facilities[1]

39
FACILITIES/DEMOGRAPHICS COMMITTEE REPORT GLOUCESTER COUNTY SCHOOL SYSTEM

Upload: kenneth-hogge-sr

Post on 12-Apr-2017

442 views

Category:

Education


0 download

TRANSCRIPT

Page 1: Facilities[1]

FACILITIES/DEMOGRAPHICS COMMITTEE REPORT

GLOUCESTER COUNTY SCHOOL SYSTEM

Page 2: Facilities[1]

Progress / Growth

Page 3: Facilities[1]

County Population Growth Actual / Projected

• Year Year 1.5% Projected

• 99 33,900 200 05 35,000 525• 00 34,500 600 06 36,057 533• 01 34,780 280 07 36,598 540• 02 35,410 630 08 37,147 548• 03 35,400 -10 09 37,704 557• 04 35,000 -400 2010 38,270 565

Page 4: Facilities[1]

Gloucester CountyRegistered Voters

Year 2000 2001 Diff 2002 Diff 2003 Diff 2004 Diff

Petsworth 3,506 3,634 128 3,619 -15 3,675 56 3,757 82

Ware 4,448 3,965 -483 3,956 -9 3,976 20 4,095 119

Abingdon 3,749 4,135 386 4,094 -41 4,123 29 4,242 119

York 3,593 3,620 27 3,601 -19 3,599 -2 3,632 33

Gloucester Point 3,442 3,828 386 3,731 -97 3,752 21 3,799 47

Total Reg. Voters 18,738 19,182 444 19,001 -181 19,125 124 19,525 400

County Pop. 30,131 34,780 4,649 35,000 220 35,400 400 35,000 -400

School Pop. 6,526 6,411 -115 6,350 -61 6,309 -41 6,100 -209

Page 5: Facilities[1]

NEW CONSTRUCTION 2000/2004

• Permits Issued 974

• Total Value $119,585,226

• Total Certificates • of Occupancy 852

• Average Home Cost 2004 $166,200

Page 6: Facilities[1]

PROPOSED NEW CONSTRUCTION IMPACT• New Subdivisions: Lots Est.Children• Twin Island Farms 15 4• The River Club PUD 39• Stokes Perdue 50 11• Rivers Edge 8 • Beckwith Farms 77 16• Sewell’s Trace 95 20• Sarahs Cove 39 8• Sarahs Creek 18 4• Barrens 1200 264• Total 1502 327

Page 7: Facilities[1]

Upper County Proposed New Construction Impact

• New Subdivisions Lots Est. # Children• Pine Mill 67 14• Riverwatch 80 10• Town Commons 35 7• Hutch Creek 15 3• Robinson’s Pond 21 5• Total 218 39

Page 8: Facilities[1]

Elementary School

Page 9: Facilities[1]

Lower County Elementary Schools

• Abingdon 03/04 04/05 410 410

• Achilles 03/04 04/05• 322 310

• T. C. Walker 03/04 04/05 491 443

Page 10: Facilities[1]

Upper County Elementary Schools

• Bethel 03/04 04/05• 534 515

• Botetourt 538 542

• Petsworth 341 348

Page 11: Facilities[1]

Enrollment Statistics FY 2003/2004

• Year 2003 2004 Seat Avail.• Cap. Seats

• Abingdon 411 410 510 100• Achilles 322 310 472 162• T. C. Walker 491 443 496 53

• Total 1,224 1,163 1,478 315

Page 12: Facilities[1]

Enrollment Statistics FY 2003/2004

• Year 2003 2004 Seat Avail.• Cap. Seats• Bethel 534 515 580 65• Botetourt 538 542 658 116• Petsworth 341 348 388 40

• Total 1,413 1,405 1,626 221

Page 13: Facilities[1]

Elementary Available Seat Impact

• The aggregate total is 536 available seats.• Equivalent to one complete elementary

school or 1 and 1/2 elementary schools with smaller populations.

• Space may well be available now to remove all portables (trailers) and house all the students effected within the primary structure.

Page 14: Facilities[1]

Elementary Population Trends 1998-2004

• Year Elementary Difference• 1998 2,966 • 1999 2,949 25 • 2000 2,821 120 • 2001 2,788 33 • 2002 2,711 77 • 2003 2,632 79 • 2004 2,568 64

Page 15: Facilities[1]

Elementary Fall Timeline Actual / Projected 02/03-05/09

• Year Total Diff. +/• 02/03 2,711 77• 03/04 2,625 86• 04/05 2,568 28• 05/06 2,589 21• 06/07 2,617 28• 07/08 2,637 20• 08/09 2,648 11

Page 16: Facilities[1]

Elementary Schools CIP Program

• Provide for increased development of school storage areas.

• Ensure all sinks are modern and their stations are upgraded.

• Provide adequate parking at all facilities.• Institute an Annual Facility External / Interior

Maintenance Program in addition to the current CIP program initiatives.

