european requalification system emrah t. sak march 2013

39
European R equalification System Emrah T. SAK March 2013

Upload: thaddeus-townsell

Post on 19-Jan-2016

227 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: European Requalification System Emrah T. SAK March 2013

European Requalification System

Emrah T. SAK March 2013

Page 2: European Requalification System Emrah T. SAK March 2013

Today’s Outline

Brief Information About EVASBrief Information About EVAS

Periodic Inspection in EuropePeriodic Inspection in Europe

General Information About Related EN StandardsGeneral Information About Related EN Standards

Refurbishment ProcessRefurbishment Process

Page 3: European Requalification System Emrah T. SAK March 2013

ABOUT EVAS

• The first LPG cylinder manufacturer of Turkey.The first LPG cylinder manufacturer of Turkey.

• OOne of the biggest LPG ne of the biggest LPG ccylinder ylinder producersproducers in Europe in Europe..

• SHV ENERGY companySHV ENERGY company

• AAnnually nnually around 2around 2 million cylinder million cylinderss productionproduction..

• Annually around 600.000 cylinders refurbishment.Annually around 600.000 cylinders refurbishment.

• Active in 5 Continets, 49 Countries all around the WorldActive in 5 Continets, 49 Countries all around the World

Page 4: European Requalification System Emrah T. SAK March 2013

Power to Contain World’s Energy

Page 5: European Requalification System Emrah T. SAK March 2013

ABOUT EVAS

İstanbul-New Cylinder Manufacturing

Ankara- Refurbishment

İzmir- Refurbishment

Page 6: European Requalification System Emrah T. SAK March 2013

Today’s Outline

Brief Information About EVASBrief Information About EVAS

Periodic Inspection in EuropePeriodic Inspection in Europe

Page 7: European Requalification System Emrah T. SAK March 2013

Periodic Inspection Period

Working life of cylinder?Working life of cylinder?

There is no calculated life span for LPG cylinders

Page 8: European Requalification System Emrah T. SAK March 2013

Periodic Inspection Period

Average life span of cylinders:

-In West Europe 41 years -In Turkey 32 years-In UAE (officially )15 years-In Malesia 11 years

Malesia-Cylinder Distribution

Page 9: European Requalification System Emrah T. SAK March 2013

Number of received cylinders in 2012: 550.000 units

Testing without repair: 87.000 units

Testing with repair: 326.000 units

Scrap: 137.000 units

EVAS Refurbishment Factories-2012

Page 10: European Requalification System Emrah T. SAK March 2013

Luxembourgish Company

Number of received cylinders in 2012: 680.000 units from 5 countries

PRESTAGAZ Statistics-2012

0

50.000

100.000

150.000

200.000

250.000

Belgium Netherlands France Switzerland Germany

144.339 162.641 155.334

72.041

20.697

32.897 14.071

6.393

4.521

4.936

36.084 19.697

6.033

2.914

5.678

Scrapped

Repaired

Just Testing

Page 11: European Requalification System Emrah T. SAK March 2013

Comparison of Turkish and European Data

Turkey West EuropeRetesting Period: 10 years 10 or 15 years

Distribution of process:

Assessment before retesting period:

Average Life Span:

Average number of retesting during lifespan:

32 years 41 years

66% 11%

6 times 4 times

Page 12: European Requalification System Emrah T. SAK March 2013

- Normally for all cylinders Periodic Inspection Period is 10 years.

- It can be extended to 15 years if followings are fulfilled:

Cylinder is be owned by and under the responsibility for checking, filling and maintenance of a competent gas organisation

Periodic Inspection Period in Europe

Page 13: European Requalification System Emrah T. SAK March 2013

Periodic Inspection Period in Europe

11 kg German deposit Cylinder15 Years Periodic Inspection

11 kg German Nutzung Cylinder10 Years Periodic Inspection

Page 14: European Requalification System Emrah T. SAK March 2013

- Normally for all cylinders Periodic Inspection Period is 10 years.

- It can be extended to 15 years if followings are fulfilled:

Cylinder is be owned by and under the responsibility for checking, filling and maintenance of a competent gas organisation

there must be an external protection against corrosion

Cylinder should be filled in accordance with EN 1439

Periodic Inspection Period in Europe

Page 15: European Requalification System Emrah T. SAK March 2013

Today’s Outline

Brief Information About EVASBrief Information About EVAS

Periodic Inspection in EuropePeriodic Inspection in Europe

General Information About Related EN StandardsGeneral Information About Related EN Standards

Page 16: European Requalification System Emrah T. SAK March 2013

EN 1439 - LPG equipment and accessories. Procedure for checking LPG cylinders before, during and after filling EN 1440 - LPG equipment and accessories. Periodic inspection of transportable refillable LPG cylindersEN 14912 - LPG equipment and accessories - Inspection and maintenance of LPG cylinder valves at time of periodic inspection of cylinders

European Norms

Page 17: European Requalification System Emrah T. SAK March 2013

SCOPE Covers the control operations applied on transportable, refillable LPG cyliders before, during and after filling.

