.00 6.04
6.05
56,250.00 6.07
1,890.00 6.08
1,250.00 6.09
1,875.00 6.1
850.00 6.12
1,755.00 6.13
700.001,200.00 7.001,750.003,750.00 7.011,093.75 7.0295,488.75 7.03
7.0422,500.00 7.051,500.00 7.062,187.50233.75 7.01233.75 7.02
6,012.50 7.03170.00 7.04
2,250.00 7.054,500.00 7.061,000.00 7.0740,587.50 7.08
-
7.097,218.75 7.102,200.00 7.111,697.503,587.50 8.00687.50 8.01
2,337.50 8.02970.00 8.03687.50 8.04900.00 8.05
20,286.25 8.068.078.08
1,400.75 8.0912,121.88 8.1012,100.00
645.75 9.0026,268.38 9.01
9.029.03
8,400.00 9.041,800.00 9.051,312.50 9.061,687.50 9.072,700.00 9.081,650.00 9.09
252,362.5010.00
45,225.00 10.0130,987.50 10.02346,125.00 10.03
2,993,117.44 10.04
PRICE FOR BIDDING11.00
/m11.01
11.02
11.0311.0411.05
-
11.06
11.01
11.0211.03
-
TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK
DETAILED ESTIMATESCOST (MATERIALS AND LABOR AND LABOR ONLY)
DESCRIPTION COST
MATERIALS AND LABORGENERAL REQUIREMENTSMobilization/Temporary Structures, Utilities
Php 278.57 and Services/Demobilization/Permits
Earthworks Php 379.36 Clearing and Grubbing Php 50.00 Structural Excavation Php 135.36 Backfilling and Compaction Php 71.43 Gravel Bedding G-1 Php 39.46 Select Fill Php 18.11 Soil Poisoning Php 65.00
Concreting Works Php 63,257.24 Concreting of Column Footing (F1) Php 3,916.00 Portland Cement Php 2,421.00 Crushed Gravel 1" Php 1,105.00 Washed Sand Php 390.00 Concreting of Wall Footing (WF1) Php 3,103.01 Portland Cement Php 1,992.59 Crushed Gravel 1" Php 460.42 Washed Sand Php 650.00 Column (C1 & C2) Php 8,430.96 Portland Cement Php 5,230.56 Crushed Gravel 3/4"" Php 2,365.52 Washed Sand Php 834.89 Beams (FTB-1, RCB-1 & RFB-1) Php 12,311.54 Portland Cement Php 7,621.67 Crushed Gravel 3/4"" Php 3,466.43 Washed Sand Php 1,223.44 Slab on Grade (S-1) Php 34,848.05 Portland Cement Php 20,772.78 Crushed Gravel 1" Php 10,406.24 Washed Sand Php 3,669.03 Stairs Php 647.69
-
Portland Cement Php 398.52 Crushed Gravel 1" Php 184.17 Washed Sand Php 65.00
Rebar Works Php 8,162.37 Reinforcing Steel Bars in Footings Php 3,582.52 Column Footing (C1F1) Php 1,651.05 16 mm Php 1,601.60 #16 G.I. Wire Php 49.45 Column Footing (C2F1) Php 1,849.48 16 mm Php 1,801.80 #16 G.I. Wire Php 47.68 Wall Footings Php 81.99 12 mm Php 41.60 10 mm Php 27.08 #16 G.I. Wire Php 13.31 Reinforcing Steel Bars in Column Php 1,629.87 Column (C1F1) Php 731.87 16 mm Php 450.45 10 mm Php 233.51 #16 G.I. Wire Php 47.91 Column (C2F1) Php 898.00 16 mm Php 600.60 10 mm Php 233.51 #16 G.I. Wire Php 63.89 Reinforcing Steel Bars in Roof Beams Php 1,686.46 FTB-1 Php 653.88 12 mm Php 300.00 10 mm Php 284.35 #16 G.I. Wire Php 69.53 RCB-1 and RFB-2 Php 1,032.58 16 mm Php 655.20 10 mm Php 284.38 #16 G.I. Wire Php 93.00 Reinforcing Steel Bars in Slabs Php 1,263.52 Ground Floor Slab Php 738.52 12 mm Php 677.62 #16 G.I. Wire Php 60.90 S-1 Php 525.00 12 mm Php 275.13
-
10 mm Php 174.87 #16 G.I. Wire Php 75.00
