experience sharing of process of product certification · scheme. 1: production and supply of...
TRANSCRIPT
![Page 1: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/1.jpg)
Experience Sharing of Process of Product Certification
Fugro Certification Services LimitedJoseph PoonOctober 2010
![Page 2: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/2.jpg)
Summary of Presentation
• Certification Process
• Certification Requirements
• Preparation for Certification
![Page 3: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/3.jpg)
Types of Construction Product Certification Available
No. Description Scheme
1 Production and Supply of Concrete QSPSC
2 Passive Fire Protection Products HKISC PCCS-PFPP
3 Heat Soaked Tempered Glass HKISC PCCS-TG
4 Tile Adhesives HKCI PCCS-TA
5 Cement HKCI PCCS-CP
6 Repair Mortars HKCI PCCS-RM
7 Ceramic Tiles HKCI PCCS-CT
![Page 4: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/4.jpg)
What is a Type 5 (System 5)Product Certification Scheme
According to ISO/IEC Guide 67
• initial assessment of quality and production systems
• initial inspection / testing
• reassessment of quality and production systems
• regular audit testing
![Page 5: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/5.jpg)
Certification Process
![Page 6: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/6.jpg)
Information to be provided by Manufacturer
• Application form• Quality manual• Quality procedures and work instructions related to all activities
stated in product certification scheme• Product models to be certified• Organization chart showing key personnel• Related CVs of competent personnel (if necessary) • Drawings and technical information related to Products• Certificates of origin for raw materials
![Page 7: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/7.jpg)
Document Review
• Adequacy of Quality System documents
• Availability and adequacy of the technical documentation to meet scheme requirements
![Page 8: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/8.jpg)
1st Stage Audit
• Review of the major elements of ISO9001 implemented by manufacturer
• Understanding of the inspection process of raw materials.
• Understanding of the production process.
• Understanding of the packaging and storing process.
• Understanding of the transportation process.
• Discussion of the sampling procedures of audit testing
• Review of quality control laboratory
• Review of 3 months quality control records
![Page 9: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/9.jpg)
2nd Stage Audit
ItemProcess Verification
Records Verification In
SchemeIn
procedure
ISO9001 Management System
Yes Yes Management review, internal audit
Raw materials Yes Yes Checking records, acceptance criteria, testing certificates, personnel training records
Production Yes Yes Calibration and maintenance records for equipment, records of NC products, personnel training records
Packaging and Storage Yes Yes Calibration and maintenance records for equipment, personnel training records
Transportation Yes Yes Calibration and maintenance records for equipment, personnel training records
Quality Control Laboratory Yes Yes Calibration certificate and maintenance records for equipment, personnel training records
![Page 10: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/10.jpg)
Initial Type Testing / Audit Testing
• Samples selected by the audit team• Chain of custody• Laboratory appointed by CB• Testing witnessed by the audit team• Results to be reviewed by the audit team
![Page 11: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/11.jpg)
Failure of Audit Testing
• Case of failure must be investigated and appropriate actions to be taken
• Re-test on additional samples
• If result of re-test is unacceptable, certification cannot be proceeded / certification is suspended
![Page 12: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/12.jpg)
Outcome of Certification Audit
No NC – Certification recommended
Minor NC – Certification is recommended after receipt ofcorrection and corrective action plan follow up visit s required
Major NC or – a follow up visit is required systematic Minor NC
Critical NC – system failure, certification to be re-applied
![Page 13: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/13.jpg)
Actions to be Taken after Certification Audit
No NC -
Minor NCs Corrective Action Plan within 2 weeks Actions to be completed within 4 weeks
Major NC or Systematic minor NCs
Corrective Action Plan within 2 weeks Actions to be completed within 1-3 months A follow up assessment is required
Critical NC Certification to be re-applied after at least 6 months following date of Certification Assessment
![Page 14: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/14.jpg)
Certificate Example
![Page 15: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/15.jpg)
Obligations of Manufacturers
