events & updates · forest land 21 0 21 0 0 0 21 0 21 0 0 0 2 reach-2 extn ... bangalore urban...

11
1 In This Issue ——————————————–— Events & Updates Namma Metro Green Initiative Land Acquisition Status & Critical Issues Civil Works & Progress photos at a Glance What's’ Happening beneath the Ground Track Works at a Glance E-News Letter for BMRCL Website only https://english.bmrc.co.in/News/NewsSection Shri Durga Shanker Mishra, IAS Secretary to GoI, Ministry of Housing & Urban Affairs, & Chairman, Bangalore Metro Rail Corporation Limited Shri Ajay Seth, IAS Managing Director Bangalore Metro Rail Corporation Limited Address: Bangalore Metro Rail Corporation Limited 3rd Floor, BMTC Complex, K H Road, Shanthinagar, Bengaluru - 560 027. Web: www.bmrc.co.in 1 June 2020 Issue 122 Events & Updates Nine IAS Probationers of 2018 Batch, Karnataka Cadre , visited Namma Metro on 8th June 2020 as part of their Training Programme,.

Upload: others

Post on 31-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Events & Updates · Forest Land 21 0 21 0 0 0 21 0 21 0 0 0 2 Reach-2 Extn ... Bangalore Urban and Karnataka Slum Development Board. ... Segment Erection for Span BP 58 & 59 R-1B

1

In This Issue

——————————————–—

Events & Updates

Namma Metro Green Initiative

Land Acquisition Status & Critical Issues

Civil Works & Progress photos at a Glance

What's’ Happening beneath the Ground

Track Works at a Glance

E-News Letter for BMRCL Website only

https://english.bmrc.co.in/News/NewsSection

Shri Durga Shanker Mishra, IAS

Secretary to GoI, Ministry of Housing & Urban Affairs, &

Chairman, Bangalore Metro Rail Corporation Limited

Shri Ajay Seth, IAS

Managing Director

Bangalore Metro Rail Corporation Limited

Address: Bangalore Metro Rail Corporation Limited

3rd Floor, BMTC Complex, K H Road, Shanthinagar,

Bengaluru - 560 027. Web: www.bmrc.co.in

1

June 2020 Issue 122

Events & Updates

Nine IAS Probationers of 2018 Batch, Karnataka Cadre , visited Namma Metro on 8th June 2020 as part of their

Training Programme,.

Page 2: Events & Updates · Forest Land 21 0 21 0 0 0 21 0 21 0 0 0 2 Reach-2 Extn ... Bangalore Urban and Karnataka Slum Development Board. ... Segment Erection for Span BP 58 & 59 R-1B

2

2

NAMMA METRO’S GREEN INITIATIVE

Mass Plantation at Rachenahalli Lake, gara Horamavu Lake, Avalahalli Lake & Jakkur

by BMRCL in Coordination with BBMP

As part of Environment Management and Compensatory Plantation plan

for Metro Phase-2, afforestation activities are being carried out by BMRCL,

for planting around 10,000 Saplings with a maintenance period of 03

years, at various locations in Bangalore in coordination with various Gov-

ernment Agencies such as BBMP, Army Authorities, BSF, Railway, NDRI etc .

Rachenahalli Lake Agara Horamavu Lake

Avalahalli Lake Jakkur Lake

Page 3: Events & Updates · Forest Land 21 0 21 0 0 0 21 0 21 0 0 0 2 Reach-2 Extn ... Bangalore Urban and Karnataka Slum Development Board. ... Segment Erection for Span BP 58 & 59 R-1B

3

3

NAMMA METRO’S GREEN INITIATIVE

Mass Plantation at BSF–Karahalli, Bangalore by BMRCL in

Coordination with BBMP

Mass Plantation at BSF Training Centre, Yelahanka Bangalore by

BMRCL in Coordination with BBMP

Page 4: Events & Updates · Forest Land 21 0 21 0 0 0 21 0 21 0 0 0 2 Reach-2 Extn ... Bangalore Urban and Karnataka Slum Development Board. ... Segment Erection for Span BP 58 & 59 R-1B

4

4

Sl. No

Reaches

No. of properties Required

No. of properties Acquired

[As per 28(4) & 3(1)]