EN 1439

EN 1439

Page 18: European Requalification System Emrah T. SAK March 2013

EN 1439 Segregation of Cylinders before Filling

Page 19: European Requalification System Emrah T. SAK March 2013

EN 1439 Defects for Rejection

Page 20: European Requalification System Emrah T. SAK March 2013

EN 1439 Defects for Rejection

Page 21: European Requalification System Emrah T. SAK March 2013

EN 1439 Defects for Rejection

Page 22: European Requalification System Emrah T. SAK March 2013

EN 1439 Controls During the Filling

Page 23: European Requalification System Emrah T. SAK March 2013

EN 1439 Post Filling Controls

Page 24: European Requalification System Emrah T. SAK March 2013

SCOPE Covers the periodic inspection and tests on transportable, refillable LPG cylinders. Periodic inspections/tests shall be carried out by a competent person under the control of an inspection body based on a written scheme and in accordance with the procedures.

It also consists general frame of repair and it is requirements.

EN 1440

Page 25: European Requalification System Emrah T. SAK March 2013

EN 1440 Procedures for periodic inspection

Page 26: European Requalification System Emrah T. SAK March 2013

Today’s Outline

Brief Information About EVASBrief Information About EVAS

Periodic Inspection in EuropePeriodic Inspection in Europe

General Information About Related EN StandardsGeneral Information About Related EN Standards

Refurbishment ProcessRefurbishment Process

Page 27: European Requalification System Emrah T. SAK March 2013

Before-After

Refurbishment

Page 28: European Requalification System Emrah T. SAK March 2013

Refurbishment Process in EVAS

Page 29: European Requalification System Emrah T. SAK March 2013

Refurbishment De-Gasing & Valve Removing

EX-ZONEEX-ZONE

Detection of liquid gas

2 Gamma radiation sources which detect up to 400 gr gas left in the cylinders.

Drain and gas recovery

Emptying bottles and recovering the gas-in the gas phase or liquid.The recovered gas is stored and re-used. No atmospheric emissions!

Valve removing

All valves removed are stored and inspected later according EN14912 standard or as per customer specs

Page 30: European Requalification System Emrah T. SAK March 2013

Internal Washing

Every cylinder is internaly washed in automatic carousel

Refurbishment Washing & Visual Inspection

Visual Inspection

Then cylinders are visually inspected and separated either for repairing or scraping, or conform ones, send to the finishing hall.Inspection is realized by qualified and trained personnel.

Page 31: European Requalification System Emrah T. SAK March 2013

Separated Damaged Cylinder

Refurbishment Washing & Visual Inspection

Straighten of Foot-Ring and/or Collar

Changing of Foot-ring or Valve Guard

Page 32: European Requalification System Emrah T. SAK March 2013

Blowing

Damaged cylinders are de-dented by means of pressured air and heating of dent zone.

Refurbishment De-Denting

Page 33: European Requalification System Emrah T. SAK March 2013

Heat Treatment (stress relieving) at 600-630 oC

Refurbishment

Hydrostatic Testing

Shot Blasting

Page 34: European Requalification System Emrah T. SAK March 2013

Zinc Coating

Refurbishment Finishing

Painting Recording•Retest date,•Manufacture date•Manufacturer’s name

Page 35: European Requalification System Emrah T. SAK March 2013

Valve Fitting

Refurbishment Finishing

Inkjet MarkingPrinting all information regarding tare weight, test date and next retest date on the cylinders.It allows much more legibility and visibility of all essential information. Leakage Test

Page 36: European Requalification System Emrah T. SAK March 2013

Before-After

Refurbishment

Page 37: European Requalification System Emrah T. SAK March 2013

No Repairable Cylinders

Bulge Depresed Bung

Lamination

Cut (which exceeds min. thickness)

Depresed Shroud or Foot-ring

Page 38: European Requalification System Emrah T. SAK March 2013

Smashed Cylinders

Refurbishment Scrapping

Page 39: European Requalification System Emrah T. SAK March 2013

THANK YOU!

AIPGL Mexico City-2013