Page 17: Facilities[1]

Modifications Required by School

• Abingdon: Upgrade cafeteria, provide more safe parking, new entry way and develop a structural design that provides for the “Quad Classrooms” to exit their rooms without passing through other classrooms but still be within a structure cover.

• T.C Walker: Move forward with renovation.

Page 18: Facilities[1]

Accountability

Page 19: Facilities[1]

SOL Testing Progression• 2002 Lower County 2004 Grade 5 Total• Grade 3 Writing 38 56• Eng. 61 R L R 24 68

• Math. 36 Math. 29 98

• Hist. 46 Hist. 20 40

• Sci. 39 Sci. 22 53• 2002 Upper County 2004 Grade 5 04 • Grade 3 Writing 18 Grade 6• Eng. 63 R L R 44 315• Math. 41 Math. 69

• Hist. 37 Hist. 20

• Sci. 35 Sci. 31

Page 20: Facilities[1]

Annual Division Retention Level

• Year Division Grade Number

• 01/02 Elem. K-5 67

• 02/03 Elem. K-5 60

• Total 127

Page 21: Facilities[1]

Middle School Pivot Point

Page 22: Facilities[1]

A Message from the Superintendent of Gloucester County Public Schools

“Quote, There is a direct correlation between one’s

education and his/her earnings potential. My desire is for all

students to be successful academically and become responsible citizens able to

contribute to the welfare of their community Unquote”

Page 23: Facilities[1]

Middle School Population Trends 1998-2004

• Year Middle School Difference• 1998 1,709• 1999 1,604 105 • 2000 1,554 50• 2001 1,539 15• 2002 1,539 0• 2003 1,524 15• 2004 1,558 34 •

Page 24: Facilities[1]

Middle School Timeline Actual / Projected 02/03-08/09

• Year Total Diff. +/-• 02/03 1,561 2• 03/04 1,569 8• 04/05 1,558 11• 05/06 1,489 69• 06/07 1,423 66• 07/08 1,412 11• 08/09 1,388 24

Page 25: Facilities[1]

Middle School Enrollment Statistics FY 2003/2004

• Year 2003 2004 Seat Avail.• Cap. Seats• Page 642 636 720 84

• Peasley 882 922 874 48

Page 26: Facilities[1]

Accountability

Page 27: Facilities[1]

Middle Schools GPA

• Year 03/04• GPA < 2.5 496• C Grade 84-75• GPA < 2.0 245• D Grade 74-65

Page 28: Facilities[1]

6 Year SOL Progression Record• 99 Grade 3 01 Grade 5 04 Grade 8• Lower County Writing 24 Writing 91• Eng. 86 R L R 38 R L R 89• Math. 71 Math. 58 Math. 38• Hist. 86 Hist. 66 Hist. 76• Sci. 61 Sci. 26 Sci. 26• Upper County Writing 26 Alg. I 7• Eng. 96 R L R 54 Geom. 0• Math. 82 Math. 87• Hist. 72 Hist. 64 Total 327• Sci. 61 Sci. 47• Combined Eng. 182 Writing 50 R L R 92• Math. 153 Math. 145• Hist. 158 Hist. 130• Sci. 122 Sci. 73

Page 29: Facilities[1]

Annual Division Retention Level

• Year Division Grade Number

• 01/02 Middle 6-8 56

• 02/03 Middle 6-8 24• Total 80

Page 30: Facilities[1]

8th Grade SOL Progression to 9th Grade• Year Year Year• 2002 2003 2004• Tot. Stds. Tot. Stds. Tot.Stds.• 482 519 519• Writing 121 104 91• R L R 116 87 89• Math. 100 89 38• History 50 76 76• Science 60 35 26• Algebra I 17 0 7• Geometry 0 0 0• Total 464 391 327• Sept. 9th. Grd. 592 582 620

Page 31: Facilities[1]

Committee Recommendations

The School Board actively pursue re-districting for the FY 2005/06

school year.

Page 32: Facilities[1]

Middle School Recommendations

• Leave the Victory Academy Concept intact at both Middle Schools.

• Have Board re-district to maximize Page Middle enrollment.

• Ensure annual maintenance is performed and budgeted to maintain structural longevity.

Page 33: Facilities[1]

• Page Middle: Requires more classrooms, office renovation and media center.

• Ensure when all renovations are accomplished all trailers have been removed and students housed within main structure.

Page 34: Facilities[1]

SUMMARY

• Continue to upgrade Abingdon and T. C. Walker Schools.

• Use all available classrooms at each school to create smaller class sizes.

• Pursue re-districting for the FY 2005/06 school year.

Page 35: Facilities[1]

Gloucester CountyHigh School

Page 36: Facilities[1]

TO BE CONTINUED

GHS PRESENTATION TO BE HELD ON 11 JAN. 05

Page 37: Facilities[1]
Page 38: Facilities[1]
Page 39: Facilities[1]