facilities and technology task force meeting€¦ · 2010 2012 art/science addition/band hall...

39
September 30, 2015 Facilities and Technology Task Force Meeting

Upload: others

Post on 17-Oct-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

September 30, 2015

Facilities and Technology

Task Force Meeting

Page 2: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Major Renovations, and

Upgrades/Refurbishments

Page 3: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Major Renovations

Historical Perspective

Generally occurred every 20 years

Increased classroom size to current TEA standards

Re-engineered Major Building Systems (mechanical,

electrical, plumbing, HVAC)

Added square footage as required

Improved circulation (how students/adults moved through the building)

Upgraded the cafeteria and provided new kitchen equipment

Update finishes (carpet, tile, paint, etc.) throughout the building

Addressed Life Safety and Code issues

Addressed advanced technology needs

Freshened up exterior appearance with special focus on main entry

Page 4: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Refurbishments

Update finishes (carpet, tile, paint, etc.) in select areas of the building.

Improve overall exterior of building including painting and landscaping.

Flooring (if necessary).

Minor renovations such as moving walls/doors or modifying casework to increase functionality.

Page 5: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Davis Elementary

Huffman Elementary

Carlisle Elementary

Mathews Elementary

Meadows Elementary*

Aldridge Elementary

Hendrick Middle School

Sigler Elementary*

Clark High School

Mendenhall Elementary*

Jackson Elementary

Memorial Elementary*

Weatherford Elementary

Mitchell Elementary

Rasor Elementary

Brinker Elementary

Daffron Elementary

Bethany Elementary

Hedgcoxe Elementary

2004 2008

Major Renovation Projects Last Two Bond Programs

*Existing facility demolished and new building constructed in lieu of renovation.

Page 6: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Illustration of Major Renovation

Brinker Elementary School

Project began in spring of 2013 and completed fall of 2014

Total cost - $13.2 million

Added over 25,000 square feet

Classroom sizes increased from +/-600 to +/-800

Every portion of building touched

Page 7: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Bri

nker

Ele

men

tary

Sch

oo

l –

Befo

re

Admin. suite was small.

Small classrooms generally with

no real delineation between

hallway and classroom.

Special Education suite

undersized.

No security vestibule.

Library was open to the

corridors and used for

circulation.

Music and art were undersized.

Gym was outdated with old

equipment.

Page 8: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Larger admin suite with

security vestibule.

Library enclosed. No

longer used for

circulation. Less noisy.

Larger art

room.

Classrooms were made

larger, were podded and the

building received additional

classrooms.

Larger music room.

Increased size of

Special Education

rooms.

Bri

nker

Ele

men

tary

Sch

oo

l –

Aft

er

Page 9: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Refurbishment Examples

Hughston and Christie Elementary Schools

Summer of 2015

Budget of $1,250,000 each

Page 10: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Refurbishments – Hughston

Page 11: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation
Page 12: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation
Page 13: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation
Page 14: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Refurbishments – Christie

Page 15: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation
Page 16: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation
Page 17: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Shepton High School

Robinson Middle School

Recommended Major Renovations

Page 18: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Wh

y S

he

pto

n?

Clark

2003

2010

2012

Art/Science Addition/Band Hall Addition

20-Year Renovation/Addition

Science/Classroom Addition

Jasper

2001

2004

2006

Renovation

Art Addition/Band Hall Addition

Science Addition

McMillen 2011 New High School

Shepton

2003

2007

HVAC, Front Entry & Special Ed

Science Addition, Band Room Addition, Minor Renovations

Vines

2003

2003

2010

HVAC & Renovation

Locker Room Renovation

Science and Fine Arts Additions, Admin Relocation/Expansion and

Other Renovations

Williams

2003

2005

2006

2012

2013

20-Year Renovation/Addition

Auditorium Renovation

Science Addition

Upgrades (Collaboration Project)

Health Sciences Academy

Page 19: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Opened in 1984 as Shepton High School.

1986-90 – Housed both Shepton High School and Renner Middle School.

1990-98 – Exclusively Renner Middle School.

1998-Present – Shepton High School.

History of 5505 Plano Parkway

Page 20: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Mechanical Floor Plan

Renovations at Shepton High School 2002/03 Scope of Work

• New central plant and chillers

• 2 to 4 pipe HVAC conversion

• Fire alarm

• Fire sprinkler

• Room numbers, signage and hardware

• New data / phone cabling

• Public Address system

• Security system cabling

• CATV drops

• New ADA compliant entry and parking

• New entry canopy

• New Special Education area

Page 21: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Science classroom addition (district-wide project).

