experience list of civil project 2016
TRANSCRIPT
www.asturi.com.my
Road Over BridgeFitter Galery
EXPERIENCE LISTOF CIVIL PROJECTAND PHOTOS@ 2016
Main Office :
Lot 74-A, Jalan Gebeng 1/6, Gebeng Industrial Estate,26080 Kuantan, Pahang, MALAYSIA
T : +6(09) 5833 888 F : +6(09) 5833 999E : [email protected]
KL Office :
C-3-2-10, Level 2, Block C3, PublikaSolaris Dutamas, Jalan Dutamas 1, 50480 Kuala Lumpur, MALAYSIA
T : +6(03) 6207 9988F : +6(03) 6207 9889
Trusted Fabricator for Oil and Gas,Petrochemical & Energy Industries
Serambi Pekan
Anjung WarisanJalan Awan Besar
Contractor SPKK Class A& CIDB Grade 7
1 Completed
2 Completed
4 JKA-57/2005(T) 15/06/2005 15/06/2005 14/06/2006
Completed
5 PLUS/WU/UUD/0425/C2,C3/05-011 01/09/2005 01/03/2007 01/03/2007
Completed
J/PHG/LKPP/DK-03/2001
PHG/KKB/010-DK/2003
26/07/2001
14/01/2003
25/07/2002
15/09/2003 15/09/2003
25/07/2002
6 PLUS/WU/UUD/0425/C2,C3/05-011 01/09/2005 01/06/2007 01/03/2007 Completed
7 - 01/05/2007 01/05/2007 01/09/2008 Completed
MTD/ECE/SC/RW-1F1/01.001 01/06/2003 03/04/2004 31/03/2004 Completed3
1
CIVIL PROJECT EXPERIENCE LIST
Building Construction for LKPP’s Fertilizer Factory, Lepar, Pekan, Pahang
Building Construction for Kinsteel Bhd. Factory Kuantan, Pahang
Proposed Third Lane Widening BetweenTanjung Malim and Slim River - Package 4Sub-Contract for Drainage Works
Extension Factory Phase 3 - Block E, F, G, & H at Lot 74-A, Gebeng Industrial Estate, Kuantan, Pahang
8 Water Supply Plan at Jerantut :Package A(i): Proposed Construction and Completion of Batu Embun’s Plant,Jerantut, Pahang
Proposed Third Lane Widening BetweenTanjung Malim and Slim River - Package 4Sub-Contract for Clearance and Earthworks
Proposed of Missing Road Link from Jalan Awan Besar to Shah Alam Highway, Kuala Lumpur- Proposed of Ramp from Jalan 2/149, Bandar Baru Sri Petaling to Shah Alam Highway towards Cheras.(At the Awan Kecil’s interchange) Kuala Lumpur through 'Design And Build' (2004/A146)
Design, Construction and Completion of East Coast Expressway Project for Phase 1 from Karak-Kuantan and to the Border of Pahang /Terengganu.Subcontract for Earthworks and DrainageWorks for Package 1F1 (Ch 148+885 to 152+600)
PROJECT DESCRIPTION CONTRACT NO. AWARD DATE ACTUAL DATE STATUSDATECONTRACTUAL
S/PHG/JBA/IP/DK/011/2007 08/05/2007 28/07/2008 31/07/2010 Completed
9 Completed
14 S/PHG/JBA/IP/DK/008/2011 18/11/2011 02/05/2012
Completed
F/PHG/DK/1107/2009 02/04/2009 26/05/2010 30/04/2010
15 19/07/20124600000239 30/11/2013 30/11/2013 Completed
- 15/06/2009 01/09/2010 - Completed10
Completion of Abandoned Works for Upgrading Project of Jalan Kg. Tg. Lumpur Route 3 (C13),Kuantan, Pahang
11 Completed- 15/06/2009 01/09/2010Building Construction for IM’s Factory Lot 49545- Siklon Separator Sdn. Bhd.
13 CompletedMIAC/PCD/C/03/2011 06/06/2011 20/06/2011 19/2/2012Proposed Infrastructure Development for Phase 3 of Malaysia International Aerospace Centre (MIAC) at Sultan Abdul Aziz Shah Airport, Subang, Selangor
17 In progressMIAC/PCD/C/03/2011 14/8/2015 10/4/2017To Build 3 Units Open Concept Warehouse, Steel Frame 60’ x 100’ x 30’ H with Toilet Facilities at Jalan Patau - Patau, Labuan
Supply Works and Installation of baffle board for Thickening Tanks and Related Work at Jabatan Bekalan Air Pahang Plants.