Handed over to Eng. Section up to June - 2020

Balance to be Handed over to Engg. Section

Govt. Priv. Total Govt. Priv. Total Govt. Priv. Total Govt. Priv. Total

1

Reach-1 Extn 38 487 525 38 487 525 38 485 523 0 2 2

Forest Land 21 0 21 0 0 0 21 0 21 0 0 0

2

Reach-2 Extn Station & Viaduct

25 99 124 25 97 122 25 97 122 0 2 2

Challaghatta Depot 10 24 34 10 24 34 10 24 34 0 0 0

3 Reach-3C Extn 3 111 114 3 105 108 3 105 108 0 6 0

4

Reach-4B Extn. 12 294 306 12 294 306 12 294 306 0 0 0

Anjanapura Depot 1 20 21 1 20 21 1 1 2 0 19 19

5

Reach-5 New Line 46 798 844 46 798 844 46 798 844 0 0 0

Hebbagodi Depot 1 57 58 1 57 58 1 57 58 0 0 0

6

Reach-6 (Elevated) 34 222 256 34 222 256 34 222 256 0 0 0

Reach - 6 (UG) 52 276 328 52 276 328 49 270 319 3 6 9

Kothnur Depot 4 64 68 4 64 68 4 64 68 0 0 0

Total 247 2452 2699 226 2444 2670 244 2417 2661 3 35 38

7 ORR Line 31 56 87 30 55 85 29 53 82 2 3 5

8 Airport line 60 229 289 60 178 238 13 12 25 47 217 264

Total 91 285 376 90 233 323 42 65 107 49 220 269

Grand Total 338 2737 3075 316 2677 2993 286 2482 2768 52 255 307

Land Acquisition Status for the month of June, 2020 of Phase-2, ORR -2A & Airport -2B Line

Page 5: Events & Updates · Forest Land 21 0 21 0 0 0 21 0 21 0 0 0 2 Reach-2 Extn ... Bangalore Urban and Karnataka Slum Development Board. ... Segment Erection for Span BP 58 & 59 R-1B

5

5

Critical issues faced regarding Land Acquisition for Phase-2 of the Project

Reach-6 Underground Section

Langford Town Station:- Local Military Authorities (LMA) have sent the proposal for

transfer of 2137.334. sqm of land on permanent basis and 5866.569 sqm on

temporary basis to Army Head Quarters. Matter is being pursued with Defence

Authorities.

Lakkasandra Village Sy. No. 14 and 15:- The re-location of 101 encroachers at

Lakkasandra land is under consideration of Deputy Commissioner, Bangalore

Urban and Karnataka Slum Development Board.

Phase-2 Progress up to 30th June, 2020

26

49

81

78

90

61

84

96

79

66

PHASE-2 CIVIL WORKS PROGRESS IN PERCENTAGE

Series1 Series2 Series3 Series4 Series5 Series6 Series7 Series8

Page 6: Events & Updates · Forest Land 21 0 21 0 0 0 21 0 21 0 0 0 2 Reach-2 Extn ... Bangalore Urban and Karnataka Slum Development Board. ... Segment Erection for Span BP 58 & 59 R-1B

6

Phase– 2 Progress Photos at a glance

R-1A: Segment Erection for Span BP 58 & 59 R-1B : Whitefield Station I-Girder Erection work in progress

R-2A: GFRC/GRC Elevation Mock up at Jnanabharathi Station R-2B: View of Kengeri Station off road works.

R-3C: Transition Span Girder Erection works at Jindal station R-4B: Right Hand Side Elevation works at

Doddakallasandra Station

6

Page 7: Events & Updates · Forest Land 21 0 21 0 0 0 21 0 21 0 0 0 2 Reach-2 Extn ... Bangalore Urban and Karnataka Slum Development Board. ... Segment Erection for Span BP 58 & 59 R-1B

7

Phase– 2 Progress Photos at a glance:

R-5-P1: Depot Line I – Girder Erection in progress R-5-P2: Hosa Road Station- Grid E/4 Concourse Level

Pier Arm concreting work in progress.

R-5-P3: RP 138F Pile Cap Concrete work completed R-6-Ele: Viaduct– Pier work (03 Nos Pier completed)

R-6-UG-RT1: Piling Work Ongoing at Vellara Launching Shaft. R-6-UG-RT1: Segment Mould Installation Work in Progress

7

Page 8: Events & Updates · Forest Land 21 0 21 0 0 0 21 0 21 0 0 0 2 Reach-2 Extn ... Bangalore Urban and Karnataka Slum Development Board. ... Segment Erection for Span BP 58 & 59 R-1B

8

8

UNDERGROUND WORKS - REACH 6

DAIRY CIRCLE TO NAGAWARA -TOTAL LENGTH -13.9 KMS

Contractor - M/s Afcons Infrastructure Limited—RT-01

Sl No

RT-01 Progress Details

1 Alignment of RT-1 Between South Ramp to Vellara Junction.

2 UG Works are divided into 4 Packages

Package-1

3 Station Works Progress

South Ramp:

Utility diversion work is in progress (90% completed).

Barricading board installation work is in progress (20% completed).

Retaining wall construction work is in progress (90% completed).

Drain construction work is in progress (50% completed).

Road diversion work is in progress (62 % completed).

Trial trench excavation for utility identification is completed.

Dairy Circle Station:

Building Demolition work completed.

Utility diversion work is in progress (75% completed).

Barricading board installation work is in progress (90% completed).

Secant Pile wall Construction work is in Progress (11% completed).

Drain construction work is in progress (14% completed).

Trial trench for utility identification is in progress

Lakkasandra Station:

Building demolition work is in progress (72% completed).

Work area barricading is in progress (44% completed)

Geo Technical investigation work completed.

Langford Station:

Surveying and Marking completed for station boundary.

Work area barricading for entry structure completed.

Vellara Launching Shaft:

Diversion of 900mm dia water supply line completed.