Installation of Forms and Scaffoldings Php 15,776.57 Column form Php 2,300.24 Good lumber ( 2" x 2" x 12') Php 740.24 Plywood Ordinary, 1/4" x 4" x 8' Php 1,101.18 CWN, Assorted Php 458.82 Column & Roof beam Scaffolding Php 10,510.81 Vertical Support ( 2" x 3" x 12' Good lumber) Php 4,551.94 Horizontal Support (2" x 2" x 12' Good lumber) Php 3,527.39 Diagonal braces (2" x 2" x 12' Good lumber) Php 1,896.18 CWN, Assorted Php 535.29 Beam form Php 2,965.53 Good lumber ( 2" x 2" x 12') Php 1,160.82
Plywood Ordinary, 1/4" x 4" x 8' Php 1,345.88
CWN, Assorted Php 458.82
Masonry Works Php 3,690.59
Masonry wall Php 3,491.59
CHB 5" THK Php 144.38
CHB 4" THK Php 131.88
Portland Cement Php 2,486.81
Washed Sand Php 667.29
12mm x 6m RSB Php 48.65
#61 G.I. Tie wire Php 12.59
Plastering Php 199.00 Portland Cement Php 62.56 Washed Sand Php 136.45
-
Installation of Doors And Windows Php 3,236.38
D-1, Double swing panel door with 2" x 6" wooden frame & 2" x 6" wooden door jamb Php 147.79
Php 307.89
Php 102.43
Php 119.05
Php 923.68
Php 574.74
Php 538.82
Php 150.53
Php 287.37
Php 43.04
Php 41.05
Electrical Works Php 1,005.14 Installation of Roughing-ins Php 243.42 Electrical Conduit uPVC, 15mm Php 38.16 RSC 60mm Php 144.74 Entrance Cap 60mm dia. Php 11.58 Junction Box , 4" x 4" G.I Php 8.95 Utility Box, 2" x 4" x G.I Php 3.16 Grounding Rod, 2.4m x 16mm dia. Php 36.84 Wires and Fixtures Php 761.72 3.5 mm2 THW wire , Stranded Php 592.11 Duplex C.O. with Plate Php 19.89 3 Way Switch With Plate Php 13.16 40 watts Flourescent Lamp Php 19.74 Single Switch with Plate Php 8.95 2-Gang Switch with Plate Php 18.47 Incandescent Bulb 50W Php 7.37 Panel Box, Flush Type, 4 Branches Php 12.63
D-2, Panel door with 2" x 6" wooden frame& 2" x 6" wooden door jamb
D-3, Panel door with 2" x 6" wooden frame& 2" x 6" wooden door jamb
W-1, 12mm thk. bronze glass on powder coatedaluminum frame
W-2, 6mm thk. bronze glass on powdercoated aluminum frame
W-3, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.
W-4, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.
W-5, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.
W-6, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.
W-7, 12mm thk. bronze glass on powder coatedaluminum frame
W-8, 6mm thk. bronze glass on powder coatedaluminum frame with open back, screen & lock accs.
-
Circuit Breaker, 20A 2P Php 18.42 Main Circuit Breaker, 175A 2P Php 39.47 Electrical Tape Php 11.51
Plumbing Works Php 427.24 Water Closet 1.6gpf with Accessories Php 236.84 Kitchen Sink Php 15.79 Faucet , Hose Bibb , Brass 3/4" Php 23.03 G.I Coupling, 3/4" Php 2.46 G.I Tee, 3/4" Php 2.46 G.I. Pipe 3/4" Sch.40 Php 63.29 G.I. Elbow 90 x 3/4" Php 1.79 Gate Valve , 3/4"dia. Php 23.68 Check Valve , 3/4"dia. Php 47.37 S.S. Floor Drain 4' x 4" Php 10.53
Sanitary works Php 213.54 uPVC Sanitary Pipe 4" x 10' Php 75.99 uPVC Wye 4" x 4" Php 23.16 uPVC Wye 4" x 2" Php 17.87 uPVC Sanitary Pipe 2" Php 37.76 uPVC P-TRAP 2" Php 7.24 uPVC P-TRAP 4" Php 24.61 uPVC Elbow 45 x 4 " Php 10.21 uPVC Cleanout 4" diameter Php 7.24 PVC Cement Php 9.47
Painting Works Php 87.56
