eton capability presentation winwards220312

52
MODULAR SOLUTIONS TO COMMUNITY DEVELOPMENT ETON MODULAR

Upload: etonmodular

Post on 22-Jun-2015

152 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Eton capability presentation   winwards220312

MODULAR SOLUTIONS TO COMMUNITY DEVELOPMENT

ETON MODULAR

Page 2: Eton capability presentation   winwards220312

CONTENTS

BETTER BY DESIGN

QUALITY

EXPERIENCED TEAM

PAST EXAMPLES

Page 3: Eton capability presentation   winwards220312

CONTENTS

BETTER BY DESIGN

QUALITY

EXPERIENCED TEAM

PAST EXAMPLES

Page 4: Eton capability presentation   winwards220312

All Designs and Concepts are Copyright

4

MINING VILLAGES

Page 5: Eton capability presentation   winwards220312

MINING VILLAGES

2, 3 or 4 Bed Modules

Page 6: Eton capability presentation   winwards220312

CENTRAL CORRIDOR - IMPROVED LIVING

CENTRAL CORRIDOR

2, 3 or 4 Bed Modules

Page 7: Eton capability presentation   winwards220312

ENTRY

VIEW TO PRIVATE SPACE

REVISED ENTRY - IMPACT ON UNIT LAYOUT

Page 8: Eton capability presentation   winwards220312

COMPARISON TO CONVENTIONAL CAMPS

ENTRY

VIEW TO PUBLIC SPACE

Page 9: Eton capability presentation   winwards220312

PRIVATE BALCONIES

Balconies provide 50% increase in personal space.

Privacy Screen

Adjustable Bamboo Blinds

Page 10: Eton capability presentation   winwards220312

DISTANT VIEWS

Distant views over private balconies give the room the impression of a larger “borrowed” space.

Page 11: Eton capability presentation   winwards220312

WINDOWS TO THE BATHROOM

More daylight to the bathroom. Views outside.

Page 12: Eton capability presentation   winwards220312

BETTER DESIGN – VALUE FOR MONEY

Page 13: Eton capability presentation   winwards220312

2 ROOM MODULE PLAN

Page 14: Eton capability presentation   winwards220312

3 ROOM MODULE PLAN

Page 15: Eton capability presentation   winwards220312

4 ROOM MODULE PLAN

Page 16: Eton capability presentation   winwards220312

All Designs and Concepts are Copyright

16

Page 17: Eton capability presentation   winwards220312

CONTENTS

BETTER BY DESIGN

QUALITY

EXPERIENCED TEAM

PAST EXAMPLES

Page 18: Eton capability presentation   winwards220312

Quality Performance: Fully Compliant with Brief Fully Compliant with BCA Equivalent to 6 Star Rating Mock-ups produced to sign off quality.

Quality Certification by: WA Registered Building Surveyor experienced with Modular Fabrication (PLP) Registered Architects (Peddle Thorp & Papapetrou Rice) Registered Structural Engineers (Winward Structures) Registered Services Engineers (McCormack Associates Consulting) Registered Fire Engineers (Scott Young & Assoc) Licensed Plumbers Licensed Electricians

18

QUALITY PRODUCT

Page 19: Eton capability presentation   winwards220312

19

QUALITY PRODUCT

Eton Modular

Independent to the Manufacturer to ensure Quality.

Experienced personnel to be based at the factory for the duration of Manufacturing continually inspecting the works.

Australian Plumbers and Electricians verifying and certifying the works at the factory.

Page 20: Eton capability presentation   winwards220312

20

QUALITY PRODUCT

MANUFACTURE

Selected by Eton Modular for this project our manufacturing partner represents the best of quality manufacturing in China.

International standard processes ensure quality. - LEAN Manufacturing.

- 6 Sigma Process.

BRE (British Research Establishment) certified by independent auditors on past projects. First time for modular buildings in China.

Page 21: Eton capability presentation   winwards220312

21

QUALITY PRODUCT

Crestwood (Material Supplier)

Independent sourcing of materials with quality checks of all material supply.

SQC (Quality Consultant)

Independent verification of the material standards.

Page 22: Eton capability presentation   winwards220312

QUALITY PRODUCT

Peddle Thorp Architects (Architects & Interiors)

Review of mock-ups to ensure the product is in accordance with the design specification.

Page 23: Eton capability presentation   winwards220312

CONTENTS

BETTER BY DESIGN

QUALITY

EXPERIENCED TEAM

PAST EXAMPLES

Page 24: Eton capability presentation   winwards220312

EXPERIENCED TEAM

Page 25: Eton capability presentation   winwards220312

EXPERINCED TEAM – ETON MODULAR (PM)

A specialist Modular Construction company focusing on quality products from China into the Australian market.

Experienced Staff with over 30 years experience in the construction industry.

A focus on quality - responding to the market demand for better products that drive staff retention.

Page 26: Eton capability presentation   winwards220312

• Neil Mallalue FRIC S AAIQS Managing DirectorBringing over 35 years of experience in the building industry, including modular construction in Australia, construction, finance, and development management, in China, Australia and the United Kingdom.

His career includes 17 years within the senior management of Abigroup Ltd, with responsibilities such as development, commercial and contracts management.

Neil has been involved in construction projects with a combined value of which exceeds over $1 billion dollars.

• Stephen Fraser B.Eng.(Civ.), Director of Operations

Stephen is an experienced building and engineering professional, with over 37 years experience including modular construction in Australia, project management, consulting and the ‘concept to completion’ building process.

