example 1 - ncdot...tickets). during the pour, depth and cwer checks were made witha wire probe at...

13

Upload: others

Post on 19-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged
Page 2: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged
Page 3: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged

Example 1 INSPECTOR’S DAILY REPORT EXAMPLES

Page 4: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged
Page 5: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged

Example 2

Page 6: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged
Page 7: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged

Example 3

Page 8: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged
Page 9: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged

Example 4

Page 10: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged
Page 11: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged

Example 5

Page 12: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged
Page 13: Example 1 - NCDOT...tickets). During the pour, depth and cwer checks were made witha wire probe at 10th point locations. C.cwer was over 25" at all locations. Depth readings ranged