extended reach drilling

1
JMA JMA Extended Reach Drilling Extended Reach Drilling Impact - UK Southern Gas Impact - UK Southern Gas Basin Basin Cost Savings = $70 million Cost Savings = $70 million 1 less well - $12 million 1 less well - $12 million Lower drilling cost - $18 million Lower drilling cost - $18 million One platform instead of two - $40 million One platform instead of two - $40 million Increased Reserves Increased Reserves Tristan: 34 BCF developed from Welland Field Tristan: 34 BCF developed from Welland Field Cador: 20 BCF developed from Camelot Field Cador: 20 BCF developed from Camelot Field

Upload: zona

Post on 05-Jan-2016

49 views

Category:

Documents


2 download

DESCRIPTION

Extended Reach Drilling. Impact - UK Southern Gas Basin. Cost Savings = $70 million 1 less well - $12 million Lower drilling cost - $18 million One platform instead of two - $40 million Increased Reserves Tristan: 34 BCF developed from Welland Field - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Extended Reach Drilling

JMAJMA

Extended Reach DrillingExtended Reach DrillingImpact - UK Southern Gas BasinImpact - UK Southern Gas Basin

• Cost Savings = $70 millionCost Savings = $70 million1 less well - $12 million1 less well - $12 millionLower drilling cost - $18 millionLower drilling cost - $18 millionOne platform instead of two - $40 millionOne platform instead of two - $40 million

• Increased ReservesIncreased ReservesTristan: 34 BCF developed from Welland FieldTristan: 34 BCF developed from Welland FieldCador: 20 BCF developed from Camelot FieldCador: 20 BCF developed from Camelot Field