experience list of civil project 2016

10
www.asturi.com.my Road Over Bridge Fitter Galery EXPERIENCE LIST OF CIVIL PROJECT AND PHOTOS @ 2016 Main Office : Lot 74-A, Jalan Gebeng 1/6, Gebeng Industrial Estate, 26080 Kuantan, Pahang, MALAYSIA T : +6(09) 5833 888 F : +6(09) 5833 999 E : [email protected] KL Office : C-3-2-10, Level 2, Block C3, Publika Solaris Dutamas, Jalan Dutamas 1, 50480 Kuala Lumpur, MALAYSIA T : +6(03) 6207 9988 F : +6(03) 6207 9889 Trusted Fabricator for Oil and Gas, Petrochemical & Energy Industries Serambi Pekan Anjung Warisan Jalan Awan Besar Contractor SPKK Class A & CIDB Grade 7

Upload: others

Post on 30-Nov-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

www.asturi.com.my

Road Over BridgeFitter Galery

EXPERIENCE LISTOF CIVIL PROJECTAND PHOTOS@ 2016

Main Office :

Lot 74-A, Jalan Gebeng 1/6, Gebeng Industrial Estate,26080 Kuantan, Pahang, MALAYSIA

T : +6(09) 5833 888 F : +6(09) 5833 999E : [email protected]

KL Office :

C-3-2-10, Level 2, Block C3, PublikaSolaris Dutamas, Jalan Dutamas 1, 50480 Kuala Lumpur, MALAYSIA

T : +6(03) 6207 9988F : +6(03) 6207 9889

Trusted Fabricator for Oil and Gas,Petrochemical & Energy Industries

Serambi Pekan

Anjung WarisanJalan Awan Besar

Contractor SPKK Class A& CIDB Grade 7

1 Completed

2 Completed

4 JKA-57/2005(T) 15/06/2005 15/06/2005 14/06/2006

Completed

5 PLUS/WU/UUD/0425/C2,C3/05-011 01/09/2005 01/03/2007 01/03/2007

Completed

J/PHG/LKPP/DK-03/2001

PHG/KKB/010-DK/2003

26/07/2001

14/01/2003

25/07/2002

15/09/2003 15/09/2003

25/07/2002

6 PLUS/WU/UUD/0425/C2,C3/05-011 01/09/2005 01/06/2007 01/03/2007 Completed

7 - 01/05/2007 01/05/2007 01/09/2008 Completed

MTD/ECE/SC/RW-1F1/01.001 01/06/2003 03/04/2004 31/03/2004 Completed3

1

CIVIL PROJECT EXPERIENCE LIST

Building Construction for LKPP’s Fertilizer Factory, Lepar, Pekan, Pahang

Building Construction for Kinsteel Bhd. Factory Kuantan, Pahang

Proposed Third Lane Widening BetweenTanjung Malim and Slim River - Package 4Sub-Contract for Drainage Works

Extension Factory Phase 3 - Block E, F, G, & H at Lot 74-A, Gebeng Industrial Estate, Kuantan, Pahang

8 Water Supply Plan at Jerantut :Package A(i): Proposed Construction and Completion of Batu Embun’s Plant,Jerantut, Pahang

Proposed Third Lane Widening BetweenTanjung Malim and Slim River - Package 4Sub-Contract for Clearance and Earthworks

Proposed of Missing Road Link from Jalan Awan Besar to Shah Alam Highway, Kuala Lumpur- Proposed of Ramp from Jalan 2/149, Bandar Baru Sri Petaling to Shah Alam Highway towards Cheras.(At the Awan Kecil’s interchange) Kuala Lumpur through 'Design And Build' (2004/A146)

Design, Construction and Completion of East Coast Expressway Project for Phase 1 from Karak-Kuantan and to the Border of Pahang /Terengganu.Subcontract for Earthworks and DrainageWorks for Package 1F1 (Ch 148+885 to 152+600)

PROJECT DESCRIPTION CONTRACT NO. AWARD DATE ACTUAL DATE STATUSDATECONTRACTUAL

S/PHG/JBA/IP/DK/011/2007 08/05/2007 28/07/2008 31/07/2010 Completed

9 Completed

14 S/PHG/JBA/IP/DK/008/2011 18/11/2011 02/05/2012

Completed

F/PHG/DK/1107/2009 02/04/2009 26/05/2010 30/04/2010

15 19/07/20124600000239 30/11/2013 30/11/2013 Completed

- 15/06/2009 01/09/2010 - Completed10

Completion of Abandoned Works for Upgrading Project of Jalan Kg. Tg. Lumpur Route 3 (C13),Kuantan, Pahang