• Implement a QMS • Comply with Regulations and Scheme Requirement• Pay to the Certification Body fees for Certification Audit• Afford assessment team full assistance and cooperation during
the Certification audit• Keep Certification Body inform in writing of changes:
Ownership or name Management Representative or company directors Quality Manual or significant items in its plant Location of the plant and/or Quality System Management
Office Close of a manufacturing plant
![Page 16: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/16.jpg)
Surveillance & Re-Certification Audit
Intervals Fire product Glass QSPSC Tile
AdhesiveRepair Mortar Cement
Surveillance Audit
6 – 9 months
6 months 3 months– 1st year
4 months - 2nd year
6 months – 3rd year
1 year 1 year 6 months
Re-certification Audit
(2nd Cycle)
3rd Year 3rd Year 3rd Year 3rd Year 3rd year 3rd year
2nd Cycle (SV) 6 – 9 months
6 months 6 months 1 year 1 year 9 months
![Page 17: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/17.jpg)
Use of Certification Mark
• Product
• Packaging materials
• Quotations
• Delivery notes
• Stationery
• Brochures and other advertising media PCCS-TABSEN 12004:2007
Product Model : XXXXX
![Page 18: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/18.jpg)
Certificate No. XXXX
Use of HKCAS Accreditation Symbol
• Stationery
• Literature
• Advertisements
• Not product
• Not packaging materials
![Page 19: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/19.jpg)
Certification Regulations
• Procedure for application and certification• Obligation of manufacturers
• Obligation of certification body
• Certification rights
• Surveillance visit / renewal audit
• Use of certification mark
• Complaints
• Appeal
![Page 20: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/20.jpg)
Preparation for Certification
To make the Certification Process smoother
• Approach / Engage a CB at an early stage
• Provide all relevant documentation to the CB for review at theearliest possible stage
![Page 21: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/21.jpg)
Certification Requirements
• Establish & maintain a documented QMS to ISO 9001:2008 standard
• Demonstrate compliance with the Administration Procedure and Technical Requirements of the specific scheme
• Maintain a QMS office for the overall management, manufacturing and supply of the products
• Establish product related procedures and maintain quality records for a period of time (3 months)
• Obtain all relevant statuary regulatory licences for the operation / production of the plant
![Page 22: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/22.jpg)
Preparation for Certification
• Identify the criteria for competent persons• Ensure responsible person are competent • Provide regular training to the competent persons who affect product
quality • Control incoming materials (procedures and criteria)• Control suppliers / sub-contractors (procedures and criteria)• Monitor the implementation of the production plans regularly• Review quality system every year• Maintain quality records
![Page 23: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/23.jpg)
Preparation for Certification (Documentation)
• Quality System Manual
• Plant Production Control (PPC) Plan to include
Incoming raw materials
Production process
QC control
Statistical techniques
Product traceability
![Page 24: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/24.jpg)
Preparation for Certification (Documentation)
Production Process to
• Define plant and production process
• Verify the processes by means of inspection and testing
• Document in a plan
• Include frequency, value and criteria on equipment and operation
• Define actions to be taken if control values not obtained
![Page 25: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/25.jpg)
Preparation for Certification (Documentation)
Finished Products Testing Plan to include
• Number and size of samples
• Frequency of sampling
• tests to be performed
![Page 26: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/26.jpg)
Preparation for Certification (Documentation)
Schedules
• Calibration and maintenance of production equipment
• Calibration and maintenance of QC equipment
• Staff training
• Inspection and testing of raw materials
![Page 27: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/27.jpg)
Preparation for Certification (Records)
• Quality system records
• Records of inspection and testing of raw materials• Calibration and maintenance records of production / testing
equipment
• Staff training records
• Production records
![Page 28: Experience Sharing of Process of Product Certification · Scheme. 1: Production and Supply of Concrete. QSPSC: 2. Passive Fire Protection Products: HKISC PCCS-PFPP. 3: Heat Soaked](https://reader033.vdocuments.site/reader033/viewer/2022050304/5f6d396120be33191a629ed6/html5/thumbnails/28.jpg)
~ END ~