He has expertise in the management of a wide range of design and construction contracts and major capital projects, with a total value of over $2.4 billion dollars.

Over his career, Stephen has held senior positions with a number of major companies in the construction industry including John Holland Ltd, Leighton Holding’s Ltd, Fletcher Constructions Ltd, Abigroup Ltd, and Concrete Constructions Pty Ltd.

EXPERINCED TEAM – ETON MODULAR (PM)

Page 27: Eton capability presentation   winwards220312

EXPERINCED TEAM – MANUFACTURE

UK owned and managed foreign enterprise in China.

Total of over one million square feet of factory production area.

Over ten million dollars investment in plant and equipment with no borrowings.

Operates ‘Modern Methods of Manufacturing’ as developed by Toyota, Motorola, and GE. Keeping quality high.

Page 28: Eton capability presentation   winwards220312

EXPERINCED TEAM – MANUFACTURE Modern Manufacturing Methods Applied to Modular

Process validation rather than reliant on inspection.

Work instructions and process controls ensuring consistent quality.

Documented builds reflecting all elements of control for individual modules

Page 29: Eton capability presentation   winwards220312

• Manufacturing systems not construction methods.

• Western standards applied• Certification and standards

rigorously confirmed and challenged.

• Lean manufacturing reduces waste and environmental impact

• Six Sigma driving down costs

EXPERINCED TEAM – MANUFACTURE Modern Manufacturing Methods Applied to Modular

Page 30: Eton capability presentation   winwards220312

Manufactured the only BRE audited and qualified modular project in China. (Cert ABP010)

The extensive audit included build quality, materials, fire safety, environmental, health and safety, durability, sound insulation and management systems.

EXPERINCED TEAM – MANUFACTURE Modern Manufacturing Methods Applied to Modular

Page 31: Eton capability presentation   winwards220312

31

EXPERINCED TEAM - MANUFACTURE Modern Manufacturing Methods Applied to Modular

Modern Fabrication in new facilities.

Welding to Inter-national standards MIG, MAG, TIG and Spot.

Robotic Welding.

Pressed in Hardware.

Stitching.

Page 32: Eton capability presentation   winwards220312

32

EXPERINCED TEAM – MANUFACTURE Modern Manufacturing Methods Applied to Modular

Page 33: Eton capability presentation   winwards220312

EXPERINCED TEAM - MANUFACTURE Modern Manufacturing Methods Applied to Modular

Page 34: Eton capability presentation   winwards220312

EXPERINCED TEAM – MANUFACTURER Modern Manufacturing Methods Applied to Modular

Page 35: Eton capability presentation   winwards220312

EXPERINCED TEAM – PEDDLE THORP (Arch)

Australian Company.

140 years of experience.

Largest Foreign owned architecture company in China.

Scope includes Architecture and Interior Design.

Page 36: Eton capability presentation   winwards220312

Established 1980 in the UK (Privately owned company)

Sourcing building materials from Asia for 25 years.

One of the UK’s leading building material distributors. Crestwood Asia office established 8 years ago.

Supplying on a Global basis.

Independent quality checking.

EXPERINCED TEAM – CRESTWOOD (Materials)

Page 37: Eton capability presentation   winwards220312

Set up 4 years ago in China to deal with a major global supply project for Philips.

Headed up by ex-Bureau Veritas senior managers.

Provides independent Quality Assurance in China to major international clients.

Independent verification of the material standards.

EXPERINCED TEAM – SQC (Quality Consultant)

Page 38: Eton capability presentation   winwards220312

CONTENTS

BETTER BY DESIGN

QUALITY

EXPERIENCED TEAM

PAST EXAMPLES

Page 39: Eton capability presentation   winwards220312

BHPB PORT HAVEN - PORT HEDLAND

PAST EXAMPLES - BHP PORT HAVEN

Page 40: Eton capability presentation   winwards220312

PAST EXAMPLES - BHP PORT HAVEN

Page 41: Eton capability presentation   winwards220312

PAST EXAMPLES - BHP PORT HEADLAND

Page 42: Eton capability presentation   winwards220312

PAST EXAMPLES - BHP PORT HEADLAND

Page 43: Eton capability presentation   winwards220312

PAST EXAMPLES - RUSKIN ARMS HOTEL - UK

Page 44: Eton capability presentation   winwards220312

PAST EXAMPLES - RUSKIN ARMS HOTEL - UK

Page 45: Eton capability presentation   winwards220312

PAST EXAMPLES - RUSKIN ARMS HOTEL - UK

Page 46: Eton capability presentation   winwards220312

PAST EXAMPLES - NORWICH HOUSING - UK

Page 47: Eton capability presentation   winwards220312

CURRENT PROJECT - NADZAB HOTEL, PNG

Page 48: Eton capability presentation   winwards220312

CURRENT PROJECT - NADZAB HOTEL, PNG

Page 49: Eton capability presentation   winwards220312

CURRENT PROJECT - LAE RESIDENTIAL, PNG

Page 50: Eton capability presentation   winwards220312

CURRENT PROJECT - LAE RESIDENTIAL, PNG

Page 51: Eton capability presentation   winwards220312

CURRENT PROJECT - LAE RESIDENTIAL, PNG

Page 52: Eton capability presentation   winwards220312

CURRENT PROJECT - LAE RESIDENTIAL, PNG