Concrete surfacesNeutralizer Php 4.67 Latex, Flat Php 40.41 Latex, Semi Gloss Php 40.33 Acri Color Php 2.15
TileWorks Php 3,643.42 Wall Php 184.74 Unglazed Wall Tiles 20cm x 30cm T&B Php 88.42 Unglazed Wall Tiles 20cm x 20cm KITCHEN Php 18.95 Tile Trim 6mm. Php 13.82 Lining 2" X 20cm (T&B and KITCHEN) Php 17.76 Tile Adhesive 25kg/bag Php 28.42
-
Tile Grout 5 kg/bag Php 17.37 Flooring Php 3,458.68 Glazed Floor Tiles 20cmx 20cm
Php 2,656.45 (INTERIOR )Tile Adhesive 25kg/bag Php 476.05 Tile Grout 5 kg/bag Php 326.18
-
TWO STOREY RESIDENTIAL BUILDING WITH ROOFDECK
DETAILED ESTIMATESCOST (MATERIALS AND LABOR AND LABOR ONLY)
COST
MATERIALS AND LABOR LABOR
Php 278.57 Php 64.29
Php 379.36 per m Php 231.50 per m Php 50.00 per m Php 50.00 per m Php 135.36 per m Php 135.36 per m Php 71.43 per m Php 17.86 per m Php 39.46 per m Php 9.11 per m Php 18.11 per m Php 4.18 per m Php 65.00 per m Php 15.00 per m
Php 63,257.24 Php 15,393.39 Php 3,916.00 Php 1,174.00 Php 2,421.00 Php 594.00 Php 1,105.00 Php 255.00 Php 390.00 Php 90.00 Php 3,103.01 Php 745.14 Php 1,992.59 Php 488.89 Php 460.42 Php 106.25 Php 650.00 Php 150.00 Php 8,430.96 Php 2,021.89 Php 5,230.56 Php 1,283.33 Php 2,365.52 Php 545.89 Php 834.89 Php 192.67 Php 12,311.54 Php 2,952.28 Php 7,621.67 Php 1,870.00 Php 3,466.43 Php 799.94 Php 1,223.44 Php 282.33 Php 34,848.05 Php 8,344.81 Php 20,772.78 Php 5,096.67 Php 10,406.24 Php 2,401.44 Php 3,669.03 Php 846.70 Php 647.69 Php 155.28
per m per m
per m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per mper m per m
-
Php 398.52 Php 97.78 Php 184.17 Php 42.50 Php 65.00 Php 15.00
Php 8,162.37 per m Php 2,448.71 per m Php 3,582.52 per m Php 1,074.76 per m Php 1,651.05 per m Php 495.32 per m Php 1,601.60 per m Php 480.48 per m Php 49.45 per m Php 14.84 per m Php 1,849.48 per m Php 554.84 per m Php 1,801.80 per m Php 540.54 per m Php 47.68 per m Php 14.30 per m Php 81.99 per m Php 24.60 per m Php 41.60 per m Php 12.48 per m Php 27.08 per m Php 8.12 per m Php 13.31 per m Php 3.99 per m Php 1,629.87 per m Php 488.96 per m Php 731.87 per m Php 219.56 per m Php 450.45 per m Php 135.14 per m Php 233.51 per m Php 70.05 per m Php 47.91 per m Php 14.37 per m Php 898.00 per m Php 269.40 per m Php 600.60 per m Php 180.18 per m Php 233.51 per m Php 70.05 per m Php 63.89 per m Php 19.17 per m Php 1,686.46 per m Php 505.94 per m Php 653.88 per m Php 196.16 per m Php 300.00 per m Php 90.00 per m Php 284.35 per m Php 85.31 per m Php 69.53 per m Php 20.86 per m Php 1,032.58 per m Php 309.77 per m Php 655.20 per m Php 196.56 per m Php 284.38 per m Php 85.31 per m Php 93.00 per m Php 27.90 per m Php 1,263.52 per m Php 379.06 per m Php 738.52 per m Php 221.56 per m Php 677.62 per m Php 203.29 per m Php 60.90 per m Php 18.27 per m Php 525.00 per m Php 157.50 per m Php 275.13 per m Php 82.54 per m
per m per mper m per mper m per m
-
Php 174.87 per m Php 52.46 per m Php 75.00 per m Php 22.50 per m