The Proposed Construction and Completionof Pekan Heritage Tourism Development (Phase 1B And F&B Building) and Small & Medium Enterprise Marketing and Exhibition Centre in Pekan, Pahang for East Coast Economic Region Development Council (ECERDC)
16 The Construction and Completion of Contractor Maintenance Cabin and Yard at Johor Port Bhd
Extension Factory Phase 4 - Block K, L, M & N at Lot 74 - A, Gebeng Industrial Estate, Kuantan, Pahang
MAHB/PCD/C/KLIA2 /22/2012 29/08/2012 03/09/2012 02/02/2013 Completed12 Proposed Development of KLIA2 and associated works at KL International Airport, Sepang, Selangor
JPB/12/2014 10/4/2014 19/6/2014 12/11/2014 Completed
PROJECT DESCRIPTION CONTRACT NO. AWARD DATE ACTUAL DATE STATUSDATECONTRACTUAL
2
EAST COAST HIGHWAY PHASE 1 Package 1F-1 (Ch 148+885 ke Ch 152+600)
Earth Works Earth Works
Earth Works
Installation of Concrete Culvert Installation of Concrete Culvert
Plastering of 75mm ACBC
LandscapeBridge
AWAN BESAR ROAD TO SHAH ALAM HIGHWAY, Design and Build (2004/A146)
Completed Work Completed Work
Completed WorkPavement
CIVIL PROJECT PHOTOS
3
Chlorine Contact Tank Water Intake
Administration Building Water Tank
Filter Gallery
Installation of Concrete Culvert
Plastering Work for Crush Run
Earth Works
NORTH-SOUTH EXPRESSWAY TANJUNG MALIM & SLIM RIVERPackage 4 PLUS/WU/UUD/0425/C2,C3/05-011
Completed Work
Slope Works
Installation of Culvert Box
WATER SUPPLY PLAN JERANTUT PAHANGPackage A (i) S/PHG/JBA/IP/DK/011/2007
4
BUILDING CONSTRUCTION FOR KINSTEEL’S FACTORY KUANTAN, PAHANG
BUILDING CONSTRUCTION FOR LKPP’S FERTILIZER FACTORY, LEPAR, PEKAN, PAHANG
Construction works in progress
Installation of Equipment Installation of Equipment
Pilling Works Foundation Works
Construction works in progress Completed Work
5
Construction work in progress Construction work in progress
Completed Work
JALAN TANJUNG LUMPUR C13, KUANTAN, PAHANGF/PHG/K/DK/1107/2009
Earth Works
Completed Work
Construction work in progress
Footing Installation
EXTENSION FACTORY PHASE 4BLOCK K,L,M & N at Lot 74-A, Gebeng Industrial Estate, Kuantan
Pilling Process
Construction work in progress
Footing Installation
Structure Work in progress
Completed Work
6
BUILDING CONSTRUCTION AT INDERA MAHKOTA, KUANTANSIKLON SEPARATORS SDN BHD
Office Construction
Construction Site
Office Construction
Structure Work in progress
Structure Works
Construction Work in progress
Siklon Factory
Silkon Office Inside Factory View
7
8
THE PROPOSED CONSTRUCTION AND COMPLETION OF PEKAN HERITAGE TOURISM DEVELOPMENT (PHASE 1B AND F&B BUILDING) IN PEKAN, PAHANG FOR EAST COAST ECONOMIC REGION DEVELOPMENT COUNCIL (ECERDC)
ANJUNG WARISAN
Completed Work
Construction Works in progress