FACILITIES DESIGN & CONSTRUCTION SEALED BID NO.: 4802/A4S-021/966194 DATE: 10/14/14 PROJECT: THORNTON AIR HANDLER REFURBISHMENT TIME: 2:00 P.M. PROJECT DELIVERY METHOD: BID BUILD ESTIMATED CONSTRUCTION COST: $300,000 LUMP SUM ALTERNATE ALTERNATE YES NO BASE BID NO. 1 NO. 2 TOTAL UNIVERSITY MECHANICAL #1 EL CAJON - 1:36 P.M. COUNTYWIDE MECHANICAL #2 SANTEE - 1:42 P.M. DAILY RATE OF COMPENSATION X 10 MULTIPLIER $144,781 $350 X 10 $3,500 $456,594 $369,000 $100 X 10 $1,000 $494,400 $136,888 $171,425 $34,500 $89,900 CONTRACTOR'S NAME CITY - TIME REC'D BID X PREQUALIFIED X

Upload: others

Post on 30-Apr-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

FACILITIES DESIGN & CONSTRUCTION

SEALED BID NO.: 4802/A4S-021/966194 DATE: 10/14/14

PROJECT: THORNTON AIR HANDLER REFURBISHMENT TIME: 2:00 P.M.

PROJECT DELIVERY METHOD: BID BUILD ESTIMATED CONSTRUCTION COST: $300,000

LUMP SUM ALTERNATE ALTERNATEYES NO BASE BID NO. 1 NO. 2 TOTAL

UNIVERSITY MECHANICAL #1

EL CAJON - 1:36 P.M.

COUNTYWIDE MECHANICAL #2

SANTEE - 1:42 P.M.

DAILY RATE OF COMPENSATIONX 10 MULTIPLIER

$144,781 $350 X 10 $3,500 $456,594

$369,000 $100 X 10 $1,000 $494,400

$136,888 $171,425

$34,500 $89,900

CONTRACTOR'S NAMECITY - TIME REC'D BID

X

PREQUALIFIED

X

THORNTON AIR HANDLER REFURBISHMENT UCSD MEDICAL CENTER- LA JOLLA UNIVERSITY OF CALIFORNIA, SAN DIEGO

9.0 LIST OF SUBCONTRACTORS

Project No.: 4802/A4S-021/966194

BIDDING COMPANY'S NAME: University Mechanical & Engineering Contractors, Inc.

Bidder will use Subcontractors for the Work:

Yes_&_ No

If "yes", provide In the spaces below (a) the name and the location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specifically fabricates and installs a portion of the work or Improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of 1/2 of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

(e.g. electrical, mechanical concrete)

Restoration

Controls

Test & Balance

March 3, 2014 LF/BF/MP-BF

Subcontractor Name of Business Location of Business License No.

(City)

AJW San Diego 987246

Johnson Contro s San Diego 22445

SpiraLoc El Cajon 583829

(Note: Add additional pages if required.)

Bid Form 5

THORNTON AIR HANDLER REFURBISHMENT UCSD MEDICAL CENTER - LA JOLLA UNIVERSITY OF CALIFORNIA, SAN DIEGO

Project No.: 4802/A4S-0211966194

10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES No changes

BIDDING COMPANY'S NAME:_ University Mechanical & Engineering Contractors, Inc.

The information below must be provided for all changes In first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of 1/2 of 1% of Bidder's Total Bid.

Alternate No.

March 3, 2014 LF/BF/MP-BF

Subcontractor Portion of the Work Name Location License No.

Activity (City) (e.g. electrical, mechanical, concrete)

(Note: Add additional pages if required.)

Bid Form 6

rHORNTON AIR HANDLER REFURBISHMENT UCSD MEDICAL CENTER- LA JOLLA UNIVERSITY OF CALIFORNIA, SAN DIEGO

Project No.: 4802/A4S-021/966194

~.0 LIST OF SUBCONTRACTORS

BIDDING COMPANY'S NAME:Countywide Mechanical Systems, Inc.

Bidder will use Subcontractors for the Work:

Yes X No

If "yes", provide in the spaces below (a) the name and the location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the state of California who, under subcontract to the prime contractor, specifically fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of 1/2 of 1 percent of the prime contractor's total bid, (b) the portion of the work which will be done by each subcontractor. The prime contractor shall list only one subcontractor for each such portion as is defined by the prime contractor in its bid.

Portion of the Work Activity

(e.g. electrical, mechanical concrete)

1 es. t- .1. f.» ().l tl~C e..

\t'l.sulo.h'o~

Cor\+~15

f==o.~ Wkee Laok~ Fot"-Q'\~ ; c J11'Ctl'fs •:S Uni+ Cl~OI\A..,q

March 3, 2014 LF/BFIMP-BF

Subcontractor Name of Business Location of Business License No.

(City)

So.~ l?i ~ ~ ( &e-,t Qt\tt. ~q.n 0 j.,g 90 J CA lt;;.31~ 9 J1 M \t~'fs-lbr~e. ~pr,· f\ j V tAU e."( , eli C/3 'f'il jo~.-tso,., Cor1+n>rs ~o"' Oie.9o 1 CA UVAC f\.tfcJ,~ .... ~Iys,·s SO.~ O i~o, CA 9/213S FACS QaW\oho D•rM.-'J~rJ , Cb

jt.M ~e'tr~".At ~pr i ~,'fetfl ey1 ell ~13q q I

(Note: Add additional pages If required.)

Bid Form 5

rHORNTON AIR HANDLER REFURBISHMENT UCSD MEDICAL CENTER -LA JOLLA UNIVERSITY OF CALIFORNIA, SAN DIEGO

Project No.: 4802/A4S-021/966194

10.0 LIST OF CHANGES IN SUBCONTRACTORS DUE TO ALTERNATES

BIDDING COMPANY'S NAME: Countywide Mechanical Systems, Inc.

The information below must be provided for all changes in first-tier Subcontractors if University selects Alternates. List changes in Subcontractors only for those portions of the Work valued in excess of 1/2 of 1% of Bidder's Total Bid.

Subcontractor Alternate Portion of the Work Name Location License No.

No. Activity (City) (e.g. electrical, mechanical, concrete)

I

i

I

J

March 3, 2014 LFIBFIMP-BF

(Note: Add additional pages if required.)

6

- • I

I

Bid Form