experiences with ebrd - rvo.nl · 2013. 8. 7. · royal haskoning & ebrd assignments,...

12
1 Henk Oosterdijk 17 March 2011 Experiences with EBRD

Upload: others

Post on 10-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Experiences with EBRD - RVO.nl · 2013. 8. 7. · Royal Haskoning & EBRD Assignments, continued: Water sector Preliminary Design and Procurement Support for Subotica Waste Water Treatment

1

Henk Oosterdijk17 March 2011

Experiences with EBRD

Page 2: Experiences with EBRD - RVO.nl · 2013. 8. 7. · Royal Haskoning & EBRD Assignments, continued: Water sector Preliminary Design and Procurement Support for Subotica Waste Water Treatment

2

Profile Royal Haskoning

� Consultants, architects & engineers

� Established in 1881

� Independent ownership structure

� 3,400 professionals (world wide)

� Net turn over: some 360 mln. Euro

� Added value: 273 mln. Euro

� Result (Ebitda): 18.6 mln. Eur

� 11 divisions

� Worldwide offices and experience

All figures: 2009

Profile of Royal Haskoning

Page 3: Experiences with EBRD - RVO.nl · 2013. 8. 7. · Royal Haskoning & EBRD Assignments, continued: Water sector Preliminary Design and Procurement Support for Subotica Waste Water Treatment

3

Organisational structure Royal HaskoningDivisions within Royal Haskoning

CLIENTSS

patial D

evelo

pm

ent

Infr

astr

uctu

re &

Tra

nsport

Arc

hitectu

re &

Build

ing

Build

ing M

anagem

ent

&

Consultancy

Industr

ial In

sta

llations

Environm

ent

Wate

r

Build

ing I

nsta

llations

Maritim

e

Coasta

l &

Riv

ers

Royal H

askonin

g A

sia

Corporate Support Groups

Board of Management

Page 4: Experiences with EBRD - RVO.nl · 2013. 8. 7. · Royal Haskoning & EBRD Assignments, continued: Water sector Preliminary Design and Procurement Support for Subotica Waste Water Treatment

4

Offices worldwideOffices

Page 5: Experiences with EBRD - RVO.nl · 2013. 8. 7. · Royal Haskoning & EBRD Assignments, continued: Water sector Preliminary Design and Procurement Support for Subotica Waste Water Treatment

5

Net turnover by regionTurn over by region

Page 6: Experiences with EBRD - RVO.nl · 2013. 8. 7. · Royal Haskoning & EBRD Assignments, continued: Water sector Preliminary Design and Procurement Support for Subotica Waste Water Treatment

6

Royal Haskoning & EBRD

Assignments:

� Environmental Management Trainings:

� (Ballast Water) Black Sea

� Technical Due Diligences:

� Terminals

� Ports

� Framework contracts:

� Regional: Energy Efficiency Programme for the Corporate Sector (2010-2012)

� Energy Audits and Energy Management Training Programme (2007-2009)

� Energy Efficiency & Environment auditing (1999 - 2003)

� Multilateral Carbon Credit Fund (on-going)

Page 7: Experiences with EBRD - RVO.nl · 2013. 8. 7. · Royal Haskoning & EBRD Assignments, continued: Water sector Preliminary Design and Procurement Support for Subotica Waste Water Treatment

7

Royal Haskoning & EBRD

Assignments, continued:

� Water sector

� Preliminary Design and Procurement Support for Subotica Waste Water Treatment Plant, Serbia (2006)

� FOPIP Ruse, Bulgaria (financial & operational performance improvement plan) (2008 – 2009)

� FOPIP and Corporate Development Plan Plovdiv, Bulgaria (2009 – 2010)

� Constanta Concession Project Romania (2002 – 2003)

� Arges Regional Water Project - Master Plan and Feasibility Study Romania (2007 – 2009)

� Municipal Environment Loan Facility Project Management Romania (2004 – 2006)

� Municipal Utilities Development Programme (MUDP II) Romania (1995 – 2002)

Page 8: Experiences with EBRD - RVO.nl · 2013. 8. 7. · Royal Haskoning & EBRD Assignments, continued: Water sector Preliminary Design and Procurement Support for Subotica Waste Water Treatment

8

Success factors

Success factors (general):

� Local offices in EBRD’s CoO

� Local partners in EBRD’s CoO

� Long track record (> 20 years) in EBRD’s CoO

� Large number senior experts available (> 10 yrs of relevant

experience)

� Significant number of relevant & recent (< 5 yrs) project

references

� Have single contact point within your organization for EBRD

� Take knowledge of procedures of EBRD

For framework contracts:

� Covering more disciplines

Page 9: Experiences with EBRD - RVO.nl · 2013. 8. 7. · Royal Haskoning & EBRD Assignments, continued: Water sector Preliminary Design and Procurement Support for Subotica Waste Water Treatment

9

Success factors

Success factors in proposal phase:

� Use expertise from (external) network

� Form joint ventures / strategic relationships with capable

partners (national and international)

� Focus on technical proposal

� approach, expert team, references

Page 10: Experiences with EBRD - RVO.nl · 2013. 8. 7. · Royal Haskoning & EBRD Assignments, continued: Water sector Preliminary Design and Procurement Support for Subotica Waste Water Treatment

10

Success factors

Success factors in project operational phase:

� Be flexible (adjust to their schedule)

� Respond quick and adequately

� Assure continuity in expert team

� Report to the point (what Bankers like to read; not too

technical)

Page 11: Experiences with EBRD - RVO.nl · 2013. 8. 7. · Royal Haskoning & EBRD Assignments, continued: Water sector Preliminary Design and Procurement Support for Subotica Waste Water Treatment

11

Questions?

Page 12: Experiences with EBRD - RVO.nl · 2013. 8. 7. · Royal Haskoning & EBRD Assignments, continued: Water sector Preliminary Design and Procurement Support for Subotica Waste Water Treatment

12

Thank you for your attention

[email protected]