euclid creek tunnel ppt feb2013

24
euclidcreek.blogspot.com Euclid Creek Tunnel Community Update February 19, 2013

Upload: northeast-ohio-regional-sewer-district

Post on 04-Jul-2015

602 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Euclid Creek Tunnel

Community Update

February 19, 2013

Page 2: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Agenda

• Housekeeping

• Project Overview

• Construction Updates

• Shaft Updates

• Contact Info

Page 3: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Because Dogs Can’t Flush

Page 4: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

neorsd.org/pup

Page 5: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Project Overview

Page 6: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Euclid Creek Tunnel: By the Numbers

• Tunnel

– 24’ diameter

– 17,750’ in length

– 60,100,000 gallons

• ~30 near surface structures

– 10 complete

– 9 under construction

• Shafts: 5 total

– 24’ to 60’ diameter

– 185-225’ deep

• 2,440 linear feet of open cut pipe placed

• 2,110 linear feet of microtunnel complete

– 240 more to go

Page 7: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Construction Updates

• New sewer, Lakeshore BoulevardEast 150th Street to (east of) Collinwood Rec.

– Work completed: Sept 2013

• New sewer, St. Clair Ave. and Nottingham Rd.

– Work completed: Oct 2013

Page 8: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Shaft #1Construction Staging Site

• “Mackenzie” tunneled and lined 5400’

• Operating 24/7 with regularly-scheduled maintenance periods

• Currently beneath Easterly WWTP

Page 9: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Project Overview

Page 10: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Page 11: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Shaft #2Easterly Wastewater Treatment Plant

• 80 feet excavated

• Installing base slab for adjacent structure(Structure 2-1).

Page 12: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Page 13: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Shaft #2Easterly Wastewater Treatment Plant

• 80 feet excavated

• Installing base slab for adjacent structure(Structure 2-1).

• Blasting last 100 feet

– Will begin this year

– Field trips… any interest?

Page 14: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

• Construction staging area

– Secant pile wall installation

• Increased truck traffic (spoils removal and concrete delivery)

• 17 piles complete– 10 primary piles, 7 secondary

– East 156th Street

• West side sidewalk still closed

• Will be replaced when feasible

Shaft #3Beulah Park

Page 15: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Page 16: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Shaft #3: Schedule*2013 2014

January February March April May June July Aug Sept Oct Nov Dec Jan Feb Mar April May June July Aug

Shaft Support & Excvation

Shaft Structural Work

Strs 3-2 & 3-3 (Btw Wadsworth & Gordon)

Close E 156th Street

Diversion Sructure E 156th

Microtunneling

Str 3-5 (Lakeshore & E 156th)

Non-Working Holidays

Memorial Day

July 4th

Labor Day

Thanksgiving Day

Christmas Day

New Years Day

*Schedule subject to change

Page 17: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Shaft #3: Schedule

1/13–6/1310/13–12/131/14—8/14

4/13–8/14

3/13–3/14

8/13–11/13

4/13–3/14

Page 18: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Repaved Roads

Page 19: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Shaft #4Triangle Park

• Excavation work is complete at this site

• Currently installing rebar to reinforce shaft

• Fencing will remain throughout 2014

Page 20: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Shaft #4Triangle Park

Page 21: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Shaft #5Nottingham & St. Clair

• Excavation nearing completion

– 210 feet excavated

– 10 more to go

Page 22: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Stay Informed

• Blog

– EuclidCreek.blogspot.com

• Semi-Monthly Newsletter

– E-mail distribution

[email protected] to be added to the list

Page 23: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

How to Reach Us

Social Mediafacebook.com/yoursewerdistrict@neorsd | @wallywaterdrop

Customer Service (216) 881-8247

Emergencies: NEORSD ECT Field Office(216) 268-5469

Ryan Sullivan, [email protected] Elting, [email protected]

Page 24: Euclid creek tunnel ppt feb2013

euclidcreek.blogspot.com

Next Meeting

Tuesday, March 19, 20136:00 p.m.Cleveland Public Library,Memorial-Nottingham Branch

Save the Date!

– April 16 (possible location/date change)

– May 21

– June 18

Dates

May

Change!