11 Completed- 15/06/2009 01/09/2010Building Construction for IM’s Factory Lot 49545- Siklon Separator Sdn. Bhd.

13 CompletedMIAC/PCD/C/03/2011 06/06/2011 20/06/2011 19/2/2012Proposed Infrastructure Development for Phase 3 of Malaysia International Aerospace Centre (MIAC) at Sultan Abdul Aziz Shah Airport, Subang, Selangor

17 In progressMIAC/PCD/C/03/2011 14/8/2015 10/4/2017To Build 3 Units Open Concept Warehouse, Steel Frame 60’ x 100’ x 30’ H with Toilet Facilities at Jalan Patau - Patau, Labuan

Supply Works and Installation of baffle board for Thickening Tanks and Related Work at Jabatan Bekalan Air Pahang Plants.

The Proposed Construction and Completionof Pekan Heritage Tourism Development (Phase 1B And F&B Building) and Small & Medium Enterprise Marketing and Exhibition Centre in Pekan, Pahang for East Coast Economic Region Development Council (ECERDC)

16 The Construction and Completion of Contractor Maintenance Cabin and Yard at Johor Port Bhd

Extension Factory Phase 4 - Block K, L, M & N at Lot 74 - A, Gebeng Industrial Estate, Kuantan, Pahang

MAHB/PCD/C/KLIA2 /22/2012 29/08/2012 03/09/2012 02/02/2013 Completed12 Proposed Development of KLIA2 and associated works at KL International Airport, Sepang, Selangor

JPB/12/2014 10/4/2014 19/6/2014 12/11/2014 Completed

PROJECT DESCRIPTION CONTRACT NO. AWARD DATE ACTUAL DATE STATUSDATECONTRACTUAL

2

EAST COAST HIGHWAY PHASE 1 Package 1F-1 (Ch 148+885 ke Ch 152+600)

Earth Works Earth Works

Earth Works

Installation of Concrete Culvert Installation of Concrete Culvert

Plastering of 75mm ACBC

LandscapeBridge

AWAN BESAR ROAD TO SHAH ALAM HIGHWAY, Design and Build (2004/A146)

Completed Work Completed Work

Completed WorkPavement

CIVIL PROJECT PHOTOS

3

Chlorine Contact Tank Water Intake

Administration Building Water Tank

Filter Gallery

Installation of Concrete Culvert

Plastering Work for Crush Run

Earth Works

NORTH-SOUTH EXPRESSWAY TANJUNG MALIM & SLIM RIVERPackage 4 PLUS/WU/UUD/0425/C2,C3/05-011

Completed Work

Slope Works

Installation of Culvert Box

WATER SUPPLY PLAN JERANTUT PAHANGPackage A (i) S/PHG/JBA/IP/DK/011/2007

4

BUILDING CONSTRUCTION FOR KINSTEEL’S FACTORY KUANTAN, PAHANG

BUILDING CONSTRUCTION FOR LKPP’S FERTILIZER FACTORY, LEPAR, PEKAN, PAHANG

Construction works in progress

Installation of Equipment Installation of Equipment

Pilling Works Foundation Works

Construction works in progress Completed Work

5

Construction work in progress Construction work in progress

Completed Work

JALAN TANJUNG LUMPUR C13, KUANTAN, PAHANGF/PHG/K/DK/1107/2009

Earth Works

Completed Work

Construction work in progress

Footing Installation

EXTENSION FACTORY PHASE 4BLOCK K,L,M & N at Lot 74-A, Gebeng Industrial Estate, Kuantan

Pilling Process

Construction work in progress

Footing Installation

Structure Work in progress

Completed Work

6

BUILDING CONSTRUCTION AT INDERA MAHKOTA, KUANTANSIKLON SEPARATORS SDN BHD

Office Construction

Construction Site

Office Construction

Structure Work in progress

Structure Works

Construction Work in progress

Siklon Factory

Silkon Office Inside Factory View

7

8

THE PROPOSED CONSTRUCTION AND COMPLETION OF PEKAN HERITAGE TOURISM DEVELOPMENT (PHASE 1B AND F&B BUILDING) IN PEKAN, PAHANG FOR EAST COAST ECONOMIC REGION DEVELOPMENT COUNCIL (ECERDC)

ANJUNG WARISAN

Completed Work

Construction Works in progress

THE PROPOSED OF SMALL AND MEDIUM ENTERPRISE MARKETING AND EXHIBITION CENTRE IN PEKAN, PAHANG FOR EAST COAST ECONOMIC REGION DEVELOPMENT COUNCIL (ECERDC)

SERAMBI PEKAN

Launching Ceremony by YAB Dato’ Sri Najib Tun Hj Abdul Razak

Construction Works in progress

9