Php 15,776.57 per m Php 4,732.97 per m Php 2,300.24 per m Php 690.07 per m Php 740.24 per m Php 222.07 per m Php 1,101.18 per m Php 330.35 per m Php 458.82 per m Php 137.65 per m Php 10,510.81 per m Php 3,153.24 per m Php 4,551.94 per m Php 1,365.58 per m Php 3,527.39 per m Php 1,058.22 per m Php 1,896.18 per m Php 568.85 per m Php 535.29 per m Php 160.59 per m Php 2,965.53 per m Php 889.66 per m Php 1,160.82 per m Php 348.25 per m
Php 1,345.88 per m Php 403.76 per m
Php 458.82 per m Php 137.65 per m
Php 3,690.59 per m Php 1,107.18 per m
Php 3,491.59 per m Php 1,047.48 per m
Php 144.38 per m Php 43.31 per m
Php 131.88 per m Php 39.56 per m
Php 2,486.81 per m Php 746.04 per m
Php 667.29 per m Php 200.19 per m
Php 48.65 per m Php 14.60 per m
Php 12.59 per m Php 3.78 per m
Php 199.00 per m Php 59.70 per m Php 62.56 per m Php 18.77 per m Php 136.45 per m Php 40.93 per m
-
Php 3,236.38 per m Php 970.92 per m
Php 147.79 per m Php 44.34 per m
Php 307.89 per m Php 92.37 per m
Php 102.43 per m Php 30.73 per m
Php 119.05 per m Php 35.72 per m
Php 923.68 per m Php 277.11 per m
Php 574.74 per m Php 172.42 per m
Php 538.82 per m Php 161.64 per m
Php 150.53 per m Php 45.16 per m
Php 287.37 per m Php 86.21 per m
Php 43.04 per m Php 12.91 per m
Php 41.05 per m Php 12.32 per m
Php 1,005.14 per m Php 301.54 per m Php 243.42 per m Php 73.03 per m Php 38.16 per m Php 11.45 per m Php 144.74 per m Php 43.42 per m Php 11.58 per m Php 3.47 per m Php 8.95 per m Php 2.68 per m Php 3.16 per m Php 0.95 per m Php 36.84 per m Php 11.05 per m Php 761.72 per m Php 228.52 per m Php 592.11 per m Php 177.63 per m Php 19.89 per m Php 5.97 per m Php 13.16 per m Php 3.95 per m Php 19.74 per m Php 5.92 per m Php 8.95 per m Php 2.68 per m Php 18.47 per m Php 5.54 per m Php 7.37 per m Php 2.21 per m Php 12.63 per m Php 3.79 per m
-
Php 18.42 per m Php 5.53 per m Php 39.47 per m Php 11.84 per m Php 11.51 per m Php 3.45 per m
Php 427.24 per m Php 128.17 per m Php 236.84 per m Php 71.05 per m Php 15.79 per m Php 4.74 per m Php 23.03 per m Php 6.91 per m Php 2.46 per m Php 0.74 per m Php 2.46 per m Php 0.74 per m Php 63.29 per m Php 18.99 per m Php 1.79 per m Php 0.54 per m Php 23.68 per m Php 7.11 per m Php 47.37 per m Php 14.21 per m Php 10.53 per m Php 3.16 per m
Php 213.54 per m Php 64.06 per m Php 75.99 per m Php 22.80 per m Php 23.16 per m Php 6.95 per m Php 17.87 per m Php 5.36 per m Php 37.76 per m Php 11.33 per m Php 7.24 per m Php 2.17 per m Php 24.61 per m Php 7.38 per m Php 10.21 per m Php 3.06 per m Php 7.24 per m Php 2.17 per m Php 9.47 per m Php 2.84 per m
Php 87.56 per m Php 26.27 per m
Php 4.67 per m Php 1.40 per m Php 40.41 per m Php 12.12 per m Php 40.33 per m Php 12.10 per m Php 2.15 per m Php 0.65 per m
Php 3,643.42 per m Php 1,093.03 per m Php 184.74 per m Php 55.42 per m Php 88.42 per m Php 26.53 per m Php 18.95 per m Php 5.68 per m Php 13.82 per m Php 4.14 per m Php 17.76 per m Php 5.33 per m Php 28.42 per m Php 8.53 per m
-
Php 17.37 per m Php 5.21 per m Php 3,458.68 per m Php 1,037.61 per m
Php 2,656.45 per m Php 796.93 per m
Php 476.05 per m Php 142.82 per m Php 326.18 per m Php 97.86 per m
FACTORBOM & DET