Contract also included a fine arts addition, new bus turn lane, some interior finish improvements and a kitchen renovation.

Renovations at Shepton High School 2006/07 Scope of Work

Page 22: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Proposed Renovations - Shepton Major classroom renovations in main academic area

Library renovations

Classroom addition

Cafeteria renovations

Kitchen renovation

New administrative area

Traffic flow improvements

Band/orchestra addition

New dance team area

Flooring replacement

New Roof

Address problem areas with HVAC

Estimated cost - $35 million

Page 23: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Provide separate drives for:

• student/parent drop-off

• teacher parking, and

• bus loading/unloading

Sh

ep

ton

Hig

h S

ch

oo

l –

Sit

e P

lan

Page 24: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Sh

ep

ton

Hig

h S

ch

oo

l –

Fir

st

Flo

or

Renovate classrooms.

Improve cafetorium acoustics.

Expand kitchen.

Improve building circulation throughout.

Page 25: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Sh

ep

ton

Hig

h S

ch

oo

l –

Seco

nd

Flo

or

Relocate and renovate

administration.

Update library.

Improve building circulation throughout.

Renovate classrooms.

Page 26: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Built in 1994 – now 21 years old. Will be 27 years old by 2021.

Hendrick Middle School built in 1987, received major renovation in 2008 which improved/ corrected problematic design features.

Robinson Middle School has virtually identical floor plan to the original Hendrick design.

Originally scheduled for what would have been the 2012 bond program.

Why Robinson Middle School?

Page 27: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Hen

dri

ck M

idd

le S

ch

oo

l – F

irst

Flo

or

(Befo

re)

The cafeteria was

open and loud.

The kitchen equipment

was old and the serving

lines not very functional.

The administration suite was

hidden behind the stairs and

located across from front

door.

No security vestibule.

The classrooms were

small and not in pods.

Not enough lockers

for PE and athletics.

The gym had an old floor

and dated equipment.

Music rooms

not large

enough and

without proper

storage.

Page 28: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Hen

dri

ck M

idd

le S

ch

oo

l – F

irst

Flo

or

(Aft

er)

Larger classrooms.

Cafeteria was enclosed all the

way up to the 2nd floor. Tiered

flooring was modified.

All new kitchen equipment,

kitchen layout and serving

lines.

Fine Arts

completely

renovated.

New lockers.

Adjusted layout.

New wood floor in the gym.

New goals and bleachers.

New Special Education suite.

New administration suite by

the front door with security

vestibule.

Page 29: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

He

nd

ric

k M

idd

le S

ch

oo

l –

Se

co

nd

Flo

or

(Be

fore

)

Science labs were

small and without the

proper storage or

equipment.

Art room was small

and not functional.

Library was outdated.

Page 30: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

He

nd

ric

k M

idd

le S

ch

oo

l –

Se

co

nd

Flo

or

(Aft

er)

Larger science labs

with proper storage.

Larger art room with

office, storage and

kiln.

Updated library. Provided

ancillary spaces it needed.

Page 31: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Robinson Middle School

Estimated cost of $34.8 million is based on actual Hendrick Middle School renovation cost adjusted for inflation.

Page 32: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

1. Miller

2. Haggar

3. Barksdale

Recommended Elementary School Refurbishments

4. Gulledge

5. Haun

6. Skaggs

Page 33: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Why These Six?

Initially scheduled to be included in what would have been the 2012 bond program. They are next on the list.

All were built in the 1995-97 timeframe.

Page 34: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Work will not be nearly as extensive as previous “20-year” projects due to a deceleration in changing standards (codes, circulation, classroom size, etc.)

These schools already have TEA sized classrooms, good circulation, and enclosed dining rooms and libraries.

Recommending $2 million each, total of $12 million.

Elementary School Refurbishments

Page 35: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

1. Wilson

2. Bowman

Recommended Middle School Refurbishments

Page 36: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Our two oldest middle schools.

Were scheduled to be part of the 2012 and 2016 bond programs.

Most dated looking middle school facilities.

Why These Two?

Page 37: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Not as extensive as major renovations.

Recommending $4 million each (2X cost of elementary).

Middle School Refurbishments

Page 38: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

Recommending Jasper High School.

Originally scheduled for 2012 bond program.

Built in 1996.

Estimated cost of $7 million (3.5X cost of elementary).

High School Refurbishment

Page 39: Facilities and Technology Task Force Meeting€¦ · 2010 2012 Art/Science Addition/Band Hall Addition 20-Year Renovation/Addition Science/Classroom Addition Jasper 2001 2006 Renovation

September 30, 2015

Facilities and Technology

Task Force Meeting