experience from implementation of common structural rules ...experience from implementation of...
TRANSCRIPT
Experience from Implementation of Experience from Implementation of Common Structural Rules Common Structural Rules
for Tankers and Bulk Carriersfor Tankers and Bulk Carriers
IACS Common Structural Rules 1
Dr. Kirsi TikkaABS on behalf of IACS
Background of Background of IACS Common Structural RulesIACS Common Structural Rules
Effective to Ships Contracted on or after 1 April 2006
IACS Common Structural Rules 2
IACS CSR and IMO Performance IACS CSR and IMO Performance Standard for Protective CoatingsStandard for Protective Coatings
• IMO PSPC has applied as a condition of class to CSR ships contracted for construction from 8 Dec 2006
• IMO implementation for all ships contracted from 1 July 2008
IACS Common Structural Rules 3
240
280
320
360
Aframax
Suezmax
VLCC
IACS CSR Req'mts effective 1 Apr 06
100
120
140 HandySize
Handymax
Panamax
Capesize
Large Tanker Orders Bulk Carrier Orders
Large Volume of Large Volume of Tanker and Bulk Carrier OrdersTanker and Bulk Carrier Orders
IACS CSR Req'mts effective 1 Apr 06
IACS Common Structural Rules 4
4
39
0
40
80
120
160
200
2004 2005 2006 2007 20080
20
40
60
80
100
2004 2006 20072005
PSPC for CSR PSPC for CSR
IACS CSR Maintenance ActivityIACS CSR Maintenance Activity(as of 31 July 2008)
• Knowledge Center since 1 August 2006 to capture Questions & Answers, Common Interpretations, and Rule Change requests
• 657 entries in the database - 214 relating to the Tanker Rules, 435 to the Bulker Rules and 8 to both sets of Rules
IACS Common Structural Rules 5
• 550 of the items have been completed (195 tanker, 349 bulker and 6 both)
• 222 items led to a rule change being requested (around 50% editorial changes)
Adopted CSR Rule Changes Adopted CSR Rule Changes and Corrigendaand Corrigenda
Tanker:• Rule Change Notice 1 (Sept 2006) • Corrigenda 1 (Apr 06)• Corrigenda 2 (July 06)• Corrigenda 3 (Nov 2007) • Rule Change Notice 2 (Feb 2008) • Corrigenda 4 (June 2008)
IACS Common Structural Rules 6
Bulk Carrier:• Corrigenda 1 (May 06)• Corrigenda 2 (Jan 07)• Corrigenda 3 (July 07)• Corrigenda 4 (Sept 07) • Rule Change Notice 1 (Nov 2007)• Rule Change Notice 2 (Feb 2008)• Corrigenda 5 (May 2008)• Rule Change Notice 3 (12 Sept 2008)
CSR Tracking DatabaseCSR Tracking Database
Objective:
• Provide users with a searchable database on CSR revision history with supporting materials.
• Provide users easy and quick access to a full and up-to-date history of a particular requirement
What is published:
IACS Common Structural Rules 7
p
• Full History of Revision
• Date of approval, what was amended/corrected, Technical Background, implementation date
Industry and interested users are invited to contact the IACS CSR Secretariat ([email protected]) for log-in IDs and a User Manual. Web link: www.iacs-csrtrack.org.uk
IACS Organisation for CSRIACS Organisation for CSR
IACS Council
SG/CSR
CSR Secretariat
IACS Common Structural Rules 8
Hull Panel Project Management TeamCSR Harmonization
CSR Secretariat
Project Teams(Including Cross Check Teams)
Project Teams(Including Development Projects)
Technical review
CSR and CSR and IMO GoalIMO Goal--Based Regulatory Framework Based Regulatory Framework
Tier I
Tier II FunctionalRequirements
Goals
IMO
GB
S
IACS Common Structural Rules 9
Tier III
Tier V
Tier IV
Applicable Industry Standards & Codes of Practice
Prescriptive Regulations & Class Rules
Verification Process
Requirements IM
(ref. MSC78/6/2)
IMO Goal Based Standards and IACS IMO Goal Based Standards and IACS Common Structural Rules Common Structural Rules
• The IACS has participated actively in the development of the GBS
• CSR has been the basis of the Pilot Project to examine and evaluate the GBS verification framework
Procedures and Quality Systems
Requirements, Rules & Industry Standards
Verification & Acceptance criteria
FunctionalRequirements
Goals
IACS CSR IACS CSR –– Current DevelopmentCurrent Development
Harmonization of the two rule sets
• Uniform technical approach
• Response to Industry comments
• Alignment with IMO GBS
• Issue of complete harmonized rule for stakeholder t D 2011
IACS Common Structural Rules 11
comment Dec 2011