Secant Pile wall Construction work is in progress (51% completed).

Casting Yard (Baiyappanahalli):

Work area barricading is in progress (85% completed).

Tunnel segment moulds commissioning work is in progress.

Batching plant erection work completed, calibration and commissioning work is in progress.

Quality control lab building completed.

Other site establishment work is in progress.

Page 9: Events & Updates · Forest Land 21 0 21 0 0 0 21 0 21 0 0 0 2 Reach-2 Extn ... Bangalore Urban and Karnataka Slum Development Board. ... Segment Erection for Span BP 58 & 59 R-1B

9

9

Main Shield body parts lowering at Shaft Area

UNDERGROUND WORKS - REACH 6

DAIRY CIRCLE TO NAGAWARA -TOTAL LENGTH -13.9 KMS

Contractor - M/s Larson & Toubro Ltd—RT-02

Sl No

RT-02 Progress Details

1 Alignment of RT-2 Between Vellara to Shivajinagar.

2 UG Works are divided into 4 Packages

Package-2

3 Station Works Progress

Rastriya Military School Station: Secant Piled wall are being provided as temporary support structures. 48.8% of the piles for station box and 44% of the piles for entry exit have been completed. 11579 Cum (9.7%) of excavation for the station have been completed.

M G Road Station: Secant Piled wall are being provided as temporary support structures. 100% of the piles for station box and 31.8% of the piles for entry exit have been completed. 30459 Cum (31.3%) of excavation for the station have been completed.

Shivajinagar Station: Secant Piled wall are being provided as temporary support structures. 100.1% of the piles for station box and 57.6% of the piles for entry exit have been completed. 81607 Cum (71%) of excavation for the station have been completed.

4 Tunnel Works Progress

TBM 1: AVNI -(Tunnel Boring Starts at Shivajinagar & Ends at Vellara Junction)

MIG welding is going on between middle and tail shield.

Grinding done of top side lifting eye of TBM1.

Gantry's shifted & area cleared of 750T crane.

TBM 2: VINDHYA-(Tunnel Boring Starts at Shivajinagar & Ends at Vellara Junction)

Welding completed of tail shield brushes.

Slurry discharge pipe lines support bracket fixed.

Pipe bracket also fixed on feed pipe line & back flush line.

Top side walk way platform shifted from TBM1 to TBM2.

Stools and wooden boxes shifted from SVJ station to stadium.

Erector walkway platform shifted from stadium yard.

Assembly work in progress for the main Shield of TBM-2

Page 10: Events & Updates · Forest Land 21 0 21 0 0 0 21 0 21 0 0 0 2 Reach-2 Extn ... Bangalore Urban and Karnataka Slum Development Board. ... Segment Erection for Span BP 58 & 59 R-1B

10

10

TBM assembly Works –TBM URJA & VINDHYA at Cantonment Station

UNDERGROUND WORKS - REACH 6

DAIRY CIRCLE TO NAGAWARA -TOTAL LENGTH -13.9 KMS

Contractor - M/s Larson & Toubro Ltd—RT-03

Sl No

RT-03 Progress Details

1 Alignment of RT-3 Between Shivajinagar to Pottery Town.

2 UG Works are divided into 4 Packages

Package-3

3 Station Works Progress

Cantonment Station:

Excavation work of 64,500 Cum has been completed out of 1,62,000 Cum.

Retaining wall of 243 m is completed out of the 381m.

A total of 90 Nos. of piles for temporary structure have been completed out of 210 Nos.

1080 sqm PCC for Base slab is completed out of the 7600 Sqm.

Pottery Town Station:

Excavation work of 14,750 Cum has been completed out of 1,72,889 Cum.

A total of 740 Nos. of piles for temporary structure have been completed out of 836 Nos.

Piling activity for Ancillary building area has been completed.

King posts of 56 Nos. have been completed out of 104 Nos.

4 Tunnel Works Progress

Casting of segments for tunnel rings: 565 rings for tunnel lining have been cast out of total

3,244 rings.

TBM No 01: URJA-(Tunnel Boring initially starts from Cantonment to Shivajinagar)

Lowering of TBM parts and its assembly has been completed.

TBM No 02: VINDYA-(Tunnel Boring initially starts from Cantonment to Shivajinagar)

The lowering and assembly of the TBM is under progress.

Aerial view of Slurry Treatment Plant works

Page 11: Events & Updates · Forest Land 21 0 21 0 0 0 21 0 21 0 0 0 2 Reach-2 Extn ... Bangalore Urban and Karnataka Slum Development Board. ... Segment Erection for Span BP 58 & 59 R-1B

11

11

Track Works at a Glance

Contractor - M/s Texmaco Rail & Engineering Limited

Sl No Item Description Unit Track Plinth Casting

Sections Track Meters Reach 4

(June 2020) Reach 2

(June 2020)

1 Scope of Work Trm 12580 17628

2 Progress for the month Trm Nil 234

3 Cumulative progress Trm 11700 5427

4 Access Handed over Trm 11700 14900

View of Track work completed at

Doddakalsandra Station of Reach-4Extn